Loading...
HomeMy WebLinkAboutSPI2003-00062 - SPI Inspections - 5/22/2003 i f ' Py�rl ST,oTFo� MASON COUNTY o A o N DEPARTMENT OF COMMUNITY DEVELOPMENT > S N Planning Division o Y y P O Box 279, Shelton,WA 98584 of to (360)427-9670 1864 Site Inspection May 22, 2003 GORDON KAUHANEN 24 CARIBOU CT MONTEREY CA 93940 Case No.: SP12003-00062 Parcel No.: 322251400030 Project Description: IDENTIR�Y APPROPRIATE SYSTEM DESIGN THAT WILL BE ACCEPTABLE TO PLANNING DEPARTMENT Dear Applicant As part of this departments review of your permit application, a Site Inspection (SPI) was performed on your property. Below you will find comments made regarding the proposed development and its critical values. In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must be included in your specific proposal; these setbacks are included as part of the comments listed below. This information is based on County and State regulations as they exist to date. These regulations may change and may affect the requirements fdr development of the subject property. Please contact me at(360) 427-9670,ext. 363 if you have questions. Sincerely, Diane Marcus Jones Land Use Planner Mason County Planning Department 5/22/2003 1 of 3 SP12003-00062 /011" ' 5/22/2003 Site Inspection ✓ Case No.: SP12003-00062 comments: The purpose of the preinspection was to determine the applicability of planning regulations in relation to the proposed project of reconfiguring and repairing a pier/ramp/float system. The subject property is located along the south shore of Hood g Canal. A site inspection was done on 5/16/2003. Project Overview: At the present time, existing pilings are located on the project site. The pilings extend out to approximately 198 feet from the Ordinary High Water Mark. The float system, ramp and pier materials that constitute a completed structure are no longer evident. The applicant representative states that these materials blew away in a storm approximately one year ago. The Mason County Shoreline Master Program, Chapter 7.08, allows for normal, maintenance and repair of existing structures which can be, "comparable to its original condition, including but not limited to its size, shape, configuration and location within a reasonable period after decay or partial destruction, except where repair involves total replacement." A reasonable period of time for repair is up to one year after decay or partial destruction. In terms of the proposed project and applicability of planning regulations and review, it is important to verify the actual timeline of destruction of the float and ramp system. The timeline will determine if the proposed project is regarded as a Shoreline exemption under "normal, maintenance and repair" or require a Shoreline exemption/Substantial development permit (dependent on cost of replacing dock). It will also determine if the configuration and size of the pier and dock can remain, as described, prior to its destruction. Current regulations, per the Mason County Shoreline Master Program permit piers and docks in salt water to a maximum length of 100 feet from the Ordinary High Water Mark. The structure, as described, extending 198 feet from the Ordinary High Water Mark would under present regulations be defined as a non-conforming development (Chapter 7.08). Providing documentation of when the structure was destroyed is the responsibility of the applicant. If the timeline has lapsed, the proposed project would be reviewed as a total replacement and required to be configured and sized, in accordance with current regulations. In addition to Shoreline Master Program compliance, the proposed project would require SEPA review, Mason County Building Permit, a Mason Environmental Permit and Habitat 5/22/2003 2 of 3 SP12003-00062 Site Inspection 5/22/2003 Case No.: SP12003-00062 Management Plan and a Joint Aquatic Resources Permit Application. Additional permits may be required by other agencies. Enclosed for your convenience is a packet of materials that explain these requirements and appropriate permit applications. 5/22/2003 3 of 3 SP12003-00062