Loading...
HomeMy WebLinkAboutSEP2007-00081 Replace Floats - SEP Determinations - 8/10/2007 p�ON.STgTFo� MASON COUNTY C DEPARTMENT OF COMMUNITY DEVELOPMENT SN Planning Division N Y P O Box 279, Shelton,WA 98584 (360)427-9670 186A DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2007-00081 Description of Proposal Reconfigure and replace existing floats. New proposed float coverage is 4,862 sq. ft. A fuel dock will be installed at the end of the main float walkway. Proponent: NORTH FORTY TRANSPORTATION Location of Proposal: 5101 E STATE ROUTE 106 UNION Parcel Number: 322325001001 Legal Description: UNION HOOD CANAL LAND & IMP CO BLK: 1 LOT: 1-4 & Directions to Site: 1 7R8&9 0P8WWff. IA Route 106. Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Ryan Crater at ext. 577 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 8/23/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. . 2 Authorized Local Government Official Date MASON COUNTY ENVIRONMENTAL CHECKLIST T /U 0 O OO 1 MASON CO. ENVIROMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Union Marina Dock Replacement. 2. Name of applicant: North Forty Transportation LLC dba Hood Canal Marina 3. Address and phone number of applicant and contact person: 22526 SE 64t" Place Suite 210, Issaquah WA 98027. 425.369.9290. Authorized Agent: Wendell Stroud—Marine Floats Corporation, 1208 East `D' Street, Tacoma WA 98421. 253.383.2740. 4. Date checklist prepared: 5-29-07. 5. Agency requesting checklist: Mason County. 6. Proposed timing or schedule (including phasing, if applicable): No phasing involved. Project will be completed within seven days, upon issuance of all required permits. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: if yes, explain. No. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. A Biological Evaluation has been prepared for the ACOE permit. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. Several permits have already been issued (for the removal of a derelict barge and the addition of a fuel tank at the site). MASON COUNTY ENVIRONMENTAL CHECKLIST z 10. List any government approvals or permits that will be needed for your proposal, if known. A Mason County Shoreline Substantial permit and building permit, a WDFW HPA, and an Army Corp of Engineer Nationwide permit. 11.Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The existing floating docks at the Union Marina shall be reconfigured and replaced. The existing pier and ramp will remain. The existing float coverage is 4,864 sq. ft. and the new proposed float coverage is 4,862 sq. ft. A fuel dock shall be installed at the end of the main float walkway. The purpose of the proposed reconfiguration is to position the floats to be waterward of 0.0' MLLW to prevent grounding. The existing pilings shall also be replaced with 21 steel pilings. 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 5101 E SR 106, Union, Mason County, 98592, Quarter section NW of NW, Section 32, Township 22N, Range 03W. N47.213, W123.051. MASON COUNTY ENVIRONMENTAL CHECKLIST 3 B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other. b. What is the steepest slope on the site (approx. percent slope)? Approx. 90 percent at the toe of the beach. C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know classification of agricultural soils, specify them and note any prime farmland. Sand, gravel, and mud. d. Are there surface indications of history of unstable soils in the immediate vicinity: If so, describe. No. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. No filling or grading will occur. f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. No. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? The project will not impact impervious surfaces. The docks shall be grated. i MASON COUNTY ENVIRONMENTAL CHECKLIST 4 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: WDOE's Best Management Practices shall be followed throughout the project. HPA provisions and WAC Marina and shoreline construction provisions shall also be strictly adhered to. 2. Al R: a. What types of emissions to the air would result from the proposal (i.e. duct, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. Machinery exhaust is not expected to be excessive. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No. C. Proposed measures to reduce or control emissions or other impacts to air, if any: None. Emissions are expected to be minimal. 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. The Hood Canal. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes. Work shall be done from a barge. 1 MASON COUNTY ENVIRONMENTAL CHECKLIST 5 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Yes. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage, industrial, containing the following chemicals...,agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None. MASON COUNTY ENVIRONMENTAL CHECKLIST 6 C. Water runoff (including storm water): 1) Describe the source of runoff (including stormwater) and method of collection and disposal, if any (include quantities, if known). Here will this water flow? Will this flow into other waters? If so, describe. None. 2) Could waste materials enter ground or surface waters: if so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: None. The project will have no impact on surface, ground, or stormwater. 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other x_shrubs x_grass pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other x_water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? No vegetation shall be disturbed. C. List threatened or endangered species known to be on or near the site. Puget Sound Chinook salmon, bull trout, Hood Canal summer-run chum salmon, Puget Sound steelhead, the eagle, the killer whale, the humpback whale, the Steller sea lion, the leatherback turtle, and the marbled murrelet are all listed on the Endangered Species List and may be found in the area. MASON COUNTY ENVIRONMENTAL CHECKLIST 7 d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: A buffer of native plants shall be planted along the shoreline (landward of the existing bulkhead), as part of the fuel dock addition project. