HomeMy WebLinkAboutBLD2023-01359 Addition, Remodel - BLD Inspections - 3/13/2025 G__ '
MASON COUNTY615 W.Alder St.Bldg 8,SHELTON,WA 98584
SHELTON:360-427-9670,EXT 352
COMMUNITY SERVICES BELFAIR:360-275-"67,EXT 352
Building.PWww+g,En ironmentalHealUtiCom unityHealtli ELMA:360-482-5269,EXT 352
-- www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http:/Iwww.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2023-01359 Date Issued 05/08/2024 Issued By i1 r It
Project ADDITION&REMODEL ,i C�
Site Address 3060 SE Old Olympic Hwy
Applicant ZAGREAN IOSIF&MARICICA
Contractor
Contractor Phone
Prima Code 2018 IBC,IRC,IFC,IEC,IMC,& T
Primary UPC Type
Permit Type ADDITION OR REMODEL- Occupancy
RESIDENTIAL
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks •Z Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches (p r •Z C
Foundation Stem Walls Other
Rough-In Groundwork Plumbing (�_��Z+{,(�(� Framing _/ _2q jj
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building 3(j-ZS DE(i
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
5B/fcDA,�S , fA(,L- ,Ja ToR,-IJ 1,V Pl.KGr
1 ',2_9 as p60_5,?& „�
h
INSPECTION RESULTS Pagel
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton,WA 98584
Permit Assistance Center,Building,Planning (360)427-9670 ext. 352
Application# BLD2023-01359 Application Type ADDITION OR REMODEL- Owner ZAGREAN IOSIF&
RESIDENTIAL MARICICA
Parcel# 319201300010 Site Address 3060 SE Old Olympic Hwy Shelton,WA
98584
Inspector Inspection Type Date Status Comments
1-23-25 DED
—4-)-E—nergy credits chosen do not match what is installed. Contact Mason County
Permit Assistance Center to adjust credits
Dave Dobson BLD-FINAL INSPECTION 01/23/2025 FAIL eliding Air Leakage Test Required
�+8)L&I Electrical Final inspection required
4)caulk exterior penetrations
)area at back corner of home to be backfilled/covered and dryer vent termination to
be completed
f"
}
CE
NOV -
2oz� u =
QQ,,��(ashington State Energy Code—.Residential
�rej6l$��e�g rgy Code Compliance for All Climate Zones in Washington
Single Family—New&Additions effective Febwryl,2021 version 1.2
These requirements apply to all IRC building types,including detached one-and two-family
dwellings and multiple single-family dwellings(townhouses).
1�1 Project Information Contact Information
\ IOSIF ZAGREAN ADDITION PETER RADULESCU/PR DESIGN &CONSULTING
\. 3060 SE OLYMPIC HY SHELTON WA 503-265-8461
nstructions:This single-family project will use the requirements of the Prescriptive Path below and
ncorporate the minimum values listed. Based on the size of the structure,the appropriate number of
additional credits are checked as chosen by the permit applicant.
Provide all information from the following tables as building permit drawings:Table R402.1-Insulation and
Fenestration Requirements by Component,Table.R406.2-Fuel Normalization Credits and 406.3-Energy Credits.
Authorized Representative ;Date I
--- .... - ----- ------ ----.__. �. _
All Climate Zones(Table R402.1.11 i
R-Value' U-Factor' it
_.. . ..._.__._._. ___. ___ ._... _ -- ..__.__ _._.------.----__ _..___ ..--
Fenestration U-Factor' n/a 0.30
Skylight U-Factor b n/a 0.50
—.-- ---—. _7
i
` Glazed Fenestration SHGC b'e n/a n/a
V J ----._.... ._.-_.....__.. --- ---- -----�
Gelling_°_ 49 _F 0.026
Wood Frame Wall s,h 21 int 0.056 l
Floor _30 _ k vA 0.029
Below Grade Wall r-h 10/15/21 int+TB 4,e _ 0_.042_
Slab R-Value&Depth 10,2 ft E i n a —
!R-values are minimums.U-factors and SHGC are maximums.When insulation is installed in a cavity that is less i
a 'than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix
Table A101.4 shall not be less than the R-value specified in the table.
b IThe fenestration U-factor column excludes skylights.
