Loading...
HomeMy WebLinkAboutBLD2013-00988 Final Garage - BLD Permit / Conditions - 3/28/2014 Inspection Line(360)427-7262 IrpoMASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 279 Shelton, WA 98584 " RESIDENTIAL BUILDING PERMIT BLD2013-00988 OWNER: JEFF OVERTURF RECEIVED: 11/12/2013 CONTRACTOR: TOWN & COUNTRY POST FRAME BLDS 425-743-1555 LICENSE: TOWNCPF099LT EXP: 6, ISSUED: 12/5/2013 SITE ADDRESS: 1241 NE BLACKSMITH DR BELFAIR EXPIRES: 6/5/2014 PARCEL NUMBER: 223107900640 LEGAL DESCRIPTION: TR 64 OF SURVEY 11/17 PROJECT DESCRIPTION: DIRECTIONS TO SITE: New Post Garage with 24' x 28' loft NE Bear Creek DeWatto Rd, Turn on NE Blacksmith Dr, continue to address. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: U-1 Lot Size: Deck: Type of Work: ACC Fire Dist.: No. of Stories: 2 Occ. Load: Building: Garage-Detached 960 Valuation: $ 68,641.92 Building Height: 24 Occ. Status: Primary Basement: Storage 672 Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: W 135.0 Ft. Shoreline: Ft. Water Body: Rear: E 655.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Shoreline Desig.: Side 1: N 25.0 Ft. Year: Serial No.: Side 2: S 180.0 Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee JWH 11/12/201 $ 504.89 S1201300000001 Planning Review Fee JWH 11/12/201 $205.00 S1201300000001 EH Plan Review CNS 11/12/201 $ 103.00 S7201300000001 Building State Fee MAU 11/26/201 $4.50 S1201300000001 Building Permit Fee MAU 11/26/201 $776.75 S1201300000001 Total $ 1,594.14 BLD2013-00988 Please refer to the following pages for conditions of this permit. Page 1 of 4 CASE NOTES FOR BLD2013-00988 CONDITIONS FOR BLD2013-00988 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. son signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owner/Agent is r spgasible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X �. 3) This structure is approved as a 2-story un-heated structure. The structure will be used as a garage on the lower floor and storage on the upper floor. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall be applied for, reviewed and approved prior to the change. X 4) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prio)"7_ urther inspections being performed or approvals granted. X � 5) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). XS 6) This structure is limited to U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the international codes and MasotlCpunty Regulations unless a "Change of Use" permit is applied for, reviewed and approved. X 7) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be-go,119ded by the Building Department prior to any further inspections being performed or approvals granted. X BLD2013-00988 Please refer to the following pages for conditions of this permit. Page 2 of 4 20) Application aonpWledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is Rural Residential 5 zone. X 21) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor's acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X /�' 22) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed. X ;_ 23) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure these structures meet the setback conditions listed. X /—_ OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERM�PLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Signature Date J� C// Z— �/�Ct OWNER �---REPBE ENTATIVE CONTRACTOR Print Name (Circle one to indicate) BLD2013-00988 Please refer to the following pages for conditions of this permit. Page 4 of 4 8) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X k 9) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X �� ` 10) All property lines shall be clearly identified at the time of foundation inspection. X �J 11) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordin pps and building regulations. X - /L- 12) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevpeto action from being taken. No more than one extension may be granted. X 13) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectgrsd flashing. Install metal connectors approved for contact with the new types of pressure treated material. X — — 14) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approve Site Plan"to ensure these structures are shown and meet the setback conditions listed. X ' 15) Approved imensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X % 16) All construction and demolition debris must be removed from the site after project completion. Proper d' osal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X 17) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent wate_Js or wetlands. Silt fencing, straw, or surface matting must be installed and maintained until upland vegetation has become established. X I IL 18) Prior to final approval, all upland areas disturbed or newly crenated by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 1-/4 19) Concrete leachate m sty contained during pouring, such that nearby surface runoff is controlled and water quality degradation of adjacent waters does not occur. X JU BLD2013-00988 Please refer to the following pages for conditions of this permit. Page 3 of 4 co o CONCRETE MECHANICAL MANUFACTURED HOME O o - �, — w