HomeMy WebLinkAboutSEPA Dock Blanket DNS - SEP Determinations - 7/22/1986 R U.).,-, ANDREA BEATTY RINIKERDirector STATE OF WASHINGTON DEPARTMENT OF ECOLOGY" Mail Stop PV-11 • Olympia, Washington 98504-8711 • (206) 459-6000 July 22, 1986 I JUL 23 1986 Patti Miller-Crowley Mason County Department GENERAL SERVICES of General Services Courthouse Annex 1 North Fourth & West Cedar P.O. Box 186 Shelton, WA 98584 Dear Ms. Miller-Crowley: I have reviewed your letter regarding "blanket" DNS's for building docks on specified lakes in Mason County. I have the following comments: 1. A DNS which covers multiple docks is an acceptable procedure under SEPA if the threshold determination was made taking into account the cumulative probable significant adverse environmental impacts of all proposed docks. This, in my opinion, could only be accomplished if there were specific dock construction criteria, which I understand is the case. Also, this presupposes that the lakeshore is such that there are no sites which are so environmentally sensitive that a dock would create a significant adverse impact. 2. I have some difficulty with the DNS only applying to certain contractors. Would the impacts differ if an individual were to build his/her own dock assuming the dock criteria were met? 3. The issuance of an expiration date on a DNS is somewhat complicated. Presumably, a DNS is valid unless conditions change which would make adverse impacts likely. An arbitrary "expiration" date does not seem to fit with this criterion. However, SEPA does provide for withdrawing a DNS if there are significant adverse environmental impacts (WAC 197-11-340(3)(a)(ii). If, as I understood you to say, each individual dock requires a building permit and if those permits have not been issued prior to obtaining new information, the DNS may be withdrawn. What I am suggesting is that Mason County may wish to review the DNS and conditions on an annual basis to see if new information under WAC 197-11-340(3) exists and if so, withdraw the DNS. While this would not technically be a part of the DNS, i.e. , expiration, it would seem to be a means of achieving the same objective. � 3 � A Patti Miller-Crowley July 22, 1986 Page 2 4. The other route we discussed is the issuance of the DNS for a specific number of docks. This would ensure periodic review and avoid cumulative impacts from sneaking up on you. I hope this is of some assistance and if you want to discuss it further, please give me a call at 459-6018. Sincerely, Marvin Vialle Environmental Review Section MV:bjw TO DATE TIME AM FROM /Z PM AREA CODE c� EXT. M E ono S S 2 Gov IL A QOQ G E SI ED PHONED[] BACK CALL RNED❑ SEE YOU ❑ Mj AFL❑ WAS IN DppF i K � MASON COUNTY DEPARTMENT of GENERAL SERVICES Courthouse Annex I N. Fourth & W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 426-5593 building environmental health maintenance parks&recreation planning sewer&water July 3, 1986 Marvin Vialle Department of Ecology Mail Stop PV-11 Olympia, Washington 98504 Dear Mr. Vialle: At long last I am writing you a summary of the conversation we had several weeks ago. Last year Bill Kingman (previous Mason County Planner) issued what I will call "blanket" DNS's for two Mason County contractors. Mr. Kingman had the contractor prepare a single checklist for all minor new construction and repair on an individual lake. Thus the checklist was defined generically (common impacts) and geographically (defined lake) . I believe that Mr. Kingman felt this action was covered under WAC 197-11-060 3,c,ii p. 4 of the SEPA rules. These checklists were prepared for Mason and Wooten Ickes. Bill then put an expiration date on each checklist to allow for annual review. Db comments to the contrary were received on this activity last year. This year, I had the contractors submit new "blanket" checklists with a new expiration date. Additionally, a new checklist was submitted for any new minor construction on Phillips Lake. Kari Rokstadt-Samuelson of DOE called me and told me that this action is not allowed under SEPA. She said I could adopt an existing checklist, but if a hydraulic permit was required there would still need to be a 15 day review period for each proposal. Since the Department of Game has issued "blanket" hydraulic permits to the contractors for minor new construction on each individual lake, I cannot understand the purpose of the review period. During our conversation I explained the situation to you and asked where in the SEPA rules it says that you cannot issue a checklist that covers similar activities in a limited geographical area. I do not propose to issue "blanket" DNS's for saltwater or wherever a "blanket" hydraulic permit has not already been issued. You informed me that you could not put an expiration date on environmental checklists and suggested I limit the number of docks or bulkheads per checklist to allow for periodic review. I am agreeable to this suggestion. I believe that the 15 day review period in these cases serves no purpose. The Department of Game is already aware of the work since a "blanket" hydraulic permit for the contractor has been issued. The only comment I _ ever receive from DOE on a lake dock or bulkhead is a form letter which tells me to make sure that the project is consistant with the Shoreline Master Plan, a fact of which I am already well aware. Vialle/DOE July 3, 1986 Page 2 Contractors have a very limited building season in this area. Often a neighbor will see work being done and will want his done at the same time to save expense. A 15 day review period for ' these minor projects is an unnecessary hardship. Finally, Mr. Vialle, I too am concerned about the cumulative impact of these projects and therefore am willing to limit the number of projects per checklist as you suggested. However, I believe that the best way to address this problem would be through an amendment of the Shoreline Master Plan. I am requesting that Mason County be allowed to use the "blanket" DNS's that we have already issued. In the future any "blanket" DNS issued to a contractor would be under the conditions you suggested. Sincerely, 1 /V W tti Miller-Crowley Planner PMC/jJ co 6 AILZ44 . -(P'``�'� �� '�°�- .