HomeMy WebLinkAboutBLD2004-00985 Cancelled Pier/Ramp/Float - BLD Permit / Conditions - 8/2/2006 Ins
tion Line 36 )427262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (36)427(96700,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
irp, Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2004-00985
OWNER: GORDON KAUHANEN
CONTRACTOR: LAKESHORE CONSTRUCTION LICENSE: EXP-. RECEIVED: 6/22/2004
SITE ADDRESS: 11170 E STATE ROUTE 106 UNION ISSUED: 8/3/2004
PARCEL NUMBER: 322251400030 PERMIT EXPIRES: 2/3/2005
LEGAL DESCRIPTION: TR 3 OF LOT 1 &T.L. 11170 STATE ROUTE 106 r}Ut'tw-
VOID BY �EQX�R(RATION
PROJECT DESCRIPTION: DIRECTIONS TO SITE: n-V !lam" '"
PIER/RAMP/FLOAT 1 MILE WEST OF TWANOH STATEPARK
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: OT No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: ACC Fire Dist.: 6 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement: DOCK 588
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
SEPA?:
Model: Width: Ft. Rear: Ft. Slope: Ft. Shoreline Desi
Side 1: Ft. g"
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee NJP 6/22/2004 $267.44 S22004
Planning Review Fee NJP 6/22/2004 $155.00 S22004
Building State Fee LDK 7/8/2004 $4.50 S22004
Building Permit Fee LDK 7/8/2004 $411.45 S22004
Total $838.39
BLD2004-00985 Please referto the following pages for conditions of this permit. 1 of 5
7/28/2004
Conditions Associated With 9:57:19AM
Case#: SEP2003-00058
1 300 Aquatic Vegetation Shading NOT MET 11/20/2003 DMJ
The pier,ramp,floa,and associated moorings shall be located to avoid shading of eelgrass and other aquatic
vegetation.X o-M"
2) 310 Enclosed Floatation NOT MET 11/20/2003 DMJ
Floatation for the structure shall be entirely enclosed contained to permanently prevent the breakup or loss
of the floatation material into the water.X
3) 260 Erosion Control NOT MET 11/20/2003 DMJ
Residential developers and individuals shall be required to control erosion during construction. Removal of
vegetation should be minimize areas disturbed should be restored to prevent erosion and other
environmental impacts.X
4) 320 Debris Removal NOT MET 11/20/2003 DMJ
Debris or deleterious material resulting from construction shall py r v d from the beach area and project site
and shall not be allowed to enter waters of the State. X
5) 330 Water Quality Degradation NOT MET 11/20/2003 DMJ
Water q I' it: be degraded to the detriment of the aquatic environment as a result of this project.
6) 340 Recreational Piers NOT MET 11/20/2003 DMJ
Recreational piers shall be no higher than 11 feet abo higher high water. Piers and docks shall have at
least an eight foot span between pilings. X feet
7) 350 Floating Surface Structure Size NOT MET 11/20/2003 DMJ
The surface of ng s ctures shall be a minimum of eight inches about the surface of the
water.X
8) 360 Intermittent Supports NOT MET 11/20/2003 DMJ
All floating structures shall include t e t supports which run parallel to the shoreline to keep structures
off the tidelands at low tide.X
9) 1 SHORELINE MANAGEMENT ACT NOT MET 11/20/2003 DMJ
The proposed project must be consistent with all applicable policies and other provisions of the Shoreline
Management Act,its rules and the Mason County Shoreline Master Program.
x QV
y
10) 1 ALL NECESSARY PERMITS REQUIRED NOT MET 11/20/2003 DMJ
All other necessary permits from Mason County,Washington State and/or Federal Agencies that are required
for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND
CONSTRUCTION(Dept.of Fish and Wildlife,US Army Corps,DOE Water Quality Concurrence).
xZ�&ee
11) 1 COMPLIANCE NOT MET 11/20/2003 DMJ
The proposed dock shall comply with all conditions of the WDFW HPA and US Army Corps permits that are
required for this project.
x
12) 1 LENGTH RESTRICTIONS NOT MET 11/20/2003 DMJ
Per the Shoreline Master Program,the total length of the proposed project shall not extend waterward further
than either 100 feet or minus 3 tide,whichever is more landward.
x
Page I of 1 caseconffido,s..rpt
7/28/2004
Conditions Associated With 9:58:03AM
Case #: MEP2003-00032 -
Z�
Hermit Condition 6 Status Updat
item# Code Title Status Changed By age ate y
1) 40 Fisheries H.P.A. NOT MET 3/8/2004 DMJ
A Hydraulic Project Approval from the Washington State Department of Fish+Wildlife must be granted prior
to construction.
