HomeMy WebLinkAboutBLD2011-00104 Cancelled Replace MFG Home - BLD Permit / Conditions - 2/25/2011 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2011-00104
OWNER: JERRY CARNAHAN RECEIVED: 2/10/2011
CONTRACTOR: SOUTH SHORE CONSTRUCTION LICENSE: SOUTHSCO16NL EXP: 3/13/2012 ISSUED: 3/11/2011
SITE ADDRESS: 141 NE SIDE WY BELFAIR EXPIRES: 9/11/2011
PARCEL NUMBER: 2231 1 76001 30
LEGAL DESCRIPTION: TR 16 OF SURVEY VOL 4/19-22
PROJECT DESCRIPTION: DIRECTIONS TO ITE:
Replacement MFG Home ST RT 3 BE AIR, L ON ST 3 0/ NORTH SHORE RD, R ON BELFAIR
TAHUYA D, R N EL NDA S RD, R ON SIDES WY TO SITE
ADDRES ON T E L SI
General Information Construction &Oc p cy I f rmatio Square Footage Information
No. of Bedroom ype of C tr.: VB
Type of Use: MH sp.Ar No. of Bathroo 2 Occ. G -3 Lot Size: Deck:
Type of Work: NEW Fire Dist.. 2 No. of tor' s: 1 Occ. oad: Building:
Valuation: B 'Iding ' ht: 17 tatus: Prima Basement:
Manufactured Home lnfprmation Setback Information Shoreline&Planning Information
Make:KARSTEN Length: 60 Ft. F nt: S 120.0 Ft. Shoreline: Ft. Water Body:
ear: N 215.0 Ft. Slope: Ft. SEPA?: No
Side 1: E 140.0 Ft.
Model: Width. 7 Ft. Shoreline Desig.: Not Applicable
Year:2011 Serial No.: ? Side 2: W 300.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Mobile Home Submittal Fee GMM 2/10/2011 $264.25 S12011000
Planning Review Fee GMM 2/10/2011 $205.00 S12011000
EH Plan Review GMM 2/10/2011 $103.00 S12011000
Mobile Home Issuance Fee LDK 2/23/2011 $264.25 512011000
Total $836.50
BLD2011-00104 Please refer to the following pages for conditions of this permit. 1 of 5
CASE NOYES FOR
BLD2011-00104
CONDITIONS FOR
BLD2011-00104
1) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
2) Own Agent i responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X ,,, / /
3) THE FO NDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X :2&w
4) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
X
5) Any retailer( anufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State
Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present
to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified
installer responsible for each major part of the installation. RCW43-63B.090
An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily
located in plain site within three of the home's front entry. There shall be one certification tag for each certified installer accounting for the work that each
installer performed or installer. certification number and signature of the certified installer responsible for each major part of the installation.
WAC365-210 X
6) A Mason County St water Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement,
inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the
owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel
prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes
an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are
responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system
of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of
the building permit the owner/agent/contractor is ackn wI dging that all components of the stormwater management system have been installed as
approved on the stormwater site plan. X
BLD2011-00104 Please referto the following pages for conditions of this permit. 2 of 5
7 Owner/builder assumes all responsibility f drainfield/reserve area is encumbered.
p Y i
A. Drainfield/Reserve requires a 10ft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. No oundation drains within 30ft, down gradient of drainfield/reserve area.
X MA
8) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads conn ct with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
9) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
10) REQUIR D INSPECTIONS (Footing Inspection-prior to pour, Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all
responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the
inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by the Mason
County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been
discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of any/all problems no occupancy(Final
Inspection)will be granted for the residence.
OWNER/CO NTRACTOR(indicate which) Signature X
11) Applicant has indicated this is a replacement unit. Prior to Mason County ing and occupnacy of the new proposed unit, the existing unit which is
on-site and is being replaced MUST be removed from the parcel. X
12) This permit is for the pl ceme)t and installation of the manufactured home only and does not imply approval or review for any other items indidcated on
the plot plan. X
13) Provisions for surfac subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your proje
X
14) Placement of str c u must comply with standards set forth per the international codes regarding descending and/or ascending slopes.
X
15) All chan to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinarT,e 9r regulation, must be reviewed and approved by Mason County prior to construction.
X
BLD2011-00104 Please refer to the following pages for conditions of this permit. 3 of 5
A b ,
16) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector all b made prior to requesting additional inspections.
X
17) The inst lation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including
installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be
clearly ma ked in the installation instructions.
X
18) Owner/a licant must obtain a seperate per or the lacement of any size propane tank serving a fixed appliance within a dwelling structure or unit
prior to the placement of the tank. X
19) All property lines shall be clearly identified at a time of foundation inspection. X
20) All building permits shall have a final inspection performed and approved by the Maso ounty Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
21) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder haveWevented action from being taken. No more than one extension may be granted.