1"10/15/21+5TB"means R-10 continuous insulation on the exterior of the wall,or R-15 continuous insulation on
lthe Interior of the wall,or R-21 cavity insulation plus a thermal break between the slab and the basement wall at
c ;the interior of the basement wall."10/15/21+STB"shall be permitted to be met with R-13 cavity insulation on
Ithe interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall."5T13"
i means R-5 thermal.break between floor slab and basement wall
_ . .....__ . __. ._.._. .._......
d ;R 10 continuous insulation is required under heated slab on grade floors.See Section R402.2.9.1.
For single rafter-orjoist-vaulted ceilings,the insulation may be reduced to R-38 if the full insulation depth
extends over the top plate of the exterior wall.
IR-7.5 continuous insulation installed over an existing slab is deemed to be equivalent to the required perimeter
f islab insulation when applied to existing slabs complying with Section R503.1.1.If foam plastic is used,it shall
meet the requirements for thermal barriers protecting foam plastics
'For log structures developed In compliance with Standard ICC 400,log walls shall meet the requirements for i
g climate zone 5 of ICC 400.
Int.(intermediate framing)denotes framing and insulation as described in Section A103.2.2 including standard
h '.,framing 16 Inches on center,78%of the wall cavity Insulated and headers.insulated with a minimum of R-10 j
insulation. I
Prescriptive Path—Single Family 2018 Washington State Energy Code-R 1
2018 Washington State Energy Code-Residential
Prescriptive Energy Code Compliance for Alf Climate Zones in Washington
Single Family-New&J4-ddiff iii(effective February ,2021)
Each dwelling unit in a residential building.shall comply with sufficient options from Table R406.2(fuel
normalization credits)and Table 406.3(energy credits)to achieve the following minimum number of
credits.To claim this credit,the building permit drawings shall specify the option selected and the
maximum tested building air leakage,and show the qualifying ventilation system and its control sequence
of operation.
1. Small Dwelling.Unit:3 credits
Dwelling-units less than 1,500 sf in conditioned floor area with less than 300 sf of fenestration area.
Additions to existing building that are greater than500 sf of heated floor area but less than 1,500 sf.
2. Medium Dwelling Unit:6 credits
All dwelling units that are not included in#1 or#3
3. Large Dwelling Unit:7 credits
Dwelling units exceeding 5,000 sf of conditioned floor area
4. Additions less than 500 square feet:1.5 credits
All other additions shall meet 1-3 above
Before selecting.your credits on this Summary table,review the details In Table 406.3(Single Family),on page 4.
Summary of fable R466.2 and 406.3
Heating f Credits-select ONE
Fuel Normalization.Descriptions User Notes
options i heating option
1 Combustion heating minimum NAECAb 0.0 ❑
2 Heat pump` - - 1.0
3 i Electric resistance heat only-furnace or zonal -1.0 ❑
4 DHP with zonal electric resistance per option 3.4 0.5 ❑
- - -
5 Ail other heating systems _ -1.0 ❑
-- _..._..----= - -- --------
Energy 'Credits select ONE I
Energy Credit Option Descriptions energy option from each
Options; cate ory
_ Y ---
1.1 Efficient Building Envelope 0.5 ❑
1.2 Efficient Building Envelope 1.0 ❑
1.3 Efficient Building Envelope 0.5 ❑
1A Efficient Building Envelope 1.0 ❑
1.5 Efficient Building Envelope 2.0 ❑
1.6 Efficient Building Envelope 10 ❑
17 ....,Efficient Building Envelope 0.5 _. __. 0_
2.1 Air Leakage Control and Efficient Ventilation 0.5
2.2 Air Leakage Control and Efficient Ventilation 1.0 ❑
2.3 ;Air Leakage Control and Efficient Ventilation 1.5
2.4 Air Leakage Control and Efficient Ventilation 2.0 ❑
3.1' =Hi hEfficiencyHVAC_ _. ..10 g ❑..__.._�-
3.2 High Effidenc HVAC 1.0 ❑
High Efficiency HVAC i ❑
3.4 High Efficiency HVAC U 1.5 ❑
3.5.2 {High Efficiency HVAC 1.5 __ ❑
3.68 'High Efficiency HVAC 2:0 ❑
4.1 High Efficiency HVAC Distribution System 0.5 I _
4.2 High Efficiency HVAC Distribution System 1.0 ❑
Prescriptive Path-Single Family 2018 Washington State Energy Code-R 2
2018 Washington State Energy Code—Residential
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Single Family-New.&Aditor3s(effective.Fe4ivary 1,,2.t11) .
..--._._........_............_ -.... --- ----
Summary of Table R406.2(cont.)
