July 17, 2023
Josh Fitzpatrick
PO Box1167
Allyn,WA 98524
Re: BLD2023-00598
Pool Installation
Mr. Fitzpatrick,
The following items are found to be deficient in the submitted information regarding installing a pool at 80 E Allynview Dr,
Allyn WA.
1. The installation of equipment must meet or exceed the Washington State Energy Code. The following codes
must be meet. Verification of compliance must be submitted prior to permit approval. Provide all manufacture's
specifications showing compliance.
403.10 Pool and permanent spa energy consumption. Pools and permanent spas shall comply with Sections
R403.10.1 through R403.10.4.2.
R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on-off switch that is
an integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet(914 mm)of
the heater. Operation of such switch shall not change the settings of the heater thermostat. Such switches shall
be in addition to a circuit breaker for the power to the heater.
R403.10.2 Time switches. Time switches or other control method that can automatically turn off and on
according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that
have built in time switches shall be deemed in compliance with this requirement.
Exceptions:
1.Where public health standards require 24-hour pump operation.
2. Pumps that operate solar-and waste-heat-recovery pool heating systems.
R403.10.3 Covers. Outdoor heated pools and outdoor permanent spas shall be provided with a vapor retardant
cover,or other approved vapor retardant means.
Exception: Where more than 75 percent of the energy for heating, computed over an operating season of not
less than three calendar months, is from a heat pump or on-site renewable energy system, covers or other
vapor-retardant means shall not be required.
R403.10.4 Residential pool pumps. Pool pump motors may not be split phase or capacitor start induction run
type.
R403.10.4.1 Two-speed capability.
1. Pump motors: Pool pump motors with a capacity of 1 hp or more shall have the capability of operating at two
or more speeds with low speed having a rotation rate that is no more than one half of the motor's maximum
rotation rate.
2. Pump controls: Pool pump motor controls shall have the capability of operating the pool pump with at least
two speeds. The default circulation speed shall be the lowest speed,with a high-speed override capability being
for a temporary period not to exceed one normal cycle.
R403.10.4.2 Pump operation. Circulating water systems shall be controlled so that the circulation. pump(s)can
be conveniently turned off, automatically or manually, when the water system is not on
R403.12 Residential pools and permanent residential spas. Residential swimming pools and permanent
residential spas that are accessory to detached one-and two-family dwellings and townhouses three stories or
less in height above grade plane and that are available only to the household and its guests shall be in
accordance with APSP-15.
2. Barrier and Entrapment Requirements must be met. Provide details showing compliance to all requirements.
Spas and hot tubs with a lockable safety cover,and pools with a powered lockable safety cover complying
with ASTM F 1346 do not need to have a barrier installed.
Barrier requirements:
• At least 48 inches taller than all grade within 3 feet horizontally from the barrier.
• Bottom of barrier no more than 2 inches above the ground.
• All other openings in barriers may not be more than a 4-inch sphere.
• Solid barriers shall not contain indentions or protrusions that form handholds or footholds
(International Swimming Pool and Spa Code, ISPSC,Section 305.2.3).
• Chain-link fences must comply with ISPSC,Section 305.2.7.
• Gates must be self-closing and have locking device.
• locking devices less than 54 inches above grade must be on the pool side of the gate,3 inches below
top of gate and no more than a%inch opening anywhere within 18 inches of the latch.
Entrapment protection for swimmingpools, hot tubs, and spa suction outlets
General: Suction outlets shall be designed to produce circulation throughout the pool or spa.
Single outlet systems, such as automatic vacuum cleaner systems, or other such multiple suction
outlets whether isolated by valves or otherwise shall be protected against user entrapment.
Suction fittings: All Pool and Spa suction outlets shall be provided with a cover that conforms
with ANSI/ASME Al 12.19.8M, or a 18"x 23"drain grate or larger, or an approved channel drain
system.
Exception: Surface skimmers
Atmospheric vacuum relief system required: All pool and spa single or multiple outlet circulation
systems shall be equipped with atmospheric vacuum relief should grate covers located therein
become missing or broken. Such vacuum relief systems shall include at least one approved or
engineered method of the type specified herein, as follows:
Safety vacuum release system conforming to ASME Al 12.19.17,or
An approved gravity drainage system
Dual drain separation. Single or multiple pump circulation systems shall be provided with a
minimum of two (2) suction outlets of the approved type. A minimum horizontal or vertical distance of
three (3)feet shall separate such outlets. These suction outlets shall be piped so that water is drawn
through them simultaneously through a vacuum relief-protected line to the pump or pumps.
Pool cleaner fittings: Where provided, vacuum or pressure cleaner fitting(s) shall be located in
an accessible position(s)at least six (6) inches and not greater than twelve (12) inches below the
minimum operational water level or as an attachment to the skimmer(s).
The following items will be conditions of permitting for final inspection and approval to fill the pool.
Electrical requirement shall be in accordance with Washington State Labor and Industries. Permitting and inspections
are required for final occupancy. Contact L&I regarding permitting.
Concealed piping including process piping that is installed in trenches shall be inspected prior to backfilling.
Backflow protection for water supplies for poos and spa shall be protected against backflow in accordance with the
Uniform Plumbing Code. Verification by inspection is required.
