HomeMy WebLinkAboutCOM2024-00086 Cell Tower Upgrade - COM Inspections - 3/31/2025 INSPECTION CARD
Mason County
N, 615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# COM2024-00086 PROJECT ADDRESS 26390 NE NORTH SHORE RD TAHUYA, WA 98588
PARCEL# 323332100000 PROJECT DESCRIPTION Eligible Facilities Request- Minor Modification
OWNER MANKE TIMBER COMPANY INC ADDRESS C/O JOEL MANKE PHONE 1.360.426.5536
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP I DATE Comments INSPECTION INSP I DATE Comments
KNOX BOX VERIFICATION I i Tz- I BLD-Final Inspection 'Z-
Presco
►;s�= Telecommunications. Inc.
Friday, March 28 2025
To whom it concerns at Mason County,
Presco Telecommunications is pleased to present you this letter affirming the completion of
construction for the Verizon Wireless Communications Facility "DEWATTO", under building permit
COM2024-00086 at 26390 NE North Shore Road, Tahuya.
The site was constructed, reviewed and completed in accordance with the approved construction
drawings,the approved structural analysis, mount analysis (TES PMI SMART: 10240124), industry standards
and the current International Building Code. Furthermore, this communications tower DOES NOT support
emergency communication systems, nor any systems as defined under Risk Category III and IV in Table
1604.5 Risk Category of Buildings and Other Structures, found in Chapter 16 of ICC IBC.
Best Regards,
Evan Jones
3/28/2025
ban �on¢s • �ro�¢cE/4lanay¢r
-152-1 951A 51/VAO, ,Cali¢ #5 •An6am, 6Uf1 9800i
C661c¢: 253-833-8088 0 74x: 253-833-3590 • 141o61le: 206-817-80-13
Mason County
♦1
Mason County - Division of Community Development
615 W. Alder St.
C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
FPROJECT
4-00086 CELIEWXPIRES:
R UPGRADE
ESCRIPTION: ELIGIBLE FACILITIES REQUEST- MINOR UED: 12/17/2024ION
ESS: 26390 NE NORTH SHORE RD TAHUYA 06/15/2025
PARCEL: 323332100000
APPLICANT: VERIZON-Crown Castle OWNER: MANKE TIMBER COMPANY INC
6210 FLEMING ST C/O JOEL MANKE
EVERETT,WA 98203 SHELTON,WA 98584
206-336-3204
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 5000.00 $5,000.00 Building Permit Fee $156.00 $0.00
ESTIMATION..) Technology Surcharge $5.06 $0.00
Plan Check Fee $97.00 $0.00
State Fee-Commercial $25.00 $0.00
Planning Commercial Review $450.00 $0.00
Fee
Total: $5,000.00 Totals : $733.06 $0.00
REQUIRED INSPECTIONS
KNOX BOX VERIFICATION BLD-Final Inspection
CONDITIONS
The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
Printed by:Annie Wilson on:12/17/2024 10:08 AM Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
CELL TOWER UPGRADE COM2024-00086
* OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
----------- -------
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the
structure. Front setbacks are measured from the front lot line or road easement boundary, whichever is closer.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
Printed by:Annie Wilson on:12/17/2024 10:08 AM
Page 2 of 3
Mason County
t
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
CELL TOWER UPGRADE COM2024-00086
Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
... ..... I............ ......
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions
�off any other state/local law regulating construction or the performance of construction.
Issued By: I-I'Y{1O� L W
Contractor or Authorized Agent: 1 Date: ,
Printed by:Annie Wilson on:12/17/2024 10:08 AM Page 3 of 3