Loading...
HomeMy WebLinkAboutMIS95-00025 Final Foundation TPN42001-44-00010 - MIS Permit / Conditions - 4/19/1995 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M I S C E L L A N E O U S P E R M I T FOR INSPECTIONS CALL 427-9670 MIS95-0025 PARCEL :420014400010 PLAT : DIV :? BLK :? LOT :? 1 JOB ADDRESS : ND I AKE, CLR SHELTON APPLICANT : DAV I D BAYLEY 426-9719 UnL - ►4-e) OWNER : DAVID C BAYLEY 426-9713 f LEGAL : Tr 1 of Sovt Lot 2 PROJECT DESCRIPTION : FOUNDATION ONLY PROJECT LOCATION : HWY 101 TO AIRPORT STORE, TURN RIGHT ON SPRING ROAD, APPROX . 1 /2 MILE LEFT ON ISLAND LAKE RD, GO TO STOP SIGN, TURN LEFT ON ISLAND LAKE DRIVE, 2/10 MILE ON LEFT SIDE . PROJECT NOTES : TYPE AMOUNT BY DATE RECEIPT STFE $ 4 .50 KS 01 / 13/95 38170 r FDNO $ 15 .00 KS 01 / 13/95 38170 TOTAL : 19 .50 OWNER OR AGENT DATE MIS-PRNT, rev; 04/01192 COMPLIANCE TO ATTACHED CONDITIONS IS REQUIRED MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 Y PERM I T CON [7 i T l ON ---, Case No . : MIS95-0025 ' I For : DAVID C BAYLEY Page : 1 1 ) PURSUANT TO 1991 UNIFORM BUILDING CODE , SECTION 305( C) AND SECTION 513 , ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . X 4-�x 2) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UNIFORM BUILDING CODE x �U ALL CONSTRUCTION MUST MEET REQUIRED SETBACKS AS ESTABLISHED PER MASON COUNTY ORDINANCE 138-VD MASON COUNTY SHORELINE MASTER PROGRAM IF APPLICABLE . X IF THE FOUNDATION IS PLACED IN VIOLATION OF ANY MASON COUNTY REGULATION , IT WILL BE THE OWNERS LIABILITY TO REMOVE SAID CONSTRUCTION AT THE OWNERS EXPENSE AND TO DO SO WITHIN THE TIME SPECIFIED BY THE BUILDING OFFICIAL k MASON COUNTY Mason County Bldg, III 426 W, Cedar P.O. Box 186 Shelton, Washington 98584 x X - a 3 ) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUAEMUTS s F i 77 77 C; oQ � 00 O ol C/) -31 -0 QL OC) 0-1 r. 00 CONCRETE MECHANICAL MOBILE HOME Footin -Setback date by Ribbons date 11 9 ci y Gas Piping date b Foundati Walls g ", date by Set Up date _ by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by PLUMBING Attic by OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by �,.. date by -77 00 C > z z (D cn :)7 0, C z 10 71-1 00 CYI 17- co CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by bo N D _ � o o � Cn xnO 00o ol � z oQn :3 O � = C � Nz o C� :3 (D O0- CTI � 00 CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by PLUMBING date by OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by c'