Loading...
HomeMy WebLinkAboutGEO2019-00072 BLD2019-01119 - BLD Engineering / Geo-tech Reports - 9/14/2019 RECEIVED SEP 2 0 L o 615 W. Alder Street Geological Assessment Mullen Single Family Residential Property 282 SE Dawnview Dr, Shelton Parcel No. 22028-32-90021 Mason County, Washington September 14, 2019 Project#19183 Prepared For: Robert and Jean Mullen 28223 34th Ave S Auburn, Washington 98001 Prepared By: Envirotech Engineering PO Box 984 Belfair, Washington 98528 Phone: 360-275-9374 CLY•r)r s ` w t • 4303!5 ` a 9/14/19 MASON COUNTY j COMMUNITY SERVICES Geological Assessment Building.Planning,Environmental Health,Community Health Instructions: This checklist must be submitted with a Geological Assessment and completed,signed,and stamped by the licensed professional(s)who prepared the Geological Assessment for review by Mason County pursuant to the Mason County Resource Ordinance. If an item is found not applicable,the report should explain the basis for the conclusion. Note:Unless specifically documented, this report does not provide compliance to the International Residential Code Sections R403.1.7 for foundations on or adjacent to slopes, Section R403.1.8 for expansive soils or section 1808.7.1 of the International Building Code Section for Foundations on or adjacent to slopes. Applicant/Owner Robert and Jean Mullen Parcel# 22028-32-90021 Site Address 282 SE Dawnview Dr Shelton (1) A discussion of the geologic conditions in the general vicinity of the proposed development,with geologic unit designation based on referenced maps. Located on page(s) 5-6 (2) (a) A discussion of ground water conditions, Located on page(s) 7 (b) A discussion of the estimated depth to water, Located on page(s) 7 (c) A discussion of the quantity of surface seepage, Located on page(s) 4 and 7 (d) A discussion of the upslope geomorphology, Located on page(s) 3 (e) A discussion of location of upland waterbodies and wetlands. Located on page(s) 3 (3) The approximate depth to hard or dense,competent soil,e.g.glacial till or outwash sand. Located on page(s) 5 (4) A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks,terraced topography indicative of landslide block movement,bowed or arched trees indicating downslope movement,etc.). Located on page(s) 4 (5) A discussion of the history of landslide activity in the vicinity,as available in the referenced maps and . records. Located on page(s) 8 (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. Located on page(s) 8 (7) A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property. Located on page(s) 12 (8) If the presence of a hazard is located within 300 feet of the proposed development,then the following are delineated on a geologic map/site map: (a) The area of proposed development, Located on map(s) Site Plan (Appendix A) (b) The boundaries of the landslide hazard area(top, both sides,and toe), Located on map(s) Site Plan(Appendix A) (c) The associated buffers (top,both sides,and toe), Located on map(s) Site Plan(Appendix A) (d) Building or other setbacks(top,both sides,and toe), Located on map(s) Site Plan (Appendix A) (9) A site map drawn to scale showing the property boundaries,scale,north arrow, and the location and nature of existing and proposed development on the site. Located on Map(s) Site Plan(Appendix A) I, Michael Staten, hereby certify under penalty of perjury that I am a civil engineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geological Assessment dated September 14,2019 ,and entitled Mullen Single Family Residential Property , meets all the requirements of the Mason County Resource Ordinance,Geologically Hazardous Areas Section,is complete and true,that the assessment demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations,and that all hazards are mitigated in such a manner as to prevent harm to property and public health and safety. L 43o45WSJ 9/14/19 Disclaimer:Mason County does not certify the quality of the work done in this Geological Assessment. Page 2 of 2 TABLE OF CONTENTS 1.0 INTRODUCTION................................................................................................................................. 1 1.1 PROJECT INFORMATION.................................................................................................................... 