2) 45 DOE Erosion Control NOT MET 3/8/2004 DMJ
Proper erosion and sediment control practices must be used on the construction site and adjacent areas to
prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to
any clearing,grading,or construction. These control measures must be effective to prevent soil from being
carried into surface water by stormwater runoff. Sand,silt,and soil will damage aquatic habitat and are
considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state
is in violation of Chapter 90.48 RCW,Water Pollution Control,and WAC 173-201A,Water Quality Standards
for Surface Waters of the State of Washington,and is subject to enforcement action. Any work in or adjacent
to waterways that will adversely affect water quality must receive specific prior authorization from the
Department of Ecology pursuant to WAC 173-201A-110. A short-term water quality standards modification
may be issued if the proponent agrees to a number of specific construction practices and techniques designed to
minimise water quality impacts. All areas disturbed or newly created by construction activities must be
revegetated using bioengineering techniques,clean durable riprap,or some other equivalent type of protection
against erosion when other measures are not practical.
3) 4 Dept.of Ecology-Water Quality NOT MET 3/8/2004 DMJ
A water quality standards modification will be required from the Department of Ecology for this project(WAC
173-201-035(8)(e)).
4) 60 Erosion Protection NOT MET 3/8/2004 DMJ
KAll upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given an
equivalent type of erosion protection(silt fencing or straw matting).
5) 100 Construction Debris Removal NOT MET 3/8/2004 DMJ
All construction and demolition debris must be removed from the beach after project completion. Proper
disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality
10 degredation of State waters.
6) 170 Temporary Erosion Control NOT MET 3/8/2004 DMJ
Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent
y� waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become
established.
7) 200 Site Plan NOT MET 3/8/2004 DMJ
Approved per dimensions and setbacks on submitted site plan.
Page 1 of 1 CaseConditions..rpt
7/28/2004
Conditions Associated With 9:59:37AM
Case#: BLD2004-00985
Status U da
Title Status Changed By Tag Da By
1 31 Shading of Aquatic Vegetation NOT MET 7/6/2004 DMJ
The pier,ramp,fl at,and associ to moo ings shall b loctated to avoid shading of eelgrass and other aquatic
vegetation.X
2) 32 Flotation Enclosure NOT MET 7/6/2004 DMJ
Floatation for the structure shall be entirely encl sed and contain d to pe ently pr ent the breakup or loss
of the floatation material into the water.X � � L
3) 34 No Degradation of Water Quality NOT MET 7/6/2004 DMJ
X Water is not to be�degr e��the detriment of the aquatic environment as a result of this project.
�1t049,/l�t••
4) 35 Recreational Piers NOT MET 7/6/2004 DMJ
Recreational piers shall be no higher than 11 feet above mean hig er hi water. Piers and docks shall have at
least an eight foot span between pilings.X e� O e.1 �►
5) 36 8 Inch Minimum Surface-Floating NOT MET 7/6/2004 DMJ
The s ace of floa g s cturres shall be a minimum of eight inches above the surface of the water.
6) 37 Intermittent Supports NOT MET 7/6/2004 DMJ
All floating structures shall include ' temvtte2t �ports which run paral 1 to the shoreline to keep structures
off the tidelands at low tide.X
7) 40 WDFW HPA NOT MET 7/6/2004 DMJ
A Hydraulic Project Approval from the Washington State Department of Fish+Wildlife must be granted prior
to construction.
X
8) 45 DOE Erosion Control NOT MET 7/6/2004 DMJ
Proper erosion and sediment control practices must be used on the construction site and adjacent areas to
prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to
any clearing,grading,or construction. These control measures must be effective to prevent soil from being
carried into surface water by stormwater runoff. Sand,silt,and soil will damage aquatic habitat and are
considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state
is in violation of Chapter 90.48 RCW,Water Pollution Control,and WAC 173-201A,Water Quality Standards
for Surface Waters of the State of Washington,and is subject to enforcement action. Any work in or adjacent
to waterways that will adversely affect water quality must receive specific prior authorization from the
Department of Ecology pursuant to WAC 173-201A-110. A short-term water quality standards modification
may be issued if the proponent agrees to a number of specific construction practices and techniques designed to
minimize water quality impacts. All areas disturbed or newly created by construction activities must be
revegetated using bioengineering techniques,clean durable riprap,or some other equivalent type of protection
agams rosion whe therm as ur s are not practical.
