Loading...
HomeMy WebLinkAboutBLD2011-00238 Final SFR - BLD Permit / Conditions - 7/25/2011 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 lrf,, Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2011-00238 OWNER: JERRY CARNAHAN CONTRACTOR: BATTLE GROUND CONSTRUCTION INC 1.360.576.0337 LICENSE: BATTLGC926J2 EXP: 4 RECEIVED: 4/1/2011 ISSUED: 5/3/2011 SITE ADDRESS: 141 NE SIDES WY BELFAIR EXPIRES: 11/3/2011 PARCEL NUMBER: 223117600160 LEGAL DESCRIPTION: TR 16 OF SURVEY VOL 4/19-22 PROJECT DESCRIPTION: DIRECTIONS TO SITE: REPLACING EXISTING MFG HOME WITH STICK BUILT WITHIN THE ST RT 3 TO BELFAIR, L ON ST RT 300/ NORTH SHORE RD, R ON BELFAIR SAME FOOTPRINT TAHUYA RD, R ON ELFENDAHL PASSE RD, R ON SIDES WAY TO SITE ADDRESS ON THE LEFT SIDE General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: 2 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3 Lot Size: Deck: Type of Work: NEW Fire Dist.: 2 No.of Stories: 1 Occ. Load: Building:1,764 Valuation: Building Height: 17 Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: W 220.0 Ft. Shoreline: Ft. Water Body: Rear: E 219.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: N 330.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: S 120.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Water Closets (Toilets) 2 Dryer Vent 1 Plan Check Fee GMM 4/1/2011 $933.50 S 120110001 Lavatories 2 Exhaust Hood 1 Planning Review Fee GMM 4/1/2011 $205.00 S 120110001 Bath Tubs 1 Furnace<100K 1 EH Plan Review KKK 4/1/2011 $103.00 S620110001 Showers 2 Ventilation Fan 3 Building State Fee LDK 4/18/2011 $4.50 S12011000( Water Heaters 1 Building Permit Fee LDK 4/18/2011 $1,436.15 S12011000( Clothes Washer 2 Mechanical Permit Fee LDK 4/18/2011 $67.50 S12011000( Kitchen Sink 1 Mechanical Base Fee LDK 4/18/2011 $28.50 S12011000( Dishwasher 1 Plumbing Permit Fee LDK 4/18/2011 $110.60 S12011000i Hosebibs 2 Plumbing Base Fee LDK 4/18/2011 $24.70 S12011000i Total $2,913.45 BLD2011-00238 Please refer to the following pages for conditions of this permit. Page 1 of 5 CASE NOTES FOR BLD2011-00238 CONDITIONS FOR BLD2011-00238 1) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depart t rit,prior to any further inspections being performed or approvals granted. 2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or remov"f approved documents will result in failure of required building inspections. X 4) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 5) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Buildin Department prior to any further inspections being performed or approvals granted. X 6) Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option III, Window(Max U-Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38 advanced or R-49 standard, Vault Insulation R-38, and Slab Insulation R-10. In addition the following credit from Table 9-1 shall be completed: 3b i X �. BLD2011-00238 Please refer to the following pages for conditions of this permit. Page 2 of 5 7) A permanent certificate, completed by the builder or registered design professional, shall be posted within three feet of the electrical distribution panel. The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient(SHGC) of fenestration. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Section 503.10.2, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 0.00030 Specific Leakage Area (SLA) when tested with a blower door at a press of 50 Pascals (0.2 inch w.g.). Testing shall occur at any time after rough in and after installation of penetrations of the building envelope, including penetrations for utilities, plumbing, electrical, ventilation, and combustion appliances and sealing thereof. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 750 square feet. Reference WSEC 105.4 Certificate and 502.4.5 Building Air Leakage Testing. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2009 Certificate"and are available in X or'/z sheets. The Mason County Permit Center will also have some available. X l 4�1 8) A minimum of 50 percent of all luminaires shall be high efficacy luminaries unless lighting compliance was approved using the options available in WSEC Section 1520 or 1530. Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaries unless permanently installed outdoor luminaires are controlled by a motion sensor(s)with integral photocontrol photosensor or installed in or around swimming pools or water features. All fluorescent fixtures must be fitted with T-8 or smaller lamps (but not T-10 or T-12 lamps). Reference WSEQ',505. X 9) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. X / lL 10) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contracto �acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X ( 11) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/Reserve requires a 10ft setback from all footing/foundations. B. Septic tank(s) requires 5ft setback from all footing/foundations. C. No foundation drains within 30ft, down gradient of drainfield/reserve area. X /4 A� BLD2011-00238 Please refer to the following pages for conditions of this permit. Page 3 of 5 12) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X 13) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 61L 14) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocajfor}. X 15) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X_ 16) Placement of structure must comply with standards set forth per the international codes regarding descending and/or ascending slopes. X " 17) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X L;l 18) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X � 19) All property lines shall be clearly identified at the time of foundation inspection. X 20) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X BLD2011-00238 Please refer to the following pages for conditions of this permit. Page 4 of 5 21) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 22) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and fla ing. Install metal connectors approved for contact with the new types of pressure treated material. X ' 23) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. X 24) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure these structures meet the setback conditions listed. X l 25) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan"t ensure these structures are shown and meet the setback conditions listed. X a� J 26) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The erson signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. i X I 27) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. x Ct v 28) All construction and demolition debris must be removed from the site after project completion. Proper dispospl of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X r 4� ,% This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason Count=access to the above described property and structure for review and inspection. OWNER OR AGENT: ` G DATE: V /,/ BLD2011-00238 Please refer to the following pages for conditions of this permit. Page 5 of 5 0 CONCRETE MECHANICAL MANUFACTURED HOME 0 rs..� > C)l Date BY X — Footings I Setbacks Gas Piping Ribbons z 6 Interior Date C6�evOBY Interior-Date By Date By > W e_�—Exterior Dat -tt_ Ell Exterior-Date By Set-up > 00 INSULATION z Point Load I Isolated Footings ---- -- Date By L Date By BG I SLAB INSULATION M Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date— BY Data Z—z By DECKS FRAMING Walls 1 Date By Ble Data Date -22 --- 0 By PROPANETANKS PLUMBING vault Data By Data By -- OTHER Groundwork Attic Date By Date 7-21- 11 By Type Data By DRYWALL Type- InLBrace Wall Date By IOU Date By Data By r CD FINAL INSPECTION 0 W (A Water Line Fire Separation IN) CD CD Date By Bye Date J/ By Date Pass or Request inspect. CD Type of Insp. Fail Date Date Done By Comments CD co 0 S-3-ft 41 IfV6 CD C/) IF > _T1 0 zv, I e :3 3-- :3 0 P?,� A'6 A h Q EP F 101-7710 -2 17-74� -41 /,5( WXYvo` PIZ 0 IF 2 -zyai �L 1 - per,d or,� ���' 7-2Z—Itl 7-2 NC P �IcE-eS Scale !'