Loading...
HomeMy WebLinkAboutBLD2024-00886 Bulkhead - BLD Inspections - 4/3/2025 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 SHELTON:360-427-9670, EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467, EXT 352 Building,Plmmng,Environmental Heslth,Community Hedldi ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2024-00886 Date Issued 11/27/2024 Issued By I/vl S Project REPLACEMENT RAMP&DOCK(NO PILINGS TO BE REPLACED ALL EXISTING) Site Address 510 N STANDSTILL DR SOUTH Applicant SINANAN MIKA&JENNIFER Contractor AMT DESIGN&CONSTRUCTION Contractor Phone 360-271-5796 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type BULKHEAD OR DOCK- Occupancy RESIDENTIAL -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building �Z� jc� Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other ��,r yl3�is Ire- "r Washington Department of Fish and HYDRAULIC PROJECT APPROVAL PO Box432134fe Olympia,WA 98504-3234 (360)902-2200 FISH MU DUPE Issue Date: 1/24/2025 Permit Number:2025-6-3WI Project End Date: 5/31/2025 Application ID:34752 APPLIES TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval(HPA)pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW.Additional authorization from other public agencies may be necessary for this project.The person(s)to whom this HPA is issued is responsible for applying for and obtaining any additional authorization from other public agencies(local, state,and/or federal)that may be necessary for this project. This Hydraulic Project Approval(HPA)shall be available on the job site at all times and all its provisions followed by the person(s)to whom this HPA is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval (HPA)is issued and operator(s)performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this HPA. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil action against you, including, but not limited to,a stop work order or notice to comply,and/or a gross misdemeanor criminal charge, possibly punishable by a fine and/or imprisonment. All Hydraulic Project Approvals(HPA)issued under RCW 77.55.021 are subject to additional restrictions, conditions,or revocation if the Washington Department of Fish and Wildlife determines that changed conditions require such action.The person(s)to whom this HPA is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. MINOR MODIFICATIONS TO THIS HYDRAULIC PROJECT APPROVAL(HPA):You may request approval of minor modifications to the required work timing or the plans and specifications approved in this HPA unless this is a General HPA. If this is a General HPA you must use the Major Modification process described below.Any approved minor modification will require the issuance of a letter documenting the approval.A minor modification to the required work timing means any change to the work start or end dates of the current work season to enable project or work phase completion. Minor modifications will be approved only if spawning or incubating fish are not present within the vicinity of the project.You may request subsequent minor modifications to the required work timing.A minor modification of the plans and specifications means any changes in the materials, characteristics,or construction of your project that do not alter the project's impact to fish life or habitat and do not require a change in the provisions of the HPA to mitigate the impacts of the modification. If you originally applied for your HPA through the online Aquatic Protection Permitting System(APPS),you may request a minor modification through APPS.A link to APPS is attts:t/tea 6h df ra,tva gov.,G. If you did not use APPS you must submit a written request for a minor modification to an existing HPA.Written requests must include the name of the permittee,the name of the authorized agent if applicable,the APP ID or HPA number,the date issued,the permitting biologist,the requested changes to the HPA,the reason for the requested change,the date of the request,and the requestor's signature. Send your written request by email to fi�AaDs_cati or by mail to Washington Department of Fish and Wildlife, PO Box 43234, Page 4 of 6 V Washington Department of Fish and Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 Olympia,WA 98504-3234 lr (360)902-2200 FISH&WILDLIFE Issue Date: 1/24/2025 Permit Number:2025-6-39+01 Project End Date: 5/31/2025 Application ID: 34752 other than a manufacturer must follow the field treating guidelines.These guidelines and best management practices are available at www.wwpinstitute.org. 14. Fully enclose and contain flotation for the structure in a shell(tub)or 20-25 mm polyethylene or polyurethane wrap.The shell or wrap must prevent breakup or loss of the flotation material into the water.The shell or wrap must not be readily subject to damage by ultraviolet radiation and abrasion. 15. Use of treated wood for decking is not authorized,but may be used for structural elements. Treated wood subject to abrasion by vessels,floats,or other objects must incorporate approved design features such as rub strips to minimize abrasion of the wood. Use of tires is not approved unless proper post-treatment for aquatic environments is performed. PROJECT DESIGN: 16. Do not construct skirting including batter fencing around the float 17. The replacement float must not exceed 8-feet of width or 10-feet of length. and the replacement ramp must not exceed 3-feet width or 12-feet of length. DEMOBILIZATION AND CLEANUP: 18. Do not relocate removed or replaced structures within waters of the state. Remove and dispose of these structures in an upland area above the limits of anticipated floodwater. 