Loading...
HomeMy WebLinkAboutBLD2023-00598 Pool - BLD Application - 4/28/2023 CANCELLED MASON COUNTY • COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health July 17, 2023 Josh Fitzpatrick PO Box1167 Allyn,WA 98524 Re: BLD2023-00598 Pool Installation Mr. Fitzpatrick, The following items are found to be deficient in the submitted information regarding installing a pool at 80 E Allynview Dr, Allyn WA. 1. The installation of equipment must meet or exceed the Washington State Energy Code. The following codes must be meet. Verification of compliance must be submitted prior to permit approval. Provide all manufacture's specifications showing compliance. 403.10 Pool and permanent spa energy consumption. Pools and permanent spas shall comply with Sections R403.10.1 through R403.10.4.2. R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on-off switch that is an integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet(914 mm)of the heater. Operation of such switch shall not change the settings of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. R403.10.2 Time switches. Time switches or other control method that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built in time switches shall be deemed in compliance with this requirement. Exceptions: 1.Where public health standards require 24-hour pump operation. 2. Pumps that operate solar-and waste-heat-recovery pool heating systems. R403.10.3 Covers. Outdoor heated pools and outdoor permanent spas shall be provided with a vapor retardant cover,or other approved vapor retardant means. Exception: Where more than 75 percent of the energy for heating, computed over an operating season of not less than three calendar months, is from a heat pump or on-site renewable energy system, covers or other vapor-retardant means shall not be required. R403.10.4 Residential pool pumps. Pool pump motors may not be split phase or capacitor start induction run type. R403.10.4.1 Two-speed capability. 1. Pump motors: Pool pump motors with a capacity of 1 hp or more shall have the capability of operating at two or more speeds with low speed having a rotation rate that is no more than one half of the motor's maximum rotation rate. 2. Pump controls: Pool pump motor controls shall have the capability of operating the pool pump with at least two speeds. The default circulation speed shall be the lowest speed,with a high-speed override capability being for a temporary period not to exceed one normal cycle. R403.10.4.2 Pump operation. Circulating water systems shall be controlled so that the circulation. pump(s)can be conveniently turned off, automatically or manually, when the water system is not on R403.12 Residential pools and permanent residential spas. Residential swimming pools and permanent residential spas that are accessory to detached one-and two-family dwellings and townhouses three stories or less in height above grade plane and that are available only to the household and its guests shall be in accordance with APSP-15. 2. Barrier and Entrapment Requirements must be met. Provide details showing compliance to all requirements. Spas and hot tubs with a lockable safety cover,and pools with a powered lockable safety cover complying with ASTM F 1346 do not need to have a barrier installed. Barrier requirements: • At least 48 inches taller than all grade within 3 feet horizontally from the barrier. • Bottom of barrier no more than 2 inches above the ground. • All other openings in barriers may not be more than a 4-inch sphere. • Solid barriers shall not contain indentions or protrusions that form handholds or footholds (International Swimming Pool and Spa Code, ISPSC,Section 305.2.3). • Chain-link fences must comply with ISPSC,Section 305.2.7. • Gates must be self-closing and have locking device. • locking devices less than 54 inches above grade must be on the pool side of the gate,3 inches below top of gate and no more than a%inch opening anywhere within 18 inches of the latch. Entrapment protection for swimmingpools, hot tubs, and spa suction outlets General: Suction outlets shall be designed