1 1.2 PURPOSE OF INVESTIGATION AND SCOPE OF WORK........................................................................ 1 2.0 SURFACE CONDITIONS....................................................................................................................3 2.1 GENERAL OBSERVATIONS..................................................................................................................3 2.2 TOPOGRAPHY..................................................................................................................................... 3 2.2.1 Upslope Geomorphology............................................................................................................ 3 2.3 SURFACE DRAINAGE.......................................................................................................................... 3 2.3.1 Upland Water Bodies................................................................................................................. 3 2.4 SLOPE AND EROSION OBSERVATIONS...............................................................................................4 3.0 SUBSURFACE INVESTIGATION.....................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING...........................................................................5 3.2 GEOLOGIC CONDITIONS....................................................................................................................5 3.3 SPECIFIC SUBSURFACE CONDITIONS.................................................................................................6 3.3.1 Groundwater............................................................................................................................... 7 4.0 ENGINEERING CONCLUSIONS......................................................................................................8 4.1 LANDSLIDE HAZARDS......................................................................................................................... 8 4.1.1 Landslides and Slope Stability Analysis...................................................................................10 4.1.2 Surface and Subsurface Drainage...........................................................................................10 4.2 EROSION HAZARDS...........................................................................................................................10 4.3 SEISMIC HAZARDS.............................................................................................................................11 4.4 OTHER CONSIDERATIONS.................................................................................................................11 5.0 CLOSURE.............................................................................................................................................12 Appendix A-Site Plan Appendix B-Soil Information 1.0 INTRODUCTION Envirotech Engineering, PLLC. (Envirotech) has completed this geological assessment for a residential property located at 282 SE Dawnview Drive, identified as parcel number 22028-32- 90021 in Mason County, Washington. As presented herein, this assessment includes information pertaining to the Project in this Introduction Section; observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soils descriptions in the Subsurface Investigation Section; and, assessments for landslides, erosion, seismic hazards, and other considerations in the Conclusions Section. An initial geological/ geotechnical evaluation of the project was conducted by Envirotech on September 5, 2019. During the evaluation and site visit by Envirotech, surface and subsurface conditions were assessed in order to determine if further geotechnical studies are required. After completion of the field work and applicable project research,Envirotech prepared this geological assessment. 1.1 Project Information Information pertaining to the project was provided by the proponent of the property, and observations from a field visit by Envirotech.The proposed development is expected to consist of a new garage and driveway, new septic tank, and other ancillary features typical of this type of development. The development is expected to be over 50 feet from any slope exceeding 40% grades, and land clearing is expected to be at least 25 feet from the top of such slopes.In addition, roof drainage is expected to be through downspouts atop splash blocks, and infiltration facilities avoided. Approximate site development with relation to existing site features are illustrated in the Site Plan in Appendix A of this report. 