X
22) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
23) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior
to construction of the retaining wall. X
24) By definition, propane tanks and heatpumps a structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure
these structures meet the setback conditions listed.
X
25) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
X
BLD2011-00104 Please referto the following pages for conditions of this permit. 4 of 5
26) Contractor registration laws are governed under RCW 18.27 and enforced-by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-80 -647-09 2. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
27) App ved er dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
28) Prior to final approval, all upland areas disturbed or newly created Py construction activities shall be seeded, vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owneror the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWNER OR AGENT: _J A_� C�3
BLD2011-00104 Please referto the following pages for conditions of this permit. 5 of 5
co
o CONCRETE MECHANICAL MANUFACTURED HOME y
o Date ----
Footings I Setbacks Gas Piping By Ribbons Z
o Intenor Date By Inferior-Date By Date By =
AExterar Date By Exterior-Date By Z
INSULATION
Point Load I Isolated Footings Date By r_
BG I SLAB INSULATION rn
Date By Data By FIRE DEPARTMENT X
Foundation Wails Floors Date By
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vain Date By
Date By OTHER �-
Groundwork Arc
Dale By Date By Type_
Date By
D.W.V DRYWALL Type:
Date e
int Brace Wall Date By W
y Date By FINAL INSPECTION p
v Water Line Fire Separation N
Dale By Date By Date By CD
m �
Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments c
a �
o _
y
O
8
7
a
o'
f/f
O
r
0
From: "Kelly Mayo" <Kelly@ci.shelton.wa.us>
To: "Debbera Coker" <Dlc@co.mason.wa.us>
Date: 8/23/2012 8:56 AM
Subject: Re: Mick needs to know....Do you want to inspect wallboard nailing?
Attachments: Text.htm
Good morning Debbera,
09 IBC, Section 110.3.5 Except. Not required.
Have a GREAT morning Debbera
km.
53D'
Exi5i- 111 MH R
�4313Es;desW_4
0
a�5
l
e
ai5'A A 10. 100 P 6,
tall
f, APFOROVED
L-UkSON COUNTY DCD PLANNING
SITE PLAN RE UIRED TO BE ON SITE
CH GE S JECTTO APPPR2SLuC�
By Date
PLAN ING
v�
1 D 3 IU ' ' �o
6os� �LAN ING.
Exisfi IS r'_ E MEASURED
MN (olo'XT' 'y ISO J FROM THE URTHEST
(141 NJes-.&s wad) Iy0A ROJECTIOil OF THE BUILDING
130
1ao�A ea CEIVED
'r)N COUNTY
s�tD' PI 04- pI a-v
NE ��cLes a� Jerrq Carnahan
223 117 6 00 1 Go
NTS
� 7,-4"
II e b i10
------------- -- --— --- ------- -- L ------ ----1
I I
Bedroom 3 • do-1is I 1 M ax _ Nock �H l
. Dining Rnorn .12
;
l I 0'-0' tilit 3l
>I 12 0 Guest 12'0 ;f ; Kitchen � f
Owr
9a9h
w
I v � fund
um
1fcr -Refer M,hd,
L' 1
�7[I OtIB
I 0143"
1 ! I Cola
�t I I ,s• 5 mst
i ti cap ® Both C
l a"
Living Room � 3 a g:� 10 l
l Bedroom t8'9" �\`a ?moo Masker Bedracrn l
Sw I
12 I 148 Lb. I
I Erress I ctr. Egress 90t `fir.i I
INqI
L-----7�! --n--- -----------� -----y ,-----------I
96-458H - > - x v
12'-0" I 18'-B" 44►_Olt I— 1��-$:, 10,-8"
?,(P At 57cps 4 60,-0"
c7errN C'ar•n al an 3 32 3 3
a-a3 117(F,oo l c, o
3 F�E �D
�LQD� �L jviUST MEET ALL CURRE�,. THESE PLANS MUST BE
HINGTON STATE COI:.. ON THE JOB SITE
FOR INSPECTION MASON COUNTY,
ccvk�<ko%kA
' FILE
COPY
APPROVED
MASON BUILDING INSPECTOR
CHANGES SUBJECT TO APPROVAL
�I — DATE
Documents attache_ d to approved plans:
ite plan:
Flan review checklist: _�S Pa-e:
THESE PLANS MUST BE Engineering: Y N Lateral Vertical
ON THE JOB SITE Number of pages
FOR INSPECTION
MUST MGTON STATE C�CURRENTET ALL `�
�,..tsHIN
,VQm
CHA[�GES r
D-
SUBMIT CHAN'• S FOR APPROVAL
PRIOR TO PCRf0f1MING,NOFK ,}
VENT
" AT 1 Skj Et Per 5.50 Sq o t
Namecleyf14CAmah an Parcel# as 311-7 [goo (oO BLD# 00 W4
Mason County
Department of Community Development
Small Parcel Stormwater Management Application/Worksheet (page 1 of 2)
Per Mason County Code,Title 14,Chapter 14.48 a stormwater site plan is required whenever a building application is
made for residential development,or redevelopment',with more than 2,000 square feet of impervious surface'.