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other Mammals: deer, bear, elk, beaver, other Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. Puget Sound Chinook salmon, bull trout, Hood Canal summer- run chum salmon, the eagle, the killer whale, the humpback whale, the Steller sea lion, the leatherback turtle, and the marbled murrelet are all listed on the Endangered Species List and may be found in the area. C. Is the site part of a migration route? If so, explain. No. d. Proposed measures to preserve or enhance wildlife, if any: WDOE's Best Management Practices shall be followed throughout the project. HPA provisions and WAC Marina and shoreline construction provisions shall also be strictly adhered to. 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electricity shall be used to operate the fuel dispensing and waste pumping facilities at the site. MASON COUNTY ENVIRONMENTAL CHECKLIST 8 affect the po tential use of solar energy by adjacent Would our project p b. Y p properties: If so, generally describe. No. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Work to be completed as quickly as possible. 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. Best management practices will be observed to insure minimal impact. 1) Describe special emergency services that might be required. An on site accident could conceivably require medical assistance. 2) Proposed measures to reduce or control environmental health hazards, if any: Best management practices will be observed to insure minimal impact. b. Noise: 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Work shall take place during daylight working hours. Noise will not be more excessive than the noise from nearby SR106. MASON COUNTY ENVIRONMENTAL CHECKLIST 9 3) Proposed measures to reduce or control noise impacts, if any" Noise will not be more excessive than the noise from nearby SR106. 8) LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? The site is an operating marina. Adjacent properties are also commercial. b. Has the site been used for agriculture? If so, describe. No. C. Describe any structures on the site. A marina with a ramp and a floating dock, a 6,000 sq. ft. building, and a concrete bulkhead are located on the site. d. Will any structures be demolished? If so, what? Yes, the existing floating docks shall be removed from the site. e. What is the current zoning classification of the site? Rural Commercial- 3. f. What is the current comprehensive plan designation of the site? Unknown. i2inr�1 �����•'�y 0-r g. If applicable, what is the current Shoreline Master Program designation of the site? Urban commercial. h. Has any part of the site been classified as an "Environmentally sensitive" area? If so, specify. Not that I know of. MASON COUNTY ENVIRONMENTAL CHECKLIST 10 i. Approximately how many people would reside or work in the completed project? Approximately 6. j. Approximately how may people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None. i. Proposed measure to ensure the proposal is compatible with existing and projected land uses and plans, if any: The project will improve the existing marina, which should benefit local businesses and residents. 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None. b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income housing. None. C. Proposed measures to reduce or control housing impacts, if any: None. 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The new pilings will be approximately the same height as the existing. MASON COUNTY ENVIRONMENTAL CHECKLIST 11 b. What views in the immediate vicinity would be altered or obstructed? None. C. Proposed measure to reduce or control aesthetic impacts, if any: None. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. C. What existing off-site sources of light or glare may affect your proposal: None. d. Proposed measures to reduce or control light and glare impacts, if any: None. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? The property is an existing public marina, so there is boating, fishing, etc. in the area. 12 MASON COUNTY ENVIRONMENTAL CHECKLIST b. would the proposed project displace any existing recreational uses? If so, describe. No, it would enhance recreational use at the site. C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None. 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None that I know of. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None that I know of. C. Proposed measures to reduce or control impacts, if any: None. 14. TRANSPORTATION a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. SR 106. Access to remain unchanged. b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. Unknown. The site is located on SR 106. C. How many parking spaces would the completed project have? How many would the project eliminate? Unknown. MASON COUNTY ENVIRONMENTAL CHECKLIST 13 d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Yes. There is an operating marina on the site. f. How many vehicular trips per day would be generated by the completed project. If known, indicated when peak volumes would occur. None. g. Proposed measures to reduce or control transportation impacts, if any: The access and parking is be reconfigured to meet current regulations. 15. PUBLIC SERVICES a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No. b. Proposed measures to reduce or control direct impacts on public services, if any: None. MASON COUNTY ENVIRONMENTAL CHECKLIST 14 16. UTILITIES a. Circle utilities serrrvicle telelable at hone,san sanitary sewer,electricity, septic natural system, other: water, refuse s p b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date submitted: 'd Z � a , i 1 1, Hood Canal , ! I I e m�• ID �__iq - Inc mecnor. � i pp6 �n . �rcnoart ............� f ..as.n .......a.�a� F... wrcr+wc ••. lL 6 a Existing c - Building I I W 8 f n _ -yam I \y � / .u,aw nnw _ �. Ye � \•L cwc s,xs '. Y I 5 N ° c I ,N cz I C fi co c 6 2J9.99 • R 0 o •� e � N Site Plan i®1 ----- Restaurant t ' ! Qa