Wastewater discharge from pools or spas such as backwash water from filters and water from deck drains discharge to
a building drainage system the connection shall be through an air gap in accordance with the Uniform Plumbing Code.
If you have any questions, please let me know. I can be reached at 360.427.9670 ext. 281 or twgmasoncountywa.gov.
Tricia Woolett
Building Inspector/Plan Review
RECEIVED
CANCELLED
APR 2 8 2C23
615 W. Alder Street
MASON COUNTY COMMUNITY SERVICES 161 Z6 / 00��S
PFR&UT ASSISTANCE CENI ER:
.SLj=tW .PLWNING.PVWJCNEAL7N.RREAWSHAL
•� MS W.AWr Sind,[N�WAPo56l
Phone Shop.pSgVaI-0R70 ext SB•--(3J<n196269 Phw
SeleF.(J80)Z75JIF7•Phme dre(9dOJIeb626p
BUILDING PERMIT APPLICATION
PROPERTY OWNER�R••INFORMATION: CONTRACTOR INFORMATION:
NAME: ,nSl. h'�LPc�Yi� NAMB: EL
V r MAILII•IQ ADDABSS: ?, II NOADDRSSS:
CITY: STATE:_Zm CITY: STAT•&_ZIP: .
L PHONSAI: PHONE: CEU.
•� PHONR#2- P•M'�:
` gN,IpII,: ,A L&T REGR H.CP.—JJ
T PRIMARY CONTACT: OWlr>t$p. CONTHACTOR❑ OTHER❑
NANH Pl HMAIt
MAn.W G ADDRESSP.C. 13 d/ 11 6-7 tlTY N SPATS�•�,Z� l.7
PRONE
PARCEL INFORMATION:� PARCNUNEHR(UDigitNumbc)f1 7K ZI'L I S-U-!OO O I b TONING
LEGALDESCRTrON(Abb_td O d�T/6 I=Dm RC
QADDRESS
t 1111y 1�
DIRECTIONS TO SITE ADDRESS
IS T73R PR078CT WITHIN 300 FT OF SLOPR(S)GREATER THAN 14%: YES[] NO❑ SNOW LOAD:_PC
ISPROP&HTYWnMN200FTOFTESFOLLo WING: R3<tertNmgyl�:
sALTwAT SR❑ LOBE❑ RIVFB/CR mx❑ POND n WSTLAND❑ sFASoNALYUNOFB❑ s78EAN❑
TYPE OF WORK: NEW n ADDICION O ALTMLA71ON❑ REPAIR❑ OTBBR n
USE OF S17RUC1TIRE(add..a Oea+---W>Ndv>
ISUSE. PRIMARY[] SEASONAL❑ NUMBFROFBEIRWW NUBOMLOFHATMWONS_
BHATPD S171I7CTORH7 YES(meieldH❑ Y� •1anL41❑ NO❑
DacLgDtH WOBg
SOUARE FOOTAGE:6-w
1STFLOOR sq.H. 2NDFLOOR sq.L. 3RDFLOOA_fq.0: HA.SQ.ODdT q.a
DECK .q.8 COVEREDDBCII fq.fI, STORAGE K-I1 OTHER -IL
GARAGE W.1-Aft=hed n DC W[I CARPORT eq.L AmeAd n D.-6 d n .
MANUFACTURED HOME INFORMATION: . •4COPIPSOFTHEFLOORPLANREQUIIiED•
,AEE MODEL YEAR 1XXGTE
WIDTH BEDROOMS BATHS SFRTALNUMBER
XNVIRONMENTAL HEALTH: •- _
SEWAGRMWPA SOURCE WnC❑ SEWER❑ / NEW[3 RUSTME]
PLUMBIDIGINsTRUCTURE7 YES❑ NO[I gye,,a..h—pldd W—Adq-.yForn
PERn,mn MOUNDATIONDRAINS PROPOSED? YFS n Non EMSTWG SO,FT.
E%LSTINO HPDRDOMS PRO POSED BEDROOMS TOTALBEDROOW
' OWNER da 'MEPn tl�d umNsdmdKKknwreb lnfvmdlm mry miRbedePuvkoNrapamdm�lonl�aWdGe+n^iEdad�bM
etPn�ee blov.l ded�e tndlvn er ndl(urdrtr derAiv dull Vn�tltled blecal+e Nb parmR eedbdo tluwdca peyued lluw
omund P�+unn d m.n�ypstlu•Indodiq w....m.d�aPerde'd wr=d ncwup a,b Peled.7b oxnerorbpd
npaerm Td dr Ydvrra0on I.a.Bsi b emsde vd Pru4�nWmw d Alewn COWysaev b bs dme damlbed m=PerO'
and d�uW�Le)fortwMe.nl lnpedlut R+b PvmFJe�on beoanm nlllwN fumt ve�OvGed mwburLm bmtrnnnrcedx01dn 1m
de»a Cw,*r a Is eupuded ter e POW d 1 m dq
PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION.INACTIVITY OF THIS
PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICA71PN TO BE EXPIRED•(MASON
COUNTY CODE 14.0EAg) /J
SlynehlndOWNER(Mudbsloned Wthe OWNERI Mts L//,
- ....�..T -., .._ ..
_.:3_ °;nAr$--`rAGSAI?OTF�!GONRAIutYs-c
HUIIDING DEPARTMENT
PLOUM40 DEPARTMENT
FIRS MARSHAL.
