Loading...
HomeMy WebLinkAboutCOM2024-00054 Cell Tower Upgrade - COM Inspections - 3/14/2025 INSPECTION CARD Mason County N 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# COM2024-00054 PROJECT ADDRESS 14190 N US HIGHWAY 101 SHELTON, WA 98584 PARCEL# 421263400050 PROJECT DESCRIPTION Equipment Upgrades at an existing wireless facility OWNER MCKASSON JEAN I ADDRESS 30620 NORTH US HWY 101 PHONE CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments BLD-Final Inspection -�'ar( 0-20-2-S— DEC see ,4*- AftINSPECTION RESULTS Page MASON COUNTY Department of Community Development COMMU:NITY� �DEVE LOPMENT 615 W Alder St, Shelton, WA 98584 t (360)427-9670 ext. 352 Application # COM2024-00054 Application Type CELL TOWER UPGRADE Owner MCKASSON JEAN I Parcel# 421263400050 Site Address 14190 N US HIGHWAY 101 SHELTON, WA 98584 Inspector Inspection Type Date Status Comments 2-20-25 DEC PLEASE PROVIDE A LETTER FROM THE PROJECT MANAGER/ENGINEER STATING THAT THE PROJECT HAS BEEN COMPLETED TO ALL Drew Carlson BLD-FINAL INSPECTION 02/20/2025 FAIL SPECIFICATIONS PER PLANS. EMAIL THE LETTER DIRECTLY TO ME AND I WILL CLOSE THE PERMIT WHEN I CONFIRM RECEIPT OF EMAIL. THANK YOU DREWC@MASONCOUNTYWA.GOV w Gel 21501 84TH Ave S. Kent WA 98032 March 12, 2025 From, Veena Parasuraman1 Project Manager Atelz123 Corp. To whom it may concern, Sub: BP#COM2024-00054 letter of completion Atelz123 confirms the following: The work as proposed has been completed in accordance with the approved construction drawings,the approved structural analysis, and the 2018 International Building Code. The tower does not support emergency communications systems or systems as defined under Risk Category III and IV in Table 1604.5 Risk Category of Buildings and Other Structures, found in Chapter 16 the 2018 IBC. Attached along with the letter are the redlined CD and some pictures from work completed. For any further question, please contact Atelz123. Thank you! Regards, 1. Veena Parasuraman Project Manager 469-861-9318 Veena.p@atelz123.com AT&T SITE NUMBER: WA6578 PROJECT INFORMATION: PLANS PREPARED FOR: PROJECT DESCRIPTION:LTE 1C RRH SWBP REDLINED REVIEWED 4 AT&T 8 And Dix at 1:45 m,Jul 24,2024 `■� Atelz123 CORP Y Y P TOWER TYPE: 150'MONOPOLE Joon.h(gatelz123.com I\ W 72ND AVE SITE ADDRESS: SHEL HIGHWAY 58 NORTH 01 11/2 2D2 549 AT&T SHELTOG WA 98584 03/11/2025 TUALATIN OR 97062 (MASON COUNTY) PLANS PREPARED FOR: JURISDICTION: MASON COUNTY 44 a sTe c PRESENT Commun cations Group OCCUPANCY TYPE: TELECOMMUNICATIONS \�� 1151 SE CARY 19.SUITE 101 FACILITY CARY NC 27518 CURRENT ZONING: RURAL RESIDENTIAL 14170 HIGHWAY 101 NORTH PROJECT INFORMATION: 1WM JOB#/ PACE# AT&T SITE#:WA6578 PARCEL ID: 42126340050 SHELTON, WA 98584 AT&T FA