to produce circulation throughout the pool or spa. Single outlet systems, such as automatic vacuum cleaner systems, or other such multiple suction outlets whether isolated by valves or otherwise shall be protected against user entrapment. Suction fittings: All Pool and Spa suction outlets shall be provided with a cover that conforms with ANSI/ASME Al 12.19.8M, or a 18"x 23"drain grate or larger, or an approved channel drain system. Exception: Surface skimmers Atmospheric vacuum relief system required: All pool and spa single or multiple outlet circulation systems shall be equipped with atmospheric vacuum relief should grate covers located therein become missing or broken. Such vacuum relief systems shall include at least one approved or engineered method of the type specified herein, as follows: Safety vacuum release system conforming to ASME Al 12.19.17,or An approved gravity drainage system Dual drain separation. Single or multiple pump circulation systems shall be provided with a minimum of two (2) suction outlets of the approved type. A minimum horizontal or vertical distance of three (3)feet shall separate such outlets. These suction outlets shall be piped so that water is drawn through them simultaneously through a vacuum relief-protected line to the pump or pumps. Pool cleaner fittings: Where provided, vacuum or pressure cleaner fitting(s) shall be located in an accessible position(s)at least six (6) inches and not greater than twelve (12) inches below the minimum operational water level or as an attachment to the skimmer(s). The following items will be conditions of permitting for final inspection and approval to fill the pool. Electrical requirement shall be in accordance with Washington State Labor and Industries. Permitting and inspections are required for final occupancy. Contact L&I regarding permitting. Concealed piping including process piping that is installed in trenches shall be inspected prior to backfilling. Backflow protection for water supplies for poos and spa shall be protected against backflow in accordance with the Uniform Plumbing Code. Verification by inspection is required. Wastewater discharge from pools or spas such as backwash water from filters and water from deck drains discharge to a building drainage system the connection shall be through an air gap in accordance with the Uniform Plumbing Code. If you have any questions, please let me know. I can be reached at 360.427.9670 ext. 281 or twgmasoncountywa.gov. Tricia Woolett Building Inspector/Plan Review RECEIVED CANCELLED APR 2 8 2C23 615 W. Alder Street MASON COUNTY COMMUNITY SERVICES 161 Z6 / 00��S PFR&UT ASSISTANCE CENI ER: .SLj=tW .PLWNING.PVWJCNEAL7N.RREAWSHAL •� MS W.AWr Sind,[N�WAPo56l Phone Shop.pSgVaI-0R70 ext SB•--(3J<n196269 Phw SeleF.(J80)Z75JIF7•Phme dre(9dOJIeb626p BUILDING PERMIT APPLICATION PROPERTY OWNER�R••INFORMATION: CONTRACTOR INFORMATION: NAME: ,nSl. h'�LPc�Yi� NAMB: EL V r MAILII•IQ ADDABSS: ?, II NOADDRSSS: CITY: STATE:_Zm CITY: STAT•&_ZIP: . L PHONSAI: PHONE: CEU. •� PHONR#2- P•M'�: ` gN,IpII,: ,A L&T REGR H.CP.—JJ T PRIMARY CONTACT: OWlr>t$p. CONTHACTOR❑ OTHER❑ NANH Pl HMAIt MAn.W G ADDRESSP.C. 13 d/ 11 6-7 tlTY N SPATS�•�,Z� l.7 PRONE PARCEL INFORMATION:� PARCNUNEHR(UDigitNumbc)f1 7K ZI'L I S-U-!OO O I b TONING LEGALDESCRTrON(Abb_td O d�T/6 I=Dm RC QADDRESS t 1111y 1� DIRECTIONS TO SITE ADDRESS IS T73R PR078CT WITHIN 300 FT OF SLOPR(S)GREATER THAN 14%: YES[] NO❑ SNOW LOAD:_PC ISPROP&HTYWnMN200FTOFTESFOLLo WING: R3<tertNmgyl�: sALTwAT SR❑ LOBE❑ RIVFB/CR mx❑ POND n WSTLAND❑ sFASoNALYUNOFB❑ s78EAN❑ TYPE OF WORK: NEW n ADDICION O ALTMLA71ON❑ REPAIR❑ OTBBR n USE OF S17RUC1TIRE(add..a Oea+---W>Ndv> ISUSE. PRIMARY[] SEASONAL❑ NUMBFROFBEIRWW NUBOMLOFHATMWONS_ BHATPD S171I7CTORH7 YES(meieldH❑ Y� •1anL41❑ NO❑ DacLgDtH WOBg SOUARE FOOTAGE:6-w 1STFLOOR sq.H. 2NDFLOOR sq.L. 3RDFLOOA_fq.0: HA.SQ.ODdT q.a DECK .q.8 COVEREDDBCII fq.fI, STORAGE K-I1 OTHER -IL GARAGE W.1-Aft=hed n DC W[I CARPORT eq.L AmeAd n D.