HomeMy WebLinkAboutHPA-Spanning Stream with Structure and Temp. Crossing - BLD Permit / Conditions - 3/18/1997 HYDRAULIC PROJECT
a APPROVAL
R.C.W. 7 5 . 2 0 . 10 0
R.C.W. 7 5 . 2 0 . 103
March 18 , 1997
DEPARTMENT OF FISHERIES ;aoo.icanz snouic refer to this date in all corresDonaence)
PAGE 1 OF PAGES
BLAST NAME FIRST ,181CONTACT PHONE(S) ;.CONTROL NUMBER
L�-- Bent , Edwina — \'408) 372-02__
, , 00-A2392-0_
!l9', STREET OR RURAL ROUTE Ii7 18 79 WRIA
24 Caribou Court — 14 . 0136
CITY SATE ZIP 114i 117!
Monterey, -3940 1
12 UATER TRIBUTARY TO I1111 TYPE OF PROJECT
Unnamed Tributary Hooa Cana- —Spanning Stream-
13 pUARTER SECTION TOWNSHIP RANGE(E-W) COUNTY
------ with Structure
n &
`-sEcoN NE 25 22N --03W -- Mason
Temp. Crossing
5 THIS PROJECT MAY BEGIN ib!!AND MUST BE COMPLETED BY
TIME LIMITATIONS : June 15 , 1997 Oct . 30 , 2001-Pry 2
THIS APPROVAL IS TO SE AVAILABLE ON THE JOB SITE AT ALL TIMES AND ITS PROVISIONS FOLLOWED BY THE PERMITTEE AND OPERATOR PERFORMING
THE WORK.
nIMMINT GFNERAL PHO SIONS ON REVERSP 41DF. OF APPMVAI.
NOTE : The agency logo, address, and phone number at the top of this
Hydraulic Pro]ect Approval (HPA) are incorrect . The correct
address is : Washington Department of Fish and Wildlife (WDFW) ,
600 Capitol North, Olympia,p ia, WA 98501-1091 . Any comments or
questions on ..his specific ec�fic HPA should hould be directed to the Area Habitat Biologist (AHB) identified at the bottom of the HPA.
Fish passage is not a concern at this site .
1 . Work shall be accomplished per plans and specifications submitted
to WDFW, except as modified by this HPA. A copy of these plans and
this HPA shall be available on site during construction.
2 . ADDITIONAL TIMING !,IMITATIONS: Work below the ordinary high water
line (OHWL) shall only occur between June 15 and September 30 of
calendar ears 1997 and 1998 . Reveetation per Provision 18 shall
g
be completed no later than October 30th the year the culvert is
installed and shall be monitored through October 30, 2001 .
3 . All work shall be accomplished duriuy a low-flow Pc=_.,.. ••-------
the time limitations per Provision 2 .
4 . The temporary culvert or bridge used to move ecruipment . and supplies
to the opposite side of the stream, shall only remain in place
between Tune 15 and September 30 of calendar years 1997 and 1998 .
This structure shall be installed and maintained to pass all
anticipated flows with consideration of the debris likely to be
encountered.
!
SEPA: DNS, Mason County, October 15, 1996
REGIONAL HABITAT MANAGER G. Mitchell (3 6 0) 4 9 5-3 0 6 8
PATROL Oh_ae 029 rp3 i
APPLICANT - WILDLIFE - READER - PATROL - HAB/MGR. - WRIA
DIRECTOR
DEPAR'_=NT OF FISHERIES -
H`=DRAULIC PROJECT
Ell
APPROVAL
R.C.W. 7 5 . 2 0 . 10 0
R.C.W. 75 . 20 . 103
DEPARTMENT OF FISHERIES I4 t March 18 , 1997
(applicant snoutd refer to this date in all corresponaence)
PAGE a OF PAGES
101LAST NAME
�18iCONTACT PHONE(S) f�CONTROL NUMBER
Bent , Edwina — (408) 372-0211 I - 00-A2392-01
121WATE
Unnamed Tributary WRIA
14 . 0136
i
5 . The structure shall be installed to maintain structural integrity
` c `he 100-ve r -.e t
a � ak i_oc� with consideration of the debr; s
-
to be encountered. -
6 . If a culvert is used, it shall be installed and maintained to avoid
inlet scouring and to prevent erosion of stream banks downstream of
the project .