PUHISCI)SAr,TH .
n hA� o5"kf-
-ti
RECEIVED
CANCELLED
APR 2 8 2023
615 W. Alder Street
E Al r�c�W Dr,
a
ex;s�;7 ti,.uc
J 6 x
i
J
�Id 2023 - ooS�3
nEO in- L) PooL
CANCELLED
SAFETY (OVER SYSTEMS
INSTALLATION & MAINTENANCE INSTRUCTIONS FOR
RECTANGULAR AND CUSTOM COVERS
IMPORTiT, 11 not 1rag (over on pool deck of ofly roughDiogging Mef on rough surfaceI I obiosionsand/or 1
Damage / dreg on rough surfa ally1.1 from(overl i
1 M F.11 I I I Ll[Nil i H ! l[K 11 FAROM I► 1 ! l ! Mal ►
PLEASE NOTE:If a curer is going to IC owhored nto a raised bond beam,spa cal, POSE NOSE:if a cower is gang to be anchored iota c raised bond beam,spa,aa
waterfol,el(.,ptoceed to the wrutt c%an il> ,up a r!!a reverse side, r:;ttertol4,etc„proceed to the iasirWons on the top of the reverse side.
STEP 1 STEP 1
Inspsct sae arsa 3'bark from the tiwater s edgt around the entire peal_ Ramove any irregu'a So,,S-pp I irnlau&tns for"INSTALLING A RECTANGULAR COVER".
abstru:tions that may protrude through the cower.Pad ou6 copiq,sharp edges,crd insiee STEP 2
(oeners with carper,fmm or similar male6ml,Extessiie view,rup to non-pwIded aians is
s �ficalhl excluded from the warranrE_ Measure exm€t dimer:�a�rs of swimming pool and crrvEr.from the dii�eterrce betty
r eosureriM,adjust the overlap so that it is equal at all locations of IN pool.Th
STEP 2 staedard:ustom cower overlaps are 1 S"•18",they moy vart severdiiixhes either
Wasare exact dimensions of swimming pool and cover. from tle difference between these G H COVER
measareyoenls,adlast the overlap so that it is equal at all corners of tie pool.ThoLo,
stanilard wedaps on stock ravels we 1?'and cwsiom covers 1 S"•18",they may.Rry t
several inches either way. pm
t �j
STEP 3 r ! R
Wasrrre 22'from corner in each direction and locate pesdon paint{A) of anchors for if
four comers_
A
( E F
STEP 3
Lecote anther positions on Figure 1.Begin vwith shop location(A)and measure 2:
%now cover.Mark this location ors the deck.Cont-rue far straps(B),'C),a �lt.
STEP 4
Install the anrlxsrs far(A), (BT,4C) & (0) ,see hrrr Install ton e oa ins of dig
Attach Hat shaped side of spring to cower straps Me he spring attached to carver I
STEP 4 spring attathment;+.Next,install tbe sp•ings on cn:hors using the installation rod r
Install the 8 anchors of the 4€orne►s and step section-f ap,a.WHE. (see Anchor GaS llatan Instal`aiian).Adjust tfae buckles so that springs wil=compress eEout 601V1)for a
on Wocrse side).Attach flat shaped side of springs to coiner straps (see spring attached to
(trier for proper spring aitathnl.ent) Next, rstca the springs on anchors using the Installation STEP 5
Rod(see Cover Instafl don oa reverse s;de).Adjust huck'es so that springs;will compress Continue Wh installing shops and anchors(E), (f),(G)& (H)as indicated�1 fig
about 60-70t:for a taut fit.
STEP G
STEP S Ater coatn)e1ing the-Initial insvllctisn of the first 8 anchors,insr0l the to morning
Ome ttlo comers are soured,install remaining anchors 22'from the cover's edge in line marking h&m tie center of the cover to rfR ends.Remenber to citemote sides en
with each strap.Mcke certain the some overlap is maintained as the corners end(trot the attach and secure each sprirg b the corer as each on(hor is instd'Ied,
strops are at a 40 degree,right angle,to the rover's edge.Adhere to right angles,or bulges
and/or gaps w,d Ncur_
2
0
I~
I LA IL
Skimme 0
rn
Swimming Pool Q�a •�N
fu
Oam
Water I n I et*4 9*4,2m*1.Bm Main Drain*2 0 F"N,
D�F-2828 0 114•�#N�W11VA
Steel Panel Quantity:28pcs DN-2833 K"Znx nWf"
Steel Panel Quantity of Water Inlet:5pcs U-CR AJU09,
Pool Depth "AU,�11:
Pool Depth Steel Panel Quantity of Skimner:4pcs o o :. *jZ1R*M*jU
0.9m Steel Panel Quantity of Main Drain:2pcs 1.7m o o �
Normal Steel Panel Quantity :17pcs � o
Need to reserved 75cm for Triangular Support as the Sidewalk System,and
the triangular support also needs to add a square pipe as the system
0
E4
support for the walkway. o i
o MM
r*4 ;
1
AIMM
750 9000 750 ��'°°0 s
- O.
s
o
to reserved 75cm for Triangular s¢ :
1000 1000 1000 1000 1000 1000 10 0 0 10 0 0 1000 Support as the Sidewalk System n STEEL SKIM POOL
( I I ��� ( INSTAI"TION DWING
*Z:
ELUDE Qraull
0 0 0
0 0 0 0 0 0 061(
co 00 coC'O 00 CC) tea:
DU� DIATI)c
SUM
It*:
ca
1000 1000 i 1000 1000 690 , 690
Norol Steel Steel Panel Quantity Steel Panel Olantity Steel Panel Quantity Normal Steel Noncal Steel aye
Panel Auntity 1 of Water Inlet 1i of Win Drai of Ski mer Panel Quantlty 2 Panel Quantity 3 mrz 2021-07-1.3
, 9
�T. Guangzhou Denor Swimming Pool Equipment Co., Ltd.