1.2 Purpose of Investigation and Scope of Work The investigation included characterizing the general project surface and subsurface conditions, and evaluating the suitability of the soils to support the planned site development. In order to fulfill the purpose of investigation, the geological/ geotechnical program completed for the proposed improvements of the Project include: • Review project information provided by the proponent of the project; • Conduct a site visit to document the site conditions that may influence the construction and performance of the proposed improvements; • Define general subsurface conditions of the site by observing soils within test pit excavations, review well logs from existing wells near the Project, and evaluate geological and hazard maps depicting the site geology for the vicinity of the project; • Perform soils testing,such as visual classifications,to determine selected index properties of the soils; • Complete an engineering assessment supported by planned site alterations and the surface and subsurface conditions that were identified by the field investigation, soil testing, and applicable project research;and, • Establish engineering conclusions based on findings and anticipated development. Envirotech Engineering Geological Assessment PO Box 984 page 1 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 N C- 1:S Project Vicinity Map from Mason County Website Envirotech Engineering Geological Assessment PO Box 984 page 2 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the project was gathered on September 5, 2019 by a representative with Envirotech. During the site visit, site features were documented that may influence construction or reveal potential geological hazards. This Surface Conditions Section provides information on general observations, vegetation, topography, drainage and slope/erosion conditions for the project and surrounding areas. 2.1 General Observations The property currently has an existing single-family residence, on-site septic, and driveway, and is surrounded by residential development. SE Dawnview Drive extends along the north side of the property, and a private access road bisects the parcel to the south and west of the home. Vegetation on and near the property consists primarily of firs, maples, and other trees and shrubbery common to this area of the Pacific Northwest. An aerial photo of the Project and immediate vicinity is provided on the following page. 2.2 Topography The topographic information provided in this section was extrapolated from a public lidar source, and incorporated observations and field measurements. Where necessary, slope verification included measuring slope lengths and inclinations with a cloth tape and inclinometer. See the Site Plan in Appendix A for an illustration of the general slope indicators with respect to the planned development. Descending slopes exceeding 15% are located on and beyond the property.The steepest,average slope grades within 300 feet of the development are approximately 56% with a vertical relief of approximately 40 feet. 2.2.1 Upslope Geomorphology Ascending grades are generally located to the northwest of the planned development. This slope is relatively minor within 300 feet of the Project, with no apparent slope grades of at least 15%.The upland area of the property is situated on a hillside and crest. Landforms are primarily of glacial origin with centuries of weathering overburden. Additional geomorphology that is pertinent to both upslope and downslope areas are provided in the Subsurface Investigation Section of this report. 2.3 Surface Drainage The majority of the stormwater runoff originating upslope from the anticipated development is expected to be minimal to moderate. Significant scour, erosion and sediment transport was not apparent near the influence of the project. 2.3.1 Upland Water Bodies There are no apparent water bodies or wetlands located upslope from the planned development that would significantly influence the Project. Envirotech Engineering Geological Assessment PO Box 984 page 3 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 2.4 Slope and Erosion Observations The existing slopes near the Project signal a potential landslide or erosion hazard area. Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine,saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees,or, • Slope sloughing or calving. A tension crack was observed within four feet of the top of the steeper ravine slope. Groundwater seepage and leaning/bowing trees were also noted within the ravine slope during the site visit indicating shallow earth slippage. N 300 Aerial Photo from Mason County Website Envirotech Engineering Geological Assessment PO Box 984 page 4 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14.2019 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the project was gathered during research and a site reconnaissance. The site visit was accomplished on September 5, 2019 by a representative with Envirotech. Specific information on field methods, sampling, field testing, subsurface conditions,and results from soil testing are presented in this section of the report.Appendix B has pertinent information on subsurface conditions for the Project, including test pit log(s) representative of the site soils, and water well report(s)originating from the subject property and/ or nearby properties. 3.1 Field Methods,Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by probing anticipated foundation areas with hand tools, and observing soils within test pit excavations and/ or earth cuts. Information on subsurface conditions also included reviewing geological maps within the Project vicinity, and water well reports originating from nearby properties. No soil samples were collected for this Project.Envirotech measured the relative density of the in-situ soils by gauging the resistance of hand tools. 3.2 Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are generally unconsolidated deposits, and dominantly deposited from glacial drift,including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation."as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered by numerous ice sheets,with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. The"Geologic Map of the Squaxin Island 7.5 Minute Quadrangle,Mason and Thurston Counties, Washington by Robert Logan et al.,2003,"provides the following caption(s)for the project area: Envirotech Engineering Geological Assessment PO Box 984 page 5 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 Vasbou till UnsoRed and highly compacted mixture of clay,stlt.sand,and gran el deposited duectly by vlacin tie. gray"here fresh and light yrllox%i%h brDun-where oxidized, :ery low pe►meabiltty,moo commonly"maum supported but may be clast-supported,matrix generally feels more grim than oumash sands nben rubbed benyeen fingers.due to being more angular than waxet-isorked srdimrms cobbles and boulders commonly faceted and i or)striated,rWits in this knt-from Willi) disconnrnwns taxers less than 1 in duck to more than 10 ft thick,thicknesses of 2 to 10 ft are most�mnruon,till may include oust ash clay,sand,silt_and gravel.or ablation nil that is too thm to subsranually mask the tmirtlymg,tolling ill plain,ritauc botddrrs me commonly associated with till plains but may also occur as lag depoun%hrn the undrrh usg:Se}osns hat,bmt modified by melnxatet,typically,weakly developed modern soil has formed on the cap of lose gravrl but the undctl mg ttil is unweathered,local textural features in the till mcludr(lost banding and apophvses extending 10 to 13 ti downwtud into underly-ing sand and gravel(or till)and that we oriented transverse to ice Mott direction N .�. Project P I ; nr '._ j ray /�`�},} •�'n./ � � } ®".>> - �rf ,A q X 7/ 4. V Geologic Meth from Washington Department of Natural Resources 3.3 Specific Subsurface Conditions The following subsurface conditions are estimated descriptions of the project subgrade utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. Envirotech Engineering Geological Assessment PO Box 994 page 6 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 The project is primarily composed of undisturbed, native soils, without indications of substantial fill. Competent bearing soils were encountered at 18 inches below the existing native ground surface in locations where the ground was probed. For engineering purposes, these native soils consist of distinguishable layers,as presented below. Soils within the upper 18 inches of natural ground were observed to be primarily organic laden soils. Soils below the duff layer extending to a depth of 4 feet are silty sands with gravel as typical in the area and shown on