-6 d n . MANUFACTURED HOME INFORMATION: . •4COPIPSOFTHEFLOORPLANREQUIIiED• ,AEE MODEL YEAR 1XXGTE WIDTH BEDROOMS BATHS SFRTALNUMBER XNVIRONMENTAL HEALTH: •- _ SEWAGRMWPA SOURCE WnC❑ SEWER❑ / NEW[3 RUSTME] PLUMBIDIGINsTRUCTURE7 YES❑ NO[I gye,,a..h—pldd W—Adq-.yForn PERn,mn MOUNDATIONDRAINS PROPOSED? YFS n Non EMSTWG SO,FT. E%LSTINO HPDRDOMS PRO POSED BEDROOMS TOTALBEDROOW ' OWNER da 'MEPn tl�d umNsdmdKKknwreb lnfvmdlm mry miRbedePuvkoNrapamdm�lonl�aWdGe+n^iEdad�bM etPn�ee blov.l ded�e tndlvn er ndl(urdrtr derAiv dull Vn�tltled blecal+e Nb parmR eedbdo tluwdca peyued lluw omund P�+unn d m.n�ypstlu•Indodiq w....m.d�aPerde'd wr=d ncwup a,b Peled.7b oxnerorbpd npaerm Td dr Ydvrra0on I.a.Bsi b emsde vd Pru4�nWmw d Alewn COWysaev b bs dme damlbed m=PerO' and d�uW�Le)fortwMe.nl lnpedlut R+b PvmFJe�on beoanm nlllwN fumt ve�OvGed mwburLm bmtrnnnrcedx01dn 1m de»a Cw,*r a Is eupuded ter e POW d 1 m dq PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICA71PN TO BE EXPIRED•(MASON COUNTY CODE 14.0EAg) /J SlynehlndOWNER(Mudbsloned Wthe OWNERI Mts L//, - ....�..T -., .._ .. _.:3_ °;nAr$--`rAGSAI?OTF�!GONRAIutYs-c HUIIDING DEPARTMENT PLOUM40 DEPARTMENT FIRS MARSHAL. PUHISCI)SAr,TH . n hA� o5"kf- -ti RECEIVED CANCELLED APR 2 8 2023 615 W. Alder Street E Al r�c�W Dr, a ex;s�;7 ti,.uc J 6 x i J �Id 2023 - ooS�3 nEO in- L) PooL CANCELLED SAFETY (OVER SYSTEMS INSTALLATION & MAINTENANCE INSTRUCTIONS FOR RECTANGULAR AND CUSTOM COVERS IMPORTiT, 11 not 1rag (over on pool deck of ofly roughDiogging Mef on rough surfaceI I obiosionsand/or 1 Damage / dreg on rough surfa ally1.1 from(overl i 1 M F.11 I I I Ll[Nil i H ! l[K 11 FAROM I► 1 ! l ! Mal ► PLEASE NOTE:If a curer is going to IC owhored nto a raised bond beam,spa cal, POSE NOSE:if a cower is gang to be anchored iota c raised bond beam,spa,aa waterfol,el(.,ptoceed to the wrutt c%an il> ,up a r!!a reverse side, r:;ttertol4,etc„proceed to the iasirWons on the top of the reverse side. STEP 1 STEP 1 Inspsct sae arsa 3'bark from the tiwater s edgt around the entire peal_ Ramove any irregu'a So,,S-pp I irnlau&tns for"INSTALLING A RECTANGULAR COVER". abstru:tions that may protrude through the cower.Pad ou6 copiq,sharp edges,crd insiee STEP 2 (oeners with carper,fmm or similar male6ml,Extessiie view,rup to non-pwIded aians is s �ficalhl excluded from the warranrE_ Measure exm€t dimer:�a�rs of swimming pool and crrvEr.from the dii�eterrce betty r eosureriM,adjust the overlap so that it is equal at all locations of IN pool.Th STEP 2 staedard:ustom cower overlaps are 1 S"•18",they moy vart severdiiixhes either Wasare exact dimensions of swimming pool and cover. from tle difference between these G H COVER measareyoenls,adlast the overlap so that it is equal at all corners of tie pool.ThoLo, stanilard wedaps on stock ravels we 1?'and cwsiom covers 1 S"•18",they may.Rry t several inches either way. pm t �j STEP 3 r ! R Wasrrre 22'from corner in each direction and locate pesdon paint{A) of anchors for if four comers_ A ( E F STEP 3 Lecote anther positions on Figure 1.Begin vwith shop location(A)and measure 2: %now cover.Mark this location ors the deck.Cont-rue far straps(B),'C),a �lt. STEP 4 Install the anrlxsrs far(A), (BT,4C) & (0) ,see hrrr Install ton e oa ins of dig Attach Hat shaped side of spring to cower straps Me he spring attached to carver I STEP 4 spring attathment;+.Next,install tbe sp•ings on cn:hors using the installation rod r Install the 8 anchors of the 4€orne►s and step section-f ap,a.WHE. (see Anchor GaS llatan Instal`aiian).Adjust tfae buckles so that springs wil=compress eEout 601V1)for a on Wocrse side).Attach flat shaped side of springs to coiner straps (see spring attached to (trier for proper spring aitathnl.ent) Next, rstca the springs on anchors using the Installation STEP 5 Rod(see Cover Instafl don oa reverse s;de).Adjust huck'es so that springs;will compress Continue Wh installing shops and anchors(E), (f),(G)& (H)as indicated�1 fig about 60-70t:for a taut fit. STEP G STEP S Ater coatn)e1ing the-Initial insvllctisn of the first 8 anchors,insr0l the to morning Ome ttlo comers are soured,install remaining anchors 22'from the cover's edge in line marking h&m tie center of the cover to rfR ends.Remenber to