XG .�
9) 47 Dept.of Ecology-Water Quality NOT MET 7/6/2004 DMJ
A water quality standards ruodification will be r quir from the Department of Ecology for this project(WAC
173-201-035(8)(e)).
10) 50 Corps Permit NOT MET 7/6/2004 DMJ
A Section 10 Permit(Rivers and Harbor Act of 1899)or exemption must be anted by the b'Co s of
Engineers prior to work within navigable waters of the United States.X
11) 60 Erosion Protection NOT MET 7/6/2004 DMJ
All upland areas disturbed or newly created by construction activities shall a seeded,ve e�ttaat�t d or iven an
equivalent type of erosion protection(silt fencing or straw matting).X�/rcu <
Pagel of 4 CaseConditions..rpt
7/28/2004
Conditions Associated With 9:59:38AM
Case #: BLD2004-00985
i�
Permit Condition 3 Status Updated
item od ; TitleOWN
Status Changed By Tag Date A6 By
12) 70 Shoreline Management Act NOT MET 7/6/2004 DMJ
The proposed project must be consistent with all applicable policies and other provi ns of the Sh rel'ne
Management Act,its rules,and the Mason County Shoreline Master Program.XA �t�isi
13) 100 Construction Debris Removal NOT MET 7/6/2004 DMJ
All construction and demolition debris must be removed from the beach after project completion. Proper
disposal of construction debris must a on land m%�f=r that deb ' cannot enter or cause water quality
degredation of State waters. X r�
14) 141 Treated Pilings NOT MET 7/6/2004 DMJ
All new treated piling to be used for this project shall recieve a post treatment vacuum of two hours at not less
than 22 inches of mercury. Subsequent to release of the vacuum, the piling shall be steamed for a two hour
period followed by eec/co'n'd v��a uum of four hours at 22 inches of mercury.
XL�/r/�I-� 11L�r
15) 140 Wood Treatments NOT MET 7/6/2004 DMJ
Pressure treated wood must be completel dry prior to lac ent in water. Use f creosote or
pentachlorophenol is prohibited. X
16) 170 Temporary Erosion Control NOT MET 7/6/2004 DMJ
Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent
waters or wetlands. ilt f ncmg m t be installed and maintained until upland vegetation has become
established. X 60IM7,
17) 180 Safe Condition- Docks NOT MET 7/6/2004 DMJ
Dock facilities must be maintained in a safe and sound condition. X �2 /�/ //Gt�t�2�tG�✓
18) 200 SITE PLAN NOT MET 7/6/2004 DMJ
Approved per dimensions and setbacks on submitted site plan.Setbacks are measured from the furthest
projec ' n of the structur .
X
19) 200 SITE PLAN NOT MET 7/6/2004 DMJ
Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest
projecti structure.
X
20) 320 All Necessary Permit Required NOT MET 7/6/2004 DMJ
All other necessary permits from Mason County,Washington State and/or Federal Agencies that are required
for this proposed de o m t d. nstruction must be obtained PRIOR TO SAME DEVELOPMENT AND
CONSTRUCTION.X_
21) 330 ACOE PERMIT NOT MET 7/6/2004 DMJ
A Department of the Army permit shall be obtained prior to the performance of any activities waterward of the
mean higher high water mark or ordinary high water mark or in wetlands. Ple4F c tact the US Army Corps of
Engineers,Regulatory Branch,P.O.Box 3755,Seattle,WA 98124. X
22) 5030 CHANGES TO APPROVED PLANS NOT MET 7/6/2004 DMJ
All changes to"approved"building plans that effect compliance with the Uniform Codes as amended and
adopted,or any other Mason County ordinance or regulation,must be reviewed and approved by Mason
County or c nstruction.
23) 5510 Property Lines NOT MET 7/6/2004 DMJ
All prope 1' s s all be clearly identified at the time of foundation inspection.
