HomeMy WebLinkAboutSEPA Lake Cushman Debris Removal Ramp - SEP Determinations - 8/13/2021 LEGAL NOTICE
City of Tacoma Determination of Environmental Non-Significance
Lead Agency: City of Tacoma, Department of Public Utilities, Light Division, DBA Tacoma
Power, Natural Resources
Applicant: City of Tacoma, Department of Public Utilities, Light Division, DBA Tacoma
Power, Matt Peter, Natural Resources
Proposal: Construction of a Debris Removal Ramp along the southern portion of Lake
Cushman Reservoir. Ramp will be approximately 170' long (including upper
graveled portion) and 40' wide with the top of the ramp being at approximate
elevation 744' and the lower end of the ramp extending down into the reservoir
to approximate elevation 730'. The structure will be comprised of precast
concrete blocks, precast concrete interlocking panels, a pour in place concrete
anchor section (located above OHW) and fill/dressing material.
Location: The project location is 52 N. Cooper Hawk PI., Hoodsport, WA 98548.
Project work will occur in the southern portion of Mason County Parcel
#422050060000, located in the South West portion of Section 5 of Township
22N and Range 4W. The project coordinates are 47.41861 N, -123.22639W.
SEPA Public Information Center File No. LU21-0185
City of Tacoma, Planning and Development Services, has made a preliminary determination
that this project does not have a probable significant adverse impact on the environment. An
environmental impact statement (EIS) is not required under RCW 43.21 C.030(2)(9c). This
decision was made after review of a completed environmental checklist and other information
on file with the lead agency. This information is available to the public on
www.tacomapermits.org or upon request.
Comments on this determination of environmental non-significance must be submitted by 5:00
p.m. on September 3, 2021 to Tacoma Public Utilities/Generation, Attn: Matt Bleich, 3628 S 35'h
Street, Tacoma, Washington 98409. The City will reconsider this determination based on timely
comments and may retain, modify, or if significant adverse impacts are likely, withdraw the
determination.
Unless modified by the City, this determination will become a final determination on September
24, 2021. There is no administrative appeal opportunity for this Determination. Appeals may
be filed at the Superior Court of the State of Washington within 21 days after the final
Determination of Non-Significance is issued. Appeals to the Superior Court shall be taken in
accordance with procedures and limitations set forth in RCW 43.21 C.075. A copy of the appeal
shall be filed with City of Tacoma, Planning and Development Services, Attn: Shirley Schultz.
The City of Tacoma does not discriminate on the basis of disability in any of its programs or
services. Upon request, special accommodations will be provided within five (5) business days
by contacting 591-5363 (VOICE) or 591-5070 (TTY).
Issue/Publication Dates: August 16, 2021 and August 23, 2021
Shelton-Mason County Journal
♦ I
V
1 ED
City of Tacoma AUG
mommad Tacoma Public Utilities
Tacoma 3628 South 35th Street 615
VV Tacoma, WA 98409 Adder Street
STATE ENVIRONMENTAL POLICY ACT
Determination of Non Significance
Date of Issuance: August 13,2021
Lead agency: City of Tacoma
Agency Contact: Matt Peter
E-mail: mpeter@citvoftacoma.org
Phone:(253)208-2814
Agency File Number: LU21-0185
Proposal: Tacoma Power is proposing the construction of a Debris Removal Ramp along the southern
portion of Cushman Dam No. 1 Reservoir(Lake Cushman).The ramp will be approximately
170'long(including upper graveled portion)and 40'wide with the top of the ramp being at
approximate elevation 744'and the lower end of the ramp extending down into the
reservoir to approximate elevation 730'. The structure will be comprised of precast concrete
blocks,precast concrete interlocking panels,a pour in place concrete anchor section(located
above OHW)and fill/dressing material.The purpose of the project is to facilitate the removal
(and hauling)of debris from the Cushman No.1 reservoir.Construction of the ramp is
intended to reduce or eliminate ground disturbance and turbid discharges associated with
dragging material up and along the shoreline. Following construction,the ramp will mitigate
discharges of material and disturbances to the shoreline.Construction of the ramp will
facilitate the removal of intact Large Woody Debris(LWD). Removal of larger pieces of LWD
and eliminating or decreasing the need to cut LWD into more manageable sizes will
ultimately result in more availability of LWD suitable for local restoration projects. LWD will
be placed along the shoreline in an area east of the ramp as mitigation for the project.