citemote sides en with each strap.Mcke certain the some overlap is maintained as the corners end(trot the attach and secure each sprirg b the corer as each on(hor is instd'Ied, strops are at a 40 degree,right angle,to the rover's edge.Adhere to right angles,or bulges and/or gaps w,d Ncur_ 2 0 I~ I LA IL Skimme 0 rn Swimming Pool Q�a •�N fu Oam Water I n I et*4 9*4,2m*1.Bm Main Drain*2 0 F"N, D�F-2828 0 114•�#N�W11VA Steel Panel Quantity:28pcs DN-2833 K"Znx nWf" Steel Panel Quantity of Water Inlet:5pcs U-CR AJU09, Pool Depth "AU,�11: Pool Depth Steel Panel Quantity of Skimner:4pcs o o :. *jZ1R*M*jU 0.9m Steel Panel Quantity of Main Drain:2pcs 1.7m o o � Normal Steel Panel Quantity :17pcs � o Need to reserved 75cm for Triangular Support as the Sidewalk System,and the triangular support also needs to add a square pipe as the system 0 E4 support for the walkway. o i o MM r*4 ; 1 AIMM 750 9000 750 ��'°°0 s - O. s o to reserved 75cm for Triangular s¢ : 1000 1000 1000 1000 1000 1000 10 0 0 10 0 0 1000 Support as the Sidewalk System n STEEL SKIM POOL ( I I ��� ( INSTAI"TION DWING *Z: ELUDE Qraull 0 0 0 0 0 0 0 0 0 061( co 00 coC'O 00 CC) tea: DU� DIATI)c SUM It*: ca 1000 1000 i 1000 1000 690 , 690 Norol Steel Steel Panel Quantity Steel Panel Olantity Steel Panel Quantity Normal Steel Noncal Steel aye Panel Auntity 1 of Water Inlet 1i of Win Drai of Ski mer Panel Quantlty 2 Panel Quantity 3 mrz 2021-07-1.3 , 9 �T. Guangzhou Denor Swimming Pool Equipment Co., Ltd. Contact me:Wendy Jiang Mob:0086 13922230849 Tel: 86 2036313615 Fax: 020-86010188 Website:www.degaullepool.com E:denorswimpool@gzdenor.cn Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. Proforma Invoice CONTECT: Outdoor Steel Structure Swimming Pool Guangzhou Denor Swimming Pool Equipment Co.,Ltd. SELLER: ADD:Room 520,5th floor,Z&Z Plaza,Pingsba 510440,Baiyun Dist,Guangzhou City,China TEL:86 2036313615 FAX:020-86010188 CLIENT: Josh Fitzpatrick CONTRAC DN0312-2020051901 CONTRAC 19-May-20 T NO.: T DATE: This Price list just for the equipment supply,no including the transportation,equipment install etc,and we will offer freely pool system drawing after received the 50%deposit. No. Project Unit Price (USD) Al Stainless Steel Structure System SET A2 Swimming Pool Equipments SET Total Price: ,.-41 _ �w _n Guangzhou Denor Swimming Pool Equipment Co., Ltd. � . C E 0 0 I Contact me:Wendy Jiang Mob:0086 13922230849 Tel: 86 2036313615 Fax: 020-86010188 Webs ite:www.degaulIepool.com E:denorswimpool@gzdenor.cn Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. Solution 1:Steel Structure Swimming Pool Price List Pool Size:7.5*31.74.5m; Pool water volume:420; Cycle Time: 6h Water Flow:70/h Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool Type:Outdoor Swimming Pool NO. ITEM DETAILS UNIT UNIT TOTAL Position To PRICE Q�"1' PRICE/ Picture Brand Set/Fuction All Stainless Steel Structure System Swimmping Width:lm Height: 1.5m 2 Install it as the I pool Thickness:2.0mm m 37 1 Degaulle pool wall main structure Material:galvanized steel 2 Pool liner Width:1.83m 2 Install it in the Thickness:1.2mm Tn 90 Made In China pool Liner Liner .-� 3 Insta Installing Accessories 2 Install it in the g (Torch/Rail,layering,moldings/Fixed m 90 Made In China pool Accessories naiUGlue.ete. Flpl-q Install it around 4 Overflow Tank Overflow Tank m 32 Degaulle the pool for overflow Material:ABS Size:25cm 5 Grating (This type of grating is more safe which m 32 Install it on the can prevent pinch phenomenon and it is overflow tank design for outdoor use) Special For Steel Pool 6 Walking The Perimeter Of The Pool Extends m2 30 alloft Install it as System 75CM walking system (Suggest to buy it in local) AMOUNT A2 Swimming Pool Accessories M1 Auxiliary Install it on the 7 Drain Auxiliary Drain EM2832V PCs 1 bottom of pool 8 Main Drain Main Drain EM2833V pcs 1 = I Install it in the pool wall Initial Supply �_. Install it in the 9 Inlet Initial Supply Inlet EM2833V PCs 1 pool wall Install it in the 10 Water Inlet Water Inlet EM2828V PCs 2 �'f pool wall / Install it in the rSF415 n Gutter Drain EM2827V PCs .� 1 s.