HomeMy WebLinkAboutDepartment of the Army Ref. 200601082 - PLN General - 9/4/2007 DEPARTMENT OF THE ARMY
SEATTLE DISTRICT,CORPS OF ENGINEERS
P.O.BOX 3755
• SEATTLE,WASHINGTON 98124-3755
REF 4 LoU1 RECEIVED
REPLY TO v
ATTENTION OF
� AA '/
Regulatory Branch ��� ova O� _17 —D 005 o KP 10 2001
426 W. CEDAR ST.
Ms. Edwina Bent and Mr. Gorden Kauhanen
1165 Castro Road
Monterey, California 93940
Reference: 200601082
Bent, Edwina &
Kauhanen, Gorden
Dear Ms. Bent and Mr. Kauhanen:
The U.S. Army Corps of Engineers' (Corps)regulatory program provides for the
authorization of certain work that is minor in nature, would not have significant individual or
cumulative impacts on the environment, and should encounter no appreciable opposition by a
type of permit known as a"Letter of Permission" (LOP). After reviewing your application for
Department of the Army authorization to install a moorage float using existing piling, we have
determined that the proposed work meets these requirements and is authorized by this LOP. The
proposed work would occur in Hood Canal, Puget Sound near Belfair, Mason County,
Washington. The purpose of the proposed project is to provide water related recreation and boat
moorage.
Your authorization to conduct the proposed work under this LOP is contingent upon you
conducting the work as shown in the enclosed drawings dated September 8, 2006, which are
made part of this permit; in compliance with the enclosed Letter of Permission General
Conditions; and the following special conditions:
a. You must implement and abide by the Endangered Species Act (ESA)requirements
Biological Evaluation dated August 18
and/or agreements set forth in the informal gi gu , 2006 in its
entirety. The U.S. Fish and Wildlife Service (USFWS) concurred with a finding of"may affect,
not likely to adversely affect"based on this document on August 15, 2007 (USFWS Reference
Number 1-3-03-I-0093). The National Marine Fisheries Service (NMFS) concurred with a
finding of"may affect, not likely to adversely affect"based on this document on
May 3, 2007(NMFS Reference Number 2006/05329). Both agencies will be informed of this
permit issuance. Failure to comply with the commitments made in this document constitutes
non-compliance with the ESA and your U.S. Army Corps of Engineers permit. The
USFWS/NMFS is the appropriate authority to determine compliance with ESA.
-2-
b. In order to protect Chinook salmon,bull trout, surf smelt and pacific herring, the
permittee may conduct the authorized activities from July 16 through September 14 in any year
this permit is valid. The permittee shall not conduct work authorized by this permit from
September 15 through July 15 in any year this permit is valid.
Failure to comply with the commitments made in the Biological Evaluation constitutes
p to
non-compliance with the ESA and your Corps permit.
Your authorization to conduct the proposed work under this permit expires SEP 4 2010
Please remember that failure to comply with the terms and conditions of this LOP, including any
special conditions, invalidates your authorization and could result in a violation of Federal law.
Any change in the plans for this work will require that you submit revised drawings to this office
and receive our written approval of those changes prior to conducting the work. If you object to
this permit decision, you may request an administrative appeal under our regulations as described
in the enclosed Appeal Process Fact Sheet and the Notification of Administrative Appeal Options
and Process and Request for Appeal form.
Upon completing the authorized work, you must fill out and return the enclosed
Certificate of Compliance with Department of the Army Permit form to the address indicated on
the form. Your signature on this form is our assurance you have conducted the work in
accordance with the terms and conditions of this LOP, including all special conditions.
We have reviewed your project pursuant to the requirements of the Endangered Species Act
(ESA). After consulting with the National Marine Fisheries Service and/or U.S. Fish and
Wildlife Service, we have determined that this project will meet the requirements of the ESA
provided you comply with special conditions "a"and"b" listed above. We have also reviewed
your project pursuant to the requirements of the Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, and determined that the
proposed action will not adversely affect Essential Fish Habitat for federally managed fisheries in
Washington.
While this project will not require further authorization from us, please note that it must
comply with all State, local, and other Federal requirements that may apply. For example, you
may need to obtain a Shoreline Substantial Development Permit from Mason County and/or a
Hydraulic Project Approval from the Washington Department of Fish and Wildlife. You should
also contact the Washington State Department of Natural Resources before starting work for a
determination of leasing requirements for work over submerged lands. For further information,
we recommend you contact the Washington Department of Ecology's Permit Assistance Center
at (800) 917-0043 or, on the Internet, at http://�,m,w.eey.wa. oilpro�ramslvea/pacl,
r
-3-
Thank you for your cooperation during the permit process. Your efforts help us protect our
nation's aquatic resources. Please remember to fill out and return the compliance certification
form within 30 days of completing the authorized work. We are interested in your thoughts and
opinions concerning your experience with the U.S. Army Corps of Engineers, Seattle District's
Regulatory Program. Please complete a Customer Service Survey form. The form is available
on our website at www.nws.usace.anny.mil click on Regulatory—Regulatory/Permits. At your
request, we will mail you a paper copy that you may complete and return to us by mail or fax.
A copy of this letter without enclosures is being furnished to Marine Surveys &Assessments
at 521 Snagstead Way, Port Townsend, Washington 98368. If you have any questions about this
letter or our regulatory program, please contact Mr. Jim Green at telephone (206) 764-6906 or
via email fames.d.grreen(a,,usace.army.mil.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
ichael McCormick
Colonel, Corps of Engineers
District Engineer
Enclosures
ry� .J���aJY �"ter��\\\\ \�\b/�`a'..a► // _I�
•' fir} f��.....` `\\"y�Il� � �
_ r/I;/`� ��f � l• � � �. �_ •Lid/ i
woI wit
n
IMM
CIA
lot I
•. 1 ' 1• 1 71 1
era �
� m
r
i
rr
HOOD CANAL
0' 25' 50' 100,
are
e Xr`5`fi�+►g,
- 200'
PROPOSED
FLOAT
STRUCTURE
- 150'
78'
96'
— 100,
• 150'
EXISTING PIER,RAMP
AND FLOAT — 50'
All dimensions
are approximate
85' �
NATURAL SHORELINE
SR 106
BENT AND KAUHANEN FLOAT PROJECT
SITE PLAN
08/16/06
s�ee+ z. o�3
g S ep 2 �
2' .E One of four
existing piles
Bent and Kauhanen 22' One-foot Gratin
Moorage Float grating g Depth ranges from
-5.0' to -8.0' in
the float area
• 6'
IE 5'�tF-15'iI
0' 5' 10'
TN
Approximately 78'
Zoo<Po l 082.
Existing pier, gc►�t f ;'�Q�ka���
ramp and f ioat�.-`
structure i I 100' to
beginning of �heG� 3 o-F 3
pier Z-0erG
I