Contact me:Wendy Jiang Mob:0086 13922230849
Tel: 86 2036313615 Fax: 020-86010188
Website:www.degaullepool.com E:denorswimpool@gzdenor.cn
Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
Proforma Invoice
CONTECT: Outdoor Steel Structure Swimming Pool
Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
SELLER: ADD:Room 520,5th floor,Z&Z Plaza,Pingsba 510440,Baiyun Dist,Guangzhou City,China
TEL:86 2036313615 FAX:020-86010188
CLIENT: Josh Fitzpatrick
CONTRAC DN0312-2020051901 CONTRAC 19-May-20
T NO.: T DATE:
This Price list just for the equipment supply,no including the transportation,equipment install etc,and we will
offer freely pool system drawing after received the 50%deposit.
No. Project Unit Price (USD)
Al Stainless Steel Structure System SET
A2 Swimming Pool Equipments SET
Total Price:
,.-41
_
�w
_n
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
� . C E 0 0 I
Contact me:Wendy Jiang Mob:0086 13922230849
Tel: 86 2036313615 Fax: 020-86010188
Webs ite:www.degaulIepool.com E:denorswimpool@gzdenor.cn
Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
Solution 1:Steel Structure Swimming Pool Price List
Pool Size:7.5*31.74.5m; Pool water volume:420; Cycle Time: 6h
Water Flow:70/h Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool Type:Outdoor Swimming Pool
NO. ITEM DETAILS UNIT UNIT TOTAL Position To
PRICE Q�"1' PRICE/ Picture Brand Set/Fuction
All Stainless Steel Structure System
Swimmping Width:lm
Height: 1.5m 2 Install it as the
I pool Thickness:2.0mm m 37 1 Degaulle pool wall
main structure Material:galvanized steel
2 Pool liner Width:1.83m 2 Install it in the
Thickness:1.2mm Tn 90 Made In China pool
Liner
Liner .-�
3 Insta Installing Accessories 2 Install it in the
g (Torch/Rail,layering,moldings/Fixed m 90 Made In China pool
Accessories naiUGlue.ete. Flpl-q
Install it around
4 Overflow Tank Overflow Tank m 32 Degaulle the pool for
overflow
Material:ABS
Size:25cm
5 Grating (This type of grating is more safe which m 32 Install it on the
can prevent pinch phenomenon and it is overflow tank
design for outdoor use)
Special For Steel Pool
6 Walking The Perimeter Of The Pool Extends m2 30 alloft Install it as
System 75CM walking system
(Suggest to buy it in local)
AMOUNT
A2 Swimming Pool Accessories M1
Auxiliary Install it on the
7 Drain Auxiliary Drain EM2832V PCs 1 bottom of pool
8 Main Drain Main Drain EM2833V pcs 1 = I Install it in the
pool wall
Initial Supply �_. Install it in the
9 Inlet Initial Supply Inlet EM2833V PCs 1 pool wall
Install it in the
10 Water Inlet Water Inlet EM2828V PCs 2 �'f pool wall
/ Install it in the
rSF415
n Gutter Drain EM2827V PCs .� 1 s.� overflow tank
Install it in the
Material:Stainless steal pcs 1 �� pool side as
er Step:4 steps pool steps
AMOUNT:
Above Amount (without tax)
TERMS&CONDITIONS:
Price Basis: Ex Works Factory
Payment: 50%Deposit, Balance transferred before shipping
Tax: ®RMo
oted above are excluded any tax.
Drawing: Construction Drawings of whole pool after 50%deposit payment
Packing: kage will be packed properly as per our standards.
Delivery Time: -35 days after deposit received.
