Loading...
HomeMy WebLinkAboutSEP2006-00069 DNS Comment - SEP Letters / Memos - 6/23/2006 JUN-23-2006 FRI 12:55 PM DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 02 STATE 0 r ws r STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775• Olympia, Washington 98504-7775• (360) 407-6300 June 23,2006 Mr. Chuck McCoy Your address Department of Community Development is in the Mason County Planning Division j 1 " Kitsap PO Box 279 watershed Shelton,WA 98584 Dear Mr.McCoy: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Barrett Dock Replacement project(SEP2006-00069), located at 551 Northeast Mountain View Drive in Tahuya,as proposed by Fred Barrett. The Department of Ecology(Ecology) reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Betsy Dickes(360)407-6294 Erosion control measures must be in place prior to any clearing, grading,or construction. These control measures must be effective to prevent soil from being carried into surface water by storcnwater runoff. -Sand, silt,clay particles,and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of-the State of Washington,and is subject to enforcement action. During construction,all releases of oils, hydraulic fluids, fuels,other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that:debris cannot enter Wooten Lake or cause water quality degradation of state waters. All trenches,depressions,or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. Ecology's comments are based upon the information provided with the SEPA checklist. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (DN: 06-4980) cc: Betsy Dickes,WQ Fred Barrett(Applicant) i�'�1