� overflow tank Install it in the Material:Stainless steal pcs 1 �� pool side as er Step:4 steps pool steps AMOUNT: Above Amount (without tax) TERMS&CONDITIONS: Price Basis: Ex Works Factory Payment: 50%Deposit, Balance transferred before shipping Tax: ®RMo oted above are excluded any tax. Drawing: Construction Drawings of whole pool after 50%deposit payment Packing: kage will be packed properly as per our standards. Delivery Time: -35 days after deposit received. Place Of OrginChina Exchange RateB=1:7Noted: ming pool solution excluding pipes/electric wire/cable BANK DETAILS: Beneficiary: Guangzhou Denor Swimming Pool Equipment Co.,Ltd Bank Account: 440 670 140 4000 3130 Swift Code: ABOCCNBJ190 Bank address: The Agriculture Bank Of China,Guangdong Guangzhou Huangshi Sub-Branch Poo/ g n Buyer P [ Signature&Seal] 4 ature&S J � Guangzhou Denor Swimming Pool Equipment Co., Ltd. contact me:Wendy Jiang Mob:008613922230849 Tel: 86 2036313615 Fax: 020-86010188 Websitewww.degaullep001com E:denorswimpom rrgzdenor.cn Seller.: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. Solution 1:Swimming Pool Equibrll'cnts List Price (Need The Machine Room) PoolSI=7.5*3.7*1.5m; Pool wVervc1umeA2tn', CyeleTimei tih WataFlow.Wlh Cycle Method:Downsuciun DisinfectionMethod:DrugDisinfeetion Pool Type:OutdoorSwlmmingPool UNIT TOTAL pas 10nTo NO IT ENI Pidnre ltrand DETAII S UNIT PRICE/ Q PRICEN 3et/Fatedots Al Swimming Pool Fntraftn System Top mount Inlet Dia:1.5"Flow Rate: 19m'/h 1 Degaulle Install it as I sand filter pc' requirement Filtration Area: 0.35m' Load: 180KG S700 0 Flow RATE-I9m3/h Head:15 as Po 2 tw Degaulle Inlet Diarnetcr.50mm Okw Install it en 2 SWPB100 PCs requirement amct (One use One Spare) AMOUNT: $610 A2 SWbnming'Pool Disinfection System Des infection for intergrative pipeless pool }' 3 DN90014 filter cros 1 # a Degaulle Throw into the water Four in one IQfloat (6 weeks use) R pressure:1-5 (Bar),Flow:20-54 (L/H), Install it as SEKO Dosing Pump head material: PCs 1 `+. Dcgaulle 4 pump AK5803 PVDF requirement SEKO water quality monitoring pcs 1 r•a•s� Degaulle Install it as 5 instrument i . requirement K042 AMOUNT: AJ Sw%uWngHeatingSystem Ucall.owestTemperature:15-C Target Heating I'cnpct-aturr.2WC Initial Heating Time:48hours number of horse:10 source C Rated voltage:380V/50Hz D Max outlet water tem 55'C �. Install it as 6 Air source heat Net weighC260kg pcs ! Degaulle requirement Pump Machine size:1450'725'1050mm be used for water pump to collect hair and Install it as 7 Haircolleclor dirty thing from water PCs Aw I lowDegaulle requirement FlowRATE:tlm3/h Head:15m as j, 8 GD40-15 POWCLI.IkW PCs I /� Degaulle Install it Inlet Diameter.50mm requirement co a h AMOUNT-1 imp A4 Swimming Pool Cleaning System (In order to savewater and labor cost.suggest to use Manual Cleaner with Automatic Cleaner Together) Cable Length 20m HJ2042L Filtration capacity:15.5m'At ---- Put it beside the pool Filtration Capability.10/I0012OOµm and as for automatic 9 Auto pool Creeping speed:12.5nt/min PCs I Degaulle cleaning machine to cleaner Waterproof IP grade:CleanerIP69 clean the pool Weight of loaner(withoutcabl e):35kg AMOUNT boy�'�1tlonn(t><rlfhoutta:) t d s- TERMS&CONDITIONS: Price Basis: Ex Works Factory Payment 50%Deposit, Balance transferred before shipping Tax: Prices Quoted above are excluded any tax. Drawing: Will offer Construction Drawings ofwhole pool after 50%deposit payment Packing: Each package will be packed properly as per our staudards Delivery Time: Within 30--35 days after deposit received. Place Of Orgin: Made In China Exchange Rate: USD:RMB=1:7 Noted: This swimming pool solution excluding pipeslelectric wirelcable BANK DETAILS: '_ Beneficiary: GuangzbouDenor Swimming Pool Equipment Co.,Ltd Bank Account: 440 670 140 4000 3130 Swift Code: ABOCCNBJ190 Bankaddress: The Agriculture Bank Of China,Guangdong GuangzhouHuangshiSub-Branch *�at Door Buyer �,�l'Seller �I J4. [Sign9ture&Seal] rr. ��� 1 mture&Sesl .a • 7 Guangzhou Denor Swimming Pool Equipment Co., Ltd. Contact me:Wendy Jiang Mob:0086 13922230849 � s` Tel: 86 2036313615 Fax: 