Place Of OrginChina
Exchange RateB=1:7Noted: ming pool solution excluding pipes/electric wire/cable
BANK DETAILS:
Beneficiary: Guangzhou Denor Swimming Pool Equipment Co.,Ltd
Bank Account: 440 670 140 4000 3130
Swift Code: ABOCCNBJ190
Bank address: The Agriculture Bank Of China,Guangdong Guangzhou Huangshi Sub-Branch
Poo/
g n Buyer
P
[ Signature&Seal] 4 ature&S
J �
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
contact me:Wendy Jiang Mob:008613922230849
Tel: 86 2036313615 Fax: 020-86010188
Websitewww.degaullep001com E:denorswimpom rrgzdenor.cn
Seller.: Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
Solution 1:Swimming Pool Equibrll'cnts List Price
(Need The Machine Room)
PoolSI=7.5*3.7*1.5m; Pool wVervc1umeA2tn', CyeleTimei tih
WataFlow.Wlh Cycle Method:Downsuciun DisinfectionMethod:DrugDisinfeetion Pool Type:OutdoorSwlmmingPool
UNIT TOTAL pas 10nTo
NO IT ENI Pidnre ltrand
DETAII S UNIT PRICE/ Q PRICEN 3et/Fatedots
Al Swimming Pool Fntraftn System
Top mount Inlet Dia:1.5"Flow Rate: 19m'/h 1 Degaulle Install it as
I sand filter pc' requirement
Filtration Area: 0.35m' Load: 180KG
S700 0
Flow RATE-I9m3/h Head:15
as
Po 2 tw Degaulle
Inlet Diarnetcr.50mm
Okw Install it en
2 SWPB100 PCs requirement
amct
(One use One Spare)
AMOUNT: $610
A2 SWbnming'Pool Disinfection System
Des infection for intergrative pipeless pool }'
3 DN90014 filter cros 1 # a Degaulle Throw into the water
Four in one IQfloat (6 weeks use) R
pressure:1-5 (Bar),Flow:20-54 (L/H), Install it as
SEKO Dosing Pump head material: PCs 1 `+. Dcgaulle
4
pump AK5803 PVDF requirement
SEKO water quality
monitoring pcs 1 r•a•s� Degaulle Install it as
5 instrument i . requirement
K042
AMOUNT:
AJ Sw%uWngHeatingSystem
Ucall.owestTemperature:15-C Target Heating I'cnpct-aturr.2WC Initial Heating Time:48hours
number of horse:10
source C Rated voltage:380V/50Hz
D Max outlet water tem 55'C �. Install it as
6 Air source heat Net weighC260kg pcs ! Degaulle requirement
Pump Machine size:1450'725'1050mm
be used for water pump to collect hair and Install it as
7 Haircolleclor dirty thing from water PCs Aw I lowDegaulle requirement
FlowRATE:tlm3/h Head:15m as
j,
8 GD40-15 POWCLI.IkW PCs I /� Degaulle Install it
Inlet Diameter.50mm requirement
co a h
AMOUNT-1 imp
A4 Swimming Pool Cleaning System
(In order to savewater and labor cost.suggest to use Manual Cleaner with Automatic Cleaner Together)
Cable Length 20m
HJ2042L Filtration capacity:15.5m'At ---- Put it beside the pool
Filtration Capability.10/I0012OOµm and as for automatic
9 Auto pool Creeping speed:12.5nt/min PCs I Degaulle cleaning machine to
cleaner Waterproof IP grade:CleanerIP69 clean the pool
Weight of loaner(withoutcabl e):35kg
AMOUNT
boy�'�1tlonn(t><rlfhoutta:) t
d s-
TERMS&CONDITIONS:
Price Basis: Ex Works Factory
Payment 50%Deposit, Balance transferred before shipping
Tax: Prices Quoted above are excluded any tax.
Drawing: Will offer Construction Drawings ofwhole pool after 50%deposit payment
Packing: Each package will be packed properly as per our staudards
Delivery Time: Within 30--35 days after deposit received.
Place Of Orgin: Made In China
Exchange Rate: USD:RMB=1:7
Noted: This swimming pool solution excluding pipeslelectric wirelcable
BANK DETAILS: '_
Beneficiary: GuangzbouDenor Swimming Pool Equipment Co.,Ltd
Bank Account: 440 670 140 4000 3130
Swift Code: ABOCCNBJ190
Bankaddress: The Agriculture Bank Of China,Guangdong GuangzhouHuangshiSub-Branch
*�at Door
Buyer �,�l'Seller �I J4.
[Sign9ture&Seal] rr. ��� 1 mture&Sesl .a
• 7
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
Contact me:Wendy Jiang Mob:0086 13922230849 � s`
Tel: 86 2036313615 Fax: 020-86010188
Website:www.degaullepool.com E:degaulleswimpool@gzdenor.cn
Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
dubai-splash-steel-structure-swim min g-pool-pro j ect
t
h
I
I
I
_ 1
Proj ectduba i-splash-steel-structure-swimming-poo I-project
Pool Szie:10'5'1.5m Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool TypeAndoor Pool
Main Configuration:stainless steel sandfilter swimming pool filter
Taiwan Steel Structure Swimming Pool Project Cases
Project:Taiwan steel Swimming pool
Pool Szie:50*30*1.8m Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool Type:Indoor Pool
Main Configuration:Integrative swimming pool filter
c
M•
r
tI
lSome Certificates of Degaulle Products
UDEM UDEM UDEM
CERTIFICATE CERTIFICATE I CERTIFICATE
ATMMI]ON CMrMICATE AIM-MMON CBrOMAII ATtESTAWN CUMMATE
OYBECTYOMAGNEDC Of EIEC'BOMACNPDC OY IIECDtOMAGNEDC
COMTAURM AND�IDLW VOWG^E DI7lFCDV6 COMPA'ImMY AND�WW VOLTAGE DDWCWES COMPA'IDMY AND LOW VOLTAGE ZKECUV`
w—_ -— C E r-._ ... .r.0 E UDEMUstVr-
'..c+"
Declaration of Conforms
r_i�rY11 tY Declaration of Conformity
5
r.._ lifer O 2 k +ten i
GrUtic■ta of Conformity C■rtlflcato of Conformity certlOoat■of Coh6crolty
.r rrr.
