Loading...
HomeMy WebLinkAboutSHX2015-00036 JARPA DEMO and Redevelopment Culvert and Rerout Mindy Creek Multiple TPN - SHX Application - 5/7/2015 --------------- �} 04101—i-9i MAY 0 7 2015 Date received:US Army Corps ; WASHINGTON STATE of Engineers•Seattle Distnd 426 VTCEDA ST. � Joint Aquatic Resources Permit Agency reference#: S 20/ — Application (DARPA) Form' Z Tax Parcel#(s): 12 12 9'- y3- 00/06 ° y 3- 00115 USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. l 23 2q-y3- cau/ao _ 1232-q y _-a?i'*)------------ 1232q - y3- ool(oo Part 1-Project Identification 1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) [hela] Belscott Development Part 2-Applicant The person and/or organization responsible for the project. h( eim 2a. Name (Last, First,Middle) Judy Scott 2b. Organization (If applicable) MJ Scott Enterprises LLC 2c. Mailing Address (Street or Po Box) NE 131 McKnight Road 2d. City, State, Zip Belfair, WA. 98528 2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail 360-275-6255 (360) 731-5298 (360)277-0385 ssconstruct@hotmail.com Part 3-Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) h[ gAi Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at hftp//www.nws.usace.army.mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSpecies asax. • Not all cities and counties accept the JARPA for their local Shoreline permits. If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to hftp://www.epermifting.wa.goy/site/alias resourcecenter/iaroa iarpa fomV9984/jarpa form aspx. For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or helpe-ora.wa.gov. JARPA Revision 2012.2 Page 1 of 20 3a. Name (Last, First,Middle) McCullough, Pat H. PE 3b. Organization (If applicable) Engineering Services and Associates Inc. (ESA Inc.) 3c. Mailing Address (Street or Po Box) 210 NE Cherokee Beach Road NE 3d. City, State, Zip Belfair, WA 98528 3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail ( 360 )275-7384 (360) 204-2356 (360) 277-3197 path@ wavecable.com Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies) where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. nel X Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First,Middle) Same as Applicant 4b. Organization (If applicable) 4c. Mailing Address (Street or Po Box) 4d. City, State, Zip 4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. of elpl ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. JARPA Revision 2012.2 Page 2 of 20 5a. Indicate the type of ownership of the property. (Check all that apply.) heI X Private ❑ Federal ❑ Publicly owned (state,county,city, special districts like schools, ports, etc.) ❑ Tribal ❑ Department of Natural Resources (DNR) —managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) h( elp] 23490, 23491,23501, 23541 NE State Route 3 5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel Belfair, WA 5d. County ht elpj Mason 5e. Provide the section, township, and range for the project location. h[ eM '/4 Section Section Township Range SE 29 23N 1 W 5f. Provide the latitude and longitude of the project location. h[ eld • Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83) 47 Degrees 27.018 Minutes North Latitude, 122 Degrees 49.707 Minutes West, Longitude 5g. List the tax parcel number(s)for the project location. hf eM • The local county assessors office can provide this information. 12329-43-00100, 1 2329-43-001 1 0, 12329-43-00120, 12329-43-00140, 12329-43-00160 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) hel Name Mailing Address Tax Parcel #(if known) Edgar, Richard B, and Patricia A 8128 187th Street Southwest .. Edmonds, WA 98026 12329-43-00091 (North Side) Stoltz, Danny 125 North Montgomery Ave, 12329-43-00260 (SouthSide) Bremerton, WA 98312 Casteel, Donald R and Linda L PO Box 1463 . .......... Belfair, WA 12329-43-00150 (South Side) State of Washington -WDFW 600 Capital Way#GJ11 12329-30-06000 (West Side) Olympia, WA 98501 JARPA Revision 2012.2 Page 3 of 20 5i. List all wetlands on or adjacent to the project location. of eM The total property is 7.2 acres. 2.7 acres of the property is wetlands. 