19. Upon completion of the project, remove all materials or equipment from the site and dispose of all excess spoils and waste materials in an upland area above the limits of anticipated floodwater. 20. Remove all trash in the project area, including concrete blocks or pieces,treated wood,drill shavings, cuttings, bricks,asphalt, metal,treated wood,glass, floating debris, and paper,that is waterward of the ordinary high water line and deposit upland. PROJECT LOCATION(S) #1 Location Sinanan Residence 510 N Standstill Dr S Hoodsport,WA 98548 Latitude Longitude County 47.425460000000000 -123.217960000000000 Mason WRIA Waterbody Tributary to 16 Lake Standstill Lake Standstill Page 3 of 6 Washington Department of HYDRAULIC PROJECT APPROVAL Fish and Wildlife PO Box 43234 Olympia,WA 504-3234 200 Ftsli awit ID:.,Fs Issue Date: 1/24/2025 Permit Number:2025-6-39+01 Project End Date: 5/31/2025 Application ID:34752 work or date the work was completed, and the permit number.The Washington Department of Fish and Wildlife may conduct inspections during and after construction; however,the Washington Department of Fish and Wildlife will notify you or your agent before conducting the inspection. REPORTING REQUIREMENTS: 6. PHOTOGRAPHS:You, your agent, or contractor must take photographs of the job site before the work begins and after the work is completed.You must upload the photographs to the post-permit requirement page in the Aquatic Protection Permitting System(APPS)or mail them to Washington Department of Fish and Wildlife at Post Office Box 43234, Olympia,Washington 98504-3234 within 30-days after the work is completed. INVASIVE SPECIES CONTROL: 7. Follow Method 1 for low risk locations(i.e.clean/drain/dry).Thoroughly remove visible dirt and debris from all equipment and gear(including drive mechanisms,wheels,tires,tracks, buckets, and undercarriage)before arriving and leaving the job site to prevent the transport and introduction of invasive species. For contaminated or high risk sites please refer to the Method 2 Decontamination protocol. Properly dispose of any water and chemicals used to clean gear and equipment.You can find this and additional information in the Washington Department of Fish and Wildlife's"Invasive Species Management Protocols", available online at hops:/twdfw.wa.gov/species-habitats/invasive/prevention. STAGING, JOB SITE ACCESS,AND EQUIPMENT: 8. Check equipment daily for leaks and complete any required repairs in an upland location before using the equipment in or near the water. 9. Equipment used in or near water must use environmentally acceptable lubricants composed of biodegradable base oils.These are vegetable oils, synthetic esters, and polyalkylene glycols. 10. Establish staging areas(used for equipment storage,vehicle storage,fueling, servicing, and hazardous material storage)in a location and manner that will prevent contaminants such as petroleum products, hydraulic fluid,fresh concrete,sediments, sediment-laden water,chemicals, or any other toxic or harmful materials from entering waters of the state. SEDIMENT, EROSION,AND POLLUTION CONTAINMENT: 11. Deposit waste material from the project,such as construction debris,silt, excess dirt,or overburden; in an upland area above the limits of anticipated floodwater. 12. Store all construction and deconstruction material in a location and manner that will prevent contaminants such as petroleum products, hydraulic fluid,fresh cement,sediments,sediment- laden water, chemicals,or any other toxic or harmful materials from entering waters of the state. CONSTRUCTION MATERIALS: 13. Do not use wood treated with oil-type preservative(creosote, pentachlorophenol)in any hydraulic project.Wood treated with waterborne preservative chemicals(ACZA,ACQ)may be used if the Westem Wood Preservers Institute has approved the waterborne chemical for use in the aquatic environment.The manufacturer must follow the Westem Wood Preservers Institute guidelines and the best management practices to minimize the preservative migrating from treated wood into aquatic environments.To minimize leaching,wood treated with a preservative by someone Page 2 of 6 Washington Department of Fish and Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 Olympia,WA 98504-3234 (360)902-2200 FISH&WA.DLIFL Issue Date: 1/24/2025 Permit Number:2025-6-39+01 Project End Date: 5/31/2025 Application ID:34752 PERMITTEE AUTHORIZED AGENT Mika Sinanan 510 N Standstill Dr S Hoodsport,Washington 98548 Project Name: Sinanan Dock Replacement Project Description: Replacing a float and ramp in the same footprint on Lake standstill.The float replacement will be built off site and floated across Lake Standstill and secured with a new pre-built ramp on the existing lakeside platform. PROVISIONS AUTHORIZED WORK TIMES: 1. You may begin the project on immediately and you must complete the project by 1/30/2030. PROJECT APPROVALS: 2. This approval is for the replacement of the existing ramp and float only and does not authorize the expansion of the structures or any new structures. 