MASON ENVIRONMENTAL PERMIT
May 22, 2007
MASON COUNTY PUBLIC WORKS
P.O. BOX 1850 TO BE KEPT IN TF 117 SHELTON WA 98584
PARCEL FILE
Parcel No.: 420021000010
Issued: 5/22/2007
Case No.: MEP2007-00004
Project Description:
Construct new Public Works Facility within Aquifer Recharge Area.
The following critical areas are present on this property:
Long-Term Commercial Forest FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
X Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit,with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter
17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other
federal, state,or local statutes, ordinances, or regulations applicable to this project. This permit may
be rescinded if the permitee fails to complete the project as proposed or fails to comply with the
standards of this ordinance.
Of
7
Authorized Local Government Official Date
Mason Environmental Permit
5/22/2007 Case No.: MEP2007-00004
Conditions:
1.) All upland areas disturbed or newly created by construction activities shall be seeded,
vegetated or given an equivalent type of erosion protection (silt fencing or straw matting).
2.) The applicant acknowledges that the project will be completed as proposed, so that the
project will be consistent with all applicable standards of the Mason County Resource
Ordinance.
3.) Temporary erosion control measures must be implemented to prevent water quality
degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained
until upland vegetation has become established.
4.) Approved per dimensions and setbacks on submitted site plan.
5.) Subject to conditions of Aquifer Notification letter.
6.) Conditions for Special Use Permit No. DDR2007-00008
1. A stormwater site plan with low impact development features such as pervious paving,
rain garden infiltration and native vegetation, will be created and implemented prior to
development, clearing, grading or construction of any portion of the proposed
development.
2. The proposal shall be required to control erosion during construction. Removal of
vegetation should be minimized and any areas disturbed should be restored to prevent
erosion and other environmental impacts.
3. Site is within a portion of the county designated as Class II Critical Aquifer Recharge
Area, under Critical Aquifer Recharge Area Chapter 17.01.080 of the Mason County
Resource Ordinance. All provisions of the CARA chapter shall be followed including
obtaining a Mason Environmental Permit, application of Best Management Practices on
site, and an engineered stormwater site plan in compliance with Ecology's stormwater,
water quality, Hazardous Waste,wetland and solid waste program BMP, and BMPs from
the departments of Health, Agriculture, Transportation and State Conservation District
Office.
4. Project applicant shall develop in compliance with Geotechnical report completed for
this site by Aspect Consulting dated January 22, 2007 and updated March 26, 2007.
5. In accordance with discussion between Squaxin Tribe and Mason County at meeting on
April 9 2007, Mason County and the Public Works department propose to work with the
Squaxin Indian Tribe to craft a Memorandum of Understanding between the two
governments, relating to proposed project measures, which further reduce impact to the
aquifer beyond that of usual development impact through a series of additional measures.
These proposed measures and the memorandum are being developed, but would include
such measures as low impact development, and minimizing water withdrawal through
conservation measures, pervious pavement, stormwater infiltration, rain gardens and
native vegetation, and proposing to hook up to City of Shelton water when it becomes
available. Although this proposed Memorandum of Understanding is still under way as of
this date, it is the understanding of the parties that it shall be completed and in place prior
to the issuance of building permits for this project.
5/22/2007 2 of 2 MEP2007-00004
PERMIT NO.: MEPa00 /— fd004
DATE RECEIVED:
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
RESOURCE ORDINANCE (Chapter 17.01 MCC)
411 N. 5TH Street/P.O. Box 279, Shelton, WA 98584"0 BE KEPT In,
ENVIRONMENTAL PERMIT APPLICATION a FI L FIL
MASON ENVIRONMENTAL PERMIT CONDITIONAL USE ❑
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical
areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58
RCW.
PLEASE PRINT
1. I-
Owner: / 6e0w &b Lf�l✓ nk4?r 5wner Mailing Address:
D- Eox /050
Site Address: //
W U1 LO✓`YIPr :5910/ -f SR/672-- City: azAYl State: WA- ZiTAMW- -
City: State Zip: Lien/Title Holder
Mason Coup
Phone: Daytime(^ �f-27— 9�7D
Address:
Fire District#:
City: State: Zip:.
Signature:_
2. Parcel Number:�ZbO - 7,7- - JDOOGIO Legal description:
Parcel Size:
3. Directions to site:
State what sections require a permit: In-Holding Lands, Chapter 17.01.062 ❑
4' Long-Term Commercial Forest, Chapter 17.10.060 ❑ Wetlands,Chapter 17.01.070 ❑
Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑
Aquifer Recharge Areas,Chapter 17.01.080 P� Landslide Hazard Areas,Chapter 17.01.100 ❑
Erosion Hazard Areas,Chapter 17.01.104 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑
Fish and Wildlife Habitat Conservation Areas,Chapter 17.01.110 0
5.
Identify current use of property with existing improvements:
1 14 LM G P
6.
Identify and describe the proposed project,including the type of materials to be used,construction methods,principle
dimensions and other pertinent nfoti n Atta h additional
needed): -#G(GALE 7� jeJ = ams7. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No 1w
8. Any water on or adjacent to property:
Saltwater 0 Lake ❑ River ❑ Pond ❑ Wetland 0 Seasonal Runoff 0
Other
9. If septic is located on project site,include records.
Connect to septic? 0 Community Septic? ❑ Public Water Supply? 0 Well?)w
10.
Type of Job: New 5C Add ❑ Alt b Repair 0 Demolition 0 Other
This permit is granted pursuant to the Resource Ordinance(Chapter 17.01 MCC)and nothing in this permit
shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or
regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be
rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance.
MASON ENVIRONMENTAL PERMIT: $510.00/$305.00(with another permit)
MASON CONDITIONAL USE ENVIR.PERMIT: $1,225.00
HABITAT MANAGEMENT PLAN: $360.00
I:\PLANNING\C&R\ENVIRONMENTAL REVISED 09-14-05