Loading...
HomeMy WebLinkAboutBRN2025-00019 - BRN Inspections - 3/28/2025 wI Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BRN2025-00019 BURN PERMIT PROJECT DESCRIPTION: BURN DEBRI ISSUED: 03/28/2025 SITE ADDRESS: UNKNOWN MASON COUNTY EXPIRES: 04/27/2025 PARCEL: 322247590120 APPLICANT: IDDINGS, EARL OWNER: BUNTINS ET UX MARK ERIC PO BOX 2755 HEATHER LYN BUNTINS-BLISS BELFAIR,WA 98528 CARPINTERIA, CA 93013 2063917502 FEES: Paid D= Burn Permit Fee $175.00 $0.00 Totals : $175.00 $0.00 REQUIRED INSPECTIONS Burn Inspection CONDITIONS After the burn is complete make sure the fire has not burned into the earth by checking the fire location for hot spots. ..................................................................................................•-----..... * Do not burn if wind is blowing more than seven (7)miles per hour. DO NOT BURN IF WIND BLOWING FROM ---------------------------------------------------------------------------------------------------------- * Upon completion of all conditions,applicant must have inspection&approval before ignition. Call(360)427-9670,ext. 352 ........... .................................................................................................... * A responsible adult and equipment shall be on site and in attendance at the fire while burning. Must provide 24 hour fire watch. ............................................................................................. ................. Fan required. * All materials must originate from the property on which the burning is to occur. * *IF BURNING WITHOUT CALLING IN,THE FIRE WILL BE EXTINGUISHED AT OWNERS EXPENSE AND POSSIBLE SUSPENTION OF PERMIT.* * All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. Printed by:Brittany King on:03/28/2025 09:36 AM Page 1 of 2 Mason County II Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BURN PERMIT BRN2025-00019 * Valid permit MUST be onsite while burning. If permit is not on site during burning the fire will be extinguished at your cost - -------- ------------------------------------------------------------------------------ ----------------------- * The following materials are prohibited and must not be burned: garbage,dead animals, asphalt, petroleum products, paints, rubber products,plastics, paper,cardboard,treated wood, construction/demolition debris, metal or any substance (other than natural vegetation)that releases toxic emissions, dense smoke,or obnoxious odors when burned. ---------------a.____...__.._.._.__-_------- * Each pile must be at least one hundred(100)feet from any structure and at lease fifty(50)feet from standing timber. ........................................................ ................ ..................... * Maximum pile size is twenty(20)feet in diameter,a minimum ten (10)feet firebreak must be constructed around each pile. ................................................................... ..................................... * Fire must be completely extinguished within three(3)days after ignition. ------------------------- ------------------------------------------------------------------ * APPLICANT'S MUST CALL 360.426.4441 EACH DAY TO REPORT BURNING ACTIVITY. .............................................................................................................. * The fire must not create a nuisance from smoke,obscure visibility on public roads and highways,or endanger life and property. ..................................................... ....... .-.................... . * Provide EXCAVATOR/DOZER(with fire extinguisher)on site with qualified operator. ............. ...... ...... ................................ * Access must be passable with 2 wheel drive vehicle. ----------------- ---------------- * Permit includes two(2)inspections maximum, additional inspections will require a re-inspection fee. (at current rate). * On Site Water is required for permits between April 15th and Oct. 15th.A pump truck or trailer with 300 gallons of water✓ " loaded and 200 ft of hose. (The pump must be capable of pumping 20 gallons per minute through a one inch(diameter)50 foot section of hose.) ............. ------------------------- ------------ * A BURN BAN when implemented by Fire Marshal will take effect as noted and all permits become null and void.After a bum ban. has been implemented,all fires must be extinguished immediately. - ----------------------------- -------------------- I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Brittany King on:03/28/2025 09:36 AM Page 2 of 2