HomeMy WebLinkAboutBLD92-00576 Bulkhead - BLD Application - 6/16/1992 b
MASON COIINT`_'
BUILDING PERMIT APPLICATION
PLEASE PRINT
► - 2oG - �3z-��oo w�
"I Owner_ JD,4 N 1)AT VU Phone# I - 2a�c -- ���- �n?•, ���
Si to Address SE.E S►TF c>,A A Ci ty St Zip� -
Owner Address )50:R2, =^vf- Na Ci ty SEATr 1,E Stv,(Q Zip_ _
Lien/Title Holder— N oo w r�
Address Ci ty St Zip_
Describe Work C�NSTRI�GT ERcS►oN owrr-one R�i�k�} x%n
#2 Contractor Name Tn h3r_ 15F_LzcT-Er) Contractor Reg#
Address E;cpir a ti on date
Ci ty St Zip Phone
#2 If septic is located on project site, include records.
Connect to Septic? Public Water Supply Well
#4 Parcel No.
Legal Description TR,98V49 oFCsam)es Ris�r3 �u w�,-►►,uS�T23Tw,,22N >;W
#5 Building Square Footage: (exdst:�ng/proposed)
1st FI / 2nd FZ / 3rd Fl / Loft /
Basement / Deck / Garage / Carports /
nbecL--ooms / #ba t:hrooms /
Other sq ft /
#6 Use of building E RA_,v p v Corm ,auA xdga n
#7 Tyae of Job: New Add Alt Repair Demolition
Plumbing Only Mec.'-yani cal Only woodstove Re-Roof
Bulkhead_&_ Other
18 P7umbing Fixtures Mectanical Fixtures
No. Toilets No. Fuel Types No. Air Handling Ohi is
Bathtubs Fur= < ZOOK BTU <- 10000 cfm.
Showers Furn >- 100K BTU > 10000 cfm.
Ba th basins Furs - Floor Other
Sinks Heat Puuns Evac Cool ers
Dishwasher vent Systems Hoods
Hot Water Htr, Vent Fans Domes. Incin.
Laundry Washer Boilers/Compressors Comml . Incin.
Floor Drains 0-3 RP Reloc/Repair
Other 3-15 RP Gas Outlets
15-30 HP Woodstozre
30-50 HP Other
50 + f£�
#9 MOBILE HCM— INF OR.'u_ATTON
Model Year Make Model
LenSt'� Widt, Serial No .
,Bedrooms TBa a.rooms
10 Any crater on or adjacent to grope=tv: salc-_facer�_ lake
"ver pond wetland seascra l ^,:.nc='
0 t'2er
I
'S iJ N r Mti?J�1 a 3 N7 FJ11 �-j+ "3� S
O'I3H 3'II302id �Fid �OdOZ MV-dCj 0.1 ZjZVDj'IaaV
:aT�oS
I
SuTzUcaa 3o aizeN
BU T,-,�r=Ta 3o G=PN
S2=amBSP2 s:;uauanosdwj pasodcaa
s �� tnl5'1I X-1-a V-4 sTTaM s s�� o��daS
dud-e--5odoy -ur a e52u rac
- �ddb oda�-a�oti� t� .rLz�o N saII�iasouS _ ��*� aa� -M
15 M sa�ua3 sa.�n;on.: S SII ;stxr
sauoZ Poo-L.- suo�suai0 �07
arts qo� o� sIIo��oastQ upId a;Ts aq; ac 5atMn o, r�ogS
,NOTICE: T IS PERP�?I BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
A=HORIZED IS NOT COIqA—�'NCED WITHIN 780 DAYS , OR IF CONSTRUCTION OR WORK
IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK
IS COMIC:b'
OWN'nRS AFF:OAVIT CONTRACTORS aFFIDALiT
I CERTIFY THAT_I AM EXEMPT FROM THE REQUIREMENTS OF THE I CERTIFY_ THAT I AM A CURRENTLT REGISTERED CONTRACTOR
CONTRACTORS REGISTRrATION LAW RCW 18.27 , AND AM AWARE IN THE STATE OF WASHINGTON AND I AM AWARE OF THE
OF THE MASON 506V*� ORDINANCE REQUIREMENTS FOR WHICH ORDINANCE REQUIREMENTS REGULATING THE WORK FOR WHICH
THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE
WITHOUT FTR INING APPROVAL FROM THE BUILDING WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING
DEPARTMENT DEPARTMENT.
DAN IAT Vu
X OWNER a BY
DAin
Retu--= per=it to: Department of General Services
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628
FOR: OFFICIAL VSE ONLY: 'Accepted by: Date: --
DEPA.R AL REVIEW
FOR OFFICE USE ONLY
Approved Cond Notd
l� Approval
I
Planning: ��
Environmental Health:
Building Plan Review:
Fire Marshall :
Other :
I
2/2/2009
Conditions Associated With 12:54:15PM
Case #: BLD92-00576
IP14
�2P11-
&(
Permit Condition Status Updated'
item# Code Title Status Changed By Tag Date By
1) 1000 SDP Conditions Met 7/8/1992 DMB
1. The outer edge of the bulkhead shall be no further waterward than three feet from the Ordinary High Water
Mark of Hood Canal on the East end. This mark to be determined by the Planning Department prior to pouring
of the footing.2. The bulkhead should terminate to the West of the proposed location of the inset steps. This
would constitute shore protection terminating at 60 feet from the West end property line.3. To minimize the
wave energy deflected from the Navarro(Dat Vu)bulkhead,the wing walls should be tapered such that the
bulkhead will be flush with the bank at the East end. The wing wall to the East should end four feet prior to the
property line so that riprap can be placed along the toe of the bank at the intersection of the bulkhead and the
bank. The riprap should be a minimum of three feet in height as measured from the beach and shall be sloped
to the existing face of the bank. Filter fabric should be staked on the bank prior to the placement of the riprap.
The riprap should be placed prior to or within one week of bulkhead completion,or as otherwise specified by
the Department of Fisheries.
2) 100 Construction Debris Removal Met 7/8/1992 DMB
All construction debris must be removed from the beach after project completion.
Pagel of] Caseconditions..rpt
I