_ IOo'' BELTAI RIWA I F o 5o ioo "54 243`x too` ExSls-nNG 2"� M�iE, �N �;�OP�t2TY 530' �-- 55 1 �'v�l S6P't C LINES 2�x ?2cif 150' /5WrlC T-AN XS wee i'+Eo �Ja 28 xGo" EXSISTING 20,11 2130" � HcAAE A.IJ C) 'k'�F'� O sa�- 6F 8,J j6vV EX&STI N 6 HOME TO BE ._ 530D APPROVE MASON COUNTY DCD LANNING SITE PLANIZEQUIRED TO BE ON SITE CHANG rlETTO APPROVAPLANNINGBy ALL SET3ACKS ARE lVicASURED ! u^Et��,D FROM THE FUR T HEST i EC l d in FROJECTiO�! OFTiiE BUILDING APR 0 2011 MASON CouNTY Name C bs Parcel# a) 3)/— 71 —G b!G o BLD# p101 1" 00;k0j1e) Iq � s 4, "Ve)(I _Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 1 of 2) Per Mason County Code,Title 14,Chapter 14.48 a Stormwater site plan is required whenever a building application is made for residential development,or redevelopment',with more than 2,000 square feet of impervious surface 2. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction,installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. ZCommon impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. To Calculate Impervious Surfaces Please Complete This Table Surface Type Length X Width = Area *All dimensions in feet Buildings X X = Measurements for buildings are taken at the X _ perimeter of the farthest projections (example: eaves/gutters) X = Driveways X X = r Length of drive begins at the right of way X = Parking Areas X = Any paved, gravel or packed area per definition X X _ above table Patios/Walks X = X = Any paved, gravel or packed area per definition above table X = Others X = X If the total impervious area of the proposed site X = development is greater than 2000 square feet a Small Parcel Stormwater Site Plan is Required Total Impervious Surface Area(sum of all areas) If the Total Impervious Surface Area is LESS THAN 2000 Square Feet, please read,acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. X ' Owner/Agent/Contractor(circle one)Date: If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet, please read,acknowledge and sign the information provided on page 2 of 2. Page 1 of 2 Name Parcel# BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity. Title 14, Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website: httpHwww.co.mason.wa—us/code/commissioners/index.htm Please follow the links to "Title 14,Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan (Mason County Code Title 14 Chapter 14.48 section 14.48.70). You will receive a copy of the Public Works document entitled "Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan". This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details* are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system (see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with"Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions,guidance and examples. (Section 14.48.130)contact Public works at: Phone: (360)-427-9670 EXT.450 Mail: P 0 Box 1850, Shelton WA 98584 Physical:415 N 6th St, Shelton WA 98584 If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other,parcel. You may also wish to consult with the septic design professional involved with the project.Mason County Division of Environmental Health can be reached at: Phone: (360)-427-9670 EXT.352 Mail: P 0 Box 1666, Shelton WA 98584 Physical: 426 W Cedar St, Shelton WA 98584 A condition will be added to the building permit that states, in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. X Owner/Agent/Contractor(circle one)Date: Page 2 of 2 - � Properti3��� �d 7 I c�attsea�r E�locu area bate ! i Bu3kTa orregl�ered�es�n�esaian� OD s� 0) m �n Cog: Vaulted R- Fbara Oymwwac cw*fladTwc R- Attic R- an gadeSvar A V1faft. 0mcgride R- Dmrs R - OD 1. Y'°.