.ram...__:- .... :■..,wu�..r.w.:r►r+u.....w.-. _. .�.,n.r.u...r....+.r�.r.r-.
rI-.+na r-N��_. .. - -:_■irlrrr�•�:. - ..-. •.\4rwrr�_Y! -
....i::i.C_:i •+-iiw+.�+1^•�.. °"'.."""-�.iY. w::__^.`-:.. rrrY■_c-ar .._�y�..
../__..-. arw..rA.■,L,FNrr4PAIY.Y.aw h....r...r��Y■rrr. :': _.. - r......r7.r'..�...r W.!.r
'...a.ir,A�ary„I..MI.^,rJ'...fF.. I...Ln.KMM.r.rYI.MK...K..+.c Wr.•a�.i Fla R,as.1..r.r....
rrr J■{{i..rri`�-_^ """.. ,..YSAM.r■�.1■,Yr'M..n1.K.•.M rr •r■an.aaAMAan.nr,\AI..nNa.
...r..»+Nr — w..K1+MRM.1Lln� _.i Y■A��.1._.__.ir.r�
.r..err r�r .J T■Y/.YA -_:: .ar.Yrr.r.rrr,r�Y� r.r�
...�^-r.n.►.^ n a,r.taY`Y _� r..Y»Y:....Y..Mr.�rr.w..rrn..rtr+�r tiWall.\.Yl..ro��YY�. �••�•
LL��®'-= ..YMI.\/.i\rY�.JWIJw..s.,l r��• 'YrY.. �1i1FYl.
�rl.11r��.—..-+�.+�-r—.�—....+~rir.-r... ar r—.rrr.w.r.• ` • r�rr .�
C E
CE C
CANCELLED
Some Certificates of Degaulle Products
UDEM UDEM UDEM
CERTIFICATE CERTIFICATE CERTIFICATE
ATEEMDON CERTIFICATE ATIES-MUON CERTIFICATE ATTESTATION CERTIFICATE
OF EIECIYOMAGNETIC OF EIECD7OMAGNEIC OF EIECTROMAGNEIC
COOMPAI TIM AND IOW VOLTAGE DIRECTIVES COMPAIMILM AND LOW VOLTAGE DMECIVES COMPAIBMY AND JLOW VOLTA,GE DIRECTIVES
r rr_....'u.�r�..`.....�rw-�c..•�.r' -.r... �,�A�r�`...-:�'�..�_rY..� "� -.....rrr...*..r:..�...`.."...'•i.`�...�'��—
"".r.r....._+......«...�=....C'r' .o-r....,.r...r.....--.ter
r.�rtx�r.rr c.rr�waw. � i.r..nr�. .rxa,r
rrrr�rnrrrrt rrn ....-air. i��,lm�x,.i,mun�iw� .x� Y�.Yrlrru•rr�a...
\x..r..ror .iii�a+n nlrn,rw.x�iUK w•••�•v w"�r n7+min r r/rr
xrn.s t• n.x.w.n��nw��ram,ir, irri.ylv''�J..rrwnv.Minstrwnvwn �.w..a"r.r/n.F nnora.nrra rrrarr,ur. —Z.
........�..�r.r. «..+..�� UDEM ...�...._ ._r_ •'+,•..�.�C~E IJ BEM '�«�' U El
1,6`�
4nx�pltkR30r1�_9rtCR'at��N"3k'.,�ll.k J�[p�.'�q($M�V1:1�2�Y�SW3m'-t�
c0
arati Declon of Conformity Declaration of Conformity
.,r .......r�.r..�r...�,r-......... `�...,,........r....,x..-+xx..,.r.r..... �i � z C
....a ao..�,a...,c sr4s�•w�'f+: Ara rR n,�, .-..�.,n aT4l� �n�� 23 5 ��
z ,
CE
K3 r/,Q r�'.3aY I
` I snfS,�f�n'�or�,ilJt�FSuF.yfl+n'Ire3x`4aRef!�R3en7D
Certificate of Conformity CortilIeSto of Oonformity Certificate of Conformity
r IOe. rAalAaxl...M1gM,eAW1M rxrc.,,.x,\,,r,arLxx�K r.�ne.r,r.Kxxa,rc '- x,rr�ra,+,Ifier\Y...Mrarn•v.