7 . Clean angular rock may be used to armor the inlet and the outlet
of the culvert . The rock shall be installed to withstand 100-year
peak flows . River gravels, other round cobbles or concrete shall
not be used as armor.
8 . Fill associated with the structure installation shall be protected
from erosion to the 100-year peak flow.
9 . If a temporary culvert culvert is used, it shall be installed in
the dry or in isolation from stream flow by the installation of a
bypass flume or by pumping the stream flow around the work area.
10 . A sandbag revetment or similar device shall be installed at the
bypass inlet to divert the entire flow through the bypass .
11 . The bypass shall be of sufficient size to pass all flows and debris
for the duration of the project .
12 . Prior to releasing the water flow to the project area, all bank
protection or armoring shall be completed.
13 . Upon completion of the project, all material used in the temporary
:wpass and the temporary crossing snaii be removed from the `site and
the site returned to preproject or improved conditions .
i4 . Erosion control methods shall be used to prevent silt-laden water
From entering the stream. This may recnzire the use of straw bales,
filter Fabric, tempora sediment gg
filled burlap bags or other material and/orcimmediate mulchinVeof
exposed areas . Accumulated silt shad be removed with the filter
fabric, straw bales or check dams upon completion of the pro ect and
the burlap bags shall be slit to allow the pea gravel to disperse
downstream.
15 . Prior to startina work, temporary filter fabric, straw bale, or
pea gravel-filled burlap bag check dam (s) shall be installed
sownstream. Accumulates sediments shall be removed during the
project and prior to removing the check dam (s) after completion of
worx .
I
1
REV 10/16/88
HYDRAULIC PROJECT
APPROVAL
R.C.W. 7 5 . 2 0 . 10 0
R.C.W. 75 . 20 . 103
7 March 18 , -- - I
DEPARTMENT OF FISHERIES (applicant should refer to this date in all corresoonaence)
PAGE 7aOF 2 PAGES
10 LAST NAME ,18 CONTACT PHONE(S) I;CONTROL NUMBER
Bent , Edwina — 408i 372-021_ L 00-A2392-01
121WATE 19 IWRIA
�Tnnamed Tributary �— 14 . 013 6 i
I
16 . Imported fill which will remain in the stream after temporary
crossing removal shall consist of clean, rounded, uniformly-graded
gravel ranging in size from 1/4 to three inches in diameter.
17 . Affected streambed and bank areas outside the temporary crossing
and associated fill shall be restored to preproject configuration
or better following construction.
18 . Disturbance of the streambed and banks shall be limited to that
necessary to place and remove the temporary crossing. The
temporary crossing and fill shall be removed, and the disturbed
bed and bank areas shall be reshaped to preproject configuration.
Within 7 calendar days of project completion, all disturbed areas
shall be protected from erosion using vegetation or other means .
Within one year of project completion, the banks shall be
revegetated with native or other approved woody species . Vegetative
cuttings shall be planted at a maximum interval or 3 feet (on
center) and maintained as necessary for three years to ensure 80
percent survival .
19 . As mitigation for the loss of stream and its function due to the
house spanning the stream the applicant, through the authorized
agent David Grellier, shad maintain a vegetative, native plant,
woody buffer along the remainder of the stream through their
ownership.
LOCATION: Take Hwy 101 north from Shelton, right on Hwy 106 or Purdy
Cut-off Road, go about 16 miles, site is on right E 11170 Hwy
106 .
rh
CC : David Grel.ler, Atelier Northwest , Inc .
2625 NE John Carlson Road
Bremerton, Washington 983i
I
I
I
i
REV 10/16/88