CODE:100313031 (MASON COUNTY) WSWOR0031327 If MRWOR075752 14170 HIGHWAY 101 NORTHSHELTON, WSWOR0031329 IfMRWOR075783 (MASON9 COUNTY) PROJECT INFORMATION WSWOR0031320 / MRWOR074709 AT&T SITE #:WA6578 PLANS PREPARED BY LATITUDE: N 47.16'31.7"(47.2754639)' LONGITUDE: W123"09'13.8"(-123.1538194)• FA LOCATION CODE: 1003303 GROUND ELEVATION: 3 279'(AMSL)•• 11 WSWOR0031389 / MRWOR075456 REVIEWED SITE NAME: PURD08, CRE WSWOR0031301 If MRWOR075816 'INFORMATION PROVIDED BY AT&T By JOMEL of 10:17 am,Jul 2024 7 TOWER COORDINATES THIS IWMIP ACE JOB N , FAV7 UMBER IS -OR ANOTHER PROJECT.SHOULD BE „�.F,. WSWOR0031427 MRWOR075702 TOIGNQAWOIAOFD110NAI� TOWER OWNER: TOWER SCOPE OF WORK: SHEET DESCRIPTION REV 326 TRYON ROAD E NAME: CROWN CASTLE • REMOVE 9 ANTENNAS T-1 TITLE SHEET D RALEIGH,NC 2760.01 ADDRESS: 1606 WESTLAKE AVENUE NORTH, REMOVE 6 RRUB OFACE:(919)661�351 SUITE$00 INSTALL 1 SECTOR MOUNT PIN:VFA10-HD3L4NP) N-1 GENERAL NOTES 0 wwIV l��p�l CITY,STATE,ZJP:SEATTLE,WA 98109 INSTALL 3 AIR64 9 B77D AN�ENNAS N-2-N3 AT&T MACRO BUILD STANDARDS 0 INSTALL 3 AIR6419 B77G ANTENNAS C-IA COMPOUND LAYOUT 0 SEAL'. APPLICANT/LESSEE: INSTALL 3 12072�ANTENNAS C-iB DETAILED EQUIPMENT LAYOUT 0 a NAME: AT&T MOBILITY INSTALL 3 RADIO 4490 BSIB12A RRU. C-2 TOWER ELEVATION 0 <I k �^c INSTALL 3 4478 B14 RRUB 7 i ADDRESS: TUAL TI 72ND AVENUE INSTALL 3 4890 82SM54A RRU. CJA EXISTING ANTENNAICABLE SCHEDULE 0 CITY,STATE,ZIP:TUAIATIN,OR 97062 IN 1 DC94B�0-24-0C4:V SQUID WB EXISTING ANTENNA ORIENTATION 0 l� CIVIL ENGINEER: INSTALL 3 BAWG DC TRUNKS CEE POSED AN SCHEDULE o INSTALL 1 24 PAIR FIBER TRUNK NAME: TOWER ENGINEERING PROFESSIONALS EXISTING(l ANTENNAS POSED ANTENNA ORIENTATION 0 ADDRESS: 328 TRYON RD EXISTING1�SQUID TRICAL NOTES 0 4 n Tr Z O CITY,STATE,ZIP:RALEIGH,NC 27603 EXISTING 2 8AWG DC TRUNKS POSED ANTENNA GROUNDING PLAN 0 CONTACT: JOSHUA H.CARDEN,P.E. EXISTING 1 18 PAIR FIBER TRUNK UNDING DETAILS o PHONE: (919)661-351 GROUND SCOPE OF WORK: 3t127c8ELECTRICAL ENGINEER: �NAME: TOWER ENGINEERING PROFESSIONALS REMOVE NOKIA BASEBAND TION ON THE ADDRESS: 326 TRYON RD INSTALL(1)POWER EXTEND CONVERTER SNAL F'CITY,STATE,ZIP:RALEIGH,NC 27603 MOUNTING KR NNA MODEL 06-25-24 CONTACT: MARK S.OUAKENBUSH,P.E. • INSTALL 6 POWER EXTEND CONVERTERS PHONE: (919)661.6351 INSTALL 2 48 RECTIFIERS LOCATION MAP PROPERTY OWNER INFORMATION: : INSTALL 1 PURCELL FLX21 CATBINET INDEX OF SHEETS O 06-25-24 oo1s CONSTRUCTION NAME: JEAN I.MCKASSON INSTALL 1 OD DC12s A 05-17-24 PRELIMINARY DIRECTIONS FROM SEATTLE-TACOMA INTERNATIONAL AIRPORT TO SITE: ADDRESS: JEAN NORTH USN 101 INSTALL 2 6651 BBUs 6610 REV DATE ISSUED FOR: HEAD SOUTH ON US-101 S TOWARD W CALIFORNIA RD.TURN RIGHTONTO IN CITY,STATE,ZIP:LILLRNAUP,WA 98555 INSTALL 1 NSTALL SAU SANDERSON WAY.TURN