Location: The project location is 52 N.Cooper Hawk PI., Hoodsport,WA 98548. Project work will occur
in the southern portion of Mason County Parcel#422050060000, located in the South West
portion of Section 5 of Township 22N and Range 4W.The project coordinates are 47°25'7"N,
123°13'35"W.From the junction of SR101 and SR119 in Hoodsport,head west for 4.20 miles
on SR119 to N Standstill Drive S. Head west 0.40 miles on N.Standstill Drive S.to the gate
above the Cushman Dam#1 switch yard.Continue through gates over the dam and spillway
0.60 miles to the project site.
Applicant: Matt Peter
Tacoma Power
3628 South 35th Street
Tacoma,WA 98409
E-mail: mpeter@citvoftacoma.org
Phone:(253)208-2814
The City of Tacoma has determined that this proposal will not have a probable significant adverse impact on the
environment.An environmental impact statement(EIS)is not required under RCW 43.21C.030(2)(c). We have
reviewed the attached Environmental Checklist and other information on file with the lead agency.This
information is available to the public upon request.
This determination is based on the following findings and conclusions by the City of Tacoma,the lead agency for
this proposal,that the requirements for environmental analysis,protection,and mitigation measures have been
adequately addressed in the development regulations and comprehensive plan adopted under Chapter 36.70A
RCW,and in other applicable local,state,or federal laws or rules,as provided by RCW 43.21C.240 and WAC 198-
11-158. The City will not require any additional mitigation measures under SEPA.
This DNS is issued under WAC 197-11-340(2)and the comment period will end on September 3,2021.
Responsible Official: Matt Bleich
3628 South 35th Street
Tacoma,WA 98409
E-mail: mbleich@citvoftacoma.org
Phone:(253)337-1079
Signature
Date: 08.13.2021
RFc
s, ft 2 F�
SEPA ENVIRONMENTAL CHECKLIST der
Street
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals:
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead
agency may exclude (for non-projects) questions in Part B - Environmental Elements—that do not
contribute meaningfully to the analysis of the proposal.
SEPA Environmental checklist(WAC 197.11-960) July 2016 Page 1 of 18
A. Background HELP
1. Name of proposed project, if applicable:
Lake Cushman Debris Removal Ramp
2. Name of applicant:
City of Tacoma
Tacoma Power
3. Address and phone number of applicant and contact person:
3628 South 35th Street
Tacoma, WA 98409-3192
Contact: Matt Peter
253-208-2814
4. Date checklist prepared:
Updated August 11, 2021
5. Agency requesting checklist:
Washington Department of Fish and Wildlife
6. Proposed timing or schedule (including phasing, if applicable):
The proposed project is anticipated to occur between October 2022 and March 2023,
during annual reservoir drawdown.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
No
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
Environmental information that has been or will be prepared that is directly related with
this proposal includes the following:
• A Water Quality Protection Plan (WQPP) will be prepared to provide Washington
Department of Ecology (Ecology) with "reasonable assurance" of the protection
of water quality.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 18
• Mason County Habitat Management Plan
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
No
10. List any government approvals or permits that will be needed for your proposal, if known.
The following are approvals and permits anticipated for the proposed project:
• Washington Department of Fish and Wildlife
o Hydraulic Project Approval
• Washington Department of Ecology
o Water Quality Protection Plan
0 401 Water Quality Certification (already obtained for FERC Project No. 460)
• Mason County
o Shoreline Conditional Use
o Shoreline Substantial Development
o Habitat Management Plan
o Fill and Grade Permit
• U.S. Army Corps of Engineers
o Section 404 Nationwide Permit(s)
• Department of Archeology and Historic Preservation Section 106 Compliance
o Letter of concurrence for proposed action and assessment
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.)
Tacoma Power is proposing the installation of a Debris Removal Ramp along the
southern portion of Cushman Dam No. 1 Reservoir (Lake Cushman). The ramp will be
approximately 170' long (including upper graveled portion) and 40' wide with the top of
the ramp being at approximate elevation 744' and the lower end of the ramp extending
down into the reservoir to approximate elevation 730'. The toe of the precast concrete
block bulkhead will extend down to approximate elevation 720'. Ordinary high water
(OHW or full pool) for Lake Cushman is elevation 738'. The structure will be comprised
of precast concrete blocks, precast concrete interlocking panels, a pour in place
concrete anchor section (located above OHW) and fill/dressing material.