020-86010188 Website:www.degaullepool.com E:degaulleswimpool@gzdenor.cn Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. dubai-splash-steel-structure-swim min g-pool-pro j ect t h I I I _ 1 Proj ectduba i-splash-steel-structure-swimming-poo I-project Pool Szie:10'5'1.5m Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool TypeAndoor Pool Main Configuration:stainless steel sandfilter swimming pool filter Taiwan Steel Structure Swimming Pool Project Cases Project:Taiwan steel Swimming pool Pool Szie:50*30*1.8m Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool Type:Indoor Pool Main Configuration:Integrative swimming pool filter c M• r tI lSome Certificates of Degaulle Products UDEM UDEM UDEM CERTIFICATE CERTIFICATE I CERTIFICATE ATMMI]ON CMrMICATE AIM-MMON CBrOMAII ATtESTAWN CUMMATE OYBECTYOMAGNEDC Of EIEC'BOMACNPDC OY IIECDtOMAGNEDC COMTAURM AND�IDLW VOWG^E DI7lFCDV6 COMPA'ImMY AND�WW VOLTAGE DDWCWES COMPA'IDMY AND LOW VOLTAGE ZKECUV` w—_ -— C E r-._ ... .r.0 E UDEMUstVr- '..c+" Declaration of Conforms r_i�rY11 tY Declaration of Conformity 5 r.._ lifer O 2 k +ten i GrUtic■ta of Conformity C■rtlflcato of Conformity certlOoat■of Coh6crolty .r rrr. .ram...__:- .... :■..,wu�..r.w.:r►r+u.....w.-. _. .�.,n.r.u...r....+.r�.r.r-. rI-.+na r-N��_. .. - -:_■irlrrr�•�:. - ..-. •.\4rwrr�_Y! - ....i::i.C_:i •+-iiw+.�+1^•�.. °"'.."""-�.iY. w::__^.`-:.. rrrY■_c-ar .._�y�.. ../__..-. arw..rA.■,L,FNrr4PAIY.Y.aw h....r...r��Y■rrr. :': _.. - r......r7.r'..�...r W.!.r '...a.ir,A�ary„I..MI.^,rJ'...fF.. I...Ln.KMM.r.rYI.MK...K..+.c Wr.•a�.i Fla R,as.1..r.r.... rrr J■{{i..rri`�-_^ """.. ,..YSAM.r■�.1■,Yr'M..n1.K.•.M rr •r■an.aaAMAan.nr,\AI..nNa. ...r..»+Nr — w..K1+MRM.1Lln� _.i Y■A��.1._.__.ir.r� .r..err r�r .J T■Y/.YA -_:: .ar.Yrr.r.rrr,r�Y� r.r� ...�^-r.n.►.^ n a,r.taY`Y _� r..Y»Y:....Y..Mr.�rr.w..rrn..rtr+�r tiWall.\.Yl..ro��YY�. �••�• LL��®'-= ..YMI.\/.i\rY�.JWIJw..s.,l r��• 'YrY.. �1i1FYl. �rl.11r��.—..-+�.+�-r—.�—....+~rir.-r... ar r—.rrr.w.r.• ` • r�rr .� C E CE C CANCELLED Some Certificates of Degaulle Products UDEM UDEM UDEM CERTIFICATE CERTIFICATE CERTIFICATE ATEEMDON CERTIFICATE ATIES-MUON CERTIFICATE ATTESTATION CERTIFICATE OF EIECIYOMAGNETIC OF EIECD7OMAGNEIC OF EIECTROMAGNEIC COOMPAI TIM AND IOW VOLTAGE DIRECTIVES COMPAIMILM AND LOW VOLTAGE DMECIVES COMPAIBMY AND JLOW VOLTA,GE DIRECTIVES r rr_....'u.�r�..`.....�rw-�c..•�.r' -.r... �,�A�r�`...-:�'�..�_rY..� "� -.....rrr...*..r:..�...`.."...'•i.`�...�'��— "".r.r....._+......«...�=....C'r' .o-r....,.r...r.....--.ter r.�rtx�r.rr c.rr�waw. � i.r..nr�. .rxa,r rrrr�rnrrrrt rrn ....-air. i��,lm�x,.i,mun�iw� .x� Y�.Yrlrru•rr�a... \x..r..ror .iii�a+n nlrn,rw.x�iUK w•••�•v w"�r n7+min r r/rr xrn.s t• n.x.w.n��nw��ram,ir, irri.ylv''�J..rrwnv.Minstrwnvwn �.w..a"r.r/n.F nnora.nrra rrrarr,ur. —Z. ........�..�r.r. «..+..�� UDEM ...�...._ ._r_ •'+,•..�.�C~E IJ BEM '�«�' U El 1,6`� 4nx�pltkR30r1�_9rtCR'at��N"3k'.,�ll.k J�[p�.'�q($M�V1:1�2�Y�SW3m'-t� c0 arati Declon of Conformity Declaration of Conformity .,r .......r�.r..�r...�,r-......... `�...,,........r....,x..-+xx..,.r.r..... �i � z C ....a ao..�,a...,c sr4s�•w�'f+: Ara rR n,�, .-..�.,n aT4l� �n�� 23 5 �� z , CE K3 r/,Q r�'.3aY I ` I snfS,�f�n'�or�,ilJt�FSuF.yfl+n'Ire3x`4aRef!�R3en7D Certificate of Conformity CortilIeSto of Oonformity Certificate of Conformity r IOe. rAalAaxl...M1gM,eAW1M rxrc.,,.x,\,,r,arLxx�K r.�ne.r,r.Kxxa,rc '- x,rr�ra,+,Ifier\Y...Mrarn•v. - eas ra....� ---- ,�A.ieo.nr+,o,rxwrxarPn�raxxPq w+' xrana PM.{r,I..N,\M1AI.Ma ^r�YasrwrrMrN�r � l,rwrrinrr.rrrrrrarrwrrr..«r.�ar e„r.rYrrr x\rKr\ro.rr\r�rr.rarxrr ,:� - erx.sww.\rrwYrOr.