'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development
including construction,installation or expansion of a building or other structure,and/or replacement of impervious surface that is not
part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment.
2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas,
concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the
natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces.
To Calculate Impervious Surfaces Please Complete This Table
Surface Type Length X Width = Area *All dimensions in feet
Buildings X $ _
X = Measurements for buildings are taken at the
X _ perimeter of the farthest projections(example:
eaves/gutters)
X =
Driveways �((�v
X = Length of drive begins at the right of way
X =
Parking Areas _ Any paved, gravel or packed area per definition
X above table
X =
Patios/Walks X =
X = Any paved, gravel or packed area per definition
above table
X =
Others X =
X If the total impervious area of the proposed site
X = development is greater than 2000 square feet a
Small Parcel Stormwater Site Plan is Required
Total Impervious Surface Area (sum of all areas)
If the Total Impervious Surface Area is LESS THAN 2000 Square Feet,please read,acknowledge and sign below.
Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that 1 am the owner,owner's legal representative,or the contractor.I
further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above-
described property for review and inspection as may be required.
X Owner/Agent/Contractor(circle one)Date:
If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet, please read,acknowledge and sign
the information provided on page 2 of 2.
Page ] of 2
Name Parcel# as 31171PD d t 10 o BLD#
Mason County
Department of Community Development
Small Parcel Stormwater Management Application/Worksheet (page 2 of 2)
Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity.
Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater
Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website:
http//www.co.mason.wa—us/code/commissioners/index.htm
Please follow the links to"Title 14,Chapter 14.48 Stormwater Management".
Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan
(Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document
entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan".This document will assist
you in preparing the necessary information and plans for Public Works to review and approve. Per Department of
Public Works this document will constitute an approved plan if all of the relevant details*are to be installed in
their entirety AND no part of the stormwater system adversely affects any septic system(see Environmental Health
information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval.
A design by a registered professional may be required for more complex sites.
*These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan
on the pages that begin with"Handout"
PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE
A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed
in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel.
B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the
system will be located as not to adversely affect any septic systems on this,or any other,parcel.
If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works
Department can provide additional instructions,guidance and examples.(Section 14.48.130)contact Public works at:
Phone:(360)-427-9670 EXT.450
Mail:P 0 Box 1850,Shelton WA 98584
Physical:415 N 6th St,Shelton WA 98584
If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or
any other,parcel.You may also wish to consult with the septic design professional involved with the project.Mason
County Division of Environmental Health can be reached at:
Phone:(360)-427-9670 EXT.352
Mail: P 0 Box 1666,Shelton WA 98584
Physical:426 W Cedar St, Shelton WA 98584
A condition will be added to the building permit that states, in part,that all conditions the stormwater site plan will be met
prior to a request for final inspection of the building permit.
Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I
further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above-
described property for review and inspection as may be required.
X Owner/Agent/Contractor(circle one)Date:
Page 2 of 2
MASON COUNTY PERMIT NO. CI 6W I — 00I0
BUILDING PERMIT APPLICATION All-An
426 W. Cedar• P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us /
APPLICANT INFORMATION CONTRACTOR INFORMATIO
Owner Carnahan Company Name �lS1k�'h ow
Mailing Address, 14 i /Ve Si dzs GIJAtI Mailing Adair ss Z-�,p L H r (S r
City- State_JYAZip Code q $ City State -14)& Zip Code q ZR
Phone 3LQ —�{ctD her Ph. Phone ?3(co— 47- Other Ph.
Lien/Title Holder Contractor Reg. # S0yTHSC 0r/&AgExp.
E mail address E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic ✓
Connect to Water System Name of Water System
Well Water System Name of Water System
PARCEL INFORMATION - 12 Digit Parcel No OD/ O Fire District
Legal Description TR 16 O S B
Site Address (Please include street name, stree number and city) 5/OE IVAY Iq ELFAlk
Dir ctions t ite W -V-'0 DD. +a C oh 0 E Ge-A 1' tA
Will timber be cut and sold in parcel preparation? Yes/ o
Is property within 200' of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE P! SEASONAL ❑
Use of Building 5 FR Describe Work
No. of Bedrooms._No. of Bathrooms ;2--Square Footage- 1 st Floor 1b ZO 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq. ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year 2,0//
Length &0 Width 97 Serial No. No. of Bedrooms o. of Bathrooms 2
Type of Heat Purchase Price $ Replacement Unit? e 012E 3 L
Installer Name —mDDY?, Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION.
X ' '[i m� � �� Date L— —
Owner/Owners Representative/Contractor indicate which one
FOR'OFFICIAL USE BEYOND THIS POINT Accepted by Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department ZAN,,
Planning Department 7ET-5`7- 2�8
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Building Permit Fee Site Inspection
Plan Review Fee EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation S TOTAL FEES