the well log. Varying soil conglomerates are below. Expanded and specific subsurface descriptions, other than what is provided in this section, are provided in the soil logs located in Appendix B of this report. According to the "Soil Survey of Mason County," by the United States Department of Agriculture, Soil Conservation Service (SCS), the site soils are described as Indianola loamy sand, Ih and L, with 8% - 30% slopes. See the soil map below, and the applicable SCS soil profile(s)in Appendix B of this report. N 0 9 f10 dID n Soil Survey from USDA Natural Resources Conservation Service 3.3.1 Groundwater From the water well report(s)and knowledge of the general area,permanent groundwater is at least 160 feet below the current ground surface. Perched groundwater at shallow depths was not observed on-site, nor indicated on the well reports. However, some seasonal groundwater is expected to flow directly above the hardpan on occasion as seepage from the hillside was indicated. Envirotech Engineering Geological Assessment PO Box 984 page 7 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 4.0 ENGINEERING CONCLUSIONS The following sections present engineering assessments and conclusions concerning the project. These conclusions have been made available based on the planned construction activities as outlined in the Introduction Section of this report; general observations of drainage and topography as summarized in the Surface Conditions Section; and, soil conditions that were identified by the field investigation and soils testing as outlined in the Subsurface Investigation Section. Conclusions for the Project that is provided herein, includes pertinent information for landslide,erosion and seismic hazards. 4.1 Landslide hazards Our conclusions are based on the planned development, as provided in the site plan and Introduction Section of this report. Although the development is within 300 feet of the landslide hazard area, it is Envirotech's opinion that the proposed development is not subjected to or cause adverse impacts to the landslide hazard area. This conclusion is based on the contents provided in this report. Landslides are natural geologic processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. Geotechnical engineering cannot eliminate these risks for any site with sloping grades because gravity is constantly inducing strain on the sloping soil mass. Excessive wet weather and/ or earthquakes will exacerbate these strains. Geotechnical engineering considers excessive wet weather and `design' earthquakes in order to provide an acceptable factor of safety for developing on or near sloping terrain.These factors of safeties are based on engineering standards such as defining engineering properties of the soil,topography,water conditions,seismic acceleration and surcharges. Surface sloughing or other types of surficial slope movements usually do not affect the deep- seated structural capability of the slope. However, excessive and/or repeated surficial slope movements, if not repaired, may represent a threat to the structural integrity of the slope. Maintenance of the slope should be completed if the situation does arise in order to prevent the possibility of further surficial or deep seated slope movements that may be damaging to life or Property According to the Coastal Zone Atlas of Mason County, Washington, the Project is within and near terrain labeled `Stable' and `Unstable' regarding potential landslide activity. Stable slopes are generally not prone to landslides due to small grades and accommodating geology. Historically, intermediate terrains have no known landslides. A site specific analyses and conclusions concerning the slopes are presented herein. A Stability Map from the Coastal Zone Atlas for the general area of this Project may be found below. Envirotech Engineering Geological Assessment PO Box 984 page 8 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 N j t-iairtstene island , v n ,4 V Project 0�!stable Wif".r Intermediate x. 77 07 " Modified I� Unstable OW Unstable(old slide) t uutabte(recent slide) Map from Washington State Department of Ecology Website According to the Department of Natural Resources (DNR) "LHZ— Final A-1 Map —Landslide Inventory — Mason Watershed, by Sarikhan, et. al., May 2007," previous landslide activity is recorded near the project, but over 300 feet away from the project. Per the Resource Map from DNR, the Project is adjacent to terrain labeled `highly unstable' or `highly erodible' relating to soils. DNR labeled portions of this project as medium to high slope instability with relation to slopes. This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without field observations or knowledge of the specific site geology or soils.A resource map from DNR is provided below: Envirotech Engineering Geological Assessment PO Box 984 page 9 Parcel 22028-32-9002 t Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 N ■ A ■ noun Project ■ % a on ip ■ So is a s Highly Un tatle �r tik t� 'J r.'