LEFT ONTO TRANSPORT RD, I 1 DC NE MASTEC SCOPING REDLINE CONTACT INFORMATION INSTALL A DC BREAKERS FOR AIR6419 DRAWN BY: SSP CHECKED BY: CCJ INSTALL 25A DC BREAKERS FOR RRU 4890 INSTALL 25A DC BREAKER FOR RRU 4478 SHEET TITLE: INSTALL 50A BREAKER FOR RRU 4490 ALL AND MAT HE CURRENT SHALL BE PERFORMED AND INSTALLED COD IN THE RlOUMED MARKING ON THIS DRAWING RlFIlCT THE ACCORDANCE WITH THE CURRENT EODIONS O THE POLLOW WO CODES -ADOPTEDISO Br ONSTRALGOVERNINC—RKNTCC NFO—OESE REQUIREMLNnaTHE MASTEC SCOPIM67lAM TITLE SHEET PUNS M TO—IONS SO F T E FOLLOWING TO FERMR WORK NOT CONFORa�G TO THE UTEST EdTK)NS OF THE FOLLOWHG'. t aSHINGTON BUILDING CODE MNEC MNS SCOPING ENGINEER: DATE: I—EDITION) 6.LOCAL BDILDWG CODE 3.WASHINGTON COW COUNCIL S.CITYICWNTYORDINANCES REVIEWED a.aNSPTH-x�zxm�t By mpau/Inio at 8:40 am,Jul 25,2024 SHEET NJMBER REVISION: 0 DRIVING DIRECTIONS CODE COMPLIANCE SCOPE OF WORK JURISDICTION APPROVAL ��� P�234625.424 r r ► Mason County 1 Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FPROJECTDESCRIPTION: 4-00054 CELL TOWER UPGRADE EQUIPMENT UPGRADES AT AN EXISTING ISSUED: 08/16/2024 FACILITY ESS: 14190 N US HIGHWAY 101 SHELTON EXPIRES: 02/12/2025 PARCEL: 421263400050 APPLICANT: AT&T-McMullin,Thomas OWNER: MCKASSON JEAN 1 1351, E Irving Park Road 30620 NORTH US HWY 101 Itasca, IL 60143 LILLIWAUP,WA 98555 6302286229 VALUATIONS: FEES: Paid Due Project Valuation (BID, 25750.00 $25,750.00 Technology Surcharge $14.20 $0.00 ESTIMATION..) Planning Commercial Review $380.00 $0.00 Fee State Fee-Commercial $25.00 $0.00 Building Permit Fee $430.37 $0.00 Plan Check Fee $279.74 $0.00 Total: $25,750.00 Totals : $1,129.31 $0.00 REQUIRED INSPECTIONS KNOX BOX VERIFICATION BLD-Final Inspection CONDITIONS " All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. " All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Printed by:Annie Wilson on:08/16/2024 04:02 PM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov CELL TOWER UPGRADE COM2024-00054 The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. " OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. " Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. " All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the structure. Front setbacks are measured from the front lot line or road easement boundary, whichever is closer. Comply with requirements of Mason County ORD 5-98 Printed by:Annie Wilson on:08/16/2024 04:02 PM Page 2 of 3 Mason County 1 Mason County - Division of Community Development YI,y 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov CELL TOWER UPGRADE COM2024-00054 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: kA ev 6L4 Date: P)hu h� Printed by:Annie Wilson on:08/16/2024 04:02 PM Page 3 of 3