Loading...
HomeMy WebLinkAboutCOM2021-00032 Cancelled Office Bldg, Retaining Walls - COM Inspections - 3/10/2025 IlaMASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 , BELFAIR:360-275-4467, EXT 352 Building,Nanning,Environmental Health.Community Health ELMA:360-482-5269, EXT 352 -- www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number COM2021-00032 Date Issued 06/29/2023 Issued Byn O Project NEW 2 STORY, 12,801 SF OFFICE BLDG"Shell Only"&RETAINING WALLS l� Site Address 2355E NE STATE ROUTE 3 �O Applicant DM BELFAIR INVESTMENTS LLC Contractor MOUNTAIN CONSTRUCTION Contractor Phone 1.253.474.5281 Primary Code UPC IBC, IRC,IFC,IEC,IMC,& Type N Permit Type NEW COMMERCIAL PERMIT Occupancy � -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. v` -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED." PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptar-tment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other Mason County Mason County - Division of Community Development 615 W. Alder St. N Building 8 Lr Shelton, WA 98584 tY� 360-427-967070 ext 352 Gnwww.masoncountywa.gov F 1-00032 NEW COMMERCIAL PERMIT ESCRIPTION: NEW 2 STORY, 12,801 SF OFFICE BLDG ISSUED: 06/29/2023 Y" & RETAINING WALLS ESS: 23554 NE STATE ROUTE 3 BELFAIR EXPIRES: PARCEL: 123294390173 APPLICANT: DM BELFAIR INVESTMENTS LLC OWNER: DM BELFAIR INVESTMENTS LLC PO BOX 217 PO BOX 217 FOX ISLAND,WA 98333 FOX ISLAND,WA 98333 1.253.405.4414 ARCHITECT: DAVID FREEMAN 7195 WAGNER WAY SUITE201 GIG HARBOR, WA98335 1.253.625.4399 GENERAL CONTRACTOR'S LICENSE: MOUNTAIN CONSTRUCTION License: MOUNTC'840RO 7457 S MADISON ST Expires: 12/20/2024 TACOMA,WA98409 1.253.474.5281 VALUATIONS: FEES: Paid Due B VB Business 12800.00 $1,759,488.00 Pre-application meeting - Major $230.00 $0.00 Uncovered Deck 1061.00 $15,915.00 EH Plan Review State Fee-Commercial $25.00 $0.00 IFC Plan Check Fee $2,875.55 $0.00 Plan Check Fee $5,751.10 $0.00 Building Permit Fee $8,847.85 $0.00 Technology Surcharge $298.24 $0.00 Planning Commercial Review $380.00 $0.00 Fee Plumbing Fees $288.00 $0.00 Plumbing Base Fee $25.00 $0.00 Total: $1,775,403.0 Totals : $18,720.74 $0.00 0 FIXTURES Printed by:Annie Wilson on:06/29/2023 09:49 AM Page 1 of 5 ti Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2021-00032 Cat Plumbing Fixtures 8.0000 Bathroom Sink 8.0000 For each repair or alteration of drainage or vent piping, each fixture 8.0000 For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping and associated backflow protection) 8.0000 Number of Toilets REQUIRED INSPECTIONS Field Inspection Shearwall Inspection Setback Inspection Framing Inspection Footing Inspection Insulation Inspection Foundation Wall-Pre-Pour Inspection BLD-Final Inspection CONDITIONS * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. Printed by:Annie Wilson on:06/29/2023 09:49 AM Page 2 of 5 y Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2021-00032 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All property lines shall be clearly identified at the time of foundation inspection. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * The foundation/footing must be placed on undisturbed,firm-native soil. Printed by:Annie Wilson on:06/29/2023 09:49 AM Page 3 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2021-00032 * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * FIRE: Extend fire alarm and fire sprinkler system. Permits are required for each system. Fire Extinguishers per IFC Section 906. Typically this means 1-2A10BC Fire Extinguisher every 75' * Shell Only Permit. All Fire Suppression, Fire Alarm, Mechanical and Plumbing permits shall be applied for, plan review shall be completed and approved PRIOR to any plumbing, mechanical or fire protection work taking place.All Electrical items shall be approved by the dept of Labor and Industries (L&I) prior to insall. * Comply with all recommendations and mitigation set forth in the wetland report. MEP2021-00030. An inspection is required prior to C of O for building. * Energy Compliance Commissioning report is required at final. * Sewer connection fees, conditions required prior to permit issuance (per public works). * A Declaration of Covenants Associated with Privately Maintained Storm Drainage Facilities (O&M) Must be executed and recorded with Mason County Auditor's Office prior to permit final Inspection. * The submitted Stormwater Pollution Prevention Plan (SWPPP)will be implemented as designed by Brett Allen, dated 1/29/2021. * Compliance with an approved Storm Water Plan shall be subject to an on site inspection, or inspections, by the engineer of record or an authorized representative. Said inspection(s)shall be performed in accordance with the approved plan, and prior to any modification that would make a determination of compliance impossible. Inspection reports and as-built drawings shall be submitted to verify all engineering requirements have been completed in accordance with the approved storm water plan. Reports shall be submitted to the Mason County Department of Community Development prior to each corresponding inspection and final permit approval. Copies of all special inspection reports shall be made available at time of inspection. * All culverts shall be maintained in perpetuity to ensure that drainage will not overflow. * Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. * All applicable recommendations and specifications shall be applied to the development on this site. Any deviation requires stamped written approval from the registered design professional responsible for the report and may require special inspection by same. Structures and/or land modifications (grading, cuts,fills, etc.)required in the geotechnical report may require a separate permit. Stormwater Operations and Maintenance Manual stamped by Brett Allen, dated 1/29/2021 Stormwater Site Plan stamped by Brett Allen, dated 1/29/2021 Construction Stormwater Pollution prevention Plan Stamped by Brett Allen, dated 1/29/2021 Plan Set stamped by Brett Allen, dated 1/29/2021 Printed by:Annie Wilson on:06/29/2023 09:49 AM Page 4 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. H Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW COMMERCIAL PERMIT COM2021-00032 I hereby certify that 1 have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: u j 1 i 1 S 0 h Contractor or Authorized Agent: Date: Printed by:Annie Wilson on:06/29/2023 09:49 AM Page 5 of 5