�.1k,•rr:r. M1: t�RCra<ai3(m) tiYmdaars u- SHGC- Dcbmk rtvng Cws•10 w=MM SYyr*Is U- SftCC- rq O -� ="• ��r� � � µid��E�ii:` - j LYEFlgdebq cn z o °o (JooTia DHW e. ✓. O t� CE o All dact9 6c$VAC in conddMCd 9=0 0310) Tnsul tw IL- � Test 'fotalTeatime —LeA3p to Wafer_Aihmdtermat TfA Tzzd_CFM@lW& Test Volt m -+ Buff&ng airTeskxA¢target.sLM0.M34-Ttswd teams a-k 3f N'v Rasasvwbis ESas�r�c P�en+e►�y.�aar N ' gygan typo tZdcd zcnmal grncrariun Kwh h 8/23/2012 Case Activity Listing 8:59:03AM IP14 Case#: BLD2011-00238 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By UpdatedUpdated By BLDB110 Building Plan Review 4/1/2011 4/18/2011 None DONE LDK 4/18/2011 LDK COMPLETED PLAN REVIEW AND SENT TO CASE MANAGER. BLDB120 WSEC Compliance Review 4/18/2011 None DONE LDK 4/18/2011 LDK PRESCRIPTIVE III;CREDIT 3b BLDB200 Environmental Health Review 4/1/2011 4/26/2011 None DONE ADR 4/26/2011 ADR Sent to staff to pull septic records. 4/26/2011 Bedrooms and plot plans match. Satisfactory pumpers report on file. BLDB210 Water Adequacy 4/1/2011 4/26/2011 None DONE ADR 4/26/2011 ADR Replacement BLDB130 Planning Review 4/1/2011 4/28/2011 None DONE AHB AHB 4/28/2011 AHB Replacement of existing MH residence. BLDA100 Approved for Issuance 5/2/2011 None DONE GMM 5/2/2011 GMM Called and talked with Jerry,let him know that the permit is ready to be picked up,also gave him the remaining amount due. BLDA500 Issue Building Permit 5/3/2011 None DONE GMM 5/3/2011 GMM BLDA540 Print Inspection Card 5/3/2011 None DONE GMM 5/3/2011 GMM BLDC 110 Footing Inspection 5/3/2011 5/4/2011 None COND TFR 5/5/2011 PIB Setbacks/Footings-Conditional Pass: Install stub for interior footings. BLDC115 Foundation Wall Inspection 5/23/2011 5/25/2011 None DONE TFR 5/26/2011 PIB Stem Wall-Done: Routing slip said stem wall-contractor wanted exterior shear-I told him about Mason County requirements and next inspection would be F/P/M/P.Also to renail many runs over driven- also R-21 in walls(R-19 at shower now) R-49 will be required in lid thus longer baffels and taller damn at attic access.. Plus I believe under vented at bird block-skips 3 then 4 has approximately 1 3/4X7" or 6? Rectangle. He said he would add a gable and vents. Has roof jacks now FYI 2'stem wall no insp.required. Page 1 of 4 . CawActivity..rpt 8/23/2012 Case Activity Listing 8:59:03AM Case #: BLD2011-00238 PIO Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated 1By BLDC140 Framing/Plumbing/Mechanical 6/2/2011 6/3/2011 None FAIL. TFR 6/6/2011 PIB FPMP-Fail: 1.) Install full caulk and seal packaage. 2.) Install or cover all windows. 3.) At top plate-support bottom plate that does not rest on stud. b.) At top plate strap plates together with 1 1/2 wide 1 1/4"each way and install 6 16d each side. 4.) Install all exhaust ducts ie one in hall and seal. b.) All joint req 3 screws except dryer duct. 5.) Provide correct truss engineering building is 28'wide truss engineering shows 26'trusses. 6.) At I13WP at top install latter blocking as detail shows or provide engineer alternative. 7.) Install attic access tall enough to hold back R49. 8.) Under master tub sister joist hacked by plumber. 9.) In crawl space all plates require minimum 2 anchor plates with washers. 10.) Nail plates at 113WP per code. 11.) Toenail floor joist with 3- 8d each end. 12.) At strip footing install 2nd joist for IBWP and build wall to bottom of joist per detail 2 on page 2. 13.) Install blocking removed by plumber. 14.) Install all double joists under IBWP and blocking where perpendicular. 15.) At strip footing install all washers and missing volts. 