Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MEP2014-00002 Dock - MEP Permit / Conditions - 3/13/2014
I �o,t,-STAT�rO MASON COUNTY A o N DEPARTMENT OF COMMUNITY DEVELOPMENT y Planning Division 0T = 7 N Y Y P O Box 279, Shelton, WA 98584 �0 7864 (360)427-9670 MASON ENVIRONMENTAL PERMIT March 13, 2014 MIKE KURESMAN 5606 NW BRYAN RD BREMERTON WA 98312 Parcel Number: 223195000095 Issued: 3/13/2014 Case Number: MEP2014-00002 Project Description: NEW FRESH WATER DOCK WITH PIERS ON WOOTEN LAKE. The following critical areas are present on this property: Long-Term Commercial Forest XX FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the oject as propos d or fails to comply with the standards of this ordinance. Authorized Local Government Official Date Mason Environmental Permit 3/13/2014 Case No.: MEP2014-00002 Conditions: 1.) Site Plan Approved per dimensions of structures and setbacks on submitted site plan; the April 17, 2012 plan has the configuration of retaining walls, walks, two sets of steps, paver sitting area, and native planting areas that are subject to this review. X OU11C Resource Ordinance The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. Future work within the vegetation buffer and shoreline critical area will be reviewed by the Dept. of Community Development prior to starting $uch work X k Shoreline Management Act The proposed project must be consistent with all applicable policies and other provisions of the Shoreline X anag�eme nt Act, its rules, and the Mason County Shoreline Master Program. WDFW Hydraulic Project Approval A Hydraulic Project Approval from the Washington State Department of Fish Wildlife must be granted prior to construction. For more information contact Habitat Biologists Gloria Rogers (Freshwater) at 360-249-1293 ext 249 or Margie Schirato (Saltwater) at 427-2179. X 1 !h : Construction Debris Removal All construction and demolition debris must be removed from the shore area after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X. KC 3/13/2014 Page 2 of 2 MEP2014-00002 RECEIVED JAN 2 4 2014 426 W. CEDAR ST. MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP 201 L4 - 0QQO a ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A,39.34, 58.17,76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: M ��Nt;Et_ allo 'foNt Mailing Address: Sloop aw tg re ydN AA o !3 K'Et►'E�To,-� �JA g8312 Work Phone: 3�0 1092- 6 i 3 1 Email Address: yK I�Ce k L 1�►.tR�sp.�ai.+ lkS. CoM Home/Cell Phone: 36a q81 -22`6 Fax#: 3 Lo (,q2 6 t31 If an agent is acting for the property owner during the permit process, complete#2. 2. AUTHORIZED AGENT Name: Mailing Address: Work Phone: Email Address: Home/Cell Phone: Fax# 3. PROJECT SITE Site Address: 181 KvJ y►,ou.,'3c��N �/�ew 1Rd To.�� Q Parcel #: a a 3 1 q - So - too 95 Legal Description: Directions to Site: 3 lobs t:Asi o� tsoAT Lau•ac a+Mp o*+ N t_ t< Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements,: 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): -To Foot' FLoATi NG VK 7. Describe why the action requiring this permit cannot be avoided. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes G 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records. Connected to Septic Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply Well 11. Type of Job(circle one): New Add Alteration Repair Demolition Other: MiCkotQI K�,�ESit'AN �t� .� I-C)g-J©ly Print Name Signature Date • r` i i b ��� off -- FeCT AD J4d DECEIVED FEB 1 2 2014 42.6 W, CEDAR S Cp ot PLANNING t=[VC 1 PLANNING: sET a�4�i ALL SETBACKS ARE MEASURED ` FROM THE FURTHEST [ PROJECTION OF THE BUILDING a zoG 1 i i 1 o a � 0 � t�[(ES 11,ldan dock in place i 1� f L iak