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. h 1p] 914 feet of Mindy Creek runs through the property. Approximately 2,000 feet downstream from the property Mindy Creek flows into Hood Canal and the Union River. 5k. Is any part of the project area within a 100-year floodplain? of einl ❑ Yes X No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. of eip] See the Graphics that accompany this DARPA application and the SEPA checklist. This is commercial redevelopment project in an existing urban area. The portion of the property that is being redeveloped has little vegetation. It is mostly buildings and parking lots. There are several patches of grass, black berries and 3 trees. The remainder of the property is heavily wooded. 5m. Describe how the property is currently used. of elal 2.75 acres of the property is used for mixed commercial uses including a church, two small dwelling units, and three additional businesses. The remainder of the property (4.45 acres) is wetlands, wetland buffers, and open space. Within the developed area there is 14,000 SF of roofs on 11 structures, 37,000 SF of asphalt pavement and 24,000 SF of hard packed gravel parking areas. (104 parking spaces) There is no structured drainage system on site and all storm water runoff currently either soaks into the ground or flows overland into Mindy Creek. See FIGURE 1 below. 1.DOWL15A/ff SVXWW ES f40WSOL/401 AM-7 2ASWKF37&VSa 4W1:EFT CFAS M17'&,R5ACMAW SOWFA a AL91pVFA1 0FX'CIP 77Efi=7ANG24'S70AV RA/N 7HATCAOSSES UEPROPSUY. RE370RAn1CWAE71aW 1.C0N37RWr315i9EEr0FAEW ,,. F/SJfFLABITATCN4A9VEM N77H y A SP 2ESnNG 2 PLA4T77EAEWS7W" , CO)Va"W N77N"DE 7REW AM LVWVAR91f tSYV PB77W /NLYTATAMANG916VTPLoW 3RES70KFAAVAEFLNT3 0W l:J �4� SWF C *E7ZAAD P� 4 C0A6VROC75WOIF4•ffWE GRAVE 7RAA:AV NE7LAAV p Bt#9%RAArA rWOW - s►- r J cyscO7TP1ROPB7AES + c,,,,. Z66U/770N PLANAAD I! lazT7VR4r1W1 FIGURE 1: SITE DEMOLITION PLAN JARPA Revision 2012.2 Page 4 of 20 5n. Describe how the adjacent properties are currently used. of eM Canal Automotive is directly to the south of the site. There is a dwelling unity directly to the north. Across SR 3 there is an automotive repair shop, used car lot, and coffee stand. 5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. n[ ei See FIGURE 1: The site currently includes four businesses: Lglesia Asamlea De Dios Aqua Int. Church (200 members), Evergreen Electric, Cannabis Care Foundation, and a metal building sales group. There are two small houses that are used for rentals, several small temporary structures, and three garages... 5p. Provide driving directions from the closest highway to the project location, and attach a map. of eM 01 SS Mason County 1 FIGURE 2: VICINTY MAP Take SR 3 to Belfair. Proceed down SR 3 to Canal Automotive. The property runs 500 feet North of Canal Automotive and includes the Lglesia Asamlea De Dios Aqua Int. Church. JARPA Revision 2012.2 Page 5 of 20 { I Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. [help] The project will redevelop 2.75 acres of the site by demolishing all 11 of the permanent and temporary structures, removing 37,000 square feet of asphalt surfaces and 24,000 square feet of gravel driveways, removing 104 feet of 36" CMP culvert that Mindy Creek currently flow through, and moving 213 feet of the existing Mindy Creek into 314 feet of new "fish friendly" restored stream channel. The redevelopment of the property will include 48 apartment units, the restoration of 30,000 SF of wetland buffer, and the restoration of 314 feet of Mindy Creek. See Figures 3, 4, and 5. Figure 6 illustrates the upper Mindy Creek watershed. Figure 4 illustrates the approximate location for Mindy Creek from SR 3 to the Union River estuary. The flow path from SR 3 is described as follows: A. 385 feet of 18" WSDOT SR 3 CMP storm drain that actually goes under the corner of Mitchell Lumber. B. 471 feet of open channel. C. 20 feet of 36" CMP culvert under a private driveway. D. 40 feet of open channel. E. 24 feet of 36" CMP culvert. F. 54 feet of open channel on the site below the church building. G. 80 feet of 36" CMP culvert under the church parking lot. H. 106 feet to the junction of the proposed new 315 foot long channel that will be constructed as part of the proposed development. I. 770 feet of open channel to the boundary of Judy Scott's property. J. 1,700 feet to the Union River. The channel winds through the Pacific Northwest Salmon Center property and thence into the Union River Estuary. RESTORE 31t'OFM/NDYCREEK INSTALL 12' WIDE8OT700lLESS8OXCULVERrArWSDOr.. j MAINTENANCE CROSSING. WSDOT 12'W/DEWS007' / �_ _./ _ �. .