16.) Clean debris from stud cavities. Do not insulate. BLDC140 Framing/Plumbing/Mechanical 6/13/2011 6/15/2011 None FAIL TFR 6/16/2011 PIB F/P/M/P-Fail: 1.) At last inspection I checked header nailing in bedroom by drieway and closest to road which mostly compiles-rest of building has only 1&some cases 0 nails at king stud to header-requires 5- Id each end-most have 1/4-3/8"gap at one end or both as stud has bowed. Install 2"x6"ledger locks to try and suck studs over and foam any remaining gaps-foam large at top plate with other small debroom 2 spots and all long skinny gaps at stud to stud. 2.) Install range hood duct. 3.) Detail on page 4 shows 3 16d into top plates at blocking not 2 and end nailed not toe nailed and plate nailing with 3- 16d. See circles items. 4.) Per last correction notice#11 toenail all joist with 3-8d each end. 5.) Per last correction notice#9 all plates require minimum 2 anchor bolts with 3"plate washers. 5.) #10 re-stated in#3 above. 7.) #14 from last correction notice not done at laundry. 8.) Clean all construction debris from crawl space. 9.) Provide gable end detail-see circled item on gable truss eng. 10.) $73 re-inspection fee due prior to next inspection. Do not insulate. Call for re-inspection when corrections are made before continuing. BLDA920 Miscellaneous Action 6/16/2011 None FEES PIB 6/21/2011 PIB An adjusted re-inspection fee of$54.70 due prior to next inspection. Page 2 of 4 CaseActivity..rpt Case Activity Listing 8/23/2012 8:59:03AM NP14 Case#: BLD2011-00238 IAKV Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By' BLDC130 Plumbing Inspection 6/16/2011 6/20/2011 None PASS TFR 6/21/2011 P1B DWV/Supply-Pass. BLDC135 Mechanical Inspection 6/16/2011 6/20/2011 None COND TFR 6/21/2011 PIB Mechanical-Conditionally Pass. BLDC125 Framing Inspection 6/16/2011 6/20/2011 None FAIL TFR 6/22/2011 PIB Frame-Fail: Ok to insulate walls. Install range hood duct by final. Per last correction notice#9 all plates require min 2 anchor bolts w/3"plate washer. At master bath corner and other end wall 2 required within 10". Epoxy will view at insulation. Doing cfm and master bedroom osb as marked on plans filed agreement. Clean all construction debris from crawl space by final. BLDC125 Framing Inspection 6/21/2011 6/23/2011 None FAIL TFR 6/24/2011 PIB Re-Frame-Fail: 1.) Install anchor bolts by next insepction or a re-inspection fee will be charged each inspection until done-#5 from last 2 inspections. 2.) If insulation is tucked under its too long. Trim to fit stud bay. 3.) If insulation is bulging its too wide. Trim to fit. 4.) Stuff insulation in all gaps between framing members or caulk exmp.living room window sill left corner and between cripples below check entire house-same window upper right comer gap at header OSB for strip short&2X4 fill gap and plate breaks look above living room window-treat all. 5.) Insulation to go all the way behind electric box exmp master bedroom left window lower right at box. 6.) At wall pockets slit and let insulation fluff if not enough install insulation. See master bedroom closet right of right window inside closet treat all. 7.) FSK insulation below master tub. Do not stock drywall. This is not a complete inspection. Call for re-inspection when corrections are made before continuing. Make corrections,items will be checked on next inspection. BLDC145 Insulation Inspection 6/21/2011 6/23/2011 None FAIL TFR 6/30/2011 PIB Wall Insulation-Fail-see notes under Framing inspection dated 6-23-2011. Note: #1 &#9 not done-$73 re-inspection fee due. BLDC145 Insulation Inspection 6/24/2011 6/24/2011 None PASS LAW 6/30/2011 PIB Wall Insulation-Pass. BLDC 150 Wallboard Inspection 6/24/2011 6/29/2011 None PASS TFR 6/30/2011 PIB IBWP-Pass. NOTE: #1&#9 not done $146.00 due. Pagp 3 of 4 CaseAetivity-rpt 8/23/2012 Case Activity Listing 8:59:03AM 1?4 Case#: BLD2011-00238 _ F Assigned Done jaw. 4w Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By , BLDA920 Miscellaneous Action 6/30/2011 None FEES RIB 6/30/2011 P113 $146.00 due as#1&#9 from FPMP inspection have not been completed-correction