X
Page 2 of 4 CaseConditions..rpt
7/28/2004
Conditions Associated With 9:59:38AM
Case#: BLD2004-00985
l
Status. Updated
Title Status Changed ' Date By
24) 1000 LENGTH RESTRICTION NOT MET 7/6/2004 DMJ
Per the Shoreline Master Program,the total length of the proposed project shall not extend waterward further
than either 1,000'or minus 3 tide whichever is more landward.
x� 4Y,�
25) 1000 PILINGS REMOVAL AND REPLACEMEM NOT MET 7/27/2004 DMJ
The proposed project will remove nine existing creosote pilings. Replacement of four of the pilings(as
specified on the site map)with environmental benign materials waterward of the proposed pier,ramp and float
is allowed.The four replacement pilings will be in the same footprint, and have same structural dimensions
(height ) as existing pilings.
x �y
26) 1001 PLANS REQUIRED ON SITE NOT MET 7/8/2004 LDK
All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans
are not available on site,then approval will not be granted. In addition,a re-inspection fee(refer to current fee
schedule,minimum 1 hour)will be charged and must be collected by the Building Department prior to any
further inspec 'being performed or approvals granted.
X
27) 1002 POST ADDRESS NOT MET 7/8/2004 LDK
In accordance with the Uniform Building Code and Title 14,Mason County Building Code,"Standards for Fire
Apparatus Access Roads,"all new structures that require an address shall have approved numbers or addresses
located at the beginning of long driveways when the address is not clearly visible from the access road. The
numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast
with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A
re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed
if the o re r contractor fail to post the address on site prior to requesting inspections.
X
28) 1012 PLOT PLAN REQUIRED ON SITE NOT MET 7/8/2004 LDK
The"approved"plot plan is required to be on-site for inspection purposes. If an inspection is requested and the
"approved"plot plan is not on site,then approval will not be granted. In addition,a re-inspection fee(refer to
current fee schedule,minimum 1 hour)will be charged and shall be collected by the Building Department prior
X an er ' e tions being performed or approvals granted.
X
29) 5001 SPECIAL INSPECTION NOT MET 7/8/2004 LDK
1997 UBC Chapter 17,Section 1701. In addition to the inspections required by UBC Section 108,the owner
or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors
who shall provide inspections during construction on the types of work listed under UBC Section 1701.5. The
special ins toTsl duties&responsibilities shall be as specified in 1701.2 and 1701.3.
X
30) 5003 ALL CONSTRUCTION NOT MET 7/8/2004 LDK
All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved
and permi d c a s' cation. Any non-approved change of use or occupancy would result in permit revocation.
X
Page 3 of 4 CaseConditions..rpt
7/28/2004
Conditions Associated With 9:59:37AM
it Case#: BLD2004-00985
Permit Condition° Status U dated
item# Code Title Status Changed By T Da By
31) 5600 FINAL INSPECTION REQUIRED NOT MET 7/8/2004 LDK
All building permits shall have a final inspection performed and approved by the Mason County Building
Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be
documented in the legal property records on file with Mason County as being non-compliant with Mason
bounty o;ds and building regulations.
32) 5610 PERMIT EEXPIRATION NOT MET 7/8/2004 LDK
All permits expire 180 days after permit issuance,or 180 days after the last inspection activity is performed.
The Building Official may extend the time for action for a period not exceeding 180 days,upon the receipt of a
written extension request indicating that circumstances beyond the control of the permit holder have prevented
action fr b ' ken. No more than one extension may be granted.
X
33) 5700 PRESSURE TREATED LUMBER NOT MET 7/8/2004 LDK
Pressure treated wood manufactured after January 1,2004 may contain high concentrations of copper which
could quickly corrode metal fasteners,connectors,and fl tall metal connectors approved for contact
with the new types of pressure treated material.X
Page 4 of 4 CaseConditions..rpt
31) All building mits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a fi I inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
• Mason County finances and build' regulations.
X
32) All permits expire 1 days er permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period no x ding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevente on from being taken. No more than one extension may be granted.
X
33) Pressure treated w d m factured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and fl hing. I all metal connectors approved for contact with the new types of pressure treated material.