• / PROPERTY ACCESS EASEMENT FOR STORM REV/SEDL0CA77ACN DRA/NAGEPOND SHOKN- / PROPOSED Pv15) rya I I' .. f'H/GH SEGMENTAL -CONCRETE WALL(T P) (T ✓ _°1.00 �' ` 0GST NG 2r CMP SRORMDRA/N- / ! RELOC477ON SHOWN ✓UDYSCOTTPROPER77ES REDVELOPMENT SITE LAYOUTPLAN A PRO"T PHASING SCALE'1 W' FIGURE 3: SITE DEVELOPMENT PLAN JARPA Revision 2012.2 Page 6 of 20 drys�ry A I 1. r MINDY CREEK BELOW THE CHURCH MINDY CREEK - 36" INLET CULVERT JARPA Revision 2012.2 Page 7 of 20 `( 1 r ' ` t WL R, FIGURE 4: NIMY CREEK FROM SR 3 TO THE UNION RIN ER LSTUARY JARPA Revision 2012.2 Page 8 of 20 NYlY01(f11CSFQ4 AAo 77E AuoNAnoroe®r111947saaY® ` DA400AEA E4=04ACAM Auw4LArA0WALL=anwqdW O f/SWRMFALL E7M]SES / AIMNNWNR14S77raW7A5W-=¢JID i.. _.._ AWMW-140%R.0WD PW=fe;maoCl/Y=awes _ --- ' fOG 1LWROW=x04tL7ip7N.J1',t•8op7Y=aD/pS 4.z t LxY1S71WC77NOftlLY AIFASN 77f �. AEWSTASW CM4AS B A147A17 - - QYOY/1�.4 Q�lA/fCiEMPC>DYA�M4 � /N97AT.I�LWT7FERIXiORAN 7 FE oo n wwRJ907Y. AAdWYCAEEKAFS7o?A 7A7NP[AN Pr VA o SCALE•f 3 -- rnu o -zea+ u'roc ecw azrmr 14' 12'SPAWNING - -- - GRAVEL 12' OPEN oz E. 807TOMESSSWOUVEW A0VYoRSECAFU0RA77o1/P1 0AEE AT►6ZWTACCESSRC4DCROSS MG Sad f'k1G' ICL 12' wsDOT SCALE I%f0' 7' MIN. h ACCESS RD. VAR VAR 4' VARIES 7' 15'¢VARIES 12' 6%TO I21t — MAX SLOPE VARIES Now JAW 8 rrPAV V?7W RA3iEMOPUSIVT ~YCA1WCAE47oR nW TYPKAL STA EAAf L7P=SEC7711 V AMA(PfiCAWAAO SEC7XW Sa4LE•fWV' FIGURE 5: PROPOSED MINDY CREEK STREAM RESTORATION 6b. Describe the purpose of the project and why you want or need to perform it. The primary purpose of the project is to provide 48 units of housing for low to moderate income families in the community of Belfair. A secondary purpose of the project is remove urban blight from the town of Belfair by redeveloping the site, restoring Mindy Creek, and restoring and re-vegetating a 50 foot wide wetland buffer to Mindy Creek. Site storm runoff will be controlled in accordance with the WWSWMM. The 40,000 square feet of parking lot for the proposed development will be porous concrete. Only clean roof runoff will be allowed to enter Mindy Creek. 6c. Indicate the project category. (check an that apply) of e ❑ Commercial X Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all that apply) [help] ❑ Aquaculture X Culvert ❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike / Levee /Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock / Pier ❑ Marina / Moorage ❑ Stairs ❑ Bridge ❑ Dredging ❑ Mining X Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool JARPA Revision 2012.2 Page 9 of 20 ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: Construct 314 feet of fish friendly stream channel habitat for Mindy Creek. 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. hei • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. The project will be constructed in two phases. Phase One of the redevelopment project will include the construction of the most southern apartment (buildings 1 and 2) along with 49 parking spaces, and the restoring the wetland buffer that is part of Phase One. Phase Two of the redevelopment project will include constructing the northern apartment buildings (buildings 3 and 4) along with 42 parking spaces, the stream restoration, and the remaining wetland buffer restoration. See Figure 3. The current schedule is for Phase One to be constructed in 2016 and Phase Two to be constructed in 2017. The standard excavator and crawler tractors will be used to construct the project. The intent is to complete the earthwork and grading during the dry months of year— May through October. Stormwater runoff during construction will be strictly controlled in accordance with the NPDES permit issued by the WSDOE. The construction of the new Mindy Creek Channel will be completed before diverting the stream