3. You must accomplish the work per plans and specifications submitted with the application and approved by the Washington Department of Fish and Wildlife,entitled"206252_New ramp and dock profile.PDF",last modified on APPS on 12120/2024,except as modified by this Hydraulic Project Approval.You must have a copy of these plans available on site during all phases of the project construction. NOTIFICATION REQUIREMENTS: 4. FISH KILLIWATER QUALITY PROBLEM NOTIFICATION: If a fish kill occurs or fish are observed in distress at the job site, immediately stop all activities causing harm. Immediately notify the Washington Department of Fish and Wildlife of the problem. If the likely cause of the fish kill or fish distress is related to water quality, also notify the Washington Military Department Emergency Management Division at 1-800-258-5990.Activities related to the fish kill or fish distress must not resume until the Washington Department of Fish and Wildlife gives approval.The Washington Department of Fish and Wildlife may require additional measures to mitigate impacts. 5. You or your agent must contact the Washington Department of Fish and Wildlife by e-mail at HPAepplications@dfw.wa.gov; mail to Post Office Box 43234,Olympia,Washington 98504-3234; or fax to(360)902-2946 at least three business days before starting work, [IF APPLICABLE ADD one day before removing the temporary bypass,]and again within seven days after completing the work.The notification must include the permittee's name,project location, starting date for Page 1 of 6 ..r Washington Department of HYDRAULIC PROJECT APPROVAL Fish and Wildlife PO Box 43234 Olympia,WA 98504-3234 (360)902-2200 F1 swu nit E Issue Date: 1/2412025 Permit Number:202"-39+01 Project End Date: 5/31/2025 Application ID:34752 to the Habitat Program Director or designee. If you are not satisfied with the results of the informal appeal, you may file a request for a formal appeal. B. FORMAL APPEALS:WAC 220-660-470 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures.The following information summarizes that rule: A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request a formal appeal of that action.You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision. You may serve WDFW by mail to the HPAAppeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia,Washington 98504-3234;e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the Habitat Program, Natural Resources Building, 1111 Washington St SE, Olympia,Washington 98501.The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, you may request a formal appeal within 30 days from the date you receive the Habitat Program Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal,the WDFW action shall be final and unappeasable. William Robinson For Director Regional Habitat Biologist r r DFW (360)890-5912 william.robinson@dfw.wa.gov Page 6 of 6 Washington Department of Fish and Wildlife rt , HYDRAULIC PROJECT APPROVAL PO Box 43234 .. Olympia,WA 98504-3234 (360)902-2200 'ISH.aihl:cLDLIF'E Issue Date: 1/24/2025 Permit Number:2025-6-39+01 Project End Date: 5/31/2025 Application ID: 34752 Olympia,Washington 98504-3234.You should allow up to 45 days for the Department to process your request. MAJOR MODIFICATIONS TO THIS HYDRUALIC PROJECT APPROVAL(HPA):You may request approval of major modifications to any aspect of your HPA.Any approved change other than a minor modification to your HPA will require the issuance of a new HPA. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a major modification through APPS.A link to APPS is if you did not use APPS you must submit a written request for a major modification to an existing HPA.Written requests must include the name of the permittee,the name of the authorized agent if applicable,the APP ID or HPA number,the date issued,the permitting biologist,the requested changes to the HPA,the reason for the requested change,the date of the request, and the requestors signature. Send your written request by email to or by mail to Washington Department of Fish and Wildlife, PO Box 43234, Olympia,Washington 98504-3234.You should allow up to 45 days for the Department to process your request. APPEALS INFORMATION if you wish to appeal the issuance, denial,conditioning,or modification of a Hydraulic Project Approval (HPA),the Washington Department of Fish and Wildlife(WDFW)recommends that you first contact the WDFW employee who issued,denied,or conditioned the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for further appeal action. If you proceed with an appeal,you may request an informal or formal appeal.WDFW encourages you to take advantage of the informal appeal process before initiating a formal appeal.The informal appeal process includes a review by WDFW management of the HPA or denial and often resolves issues faster and with less legal complexity than the formal appeal process. If the informal appeal process does not resolve your concerns,you may advance your appeal to the formal process. A. INFORMAL APPEALS:WAC 220-660-460 is