Loading...
HomeMy WebLinkAboutSWG2000-00220 - SWG Design - 1/1/2000 a a3a3 ��s-tscato Design Review Clic"St �do-l7 T L Designer: R klv Permit Y: SWG Applicant: _ r u 0 Is dia rifield placed in the area of the"ss-tholes? 1 Z,3 Cl Is soil application rate the same? Q• ❑ Is the number of bedrooms the same? infiltration area the same? &4,.3 x a= 19r� 9 C 1s reserve area adequate? FF��g is installation in soil depth correct? I a. "�" a2. ^a'�" N S S U rrlrt• d' /X Is vertical sepamtion adegwle for system design? a �'Do tydcs have risers to the surface a nd atul ,Oro or pump soreen? Is the pump tank 1.75 x daily flow? n�1 titn t rn t-M /.D Are observation pods and cletmouts adequate? �IJJ _ ble casing needed 0 Are hmiwntal w1bae watdoq perN lines,earemenfs. bw (wells,surf - a notice to title ? Q�tt1,tL�'Lt7� ZOn2. � �,,� blr rrt -r5 4v ®Ls a variance or waiver requested�� ¢WPP4 T lWroAAPM,"�' [,l,✓�U,c7M� Blk'r ❑ Is lateral length correct? 11;iC I and 0 Is orifice number corm? x-aal.ar-IB' � 0 Is g p m (@ total pressure head)correct?(rotaI or if ces s 0.59 at 3116, OR tot 6�P k (41 . 21.ob ❑ Is prefered manifold confie,.arlo¢used?Are checke valves needed and used.. ❑ Is total pressure head(tdh)correct? 1p-I" O� Transport pipe frictions head calculations(HarEn William Formula): r ss F=A(B/c7 F=transport Pipe f icrion head r1� A =transport pipe length in feet 8 =pump total pressure head(gpm Pump capacity) as gis,a C=K for transport pipe diameter/schedule Ora 11 Elevation between pump and uppermost Orifice +Residual head in feet(2 feet for 3116••orifices, 5 feet for 118"orifices) S / +Transport pipe f ic¢on head d N +0.6 oof LICILOV loss in distribution stem I (a < q =feet total discharge head(TDN)