- H,ghiy cre6bie r� o= No Data or Gavel Fits Slope Stability-West ` hlodetatP Slope InSlabWtiy Iso Map from Washington State Department of Natural Resources Website 4.1.1 Landslides and Slope Stability Analysis Past landslide activity or high slope instability indicators near the proposed development were revealed during the project research. In addition, landslide activity and potential high landslide indicators were observed during the site visit as outlined in the Surface and Subsurface Conditions Sections of this report. Due to the planned setbacks and drainage control for the proposed development, as described in the Introduction Section of this report, a slope stability analysis was not deemed necessary for this project. Considering the planned construction as summarized in the Introduction Section of this report; the aforementioned surface and subsurface conditions for the project; the slope stability assessment provided herein; and the Engineering Conclusions provided later in this report, it is our opinion that the project will not be affected by a landslide hazard area, and that the proposed site alterations will not encourage additional landslides. 4.1.2 Surface and Subsurface Drainage This project does not appear to experience significant subsurface drainage or surface runoff. It is our opinion that groundwater or surface drainage is not a limiting factor for this Project. 4.2 Erosion Hazards Based on the USCS description of the Project soils, the surface soils are considered moderately erodible. According to the Resource Map from the Washington State DNR, as provided above, the Project is not within terrain labeled `highly erodible.' This Project is not within an erosion hazard area as defined by the MCRO. Erosion hazard areas are those with USDA SCS Envirotech Engineering Geological Assessment PO Box 984 page 10 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 designations of River Wash (Ra), Coastal Beaches (Cg), Alderwood Gravelly Sandy Loam on slopes 15% or greater (Ac and Ad), Cloquallum Silt Loam on slopes 15% or greater (Cd), Harstine Gravelly Sandy Loam on slopes 15% or greater (Hb), and Kitsap Silt Loam on slopes 15%or greater(Kc). Temporary and/ or permanent erosion control measures may be required for any site when land disturbance is involved. Erosion control will mostly depend on the timeliness of construction, moisture content of the soil, and amount of rainfall during construction. Soil erosion typical to the existing conditions and planned disturbance of this Project include wind-borne silts during dry weather, and sediment transport during prolonged wet weather. Sediment transport of disturbed soils could be from stormwater runoff or tracking off-site with construction equipment. Although an engineered erosion control plan is not warranted for this project, Best Management Practices (BMP's) should be employed during and after construction. Ordinary BMP's includes silt fencing,protection of drainage outlets and vegetating denuded areas. Erosion control information and specifications may be found in the applicable "Stormwater Management Manual for Western Washington,"prepared by the Washington State Department of Ecology Water Quality Program. 4.3 Seismic Hazards Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g.This estimation is based on the United States Geological Survey(USGS)National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the next 50 years. There are no known faults beneath this project.The nearest Class `A' or 'B' fault to this property is the Tacoma Fault Zone. This fault is a Class `A', and is located approximately 12 miles to the north of the Project. This information is supported by the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be low for this project. This is based on subsurface conditions such as soil characteristics and the lack of a permanent and substantial shallow water table. Subgrade characteristics that particularly contribute to problems caused by seismic events include submerged and confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. 4.4 Other Considerations Conclusions in this report are based on the type and location of the anticipated development, and existing on-site and off-site conditions. Site development that significantly deviates from the anticipated improvements presented in this report, or nearby development that influences this Project may require geotechnical design recommendations. Envirotech Engineering Geological Assessment PO Box 984 page t t Parcel 22028-32-90021 Belfair.Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 5.0 CLOSURE Based on the project information and site conditions as presented in this report,it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this project. This conclusion is based on our geotechnical study of the project, and does not consider codes, ordinances,or differing geotechnical judgment. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during construction are different than those described in this report. Therefore, it is recommended that Envirotech is promptly notified if project and subsurface conditions found on-site are not as presented in this report so that we can re-evaluate our recommendations. This report presents a geological/geotechnical assessment,and is intended only for the owner,or owners' representative. Furthermore, this report is only valid for the project information and location described herein. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards,and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirotech Engineering Jessica Legarza,M.S. Michael Staten,P.E. Staff Geologist Geotechnical Engineer Envirotech Engineering Geological Assessment PO Box 984 page 12 Parcel 22028-32-90021 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 September 14,2019 APPENDIX A SITE PLAN A SCALE l INCH 150 FEET 150 E%STING SHED EXISTING DRIVEWAY EXISTIM SJWLE FAMILY RESIDFNLE SE DOVNVWJ DRIVE EXISTING SEPTIC DRAINFIELD AREA t ' PROPOSED DRIVEWAYPo � 1 ! t P ro t �% -EXISTING PRIVATE ROADWAY °` •. KIPOSED GARAGE PROPERTY L_ ° 41 SEA FRdI TOP e� OF RDX UMPA. �' VMEJAYION BUFFER FROM e� —TW OF SI.3PE EXCEEDING 40% i�F?'ROXDiATE� TCP W SLOPE EXCEEDING 40% faUt"f201<Id[A'Ls PRM=/ OWNER/ LOCATION, TEE 3P SLOPE SING! E FAMILY PROPERTY 40x GFOGGICAL ASSESSMENT 0PPRO)WATC WLULM NOTES, ffiers-38-90021 1. SLOPE INDICATORS WERE FIELD MEASURED BY V4VbMk0.4 AM/OR L66 %X 24VNVIEW DR EXTRAPOLATED FROM A PUBLIC LIDAR SOURCE VIER£A?P%d!',ATR BOUNDARY OF LMZSLM JVSM COLVOY, WASHINGTON 2. BOUNDARIES ON THIS SITE PLAN WERE NOT PREP/Y A lam'_ HAZARD ARkA LEGEND t1'W=l SURVEYOR.LOCATIONS OF SITE FEATURES AND Milg[CA+'ilUOR'WACE (APPROXIMATE; ._., f)C#lKIYf N ENGINEERING DESIMUST�BETIONS AS VEERIF ED BY THE OWNER, THE CDN�D TO TW Mrl�'Y L'�'tjS ...-�' RECD*f DATIDNS PROVIDED IN THE GEOTECHI(JtAL,'OfOLairA.,AF,POrT SLOPE INDICATOR DE FA tiN4 FSFAtR,1lASHINGTON 98528 ARE BASED ON GEOLOGIC AND SPECIFIC SUBSURFACE FEA74U'WA .11AY PQ PROBE ya�Q•Yyg-9y74 BE LOCATED ON AND OFF THE PROPERTY,AND AK NOf NEl'LS$MMY BASED OFF OF PROPERTY LINES SHOWN ON THIS"..EDE PEAR. TM TEST PIT SITE PLAN APPENDIX B SOIL INFORMATION TEST PIT LOG TEST PIT NUMBER TP-1 PROJECT: SFR Geological Assessment DATE OF LOG: 09/05/2019 PROJECT NO: 19183 LOGGED BY: MCS CLIENT: Mullen EXCAVATOR: N/A LOCATION: Parcel 22028-32-90021 DRILL RIG: None Mason Counti,Washington ELEVATION: NIA INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: NIA STANDARD PENETRATION TEST SOIL STRATA, DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 0 PT DUFF r rr 1 r f�i r , SM Brown,moist,medium dense SILTY 2 SAND with GRAVEL Gravel is fine and subrounded Sand is primarily coarse. Non plastic 3 Excavation terminated at approximately 3 0 feet 4 5 6 7 8 9 10 No Groundwater Encountered ENVIROTECH ENGINEERING This intonnabon pertarns only to des bmng and should not be Geotechrncal Engineering interpreted as bung mdrcfte of ft entire site Map Unit Description Indianola loan iv sand 15 to 30 percent slopes-Mason County. Yeashngton Mason County. Washington Ic—Indianola loamy sand. 15 to 30 percent slopes Map Unit Setting National map unit symbol 2t639 Elevation 0 to 980 feet A.lean annual precipitation 30 to 81 inches Mean annual air temperature 48 to 50 degrees F Frost-free period 170 to 210 days Farmland classification Farmland of statewide importance Map Unit Composition Indianola and sin dar soils 85 percent A9inoi components 15 percent Estimates are based on observations,descriptions,and transects of the mapund Description of Indianola Setting Landform. Eskers,kames,terraces Landform position(two-dimensionO. Backslope Laridfonn position(three-dimensional) Side slope gown-slope shape Linear Across-slope shape Linear Parent material Sandy glacial outwash Typical profile 01-0 to 1 inches slightly decomposed plant material A- 1 to 6 inches loamy sand Bw 1-6 to 17 inches. loamy sand Bw2- 17 to 27 inches sand BC-27 to 37 inches sand C'-37 to 60 inches sand Properties and qualities ,lope 15 to 30 percent Depth to restrictive feature More than 80 inches Natural drainage class Somewhat excessively drained Capacity of the most limiting layer to transmit water(Ksat) High to very high(5.95 to 99 90 mihr) Depth to water table. More than 80 inches Frequency of flooding None Frequency of pondntg None Available water storage in profile Low(about 3.9 inches) Interpretive groups Land capability classification(irrigated) 6e Land capability classification(noninigated) 4e Hydrologic Soil Group. A i e% Natural Resources "eb Sod Survey 918/2019 41110 Conservation Service National Cooperative Sal Survey Page 1 of 2 Map Unit Description Indianola loamv sand.15 to 30 percent slopes---Mason County. Washington Forage suitability group Droughty Sods(0002XS401 WA), Droughty Sods(0002XN402WA) Hydrrc soil rating. No Minor Components Alderwood Percent of map and 8 percent Landform Ridges,hills Landform position(trvo-dimensoorral) Backslope Landform position(three-dimensional) Side slope,nose slope.talc Down-slope shape Linear.convex Across-slope shape Convex Hydrrc soil rating No Everett Percent of rnap unit 5 percent Landform Karnes.eskers.moraines Landform position(two-drmensionaU: Backslope Landform positron(three-dimensional): Side slope Down-slope shape Convex Across-slope shape Convex Hydrrc sod rating No Norma Percent of map unit 2 percent Larxfforw Depressions,drainageways Landform po:itrorr(three-dtrmensronal) Dip Down-slope shape. Concave,linear Across-slope shape. Concave Hydrrc sod rating Yes Data Source Information Sod Survey Area Mason County,Washington Survey Area Data Version 14,Sep 10,2018 siix Natural Resources Web Soil Surrey 918/2019 adft Conservation Service National Coopetav a Soil Surrey Page 2 of 2 WATER WELL REPORT copy-E-fty. d,Ar CURRENT Notice ofkdentNo.WE(*19.3 Construction[DecommissWo rx'in circle) 2 ccj9'70 Construction lJni4uc Ecolop Well ID Tag No NAC328 (MM-4.ZMAIM1,10N WailRigm Itrow,NN WNW Qtw=N*m4 rINA SCRAA!" WC It S4ma 44ffmo 2-",F DAV6'MV" city Clwuy MASON Li Calitt L oem ion S*-' 114-1/4 N'A I Sc ,—A T%%%�'IVN ItZ—wmar M Chia K I,r SAO)KLQUJRED) w+wOnt CO%c tar TION 1)"AII-19 Let/Long Lat Deg Lat.Min/Sec (—., 0-W�+kd 6 fi.. a. 229 It 7. It- R e—A, Long Deg LmgMin/Sec 0- EA-F- R m ft, Tax Parcel No.(Required)120283290021 P110*961kIM OMMA-4 MOM,1111116111110111%F-10 OF WOW WA10400*4111. Artlottara aiviathil to imit*%Up RAMMIMIA VA A*w-we ew tkva*ataeaa 14 SUZYCLAY 14 claw. mal*m tw U,V saw" d I? Ob,K No"' GRAY 1lKTTftx*wEw7V8-L 17 SS- mww"t*N two tw GRAV SILTY MAY 46 j3r—' SM60solk o!r YI* C] T-1,00nW. 20 !m*wN§rfTYUay-FVwCAAVm —17"—a—M mumlami.".a MWMNI*MCMPS GKAY1rMKVmy 142 psi- D'A my emb mdapt -Yft---r- Fk M SH DAWN CLAY,MCI- 131 163 B34DWW 11111TYCIAVAMORAVAL Ids 1171 Qmyrm SAM Q"VV_wirr 17) ra m Mw#Akuwmnmm COAMORAVILAMWAM 2M12 rum 'r KIP. wistip"matt" j3 To ft emir~ ,�w PuaILVws 4"Amoftr im ys" PtA-k-mft A.drarrdara Aff-1111%. Rem, *k"%no%**Ado ira- WIWL" Y.* WOW 1,04 "Im, WINI'Low • boom FI*VIA-_ AV&A JL—.0Sni►.4*.bA*Rd 2m IL air J__Wv. Anvom ftw 5#0 IAM WELL CONSTRUCTION CIERVIFICATIOM,coffitructed arid/or accept re%pot*bility for construction of tWS wet,"m comms,%tv with at Was"gton wet cmurKismstandaids Materal,u%cd Anol�infortnation reported above are true to my test know'xillicanIl belief CY)r,llvrjEngmow[.:Trawm N. MiliVA P Dn'lwgCnriparry ARCADIA DRILLING M. . Driller"FAll"IterrTrairim Sigmt.. Address P0 BOX 1790 Driller or trainee Licem N. 297fr City,Sme,Zip SHELTON IF TRAINEE Vwdle� WA . 99584 Drdws signswe KrgrsrratmnNo ARCADDI099K1 Ow 715107 ECV OW 1-20(A.4m?) E.'"y is-Spa Orwri-ey E-Pt.)v,