Loading...
HomeMy WebLinkAboutHPA-Install Rip Rap - BLD Permit / Conditions - 8/15/2008 e ' tyashington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal pursuant to Chapter 34.05 Montesano,WA 98563 WILDLIFE (360)249-46,28I fN Issue Date:August 15,2008 Control Number: 114283-1 2 2- -3 Project Expiration Date: September 30,2008 FPA/Public Notice#: N/A PERMITTEE AUTHORIZED AGENT OR CONTRACTOR Carl Shauers Post Office Box 886 Belfair,WA98528 TO BE KEPT IN IHE PARCEL FIL,E Project Name: Riprap House Foundation Project Description: Install riprap around corner of the residence that is now in the stream channel as a result of the December 2007 storm. Relocate large woody material to the left bank. PROVISIONS 1. TIMING LIMITATIONS: The project may begin August 15, 2008 and shall be completed by September 30, 2008. 2. Work shall be accomplished per plans and specifications submitted to the Washington Department of Fish and Wildlife, except as modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during construction. HOUSE/BANK PROTECTION 3. Protection work shall be restricted to work necessary to protect the house and the eroding bank. 4. Placement of bank protection material waterward of the ordinary high water line shall be restricted to the minimum amount necessary to protect the house and the bank. 5. The toes shall be installed to protect the integrity of bank protection material. 6. Bank protection material shall be placed from the banks. Dumping onto the bank faces shall be permitted only if the toe is established and the material can be confined to the bank faces. 7. Bank protection material shall be clean, angular rock, and shall be installed to withstand 100- year peak flows. River gravels or other round cobbles shall not be used as exterior armor. 8. Upon completion of the project, the streambed shall contain no pits, potholes, or large depressions to avoid stranding of fish. LARGE WOODY MATERIAL Page 1 of 5 *%Vashington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal pursuant to Chapter 34.05 Montesano,WA 98563 WILDLIFE (360)2494628 Issue Date:August 15,2008 Control Number: 114283-1 Project Expiration Date: September 30,2008 FPA/Public Notice#: N/A 9. Large woody material (log jam) may be relocated to the left bank as one looks downstream. EQUIPMENT 10. The use of equipment below the ordinary high water line shall be limited to that necessary to gain position for work. 11. Equipment used for this project shall be free of external petroleum-based products while working around the stream. Accumulation of soils or debris shall be removed from the drive mechanisms (wheels, tires, tracks, etc.) and undercarriage of equipment prior to its working below the ordinary high water line. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities along the stream. WATER QUALITY 12. Prior to starting work, temporary filter fabric or pea gravel-filled burlap bag check dam(s) shall be installed downstream. Accumulated sediments shall be removed during the project and prior to removing the check dam(s) after completion of work. 13. Erosion control methods shall be used to prevent silt-laden water from entering the stream. These may include, but are not limited to filter fabric, temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of exposed areas. 14. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project shall be deposited above the limits of flood water in an approved upland disposal site. 15. Alteration or disturbance of the bank and bank vegetation shall be limited to that necessary to construct the project. Within seven calendar days of project completion, all disturbed areas shall be protected from erosion using vegetation or other means. 16. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or water quality problems develop (including equipment leaks or spills), immediately stop work except for efforts to control leaks or spills or prevent toxic substances from entering the water and notify the Washington Military Department's Emergency Management Division at 1-800-258-5990, and to the Area Habitat Biologist listed below. Work shall not restart on the project until approved by the Area Habitat Biologist. 17. If high flow conditions that may cause siltation are encountered during this project, work shall stop until the flow subsides. Page 2of5 4Vashington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal pursuant to Chapter 34.05 Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date:August 15,2008 Control Number: 114283-1 Project Expiration Date:September 30,2008 FPA/Public Notice#: N/A PROJECT LOCATIONS Location #1 WORK START: August 15, 2008 IWORK END: September 30, 2008 WRIA: Waterbody: Tributary to: 15.0495 Big Mission Creek Hood Canal 1/4 SEC: Section: Township: Range: Latitude: Longitude: County: SE 1/4 �25 �23 N �02 W N 47.44915 W 122.86703 Mason Location#1 Driving Directions From Belfair,go south on Hwy 300, right on Mission Ck Rd to 1171 NE Mission Ck Rd. APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies(local,state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued pursuant to RCW 77.55.021 (EXCEPT agricultural irrigation,stock watering or bank stabilization projects)or 77.55.141 are subject to additional restrictions, conditions or revocation if the Department of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The person(s)to whom this Hydraulic Project Approval is issued has the right pursuant to Chapter 34.04 RCW to appeal such decisions. All agricultural irrigation,stock watering or bank stabilization Hydraulic Project Approvals issued pursuant to RCW 77.55.021 may be modified by the Department of Fish and Wildlife due to changed conditions after consultation with the person(s)to whom this Hydraulic Project Approval is issued: PROVIDED HOWEVER,that such modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.301. APPEALS INFORMATION If you wish to appeal the issuance or denial of,or conditions provided in a Hydraulic Project Approval,there are informal and formal appeal processes available. Page 3 of 5 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal pursuant to Chapter 34.05 Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date:August 15,2008 Control Number: 114283-1 Project Expiration Date:September 30,2008 FPA/Public Notice#: N/A A. INFORMAL APPEALS(WAC 220-110-340)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021, 77.55.141, 77.55.181, and 77.55.291: A person who is aggrieved or adversely affected by the following Department actions may request an informal review of: (A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval;or (B)An order imposing civil penalties. A request for an INFORMAL REVIEW shall be in WRITING to the Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North,Olympia,Washington 98501-1091 and shall be RECEIVED by the Department within 30 days of the denial or issuance of a Hydraulic Project Approval or receipt of an order imposing civil penalties. If agreed to by the aggrieved party, and the aggrieved party is the Hydraulic Project Approval applicant, resolution of the concerns will be facilitated through discussions with the Area Habitat Biologist and his/her supervisor. If resolution is not reached,or the aggrieved party is not the Hydraulic Project Approval applicant, the Habitat Technical Services Division Manager or his/her designee shall conduct a review and recommend a decision to the Director or his/her designee. If you are not satisfied with the results of this informal appeal,a formal appeal may be filed. B. FORMAL APPEALS(WAC 220-110-350)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (EXCEPT agricultural irrigation,stock watering or bank stabilization projects)or 77.55.291: A person who is aggrieved or adversely affected by the following Department actions may request a formal review of: (A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval; (B)An order imposing civil penalties;or (C)Any other'agency action'for which an adjudicative proceeding is required under the Administrative Procedure Act,Chapter 34.05 RCW. A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife HPA Appeals Coordinator,shall be plainly labeled as'REQUEST FOR FORMAL APPEAL'and shall be RECEIVED DURING OFFICE HOURS by the Department at 600 Capitol Way North,Olympia,Washington 98501-1091,within 30-days of the Department action that is being challenged. The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,the deadline for requesting a formal appeal shall be within 30-days of the date of the Department's written decision in response to the informal appeal. C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (agricultural irrigation, stock watering or bank stabilization only),77.55.141, 77.55.181,or 77.55.241: A person who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to the Hydraulic Appeals Board per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE, Building Two- Rowe Six, Lacey,Washington 98504;telephone 360/459-6327. D. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO CHAPTER 43.21 L RCW: A person who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic Project Approval may request a formal appeal. The FORMAL APPEAL shall be in accordance with the provisions of Chapter 43.21 L RCW and Chapter 199-08 WAC. The request for FORMAL APPEAL shall be in WRITING to the Environmental and Land Use Hearings Board at Environmental Hearings Office, Environmental and Land Use Hearings Board,4224 Sixth Avenue SE, Building Two-Rowe Six, P.O. Box 40903, Lacey,Washington 98504;telephone 360/459-6327. E. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS results in forfeiture of all appeal rights. If there is no timely request for an appeal,the department action shall be final and unappealable. Page 4 of 5 ,, Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road WFISH and RCW 77.55.021-Appeal pursuant to Chapter 34.05 Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date:August 15,2008 Control Number: 114283-1 Project Expiration Date: September 30,2008 FPA/Public Notice#: N/A ENFORCEMENT: Sergeant Jackson (29) P3 Habitat Biologists for Director Gloria Rogers 360-249-4628 ! WDFW CC:Jim Scholz Mason Count Department of Community Development email Y P Y P (email) Page 5 of 5