�� cam.) • ' S� Z� AIO TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY A. BACKGROUND: 1. Name of proposed project, if applicable: D frvC-?.C: - , 2. Name of applicant: h Ak e- S 4vi 3. Address b phone number of applicant b contact Person: 7 /�� 2- E c t/ �, f��� 1,v,�v C c3n �, o &'y /0SS> 134? doh 4. Date checklist prepared: 5. Agency requesting checklist: ��ys�� �O�-✓� 6. Proposed timing or schedule (including phasing, if applicable) : gf •7� 7 cf 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal? If yes, explain. 14,1L' 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be neede for your proposal, if known. // /'ol /),p/ -,0 V,'I 1,4 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description. ) Dam (a ,.� s�7vct•�i.. odes a (?y s� `-ec-,/-• Is 00 b91urs w� , Uh l� cx,n_4 !'P,T�cI F/Arv,;I�q 1 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. yY) a s a �e B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one) : Flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and not any prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. 2 TO BE COMPLETED BY APPLICANT EVALUATION FOR a AGENCY USE ONLY e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. i f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. : 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. H/A C. Proposed measures to reduce or control emissions or other impacts to air, if any: N/A 3 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) of the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicated the source of fill material. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. 4 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example, Domestic sewage: Industrial, containing the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. C. Water Runoff (including storm water) : 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. 2) Could waste materials enter ground or surface waters? If so generally describe. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, others water plants: water lily, eelgrass, milfoil, other 5 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. What kind and amount of vegetation will be removed or altered? C. List threatened or endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: S. ANIMALS: a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other mammals: deer, bear, elk, beaver, other fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. C. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. N/A 6 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Would you project affect the potential use of solar energy by adjacent properties? If so, generally describe. H/A C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: N/A 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 1) describe special emergency services that might be required. N/A 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise. 1) What types of noise exists in the area which may affect your project (for example: traffic, equipment operation, other)? N/A 2) What types of levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. 7 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3) Proposed measures to reduce or control noise impacts, if any: 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? b. Has the site been used r agriculture?foIf so, describe. C. Describe any structures on the site. d. Will any structures be demolished? If so, what? e. What is the current zoning classification of the site? f. What is the current comprehensive plan designation of the site? g. If applicable, what is the current shoreline master program designation of the site? h. Has any part of the site been classified as an 'environmentally sensitive' area? If so, specify. i. Approximately how many people would reside or work in the completed project? N/A J. Approximately how may people would the completed project displace? N/A 8 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY k. Proposed measures to avoid or reduce displacement impacts, if any: N/A 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 9. HOUSING: a. Approximately how may units, if any, would be provided? Indicate whether high, middle, or low- income housing. N/A b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low- income housing. N/A C. Proposed measures to reduce or control housing impacts, if any: N/A 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? b. What views in the immediate vicinity would be altered or obstructed? C. Proposed measures to reduce or control aesthetic impacts, if any: 11. LIGHT AND GLARE: a. What type of light or glare will the proposal produce? What time of day would it mainly occur? N/A 9 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY b. Could light or glare from the finished project be a safety hazard or interfere with viers? N/A C. What existing off-site sources of light or glare may affect your proposal: N/A d. Proposed measures to reduce or control light and glare impacts, if any: N/A 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so, describe. C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so generally describe. b. Generally describe any landmark or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. C. Proposed measures to reduce or control impacts, if any: 10