into it. Fish will be removed from the portions of the stream that are to be abandoned before the stream is allowed to dry up. 6f. What are the anticipated start and end dates for project construction? (MonthNear) h( elg� • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. PHASE One: Start date: May 2016 End date: October 2016 ❑ See JARPA Attachment D PHASE Two: Start date: May 2017 End date: October 2017 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. Delp] The total project cost is estimated to be$3,800,000 6h. Will any portion of the project receive federal funding? • If yes, list each agency providing funds. ❑ Yes X No ❑ Don't know JARPA Revision 2012.2 Page 10 of 20 Part 7—Wetlands: Impacts and Mitigation X Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) hel 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. h[ eel ❑ Not applicable The project will not be excavating or filling in wetlands. 7b. Will the project impact wetlands? h[ eid ❑ Yes X No ❑ Don't know 7c. Will the project impact wetland buffers? hf eM X Yes ❑ No ❑ Don't know The wetland buffers for the site — by Mason County Ordinance — are 250 feet wide plus a 15 foot setback. The existing buffers extend to State Route 3. The functioning vegetated wetland buffer for the site is 50 feet of less in most places. In several places there is existing development that is within the existing 50 foot wide wetland buffer. After discussions with Mason County, it is proposed to provide a 50 wide wetland buffer with the only disturbance being a 4 foot wide gravel travel. (Trails are allowed in buffers) A 50 foot wide buffer along the wetland boundary will be restored by removing the invasive species, all man made paving and structures, and re-vegetating the wetland buffer in accordance with a habitat management plan that has been prepared for this project. 7d. Has a wetland delineation report been prepared? hf eU • If Yes, submit the report, including data sheets,with the JARPA package. X Yes ❑ No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? h[ io • If Yes,submit the wetland rating forms and figures with the JARPA package. X Yes ❑ No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? h[ elal • If Yes,submit the plan with the JARPA package and answer 7g. • If No, or Not applicable,explain below why a mitigation plan should not be required. ❑Yes ❑ No X Not applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. h[ elan JARPA Revision 2012.2 Page 11 of 20 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. of eld Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category' Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. Z Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 3 Indicate the days,months or years the wetland will be measurably impacted by the activity. Enter"permanent'if applicable. °Creation(C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B) Page number(s) for similar information in the mitigation plan, if available: 7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. hel 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. [hgjpj JARPA Revision 2012.2 Page 12 of 20 Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hel ❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hel ❑ Not applicable Mindy Creek has the potential to provide 2,800 feet of salmon spawning the rearing habitat if is restored. Mindy Creek is spring fed stream that flows between 1 and 3 cubic feet per second - year around. Currently, salmon migration in Mindy Creek is blocked by a culvert downstream on the Pacific Northwest Salmon property. There are plans in the works to remove downstream fish passage barrier that should open up the entire stream for salmon habitat. If the stream through the property is restored Mindy Creek will provide excellent salmon spawning and rearing habitat up to the Mitchell Lumber site which is 300 feet upstream (north) of the project site. 104 feet of the stream on the northern part of the site flows through two 36" diameter CMP culverts that are partial fish passage barriers. An asphalt parking lot covers 80 feet of the 36" culvert. This project proposes to move the stream