\r�Mrrr r Y_/.r r 11 YtlrwMrfW.J�WJY r+Y ��/rr\rrx�x,r rrrr/r Y Nor �+i/rrr. /r\\ .x/..x,r/\rxr/r Y� rw,\rrrrx .rwrr.rrx.rrrarr a�� C E C E C E w , fit% Guangzhou Denor Swimming Pool Equipment Co., Ltd. t Of 017 S Contact me:Wendy Jiang Mob:0086 13922230849 TO: 86 2036313615 Fax: 020-86010188 Websiteavww.degaullepool.com E:degaulleswimpool`r�rgzdenor.cn -Y Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. dubai-splash-steel-structure-swimming-pool-project Projectdubai-splash-steel-structure-swimming-pool project Pool Szie:10'5'1.5m Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool TypeAndoor Pool Main Configuration:stainless steel sandfilter swimming pool filter Taiwan Steel Structure Swimming Pool Project Cases Project:Taiwan steel Swimming pool Pool Szie:50*30*1.8m Cycle Method:Downstream Disinfection Method:Dnig Disinfection Pool Type:lndoor Pool Main Configuration:integrative swimming pool filter r V 6 1�• � i { 1 l� Flow RATE:I lm3/h Head:15m as 8 GD40-15 Powerl.lkw PCs 1 Degaulle Install it Inlet Diamcicr50mm requirement co rt n An7OUNT Swimming Pool Cleaning System A4 (In order to save water and labor cost,suggest to use Manual Cleaner with Automatic Cleaner Together) Cable Length20m HJ2042L Filtration capacity:15.5m'/h — Put it beside the pool 9 Auto pool Filtration Capability.10/1001200µm PCs 1 Degaulle and as for automatic P Creeping speed:12.5m/min cleaning machine to cleaner Waterproof IP grade:CleanerlP68 clean the pool Weight of cleaner(withoutcable):35kg AMOUNT Above Amount{withouttaz) , Vice *7; TERMS&CONDITIONS: Price Basis: Ex Works Factory Payment: 50%Deposit, Balance transferred before shipping Tax: Prices Quoted above are excluded any tax- Drawing: Will offer Construction Drawings of whole pool after 50%deposit payment Packing: Each packagewill be packed properly as per our standards. Delivery Time: Within 30--35 days after deposit received. Place Of Orgin: Made In China Exchange Rate: USD:RAIB=1:7 Noted: This swimming pool solution excluding pipes/electric wire/cable BANK DETAILS: ' Beneficiary: Guangzhou DenorSwimming Pool Equipment Co.,Ltd Bank Account: 440 670 140 4000 3130 Swift Code: ABOCCNBJ190 Bank address: The Agriculture Bank Of China,Guangdong Guangzhou lluangshiSub-Branch Buyer I Signature&Sea❑ pig i nature&Seal .a y Guangzhou Denor Swimming Pool Equipment Co., Ltd. r 0 F EN� aenE0086 13922230849 6010188 i mpool@gzdenocen pment Co.,Ltdolution 1:Swimming Pool 1 quionicnts List Price (Need The Machine Room) Pool Size:7.5.3.7*1.5m; Pool water volume:42m'; Cycle Time: 6h WaterFlow:7m'/h Cycle Method:Dowmstream DisinfectionMethod:DrugDisinfection Pool Type:Outdoor Swimming Pool UNIT �PRICE�f Position To NO ITE)•7 DETAILS UNfI PRICE/ QT Picture Brand Set/Fuction At Swimming Pool Filtration System p Install it as To mount Inlet Dia:1.5"Flow Rate: 19m'!h PCs � 1 � Degaulle I sand filter requirement FiltrahonArea: 0.35m' Load: 180KG S700 I& Flow RATE:I9m3/h Head 15 r I.Okw ++•- - Install it as Powe PCs 2 -ti Degaulle 2 SWPBIOO [nlctDiameter50mm � - 1 rcgwrcmrnt (One use One Spare)'._ ANIOUNT: $610 A2 Swimming Pool Disinfection System Desinfection for intergrative pipeless pool 3 DN90014 filter ctns 1 Degaulle Throw into the water Four m one 1Qfloat (6 weeks use) pressure:l-5 (Bar),Flow:20-54 (L/H), Install it as 4 SEKODosing Pump head material: PCsAV I Degaulle pump AKS803 PVDF requirement SEKO water quali monitoring + 4 Install it as 5 8 PCs Degaulle requirement instrument K042 - s ANIOUNT: A3 swimming HeatingSyste Local Lowest Temperature:I5C Target Heating Temperature28l. Initial Heating Time:48hours number of horse:10 Rated voltage:380V/50Hz UGL-I000 Max outlet watertemp:55•C (a"Z � Install it as 6 Air source heat PCs I MIND Degaulle u NetweighC280kg reqremcnt Pump Machine size:1450.725.1050mm be used for water pump w collect hair and Install it as 7 Hair collector PCs Degaulle dirty thing from water pv., requirement / Install it in the 11 Gutter Drain Gutter Drain EM2827V PCs � I � overflow tank Install it in the SF-415 Material:Stainless steel PCs I / pool side as 12 Pool Ladder Step:4 steps Y pool steps AMOUNT: Above Amount (without tax) . r � TER,17S&CONDITIONS: Price Basis: Ex Works Factory Payment: 50%Deposit, Balance transferred before shipping Tax: Prices Quoted above are excluded any tax. Drawing: Will offer Construction Drawings of whole pool after 50%deposit payment Facking: tUSD:RMB=I:7 h package will be packed properly as per our standards. Delivery Time: hin 30-35 days after deposit received. Flace Of Orgin: de In China Exchange Bate: Noted: This swimming pool solution excluding pipes/electric wire/cable BANK DETAILS: Beneficiary: Guangzhou Denor Swimming Pool Equipment Co.,Ltd Bank Account: 440 670 140 4000 3130 Swift Code: ABOCCNBJ190 Bank address: The Agriculture Bank Of China,Guangdong Guangzhou Iluangshi Sub-Branch nH Oo! Buyer �y�' e�er '"�„���. [ Signature&Seal] ature&S s Guangzhou Denor Swimming Pool Equipment Co., Ltd. C E Ge Contact me :Wendy Jiang Mob:0086 13922230849 ' Tel: 86 2036313615 Fax: 020-86010188 Webs ite:www.degauIIepool.com E:denorswimpool@gzdenoccn i Seller.: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. 