The purpose of the project is to facilitate the removal (and hauling) of debris from the
Cushman No.1 reservoir. Construction of the ramp is intended to reduce or eliminate
ground disturbance and turbid discharges associated with dragging material up and
along the shoreline. Following construction, the ramp will mitigate discharges of
material and disturbances to the shoreline. Construction of the ramp will facilitate the
removal of intact Large Woody Debris (LWD). Removal of larger pieces of LWD and
eliminating or decreasing the need to cut LWD into more manageable sizes will
ultimately result in more availability of LWD suitable for local restoration projects.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 18
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
Project work will occur in the southern portion of Mason County Parcel #422050060000,
located in the South West portion of section 5 of Township 22N and Range 4W. The
project coordinates are 47°25'7"N, 123°13'35"W. A vicinity map is attached that
illustrates the action area. The parcel where work will occur is owned and managed by
Tacoma Power.
B. Environmental Elements HELP
1. Earth hf e
a. General description of the site:
(circle one): Flat, rolling, hilly, stee slopes, ountainous, other_Gently Sloping
b. What is the steepest slope on the site (approximate percent slope)?
—30% (e.g. 3:1)
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils.
Gravel, sand, silts, mixed soil and rock
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
No
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill.
Project will consist primarily of native fill material from on-site grading capped with
imported gravel for surface dressing/hardening in addition to precast concrete blocks
and precast interlocking concrete panels. An approximate breakdown of proposed
materials is as follows:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 18
• 81 (93 C.Y.) Precast Concrete Blocks utilized for bulkhead creation around the
lower end and sides of the ramp structure
• 87 (97 C.Y.) Precast Concrete Interlocking Panels utilized for the lower ramp
surface
• 15 C.Y. of Cast in Place Concrete utilized as an anchor section (above OHW) to
secure the Precast Concrete Interlocking Panels upland
• 21 C.Y. (Y depth) of Crushed Surface Base Course (CSBC) used for dressing
upper portion of ramp
• 235 C.Y. cut volume to be used as fill following construction bulkhead structure
The entire proposed project is approximately 40' wide by 170' long and will cover
approximately 6,800 S.F.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Some potential exists for erosion to occur during construction. Construction will occur
during a period of low reservoir elevations to facilitate working in the dry. However, the
potential exists for weather conditions during actions to promote erosion. Following
construction, the Debris Ramp will be a dedicated area with hardened surface that will
preserve the adjacent shoreline areas and reduce turbid discharges resulting from
dragging debris up and along the shoreline.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
-60% precast concrete interlocking panels and precast concrete block bulkhead.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Appropriate BMPs will be utilized to mitigate potential erosion concerns. As part of this
proposal, a Water Quality Protection Plan (WQPP) will be developed in consultation with
Washington Department of Ecology to address water quality and erosion concerns.
2. Air hf e
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe
and give approximate quantities if known.
Vehicle Exhaust
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
None
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 5 of 18
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
None
3. Water h
a. Surface Water: hf elpl
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
Yes, the proposed project is located within in or near-waters of Lake Cushman
Reservoir, North Fork Skokomish River.
2)Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
Yes, the majority of construction actions will occur below the OHWM. However, work
will be scheduled during seasonal drawdown of Lake Cushman to facilitate working
in the dry.
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
Approximately 260 C.Y. of native on site material will be graded out and used as fill
below the OHWM to create the appropriate grade and base for the ramp structure.
Approximately 93 C.Y. (81 blocks) of precast concrete blocks will be used to create the
bulkhead around the lower end and the sides of the ramp structure below the OHWM.
Approximately 67 C.Y. (75 panels) of precast concrete interlocking panels will be used
for surfacing of lower end of the ramp below the OHWM.
4)Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No, all work will be done during seasonal drawdown of Lake Cushman and in the
d ry.
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
Yes, the entire project is located within the mapped 100-year floodplain.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
SEPA Environmental checklist(WAC 197-11.960) July 2016 Page 6 of 18
No
b. Ground Water: hf elpl
1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known.
No
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
None
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe.
Surface flow from precipitation is anticipated. The timing of the action will occur in
the winter during seasonal drawdown of the reservoir and appropriate BMPs will be
deployed per the WQPP to prevent erosion and turbid discharges to waters of the
state. Equipment will remain on developed surfaces as practical to prevent erosion
or creation of preferential paths for stormwater, should precipitation occur.
2) Could waste materials enter ground or surface waters? If so, generally describe.
No waste material will be generated on site.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe.
Drainage patterns will remain the same; project will not collect or concentrate flows.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 18
Proposed Debris Removal Ramp will be uniformly graded to evenly shed water. Adaptive
management through the nexus of the WQPP will be utilized should measures be
deemed necessary.