to a fish friendly habitat channel and remove the culverts located on the property. It also proposes to establish and restore buffers along the stream by planting them to maintain shade. SEE FIGURES 3, 41 5, and 6. The proposed Mindy Creek Channel has been designed to maintain low velocities and to contain the winter fish flow of 2.4 CFS and the 2 year flow of 8 CFS within the new channel. The 100 year storm event flow will overtop the channel and use the flood plain. Seven groupings of Large Woody Debris will be installed to provide habit for fish. The channel alignment has been designed to simulate a natural stream channel. We will provide pools and seven large woody debris groupings for habitat. The width of the bottom of the steam varies. The stream bottom will covered with 12" of spawning gravel to provide spawning habitat. Three man boulders will be installed to add stream complexity. The flood plain will be planted with shrubs and trees to provide shade. The stream will pass under the WSDOT access roadway. We have designed a 12 foot wide bottomless box culvert for the WSDOT access road crossing. The WSDOT storm drainage pipe that will be located in the access road will either go through the box culvert or under the culvert via a storm water siphon. The WSDOT drainage system may be constructed before this project is implemented. The project sponsor will work with WSDOT to move the WSDOT drainage to the location shown in FIGURE 4. JARPA Revision 2012.2 Page 13 of 20 A• ' rY T`•�r ✓ k a�•- ..' - .•- lg��—� •:��4 �jt•` - ,• ram. P ` ♦ i z �� Sri •_ r a 1 a y , I Sb ar �� SCALE:1'4W JUDY SCOTT PROPERTIES OFF SITE DRAINAGE ANALYSIS FIGURE 6: MINDY CREEK WATERSHED ABOVE THE PROJECT 8b. Will your project impact a waterbody or the area around a waterbody? [kV X Yes ❑ No JARPA Revision 2012.2 Page 14 of 20 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? h[ elf] • If Yes, submit the plan with the JARPA package and answer 8d. • If No, or Not applicable,explain below why a mitigation plan should not be required. X Yes ❑ No ❑ Not applicable SEE FIGURES 3 AND 4 and SECTION 8.a 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. h[ elp] The proposed mitigation plan will restore the salmon fishery habitat for over 700 feet of Mindy Creek. 8e. Summarize impact(s) to each waterbody in the table below. h2el Activity (clear, Waterbody Impact Duration of Amount of material Area (sq. ft. or dredge, fill, pile name' location impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbody Fill Mindy Creek At the Permanent 50 cubic yards 300 SF outlet of 36" culvert If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3lndicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. h[ eld JARPA Revision 2012.2 Page 15 of 20 We need to decommission 30' of Mindy Creek at the outlet of the existing culvert. The decommissioned stream channel will be filled to prevent fish stranding and to accommodate the construction of apartment building No. 4. There will be not filling in the wetland buffer. 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. hf elpl An excavator will be used to clear the area and place the fill. Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. hf eid Agency Name Contact Name Phone Most Recent Date of Contact Mason County DCD Allan Borden ( 360) 275-4467 Ext 365 3-30-15 WSDOT Karen Boone PE 360-577-6603 3-27-15 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? h[ eid • If Yes,list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: http://www.egy.wa.gov/pro-gramstwg/�3O3d/. ❑ Yes X No JARPA Revision 2012.2 Page 16 of 20 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? h( qiW • Go to http://cfpub.epa.gov/surf/lorateriindex.cfm to help identify the HUC. Hood Canal 17110018 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? hf elpl • Go to http://www.ecy.wa.gov/services/gis/mapstwria[wria.htm to find the WRIA#. WRIA 15 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? hl elp) • Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.htmi for the standards. X Yes ❑ No ❑ Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? hf pM • If you don't know, contact the