1 Solution 1: Steel Structure Swimming Pool Price List Pool Size:7.5*3.7*1.5m; Pool water volume:42m'; Cycle Time: 6h Water Flow:7m'/h Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool Type:Outdoor Swimming Pool NO. ITEM DETAILS UNIT UNIT TOTAL Position To PRICE QT1 PRICE/ Picture Brand Set/Fuction Al Stainless Steel Structure System Width:Im Swimmping Height: 1.5m 2 Install it as the Thickness:2.Omm 1 pool P 37 Degaulle pool wall main structure Material:galvanized steel 2 Pool liner Width:1.83m 2 Install it in the Thickness:1.2mm m 90 Made In China pool Liner Liner 3 Installing Installing Accessories m 2 90 _ Made In China Install it in the ! Accessories (Torch/Rail,layering,moldings/Fixed � pool nail/Glue.etc. k Install it around 4 Overflow Tank Overflow Tank m �- 32 4NOW Degaulle the pool for overflow Material:ABS Size:25cm 5 Grating (This type of grating is more safe which m 32 �;: :Lti Install it on the .::�r��.vv��•. can prevent pinch phenomenon and it is �:: ,1:;` overflow tank design for outdoor use) Special For Steel Pool (" Walking The Perimeter Of The Pool Extends 2 30 1 _ '' Install it as 6 m System 75CM 4%10& walking system (Suggest to buy it in local) AMOUNT: A2 Swimming Pool Accessories Auxiliary Install it on the 7 Drain Auxiliary Drain EM2832V PCs 1 bottom of pool 8 Main Drain Main Drain EM2833V PCs I : Install it in the pool wall 9 Initial Supply Initial Supply Inlet EM2833V PCs I Install it in the Inlet pool wall Install it in the 10 Water Inlet Water Inlet EM2828V PCs d^V* 2 pool wall Guangzhou Denor Swimming Pool Equipment Co., Ltd. Contact me:Wendy Jiang Mob:0086 13922230849 Tel: 86 2036313615 Fax: 020-86010188 Website:w%vw.degaullepool.com E:denorswimpool 1g gzdenor.en Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. Proforma Invoice CONTECT: Outdoor Steel Structure Swimming Pool Guangzhou Denor Swimming Pool Equipment Co.,Ltd. SELLER: ADD:Room 520,5th floor,Z&Z Plaza,Pingsha 510440,Baiyun Dist,Guangzhou City,China TEL:86 2036313615 FAX:020-86010188 CLIENT: Josh Fitzpatrick CONTRAC DNO312-2020051901 CONTRAC ]9-May-20 T NO,: T DATE: This Price list just for the equipment supply,no including the transportation,equipment install etc,and we will offer freely pool system drawing after received the 50%deposit. No. Project Unit Price (USD) Al Stainless Steel Structure System SET A2 Swimming Pool Equipments SET Total Price: 1 TU0 Ln Skimmer*4 0 rn Swimming Pool �• *� �: • a Water Inlet*4 9*4.2m*1.8m Main Drain*2 o rust®,--MANAIR*" DN— 8828 Steel Panel Quantity:28pcs DN-2833 TNIEipiIQN.���+xfi Steel Panel Quantity of Water Inlet:5pcs 'FAIL a�*��•ri Pool DepthxT'Ae,n7 . Pool Depth Steel Panel Quantity of Skimmer:4pcs 0.9m Steel Panel Quantity of Main Drain:2pcs 1.7m Normal Steel Panel Quantity :17pcs CI*4 o Need to reserved 75cm for Triangular Support as the Sidewalk System,and the triangular support also needs to add a square pipe as the system support for the walkway. O o 41HR 750 9000 — AwalwSmSmM - - 750 0 mi ,n o ; to reserved 75cm for Triangular ms: 1000 1 1000 1000 1 1000 1000 1000 1000 1000 1000 Support as the Sidewalk System T'STEEL sWIT Poo I. I I INSTAIIATION ORATING W8: deeaTre uon3arc - Will: EzwME UUTIM aEa GCF21 O O O O O O fit: Kni O O OI O O O 00 00 OC) 00 OC) cc) DRAMIG STATUS 1000 1000 1000 , 1000 690 690 Intl DRAM W Normal Steel Steal Panel Quantity Steel Pwwl Quantity Steal Panel Quantity Normal Steal Normal Steel EIM Panel Quantity 1 of Water Inlet of Win Drain of Skiiamer Panel Quantity 2 Panel Quantity 3 DATE 2021-07-13