4. Plants [help]
a. Check the types of vegetation found on the site:
—X—deciduous tree: alder, maple, aspen, other
_X_evergreen tree: fir, cedar, pine, other
shrubs
X grass
pasture
crop or grain
Orchards, vineyards or other permanent crops.
X wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
Upland portion of the project will improve an existing roadway. Therefore, vegetation
removal and alteration will likely be limited to an area of approximately 387 square yards
of lakebed (below OHWM) which will be graded and filled with the native material before
being covered by precast concrete blocks and precast concrete interlocking panels.
c. List threatened and endangered species known to be on or near the site.
None known
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
None, nature and use of proposed ramp will preserve adjacent shorelines and vegetation
by restricting debris removal operations to the Debris Removal Ramp.
e. List all noxious weeds and invasive species known to be on or near the site.
None Known
5. Animals hf elpl
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site.
Birds: Eagles, Hawks, Osprey, Ducks, Songbirds
Mammals: Deer, Elk, Rodents, Shrews, Moles, Coyotes
Fish: Trout, Bass, Bull Trout, Salmon, Whitefish, Suckers, Dace, Sculpin
b. List any threatened and endangered species known to be on or near the site.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 8 of 18
• Bull Trout (Salvelinus confluentus) -Threatened
• Chinook Salmon (Oncorhynchus tshawytscha) -Threatened
• Northern Spotted Owl (Strix occidentalis) —Threatened/Endangered
• Marbled Murrelet (Brachyramphus marmoratus) —Threatened
c. Is the site part of a migration route? If so, explain.
The proposed project site is located within the Pacific Flyway, a regional flight corridor
for migratory birds that extends from Alaska through South America.
d. Proposed measures to preserve or enhance wildlife, if any:
Limited vegetation will be removed as part of the project. Work will be completed
during seasonal drawdown of the reservoir, so no surface water will be present during
project construction. Erosion prevention and control measures will be implemented to
prevent impacts to the reservoir. The main impact will be the loss of natural shoreline
area that will be replaced with a precast Debris Removal Ramp. Lost shoreline habitat
is steeply sloping, minimally vegetated with little habitat complexity and is only
inundated for a limited portion of the year. Therefore, limited aquatic habitat will be lost
as a result of the project. In addition, the WQPP and HPA associated with the proposed
actions will prescribe BMPs for protection of water quality and ultimately the aquatic
species present. Based on consultation with the Washington Department of Fish and
Wildlife, Mason County, U.S. Army Corps of Engineers, and the Skokomish Tribe,
Tacoma Power will provide mitigation for the project through placement of LWD in the
reservoir in an area east of the project site. Tacoma will also provide a habitat
management plan as required by Mason County to address the project and associated
mitigation efforts.
e. List any invasive animal species known to be on or near the site.
None known
6. Energy and Natural Resources Lhel
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
This project will not use any energy.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe.
No
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 18
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
This project will not use any energy.
7. Environmental Health hf elpl
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe.
Leakage from heavy equipment utilized for the proposed project has the potential to
enter Lake Cushman. The WQPP prepared for the proposed project will prescribe
BMPs for the prevention of deleterious discharges. The HPA issued for the project will
additionally indicate provisions associated with water quality protection.
1) Describe any known or possible contamination at the site from present or past uses.
None Known
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity.
Project has no known existing hazardous chemicals that might be stored, used or
produced during the projects development or during its operating life.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project.
The only chemicals potentially present on site will be oils, lubricants, and greases
associated with the heavy equipment (excavators and heavy trucks) used to
complete the project.
4) Describe special emergency services that might be required.
Project has no special emergency service that may be required.
5) Proposed measures to reduce or control environmental health hazards, if any:
A WQPP will be prepared that will address potential spills, leaks or discharge of
deleterious materials.
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 10 of 18
There are no types of noise existing in the area that might affect this project.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
There will be noise from vehicles and construction between hours of 7am and
5pm during construction, and then again during periods of debris removal
operations. It is anticipated that debris removal will be required approximately
annually for up to 2 weeks.
3) Proposed measures to reduce or control noise impacts, if any:
No measures proposed to reduce noise impacts from this project.
8. Land and Shoreline Use hel
a. What is the current use of the site and adjacent properties?Will the proposal affect
current land uses on nearby or adjacent properties? If so, describe.
Current use of site is the wildlife boundary surrounding Lake Cushman Reservoir
and is occasionally used to remove surface debris collected from the reservoir.
This project will not affect adjacent properties.
b. Has the project site been used as working farmlands or working forest lands? If so,
describe. How much agricultural or forest land of long-term commercial significance will
be converted to other uses as a result of the proposal, if any? If resource lands have not
been designated, how many acres in farmland or forest land tax status will be converted
to nonfarm or nonforest use?