X
34) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-6 -0�82. The,perso0 signing this con ition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X e>
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of
work is by means of a progress inspection.The owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection. J
OWN ER OR AGENT: �� Gti�/li2st/ DATE:
BLD2004-00985 Please referto the following pages for conditions of this permit. 5 of 5
W ,
r
0
o CONCRETE MECHANICAL MANUFACTURED HOME
0
Footings /Setbacks Date By Ribbons
0
m Date By Gas Piping Date By
co
0, Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G / Slab Insulation Floors Final
Date By Date By Date By
FRAMING Walls FIRE DEPT
Date By Date B y Date B y
PLUMBING Attic OTHER
Groundwork Date By
Date By WALLBOARD NAILING
D.W.V. Date By
Date By FINAL INSPECTION
Water Line Date By
Date BY , f. .`: Date By
CD
1
0
C
0CC
G
1
8 O �i
b
Err
Cn
OF
'@ (X
C11
0
h
Reference: Bent,Edwina Materials:
App:Marine Surveys and Assessments
In:Hood Canal near Union Pilings:f9�•:�' treated,dass B,Doug[a
Floats:4 ALIA training lumber,flc•ation is
Purpose: Recreational use of pier,ramp& polystyrene foam enclosed in polyethylene
float
Datum: MLLW resin shells
Pier:ACZA framing lumber,galvanized
Adjacent Property Owners:
fast
1) Lyle&H Ramp:prefabricated Stokes :
aluminum
2) William&Annette Simmons
Sheet 2 of 3 Date:tAaxeJ,, 4 Z FIGURE 2 Construction and site details are contained in
REVISED SITE PLAN the project Biological Evaluation
'Piling to
be replaced
2 piling to be removed a �/
NORTH
Proposed redesigned
961 dock
rl 150'
Concrete
bulkhead
czalwo
Concrete
100, bulkhead
72' Natural shoreline 4 MY
with overhanging 85,
vegetation 24'
SR 106
A
� C �
z m
� n
APPROVED m t-0 —
MASON COUNTY DCD PLA°°!; l���, n o
rn
SITE PLAN REQUIRED TO BE ON SITE .tA
4
CHANGES SUBJECT TO APPi2OVAL
By — >`� Date - y
w o �E7� �or,y • oa�4 y
> � a
o
w � v
U CQ
Lij 3 Access ramp
--> `O to pier FIGURE 3 REVISED PLAN AND ELEVATION VIEAS
142' r 10' 1 Gate to pier
0 by 50'pier 4'by 40'ramp 9 by 16 float
_ I
SR 106 White line
centerline at road edge AAHHW AG{fyy
Concrete 11-g
footing
1--^— ---1 Float sops on
al float Pilings W-LW
of
Z APPROVED
MASON COUNTY DCD PLANNING
SITE PLAN REQUIRED TO BE ON SITE
CHANGES SUBJECT TO APPROVAL
QSy4.2a: z-kn!t� —_ Date 7'07;L-oY I
I NORTH
I
g PhW _ t
will be removed
Sic exos6ng P&W
located beNween
12 136 and199
7-wide grating 50%gig
in Rost
Reterence: Bent,Edwina Materials:
App: Marine Surveys and Assessments
In:Hood Canal near Union Pilings:t9�•:�?^ treated,class B,Doug fir
Purpose: Recreational use of pier,ramp&
Floats:4 ALLA naming lumber,flc-ation is
float polystyrene foam enclosed in polyethylene
Datum: MLLW resin shells
Pier:ACZA framing lumber,galvanized
Adjacent Property Owners:
1) Lyle&Helen Stokes fastenings
2) William&Annette Simmons Ramp:prefabricated aluminum
Sheet 2 of 3 Date:lA,arel,-,Z5.Z FIGURE 2 Construction and site details are contained in
REVISED SITE PLAN the project Biological Evaluation
4 piling to
be replaced
2 piling to be removed a �/
NORTH
Proposed redesigned rasp
96' dock
150'
win
Concrete
bulkhead
r_-T5=
Concrete
100, bulkhead
72' Natural shoreline 501
with overhanging 85,
vegetfition 24�
SR 106
A
� C �
z rn
� c7
m � m
v o C
� o rn
-4
Materials:
Relerence: Bent,Edwina
App:Marine Surveys and Assessments Pilings:14=...-?r treated,class B,Doug fir
In:Hood Canal near Union Floats:4 NULA training lumber,flc•ation is
Purpose: Recreational use of pier,ramp&
polystyrene foam enclosed in polyethylene
float resin shells
Datum: MLLW Pier:ACZA framing lumber,galvanized
Adjacent Property Owners: fastenings
1) Lyle&Helen Stokes Ram prefabricated alum m
inu
2) William&Annette Simmons p�
FIGURE 2 Construction and site details arc contained in
Sheet 2 of Date:Pk0XC), L4 Z REVISED SITE PLAN the project Bolo ical Evaluation
4 piling to
• be replaced
2 piling to be removed �
NORTH
Proposed redesigned
96' dock
150'
Concrete
bulkhead
asPa�
Concrete
100, bulkhead CN
72' Natural shoreline 501
with overhanging 85'
vegetation 24'
SR 106
N C �
0%
rn
APPROVED n � rn_
MASC," CUUNTY DCD PLC► _'"'I " v D'
n o M
SITE PLAN REQUIRED TO BE ON SIT" 7D C rn
CHIANGES SUBJECT TO APPROVAL 711 �
By�!� °'-��- Date
l) in
F—
w o Joe
N Q
WC'2 Lu
CQ v
L.Li 3 Access ramp
r `O to pier FIGURE 3 REVISED PLAN AND ELEVATION VIEWS
112' 10, I
Gate to pier
i 6'by 50'pier 4'by 4U nwV 8'by 16 float
SR 106 White line
centerline at road edge
Concrete tiff
footing
F---2U Float sops on , A�.LW ...