notices remind to have#1&#9 done when calling for inspections but they have not been completed in the past 3 inspections. BLDC050 Pre-Site Inpection 7/22/2011 7/25/2011 None PASS LAW LAW 7/26/2011 KS BLDC155 Final Inspection-Passed 7/22/2011 7/25/2011 None PASS LAW LAW 7/26/2011 KS Page 4 of 4 CaseAc ivity_.rpt MASON COUNTY PERMIT NOIJA CZ I I"COa?6 BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 � On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFOR�ATIQN, Owner t/i R c� C.jQ✓l � ;A- /J o+e,/ Company Name 1a er1C- Mailin Address !y r IV r- 5 rb r� �,�,�q Mailin Address o iv 7 City %"- State �'A'�Zip Code 'US-1 City C.• State YQ�04 h Zip Code Phone Other Ph. Phone -3 6,>7 7I Other Ph. Lien/Title Holder Contractor Reg. # Cf 1(- xp. yA.Z2,112 E mail address E Mail Address aA Hlc �-��+yh� C'bJ j., -�he G� +) �'^ M Drivers Lic.# DOB Drivers Lic.#��J9/'t�J� 5�1�/O� DOB SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect Sa�Vater System Name of Water System Well ✓ Water System Name of Water System PARCEL INFORMATION- 12 Digit Parcel No -7 Fire District Legal Description +/( 0 6 4 /k -- 5 ---- Site Address(Please include street name, street number and city) Directions to sites Will timber be cut and sold in parcel preparation? Yes Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIQENCE SEASONAL ❑ ' Describe Work S l i ck r- Use of Building es , �c� No. of Bedrooms No. of Bathrooms 'I— Square Footage- 1 st Floor�I--1 2nd Floor �— 3rd Floor Basement Deck Covered Deck Other Sq. ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make f Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ yReplacement Unit? Yes/No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. / X � ' Date• 4/I� Owner/Owners Representative/Contractor indicate which one FOR OFFICIAL USE BEYOND THIS POINT Accepted by: I Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department +f{ N 1,4 Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Building Permit Fee Site Ins ection Plan Review Fee EH Review Fee Plumbinq & Base Fee Planning Review Fee Mechanical & Base fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation $ TOTAL FEES MASON COUNTY PERMIT NO1G PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar• P.O. Box 186, Shelton,WA 98584 Shelton (360) 427-9670 • Betfair(360)275-4467•Elma (360) 482-5269 On the web www.co.mason.wa.us ' APPLICANT INFORMATION CONTRACTOR INFO Mq�IQ Owner '' tea n rV/1 1-1�r✓ � H 1p Company Name Mailing A dress % Y / �1= S f w� Mailing ddress '9,!n-9 i 7 fUe 17e7-- city Phone ('ra 'L State (�,'bZip Code 'IF5-�q City - State i'''�`` Zip Cod 1e 9 b Q` Other Ph. Phone G­7 7 Other Ph. Lien/Title Holder Contractor Reg.4 7 v � 19 G 4�� �� Exp. l E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# ,',a-1" L 1�bOB SEPTIC INFORMATION - Connect to New Septic Existing Septic. 4 Connect to Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. 2 a 3)1 - 7 Fire District Legal Description l ' / S " '')'+-- Site Address (Please include street name, street number and city) /-// Directions to site Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other IUse of Building Location of Fixtures/Units - 1 st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNIyS Type of Fixture No. of Fixtures Fees Fuel Type:Electric LPQ - Natural Gam_ Heat Pump_ Toilets 3 Type of Unit No. of Units Fees Bathroom Sink i Furnace 1 Bath Tubs Heatpumps Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer 2 _ Gas Outlets Kithen Sinks Wood/Gas/PelletStove Dishwasher Kitchen Exhaust Hood I Hosebibs 2- Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X - -- Date: Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYONDTHIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMEPitAL REVIEW APPROVED DENIED NOTES Building Department Occ Group Type Constr. IK 141,' Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES