HomeMy WebLinkAboutBLD2024-00533 DEMO - BLD Inspections - 5/30/2024 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2024-00533 PROJECT ADDRESS 11 N COHO CT HOO, WA 98548
PARCEL# 422165300054 PROJECT DESCRIPTION Demolition
OWNER LAKE CUSHMAN CO ADDRESS 24113 56TH AVENUE WEST PHONE 425-754-2069
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSf D TE Comments INSPECTION INSP DATE Comments
Connection has been verified by Demolition Final Inspection
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-00533 DEMO
PROJECT DESCRIPTION: DEMOLITION ISSUED: 04/30/2024
SITE ADDRESS: 11 N COHO CT HOO
EXPIRES: 10/27/2024
PARCEL: 422165300054
APPLICANT: Lake Cushman Company OWNER: LAKE CUSHMAN CO
24113 56th Ave W 24113 56TH AVENUE WEST
Mountlake Terrace,WA 98043 MOUNT LAKE TERRACE,WA 98043
425-775-3880
FEES: Paid Due
Demolition Fee $120.00 $0.00
State Fee-Residential $6.50 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Totals : $131.50 $0.00
REQUIRED INSPECTIONS
Connection has been verified by Health or Utilities Demolition Final Inspection
CONDITIONS
All construction debris must be removed from the site after project completion to an approved location. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic
environments.
* Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland
sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading,
or construction. These control measures must be effective to prevent soil from being carried into surface water by
stormwater runoff. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state
regulations.Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior
authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding
or upland vegetation has become established around all areas disturbed or newly created by construction activities.
Printed by:Annie Wilson on:05/03/2024 09:07 AM Page 1 of 2
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
DEMO BLD2024-00533
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire.
" OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful
for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing
materials have been removed from the area to be demolished.work shall not commence on an asbestos project or
demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia
WA 98502, 360-586-1044, 800-422-5623,www.orcaa.org
" For public safety, it is the responsibility of the applicant to confirm through written verification all utility services(electric,
gas,water, sewer, ...) have been terminated prior to demolishing a structure.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Annie Wilson on:05/03/2024 09:07 AM
Page 2 of 2
GOHO cT �D
rA
a
\' C
wz:
fS �/
�d
3tTC rPP"4: /1 GONG c7 RO
"KE cV.4,,sJM AJ
tow rL* yor-r4)
4-AP, T??h/, AP,*WWAf