This site has not been used as a working farm or forestland.
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
This project will not affect surrounding farm or forestland operations.
c. Describe any structures on the site.
Existing structures on the property include the Cushman Dam No.1 spillway and
Emergency Generator Building, as well as underground utilities associated with
operation and security of these facilities.
d. Will any structures be demolished? If so, what?
None.
e. What is the current zoning classification of the site?
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 11 of 18
Rural Residential (5 acres)
f. What is the current comprehensive plan designation of the site?
N/A
g. If applicable, what is the current shoreline master program designation of the site?
Conservancy
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
Lake Cushman Reservoir is a Critical Area.
i. Approximately how many people would reside or work in the completed project?
No people will reside or work in the completed project.
j. Approximately how many people would the completed project displace?
No people will be displaced due to this project.
k. Proposed measures to avoid or reduce displacement impacts, if any:
N/A
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
Project design is minimalistic and was scaled down from an original debris pad
concept that extended into the reservoir and included a substantial volume of fill
material. Project consists of minimal construction elements: cut/grading, placement of
precast concrete blocks, filling/grading, placement of precast concrete interlocking
panels, pouring of cast in place anchor section (above OHWM), and dressing of upper
ramp with CSBC. Fill material will be graded locally and on site. Existing use of the
location as a debris removal site will continue as it has historically.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any:
No impacts to agricultural and forestlands will result from the project.
9. Housing hf e
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 18
None
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
None
c. Proposed measures to reduce or control housing impacts, if any:
No housing impacts associated with this project.
10. Aesthetics hf e
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
The Debris Removal Ramp bulkhead is expected to be up to 10' tall. Due to the nature of
Lake Cushman Reservoir elevations, exposure of the precast concrete block bulkhead
will vary seasonally.
b. What views in the immediate vicinity would be altered or obstructed?
None
c. Proposed measures to reduce or control aesthetic impacts, if any:
N/A
11. Light and Glare hf elpl
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
There will be no light or glare from this project.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
c. What existing off-site sources of light or glare may affect your proposal?
None
d. Proposed measures to reduce or control light and glare impacts, if any:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 18
None
12. Recreation hf elpl
a. What designated and informal recreational opportunities are in the immediate vicinity?
Lake Cushman offers recreational opportunities including boating and fishing.
b. Would the proposed project displace any existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
This project will not affect recreational opportunities. This project will be located behind
a log debris boom preventing recreational access, and several signs prohibiting
unauthorized personnel and activities are posted in the area. Removal of debris from the
reservoir is intended to facilitate recreation on the reservoir and operation of the Juvenile
Fish Collector (JFC) associated with the dam.
13. Historic and cultural preservation hf elpl
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers ? If so,
specifically describe.
No
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources.
No
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
Site adjacent to reservoir spillway has already historically experienced extensive clearing
and grading.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required.
None proposed or required
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 14 of 18
14. Transportation hel
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
Project is located on private land and is accessed from the east via WA-119 to N.
Standstill Dr. and then crossing the Cushman No.1 Dam. The site can be accessed from
the west via a series of National Forest roads (NF-2355).
c. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
No, Project is rural
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate?
Project does not have, add or eliminate any parking spaces.
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private).
Project does not require new or improvement to existing roads, streets, pedestrian or
bicycle transportation facility.
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
This project does not use or occur in the immediate vicinity of water, rail or air
transportation.
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?
Project is located in a rural area and will have an estimated peak usage of five trips per
workday throughout the year of non-passenger vehicles.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.
The project will not interfere with, affect or be affected by movement of agricultural and
forest products on roads in the area.
h. Proposed measures to reduce or control transportation impacts, if any:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 15 of 18
None required
15. Public Services hf elpl
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
This project will not result in any increase to public services.
b. Proposed measures to reduce or control direct impacts on public services, if any.
None necessary of required
16. Utilities hI e
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system,
other
No utilities available at the project site.
d. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
No utilities proposed for this project.
C. Signature fHELP1
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
tt+t Digitally signed by Peter,Matt
Signature: Peter, MaDate:2021.08.11 14:33:25-07'00'
Name of signee: Matt Peter
Position and Agency/Organization: Biologist, Tacoma Power/Natural Resources
Date Submitted: 8/11/2021
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 16 of 18
D. Supplemental sheet for nonproject actions ltjELP
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in
general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for governmental protection; such as parks,
wilderness, wild and scenic rivers,threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 17 of 18
Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 18 of 18