- eas ra....� ---- ,�A.ieo.nr+,o,rxwrxarPn�raxxPq w+' xrana PM.{r,I..N,\M1AI.Ma
^r�YasrwrrMrN�r � l,rwrrinrr.rrrrrrarrwrrr..«r.�ar e„r.rYrrr x\rKr\ro.rr\r�rr.rarxrr
,:� - erx.sww.\rrwYrOr.\r�Mrrr r Y_/.r r 11 YtlrwMrfW.J�WJY
r+Y ��/rr\rrx�x,r rrrr/r Y Nor �+i/rrr. /r\\
.x/..x,r/\rxr/r Y� rw,\rrrrx .rwrr.rrx.rrrarr a��
C E C E C E
w ,
fit%
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
t Of 017 S
Contact me:Wendy Jiang Mob:0086 13922230849
TO: 86 2036313615 Fax: 020-86010188
Websiteavww.degaullepool.com E:degaulleswimpool`r�rgzdenor.cn -Y
Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
dubai-splash-steel-structure-swimming-pool-project
Projectdubai-splash-steel-structure-swimming-pool project
Pool Szie:10'5'1.5m Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool TypeAndoor Pool
Main Configuration:stainless steel sandfilter swimming pool filter
Taiwan Steel Structure Swimming Pool Project Cases
Project:Taiwan steel Swimming pool
Pool Szie:50*30*1.8m Cycle Method:Downstream Disinfection Method:Dnig Disinfection Pool Type:lndoor Pool
Main Configuration:integrative swimming pool filter
r
V 6
1�• � i
{
1
l�
Flow RATE:I lm3/h Head:15m
as
8 GD40-15 Powerl.lkw PCs 1 Degaulle Install it
Inlet Diamcicr50mm requirement
co rt n
An7OUNT
Swimming Pool Cleaning System
A4 (In order to save water and labor cost,suggest to use Manual Cleaner with Automatic Cleaner Together)
Cable Length20m
HJ2042L Filtration capacity:15.5m'/h — Put it beside the pool
9 Auto pool Filtration Capability.10/1001200µm PCs 1 Degaulle and as for automatic
P Creeping speed:12.5m/min cleaning machine to
cleaner Waterproof IP grade:CleanerlP68 clean the pool
Weight of cleaner(withoutcable):35kg
AMOUNT
Above Amount{withouttaz) ,
Vice
*7;
TERMS&CONDITIONS:
Price Basis: Ex Works Factory
Payment: 50%Deposit, Balance transferred before shipping
Tax: Prices Quoted above are excluded any tax-
Drawing: Will offer Construction Drawings of whole pool after 50%deposit payment
Packing: Each packagewill be packed properly as per our standards.
Delivery Time: Within 30--35 days after deposit received.
Place Of Orgin: Made In China
Exchange Rate: USD:RAIB=1:7
Noted: This swimming pool solution excluding pipes/electric wire/cable
BANK DETAILS: '
Beneficiary: Guangzhou DenorSwimming Pool Equipment Co.,Ltd
Bank Account: 440 670 140 4000 3130
Swift Code: ABOCCNBJ190
Bank address: The Agriculture Bank Of China,Guangdong Guangzhou lluangshiSub-Branch
Buyer
I Signature&Sea❑ pig i nature&Seal .a
y
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
r
0
F
EN� aenE0086 13922230849
6010188 i
mpool@gzdenocen
pment Co.,Ltdolution 1:Swimming Pool 1 quionicnts List Price
(Need The Machine Room)
Pool Size:7.5.3.7*1.5m; Pool water volume:42m'; Cycle Time: 6h
WaterFlow:7m'/h Cycle Method:Dowmstream DisinfectionMethod:DrugDisinfection Pool Type:Outdoor Swimming Pool
UNIT �PRICE�f
Position To
NO ITE)•7 DETAILS UNfI PRICE/ QT Picture Brand Set/Fuction
At Swimming Pool Filtration System
p Install it as
To mount Inlet Dia:1.5"Flow Rate: 19m'!h PCs � 1 � Degaulle
I sand filter requirement
FiltrahonArea: 0.35m' Load: 180KG
S700 I&
Flow RATE:I9m3/h Head 15
r I.Okw ++•- - Install it as
Powe PCs 2 -ti Degaulle
2 SWPBIOO
[nlctDiameter50mm � - 1 rcgwrcmrnt
(One use One Spare)'._
ANIOUNT: $610
A2 Swimming Pool Disinfection System
Desinfection for intergrative pipeless pool
3 DN90014 filter ctns 1 Degaulle Throw into the water
Four m one 1Qfloat (6 weeks use)
pressure:l-5 (Bar),Flow:20-54 (L/H), Install it as
4 SEKODosing Pump head material: PCsAV
I Degaulle
pump AKS803 PVDF requirement
SEKO water quali
monitoring + 4 Install it as
5 8 PCs
Degaulle requirement
instrument
K042
- s
ANIOUNT:
A3 swimming HeatingSyste
Local Lowest Temperature:I5C Target Heating Temperature28l. Initial Heating Time:48hours
number of horse:10
Rated voltage:380V/50Hz
UGL-I000 Max outlet watertemp:55•C (a"Z � Install it as
6 Air source heat PCs I MIND Degaulle
u
NetweighC280kg reqremcnt
Pump Machine size:1450.725.1050mm
be used for water pump w collect hair and Install it as
7 Hair collector PCs Degaulle
dirty thing from water pv., requirement
/ Install it in the
11 Gutter Drain Gutter Drain EM2827V PCs � I � overflow tank
Install it in the
SF-415 Material:Stainless steel PCs I / pool side as
12 Pool Ladder Step:4 steps Y pool steps
AMOUNT:
Above Amount (without tax) .
r �
TER,17S&CONDITIONS:
Price Basis: Ex Works Factory
Payment: 50%Deposit, Balance transferred before shipping
Tax: Prices Quoted above are excluded any tax.
Drawing: Will offer Construction Drawings of whole pool after 50%deposit payment
Facking: tUSD:RMB=I:7
h package will be packed properly as per our standards.
Delivery Time: hin 30-35 days after deposit received.
Flace Of Orgin: de In China
Exchange Bate:
Noted: This swimming pool solution excluding pipes/electric wire/cable
BANK DETAILS:
Beneficiary: Guangzhou Denor Swimming Pool Equipment Co.,Ltd
Bank Account: 440 670 140 4000 3130
Swift Code: ABOCCNBJ190
Bank address: The Agriculture Bank Of China,Guangdong Guangzhou Iluangshi Sub-Branch
nH Oo!