the rule describing how to request an informal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures.The following information summarizes that rule: A person who is aggrieved by the issuance,denial,conditioning,or modification of an HPA may request an informal appeal of that action.You must send your request to WDFW by mail to the HPAAppeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia,Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946;or hand-delivery to the WDFW Habitat Program, Natural Resources Building, 1111 Washington St SE, Olympia,Washington 98501.WDFW must receive your request within 30 days from the date you receive notice of the decision. if you agree,and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference,or you are not the person who applied for the HPA,the HPA Appeals Coordinator or designee may conduct an informal hearing or review and recommend a decision Page 5 of 6 4 1�f ,42:43 P\4 APPS Agwtic ion Permitting System FISH d LAPPS KDLIFE My Dashboard Application Inspection eService My Account Hello,Mika Help Logout i,triG Abtititted Appiicadoos> Track My Submitted Apps 44 Back to Search (34752) Standard Hydraulic Project '+�„1 Total Forms:1 iJ Print Receipt Submitted by Mika Sinanan 's' Required Documents:1 (Non-Review:1 ) Go to Parent Submission J On 4/15/2024 12:23:50 PM(Remaining:45 days) 'i�} Inspections:2(Ongoing:0) Go to Child Submission Address:510 N Standstill Dr S,Hoodsport Application type:Standard Submitted-Afl 4,7 ��� ,��,� Components ! Project:Sinanan Dock Replacement-Simplified i� Assigned Habitat Biologist:alossom,Brian Included r Project Review Report 00 Mitigation Review Report Application Attachment Issued Letters/Permits Correspondence Post Permit Requirements Appeals Email History Inspections Click on Online Application link to view submitted application details;to view application submission in Word document format,click on Document version of the application. Application Basic Information Application ID: 34752 Application Name: Standard Hydraulic Project Submitted Date: 4/151202412:23:50 PM Submitted by: Mika Sinanan 510 N Standstill Dr S Hoodsport WA 98548 2062511099 mikasinananO9l3@gmaii.com Status: Submitted-All Components Included Application Form(s)Detail Online Standard HPA Application Form _] Standard Application- Document Version _] JARPA Form- Document Version hops:'www.govonlinesaas.�bm: :a� DF'NrviPubliel;('lientl�V:4_lt'DY-AN PermitlPages'ApplicationiApplicationSubmitl)ataEntry.aspa 1 2 4:` Pvt APPS Application Withdrawal Reason for Withdrawal: Application Review History 1-2 of 2 item 6 r it Submitted-All Components Included Mika Sinanan 04/15/2024 I . New Mika Sinanan 04/15/2024 Copyright:4 1994-2+J?,'enfoTech&Consulting Inc.will rights reserved. Terms of Use Privacy Statement ( Last.modified Time: 2024-03-05 0"#.40 PM j haps:';cW vw.govonlinesaas.com..Wl;N WDF1v!Public.Client 1t'A_NIDI"tV'PermiUPagec Application;ApplicationSubmitl)ataCntry.a px 12 &4 w Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-00886 BULKHEAD OR DOCK- RESIDENTIAL PROJECT DESCRIPTION: REPLACEMENT RAMP & DOCK (NO ISSUED: 11/27/2024 PILINGS TO BE REPLACED ALL EXISTING) SITE ADDRESS: 510 N STANDSTILL DR SOUTH HOODSPORT EXPIRES: 05/26/2025 PARCEL: 422055200044 APPLICANT: SINANAN MIKA&JENNIFER OWNER: SINANAN MIKA&JENNIFER 510 N STANDSTILL DR S 510 N STANDSTILL DR S HOODSPORT,WA 98548 HOODSPORT,WA 98548 206.650.5787 GENERAL CONTRACTOR'S LICENSE: AMT DESIGN&CONSTRUCTION License: amtdedc833jl PO BOX 1221 Expires: 04/13/2025 BELFAIR,WA 98528 360-271-5796 VALUATIONS: FEES: Paid Due Project Valuation (BID, 4600.00 $4,600.00 Planning Residential Review $240.00 $0.00 ESTIMATION..) Fee Technology Surcharge $4.72 $0.00 Plan Check Fee $80.00 $0.00 State Fee-Residential $6.50 $0.00 Building Permit Fee $156.00 $0.00 Total: $4,600.00 Totals : $487.22 $0.00 REQUIRED INSPECTIONS Framing Inspection BLD-Final Inspection CONDITIONS All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. Printed by:Anna Schaffran on:11/27/2024 08:43 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncoun"a.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2024-00886 * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. " All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. " Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth, minimum 12 inches, shall be observed below grade in undisturbed soils. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. .. ...... .. . .. . Printed by:Anna Schaffran on:11/27/2024 08:43 AM Page 2 of 3 f , Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2024-00886 All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * A Hydraulic Project Approval from the Washington State Department of Fish and Wildlife must be granted prior to commencing work.wdfw.wa.gov Review is for the ramp and floating dock ONLY. The upland platform and stairs were not evaluated in this permit. Any work on the upland structures must be evaluated to determine compliance. m. * Dock shall be grated to WDFW standards. `"____ ______________________ I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions(of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: ✓ Date: Y1 O Printed by:Anna Schaffran on:11/27/2024 08:43 AM Page 3 of 3