HomeMy WebLinkAboutCOM2024-00073 Cell Tower Upgrade - COM Inspections - 3/27/2025 INSPECTION CARD
ip Mason County
VwF 615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# COM2024-00073 PROJECT ADDRESS 1856 W SIMPSON 2520 RD SHELTON, WA 98584
PARCEL# 419141490020 PROJECT DESCRIPTION TELECOMMUNICATIONS UPGRADE
OWNER PUD#3 OF MASON COUNTY ADDRESS PO BOX 2148 PHONE
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
BLD-Final Inspection
��•( 3_f(-2� DcC_ geE� Ff--
E
F
INSPECTION RESULTS Page
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Perrmt AssMance cencei,Budding,Plamm�6 (360) 427-9670 ext. 352
Application # COM2024-00073 Application Type CELL TOWER UPGRADE Owner PUD #3 OF MASON
COUNTY
Parcel # 419141490020 Site Address 1856 W SIMPSON 2520 RD SHELTON, WA
98584
Inspector Inspection Type Date Status Comments
3-18-25 DEC
Please have the engineer/project manager send a letter indicating that the work done
to the tower has been completed per plans and specifications required for the project.
Drew Carlson BLD-FINAL INSPECTION 03/18/2025 FAIL
Include with the email permit#, name on permit and address.
drewc@masoncountywa.gov
The project will final when I confirm receipt of email.
T
E
y' 0.
D&R Communications,
Inc.
March 27, 2025
Mason County— Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
Re: COM2024-00073—Cell Tower Upgrade
To whom it may concern,
In accordance with your request and authorization, our firm performed construction and
inspections for the above-referenced project. The work performed was to standard and plan.
If you have any questions, or if we can be of further assistance, please do not hesitate to
contact our office.
Thank you.
Zach Jacobs
Project Manager
Zach.Jacobs@DRCWA.com
(253) 320-8676 cell
80 SW Chehalis Ave, Chehalis WA 98532 (360) 996-4513 Office (360) 996-4752 Fax
Alt AdL_
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
COM2024-0 0073 CELL TOWER UPGRADE
PROJECT DESCRIPTION: TELECOMMUNICATIONS UPGRADE ISSUED: 9/24/2024
SITE ADDRESS: 1856 W SIMPSON 2520 RD SHELTON
EXPIRES: 3/23/2025
PARCEL: 419141490020
APPLICANT: AT&T-Davison,Whitney OWNER: PUD#3 OF MASON COUNTY
10 Church Circle PO BOX 2148
Annapolis Circle, MD 21401 SHELTON,WA 98584
8186937443
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 25750.00 $25,750.00 Planning Commercial Review $450.00 $0.00
ESTIMATION..) Fee
Plan Check Fee $279.74 $0.00
Technology Surcharge $14.20 $0.00
Building Permit Fee $430.37 $0.00
State Fee-Commercial $25.00 $0.00
Total: $25,750.00 Totals : $1,199.31 $0.00
REQUIRED INSPECTIONS
KNOX BOX VERIFICATION BLD-Final Inspection
CONDITIONS
" OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
Printed by:Davison,Whitney on:09/24/2024 02:09 PM Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
CELL TOWER UPGRADE COM2024-00073
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
* All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the
structure. Front setbacks are measured from the front lot line or road easement boundary,whichever is closer.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
--------------
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
Printed by:Davison,Whitney on:09/24/2024 02:09 PM
Page 2 of 3
Mason County
5 Mason County - Division of Community Development
615 W. Alder St.
C" Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
CELL TOWER UPGRADE COM2024-00073
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: kf�' Uv I
lU
Contractor or Authorized Agent: Date:
Printed by:Davison,Whitney on:09/24/2024 02:09 PM