Buyer �y�' e�er '"�„���.
[ Signature&Seal] ature&S
s
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
C E Ge
Contact me :Wendy Jiang Mob:0086 13922230849 '
Tel: 86 2036313615 Fax: 020-86010188
Webs ite:www.degauIIepool.com E:denorswimpool@gzdenoccn
i
Seller.: Guangzhou Denor Swimming Pool Equipment Co.,Ltd. 1
Solution 1: Steel Structure Swimming Pool Price List
Pool Size:7.5*3.7*1.5m; Pool water volume:42m'; Cycle Time: 6h
Water Flow:7m'/h Cycle Method:Downstream Disinfection Method:Drug Disinfection Pool Type:Outdoor Swimming Pool
NO. ITEM DETAILS UNIT UNIT TOTAL Position To
PRICE QT1 PRICE/ Picture Brand Set/Fuction
Al Stainless Steel Structure System
Width:Im
Swimmping
Height: 1.5m 2 Install it as the
Thickness:2.Omm
1 pool P 37 Degaulle
pool wall
main structure Material:galvanized steel
2 Pool liner Width:1.83m 2 Install it in the
Thickness:1.2mm m 90 Made In China pool
Liner Liner
3 Installing
Installing Accessories m 2 90 _ Made In China Install it in the
!
Accessories (Torch/Rail,layering,moldings/Fixed � pool
nail/Glue.etc. k
Install it around
4 Overflow Tank Overflow Tank m �- 32 4NOW Degaulle the pool for
overflow
Material:ABS
Size:25cm
5 Grating (This type of grating is more safe which m 32 �;: :Lti Install it on the
.::�r��.vv��•.
can prevent pinch phenomenon and it is �:: ,1:;` overflow tank
design for outdoor use)
Special For Steel Pool ("
Walking The Perimeter Of The Pool Extends 2 30 1 _ '' Install it as
6 m
System 75CM 4%10& walking system
(Suggest to buy it in local)
AMOUNT:
A2 Swimming Pool Accessories
Auxiliary Install it on the
7 Drain Auxiliary Drain EM2832V PCs 1 bottom of pool
8 Main Drain Main Drain EM2833V PCs I : Install it in the
pool wall
9 Initial Supply Initial Supply Inlet EM2833V PCs I Install it in the
Inlet pool wall
Install it in the
10 Water Inlet Water Inlet EM2828V PCs d^V* 2 pool wall
Guangzhou Denor Swimming Pool Equipment Co., Ltd.
Contact me:Wendy Jiang Mob:0086 13922230849
Tel: 86 2036313615 Fax: 020-86010188
Website:w%vw.degaullepool.com E:denorswimpool 1g gzdenor.en
Seller:: Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
Proforma Invoice
CONTECT: Outdoor Steel Structure Swimming Pool
Guangzhou Denor Swimming Pool Equipment Co.,Ltd.
SELLER: ADD:Room 520,5th floor,Z&Z Plaza,Pingsha 510440,Baiyun Dist,Guangzhou City,China
TEL:86 2036313615 FAX:020-86010188
CLIENT: Josh Fitzpatrick
CONTRAC DNO312-2020051901 CONTRAC ]9-May-20
T NO,: T DATE:
This Price list just for the equipment supply,no including the transportation,equipment install etc,and we will
offer freely pool system drawing after received the 50%deposit.
No. Project Unit Price (USD)
Al Stainless Steel Structure System SET
A2 Swimming Pool Equipments SET
Total Price:
1
TU0
Ln
Skimmer*4 0
rn
Swimming Pool �• *� �: • a
Water Inlet*4
9*4.2m*1.8m Main Drain*2 o rust®,--MANAIR*"
DN— 8828 Steel Panel Quantity:28pcs DN-2833
TNIEipiIQN.���+xfi
Steel Panel Quantity of Water Inlet:5pcs 'FAIL a�*��•ri
Pool DepthxT'Ae,n7 .
Pool Depth Steel Panel Quantity of Skimmer:4pcs
0.9m Steel Panel Quantity of Main Drain:2pcs 1.7m
Normal Steel Panel Quantity :17pcs CI*4 o
Need to reserved 75cm for Triangular Support as the Sidewalk System,and
the triangular support also needs to add a square pipe as the system
support for the walkway. O
o 41HR
750 9000 — AwalwSmSmM
- -
750 0 mi
,n
o ;
to reserved 75cm for Triangular ms:
1000 1 1000 1000 1 1000 1000 1000 1000 1000 1000 Support as the Sidewalk System T'STEEL sWIT Poo
I. I I INSTAIIATION ORATING
W8:
deeaTre uon3arc
- Will:
EzwME UUTIM
aEa GCF21
O O O O O O fit: Kni
O O OI O O O
00 00 OC) 00 OC) cc)
DRAMIG
STATUS
1000 1000 1000 , 1000 690 690 Intl
DRAM W
Normal Steel Steal Panel Quantity Steel Pwwl Quantity Steal Panel Quantity Normal Steal Normal Steel EIM
Panel Quantity 1 of Water Inlet of Win Drain of Skiiamer Panel Quantity 2 Panel Quantity 3 DATE 2021-07-13