Energy 1 I Credits-select ONE
Options j Energy Credit Option Descriptions(cont.) i energy option from User Notes
each category d
----- --
S 1° ;Efficient Water Heating - 0.5 ❑
5.2 !Efficient Water Heating
I 0.5 ❑
5.3 ;Efficient Water Heating I 1.0 ❑
5.4 ;Efficient Water Heating I 1.5 ❑
5.5 Efficient Water Heating—--- - _ 2.0 11
5.6 Efficient Water Heating Q 2.5 ❑
_6 1e Renewable Electric Energy(3 credits max) 1.0
......-- .
7.1 'Appliance Package I 0.5 ❑
- --
Total Credits 6.0 Calculate Total clear Form
a. An alternative heating source sized at a maximum of 0.5 W/sf(equivalent)of heated floor area or 500 W,
whichever is bigger,may be installed in the dwelling unit.
b. Equipment listed in Table C403.3.2(4)or C403.3.2(5)
c. Equipment listed in Table C403.3.2(1)or C403.3.2(2)
d. You cannot select more than one option from any category EXCEPT in category S.Option 5.1 may be combined
with options 5.2 through 5.6.See Table 406.3.
e. 1.0 credit for each 1,200 kWh of electrical generation provided annually,up to 3 credits max.
See the complete Table R406.2 for all requirements and option descriptions.
f. Use the single radiobutton in the upper right of the second column to deselect radiobuttons in that group.
Please print only.pages 1 through 3 of this worksheet for submission to your building official.
For Building Officials Only
Prescriptive Path Single Family 2018 Washington State Energy Code-R 3
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2023-01359 ADDITION OR REMODEL-
RESIDENTIAL
PROJECT DESCRIPTION: ADDITION &REMODEL ISSUED: 05/08/2024
SITE ADDRESS: 3060 SE OLD OLYMPIC HWY SHELTON
EXPIRES: 11/04/2024
PARCEL: 319201300010
APPLICANT: ZAGREAN IOSIF&MARICICA OWNER: ZAGREAN IOSIF&MARICICA
3060 SE OLD OLYMPIC HWY 3060 SE OLD OLYMPIC HWY
SHELTON,WA 98584 SHELTON,WA 98584
360426-2200
VALUATIONS: FEES: Paid Due
Covered Deck/Carport 225.00 $4,950.00 Mechanical Base Fee $30.00 $0.00
Project Valuation (BID, 32883.84 $32,883.84 Change in Tenant- Minor EH $130.00 $0.00
ESTIMATION..) Plan Review
R-3 VB Residential, one- 1020.00 $169,401.60 Plan Check Fee $1,138.96 $0.00
and two-family Building Permit Fee $1,752.24 $0.00
Plumbing Base Fee $25.00 $0.00
Technology Surcharge $63.96 $0.00
Plumbing Fees $90.00 $0.00
State Fee-Residential $6.50 $0.00
Planning Review Fee $240.00 $0.00
Mechanical Fees $162.00 $0.00
Total: $207,235.44 Totals : $3,638.66 $0.00
FIXTURES
CQty Mechanical Fixtures Qyt Plumbing Fixtures
1.0000 Dryer Vent(s) 1.0000 Number of Bath Tubs
1.0000 Kitchen Exhaust Hood(s) 1.0000 Number of Clothes Washers
1.0000 Furnace(s) 1.0000 Number of Dishwashers
1.0000 Heat Pump(s) 1.0000 Number of Kitchen Sinks
1.0000 Wood/Gas/Pellet Stove(s) 1.0000 Number of Showers
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 1 of 8
t 1
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
Qty Mechanical Fixtures Qtyt Plumbing Fixtures
2.0000 Spot Vent Fan(s) 1.0000 Number of Water Heaters and or Vent
2.0000 Bathroom Sink
2.0000 Number of Toilets
REQUIRED INSPECTIONS
Setback Inspection Shearwall Inspection
Footing Inspection Framing Inspection
Foundation Wall-Pre-Pour Inspection Rough- Plumbing Inspection
Underground Plumbing Mechanical Inspection
Slab Insulation Insulation Inspection
SLAB INSPECTION BLD-Final Inspection
CONDITIONS
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25' of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 2 of 8
Mason County
r1
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* All property lines shall be clearly identified at the time of foundation inspection.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 3 of 8
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries(L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 4 of 8
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
Installation of heating equipment in a single-family residence shall meet the requirements of the current WSEC R403,
applicable sections of the IRC, and IMC.
Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the
purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including
infiltration and ventilation. Design calculations shall be available for inspection during inspection.
Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct
systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other
approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be
marked 181 A-P for pressure-sensitive tape, 181 A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used
with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure-
sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings
shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B
and shall be marked 181E-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm)
and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint.
Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation
instructions.
Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be
insulated to R-8
DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit
documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building
Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website
titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results(Existing Construction)." Duct tightness testing is not
required if the air handler and all ducts are located within the heated space.
* All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Before renovating or remodeling activities in pre-1978 residential buildings or child occupied facilities and to ensure your
compliance with applicable Washington lead regulations, contact the WA State Department of Commerce Lead Paint
Program at; (360) 586-5323 or email Ibpinfo@commerce.wa.gov. Visit www.commerce.wa.gov/lead for further information.
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 5 of 8
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
* Adopted Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C,Window(Max U-
Factor):0.30, Skylight(Max U-Factor):0.50, Doors(Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation
R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10.
2 Heat pump
1.3 Prescriptive compliance is based on Table R402.1.1 with the following modifications:
Vertical fenestration U = 0.28, Floor R-38, Slab on grade R-10 perimeter and under entire slab below grade slab R-10
perimeter and under entire slab or Compliance based on Section R402.1.4: Reduce the Total conductive UA by 5%
2.1 Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour.
maximum at 50 Pascals or For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air
leakage to 0.3 cfm/sf maximum at 50 Pascals and All whole house ventilation requirements as determined by Section
M1507.3 of the International Residential Code or Section 403.8 of the International Mechanical Code shall be met with a
high efficiency fan(s)(maximum 0.35 watts/cfm), not interlocked with the furnace fan (if present). Ventilation systems using a
furnace including an ECM motor are allowed if they are controlled to operate at low speed in ventilation only mode.
4.1 All supply a return ducts located in an unconditioned a is shall ye deeply buried in ceiling insulation in accordance
with Section R403.3.7. For mechanical equipment located outside the conditioned space, a maximum of 10 linear feet of
return duct and 5 linear feet of supply duct connections to the equipment may be outside the deeply buried insulation. All
metallic ducts located outside the conditioned space must have both transverse and longitudinal joints sealed with mastic. If
flex ducts are used, they cannot contain splices.
Duct leakage shall be limited to 3 cfm per 100 square feet of conditioned floor area. Air handler(s)shall be located within the
conditioned space.
5.5 Water heating system shall include one of the following: Electric heat pump water heater meeting the standards for Tier
III of NEEA's advanced water heating specification or For R-2 Occupancy, electric heat pump water heater(s), meeting the
standards for Tier III of NEEA's advanced water heating specification, shall supply domestic hot water to all units. If one
water heater is serving more than one dwelling unit, all hot water supply and recirculation piping shall be insulated with R-8
minimum pipe insulation.
* A minimum of 90 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance
with IECC/WSEC Section R404.1.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic
wind speed for Mason County is 85 MPH.
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 6 of 8
Mason County
tom.,
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space
where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel,
the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired
Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab,
basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the
solar heat gain coefficient(SHGC)of fenestration. Where there is more than one value for each component,the certificate
shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service
water heating equipment, duct leakage rates including test conditions as specified in WSEC Chapter 4, and air leakage
results if a blower door test was conducted.
Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air
changes per hour when tested with a blower door in accordanve with WSEC Section R402.4.1.2.
The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution
panel. Air leakage testing is not required for additions less than 500 square feet. Reference WSEC R402.4.1.2.
Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate"and are
available in or'/2 sheets.
" Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.)Septic tank(s)requires 5ft setback from all footing/foundations.
C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
Planning Setbacks
Front: 25'
Sides: 20'
Rear: 20'
"all setbacks measured from the farthest projection of the building
"subject to EH setbacks
"ALL CHANGES ARE SUBJECT TO REVIEW AND APPROVAL
* A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with
the 2018 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener
spacing is required to be 4 inches or less. The shear wall schedule shown on sheet S1.0 designate wall(s)type D4 and with
fastener spacing 4 inches or less.
The required inspection may be performed by the Mason County Building Department, a WABO certified inspector, certified
to inspect lateral connections, the Engineer of record (EOR), or an authorized representative of the (EOR). The special
inspectors duties and responsibilities shall be as specified in Chapter 17. When a third party inspector is used to perform the
inspection, special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton,
WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted
to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said
project.
" Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 7 of 8
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2023-01359
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:Printed by:Annie Wilson on:05/08/2024 08:27 AM
Page 8 of 8