al float piings
Of
APPROVED
MASON COUNTY DCD PLANNING
SITE PLAN REQUIRED TO BE ON SITE
CHANGES SUBJECT TO APPROVAL
By — Date,
- i
i I
j NORTH
1
9 OkW !
will be removed
Suc Ming pings
located betvmn —
135'and196
7-wide graft50%grating oe re�� b� <
in float q
Figure 1.Project vicinity map
d Hill
\ ��moo, �.:' J �. �• '`�,
or
_ O
{ !?? H It �y � � I � •, � �''�,
Sunny Flay � �� � ,R• � t-��..• -�\�_� � /,� �/
��� �;.o Via• ��� •+( / , .�_ \Il��, 0. �...
• ,1 i� f: J l l W
/r 019,
Project Site ` p f ,` ,✓• !!
� �' �•� �; ! �"�_,. ��.L �r=�- ":' Well t '
lEast Cromwell
r i ,
�� WrIl l,;�het
Ketners Point �C ble GP0 /� ��� /'s•
',' • s + l + + ,ice gyp. + ::{;Ji�•� / J8r
IF
•z Islsn$ �< 'G: ,� Ma$''aO�tia,,.\ • � � •
• . 36 +� O�ti .-Heights`' I {
100
T
Scale: 1 inch equals 2000 feet
Copyright(C)1997,Maptech,Inc.
— -- -—- - ---- Trunk Ramp and Float Project•24
MASON COUNTY PERMIT NO.
BUILDING PERMIT APPLICATION
426 W. Cedar • PO. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner I-I , , -. E PL- .i ra,,, d,, t<r , ,,,. ;, Company Name T,a,. 7,-,--k
Mailing Address 11176 F lo/,, Mailing Address 5kor,fir)- rr, -)f; ,
City ))a&) State 6)A Zip Code 22L `42 City State 0 Zip Code
Phone 34.0- RZ'Z—;Ziff Other Ph. Phone 7 6 2 9 Other Ph.
Lien/Title Holder Contractor Reg.# Exp.
E mail address jtal- Let t f f r tin c-otv, E Mail Address
Drivers Lic.# q=q
C,Z DOB •: �' A" Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Water System Name of Water System
PARCEL INFORMATION - 12 Digit Parcel No. Fire District
Legal Description 7-22N. t;6;5 u)
Site Address (Please include street name, street number and city) ///70is 5f -, 5').2
Directions to site I m,IP L4 .. st .,% Z7,) ,A ']I,f-- 7-1eP
Will timber be cut and sold in parcel preparation?Yes/,
Is property within 200'of Saltwater yes Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No )
TYPE OF JOB - New Add Alt Repair .Other PRIMARY RESIDENCE E] SEASONAL ❑
Use of Building Describe Work - )t ! ; ,
No.of Bedrooms No.of Bathrooms Square Footage - 1 st FI or 2nd Floor
3rd Floor Basement Deck Covered DeCK — .Other — Sq.ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No.of Bathrooms
Type of Heat Purchase Price $ Replacement Unit? Yes/No
Installer Name Certification No.
OVMVER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further
declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permis-
sion from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this applica-
tion or the
work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed.
X >r/ _ Y %)"�. '/", - % Date:
caner Owners Representative/Contractor (indicate which one)
� A ,FOR OFFICIAL,U E BEYONDTHI P INT
Accepted by: '_'PTTtnning Pd fCk# Date Bld Pdnl;4 Receipt
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department L
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal i f
FEES 42
Building Permit Fee Site Ins ection STf
Plan Review Fee EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation $ TOTAL FEES