local planning department. • For more information,go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html. ❑ Rural X Urban ❑ Natural ❑ Aquatic X Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? h[ elpl • Go to http://www.dnr.wa.gov/BusinessPermits[Topics/ForestPracticesApplications/Pages/fo watertyping.aspx for the Forest Practices Water Typing System. ❑ Shoreline X Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? h[ eid • If No, provide the name of the manual your project is designed to meet. X Yes ❑ No Name of manual: 9i. Does the project site have known contaminated sediment? hf eid • If Yes, please describe below. ❑ Yes XNo 9j. If you know what the property was used for in the past, describe below. hf elpl The property has been used for light commercial (restaurant and church)for over 50 years. 9k. Has a cultural resource (archaeological) survey been performed on the project area? hel • If Yes, attach it to your JARPA package. JARPA Revision 2012.2 Page 17 of 20 ❑ Yes X No 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hf elp Summer Chum — Union River Steelhead — Union River 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hLelpl None—this is a redevelopment project and 99% of the work will be on land that is currently developed. Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.goy/opas/. • Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or helpCa)_ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) bgld • For more information about SEPA,go to www.ecy.wa.gov/programs/sea/sepa/e-review.html. ❑ A copy of the SEPA determination or letter of exemption is included with this application. X A SEPA determination is pending with Mason County DCD (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) hLelp) ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. 10b. Indicate the permits you are applying for. (check all that apply.) tL m LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance X Shoreline Exemption Type (explain): Based on the restoration of Mindy Creek JARPA Revision 2012.2 Page 18 of 20 J Other City/County permits: ❑ Floodplain Development Permit X Critical Areas Ordinance (Environmental Permit) STATE GOVERNMENT Washington Department of Fish and Wildlife: X Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: X $150 check enclosed. Check# Attach check made payable to Washington Department of Fish and Wildlife. ❑My project is exempt from the application fee. (Check appropriate exemption) ❑ HPA processing is conducted by applicant-funded WDFW staff. Agreement # ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use.) ❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012. HPA# Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: X Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): X Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ Private Aids to Navigation (for non-bridge projects) JARPA Revision 2012.2 Page 19 of 20 Fart 11—Authorizing Signatures 4 Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. hel 11a. Applicant Signature (required) heI I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby auth ril the agent named in Part 3 of this application to act on my behalf in matters related to this application. `�j (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies enterjn the property where the project is located to inspect the project site or any work related to the project. (initial) or l'1 ` Applicant Panted Name Applic Aignatu e l% Date 11 b. Authorized Agent Signature hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. Authorized Agent Printed Name V �( !� Au horized Agent Signature Date 11 C. Property Owner Signature (if not applicant) hel Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. L C1 C0-JT- Property Owner Printed Name � -?" 1 411,Property wner Si n ture 15- Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both. FORI�Apublication equire this document in another format, contact the Governor's Office for Regulatory Innovation and Assistance (ORIA)at(800) 43. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call (877) 833-6341. number: ENV-019-09 rev. 08/2013 JARPA Revision 2012.2 Page 20 of 20