Loading...
HomeMy WebLinkAboutSWG Onsite Survey ENGINEERING REPORT LARGER ON-SITE SEWAGE SYSTEM BELFAIR ELEMENTARY SCHOOL BELFAIR, WASHINGTON Owner: North Mason School District P.O. Box 167 Belfair, WA 98528 Attn: Chuck Jeu (206) 275-2883 Engineer: Art Anderson Associates 148 First Street Bremerton, WA 98310 Attn: James R. Levey, P.E. (206) 479-5600 Project Description: Modernization and additions to Belfair Elementary School Project Location: State Hwy 3, Belfair, Washington Tax Parcel No. $2332-40-60000 Existing System: The school presently consists of two buildings, each with its own septic tank and gravity fed drainfield. One is located southeast of the school and has a 3758 gallon septic tank with 556 L.F. of drainfield trench. The other is located northwest of the school and contains a 3600 gallon septic tank and 556 feet of drainfield trench. The existing system serves an occupant load of 460 students and staff. There are no showers in the building and the kitchen is only a serving kitchen so the design flow would be 10 gal/day/person or 4600 gallons per day. The required septic tank capacity is 6900 gallons compared to the combined capacities of the existing tanks of 7358 gallons. The combined length of drainfield trench for the two systems is 1206 feet. The loading rate per foot of trench length is 3.8 gal/lin ft. Domestic Water Source: Belfair Water District provides water to the school and surrounding properties. Land use: Present land use is residential on the north and south, public use on the west, and undeveloped on the east. Area Wells: The 1" = 20001 area map shows the site and drainfield locations. There are no wells within the area. Plan sheets Cl and C2 show the existing and proposed drainfield areas, structures, roads, parking, storm drainage system, site contours and water and sewer lines and drainage patterns. There is a small creek east and south of the new drainfield site. Geology and Soils: Detailed descriptions of the area geology and soils were prepared in reports by Grover way dated 16 Sep 88 and 27 Nov 88 . The soils are principally sandy, glacial tills. There is some evidence that periodic ground water seepage will occur during wet conditions. ' Location: The proposed drainfield area is located southwest of the school building. The drainfield is 150 feet from the school in an area with average slope of 1 .5%. Design Criteria: The design flow for the new additions is 10 gals. per person per day. The addition has no showers or kitchen. The occupancy of the new addition is 84 . The total daily design flow will be 840 gallons. The effluent loading rate for the drainfield is 0.8 gal/day/sq. ft. for the silty fine sand. The trenches will be 3 feet wide, and the total length will be 354 feet. The septic tank is sized for 1500 gallons with a scum storage area of 300 gallons. The baffles would permit buildup of sludge in the bottom before failure. Operation and Maintenance: This system will be operated and maintained by North Mason School District and district personnel will respond to emergencies, when warranted. Routine maintenance as outlined in O/M manual will be integrated into the district' s planned maintenance program. �S�5•w.�sLEVFY • Y A:/ ffii Q bFES 10NAFL4 G\