et Footings I Setbacks Gas By Ribbons Gas Piping � o Interior Date By interior-Date By Date By C coExterior Date By Exterior-Date BSet-up Point Load I Isolated Footings INSULATION Date By L BG 1 SLAB INSULATION ---- m Date By Data By FIRE DEPARTMENT -n Foundation Walls Floors Date By Date By Data By DECKS FRAMING Walls Date By fate _ By Data ey PROPANE TANKS PLUMBING Vault Date By Date By OTHER Groundwork Attic Typie- Date By Date By Date By o.W.V DRYWALL Type- -D Date By Int.Brace Wall Date By W v Date By FINAL INSPECTION 0 m Water Line Fire Separation 1 OIN m Date By Date By Date , �� /� By m W o Pass or Request Inspect. r Type1of Inslp. Fail Date Date done By Comments r 4 00 L 3 N Zif N +/i��` 0 O a y O CD CD 3 r m 0 Permit# 1 W MASON COUNTY BUILDING III 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location 1.7-`-t( )o,- p., This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items listed below must be corrected to gain compliance �,� S I�.I'1r1 CT �L'✓ �� liJ �(ECG't r.�.: G•1' '7' ,..S •-r�!n-�� y N N MiHf You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office ❑ Make corrections, items will be checked on next inspection regarding possible structural ❑ OK to damage incurred by recent "natural/man made" ❑Th' is not a omplete inspection disasters.This is NOT a Dat Department CORRECTION NOTICE. Inspector N IT ' 'Imfor z ' THIwt T' —omr ,n�,�cEc: 223��- 79-ao�ya No 5�k5 -�s-r�vu��a:•vc� APPROVED on MASON COUNTY DCD PLA��,^JING "' `r�;; LL _- SITE PLAN REQUIRED TO BE ON' Si T E -_j C' CHANG S SUBJECT TO APPROVAL a By Date ° • 5v �y r �c►►' i q o EJEJO /�ESER✓� I �RUf 6 5E L5I X 40 / 7 � s�, g3 o,D cis ' 0 g'20. 9 i 0.0 �• to Plan pwY] Z �}`y�. * 16521 Highway 99,Suite C•Lynnwood,WA 98037-3161 PI ase Check After Doing Site Plan: Septic and drainfield Lot size Draw North Arrow in Circl POST FRAME BUILDINGS— Everett:(425)258-4171 • Puyallup:(253)840-9552 Property dimensions Sewer linesAdm Elevation of property • FAX:(425)7 Headquarters: (425)743 1555 xisting buildings etbacks of proposed&existing buildings ❑Bodies of water � . � FAX:(425)742-4378•800.824-8552 orv�oHOF Contractors Lic.N:TOWNCPF099LT Proposed building ain road with name ❑�oorplan Quality:Our Future Depends On it.'" permabift.com•racebook.convpermablh El Easements �. . Access to proposed building El &Contours(V increments) Job Name:4 +`eal "(' $� Job Site Address: SLA"S)�(Th 3)j Tar Account#: ZI'O^7« 0 0 b g o Legal Description: Oro 2-5 8s�.93 6,0 Q O - to - 2 � REs�.e 820.91 O,O D•O WtTH IN R'•I'-t ls*Lopr `n`asc4 Coi.ray Dept. health AWS API'ROVED / /0—5vCi&1155�4�5 b AJ5' Initials falitll► _ —� Alof 11u01h70 7ZR.5To `✓lvSf9NTS �j(,D���'00q - (a�o 5?44 w AocKSTo i ET `�i to—�i" �� l s I � r: I its w rl r- i�i DO NOT SIGN INCOMPLETE SITE PLANT jpj Customer has verified and approved the location of the building,orientation of the building to the North,and verifies that all Grid White-Customer Copy Plain White-Office Copy utilities are shown on this dra in t tion.CUSTOMER SIGNATURE LEAD# f`] 4 4 UP ®2012 Perma-Bill®Industries FR-34 07/12 I IIIIII IIIII"II I'e .1 0 Overturf Small Project SWPPP Narrative and Site Plan 1241 NE Blacksmith Drive Belfair, WA 98528 Minimum Requirement#2 for small projects as defined the Department of Ecology criteria for stormwater pollution prevention plan Project File Number: Parcel: 22310-79-00640 Narrative: Proposed 24'x40' post and frame detached garage with 24'x28' loft (1632 sq.ft.)Access provided by an existing gravel driveway. Proposed roof runoff to gutters to downspouts,to splash blocks to sheet flow. This project qualifies as a small project because: This project disturbs less than 1 acre and is not part of a comment plat development. This project will not create, add or replace more than 2,000 square feet of impervious surface. This project will move less than 100 cu.yds. of material graded on site and less than 500 cu. Yds. Of material under the foundation of a building to be built pursuant to an approved building permit. This project will cause less than 7,000 sq. ft. of land disturbing activity. This project is not located within a floodplain or shoreline designation. This project will not adversely impact a wetland, stream or water of the state, or change a natural drainage course. This project does not require engineering to comply. i Page 1 Element 1—Preserve vegetation/mark clearing limits The area to be cleared and graded shall be marked prior to clearing with visible flagging to preserve vegetation and to clearly show clearing limits. Only the areas marked on the SWPPP site plan to be cleared. Vehicles will only be allowed in the areas to be graded. Element 2—Construction Access BMP C105-There is an existing stabilized construction entrance that is a minimum of 12' onto site. Element 3—Control Flow Rates Does not apply as there will be no substantial grading of site. Post holes only for building. Element 4—Sediment Control Sediment control will be controlled on-site by placement of BMP C233 Silt Fence if required. Element 5—Stabilize Soils Soils will not be stockpiled during the building stage of 2-3 weeks. No soils shall be exposed for more than 24 hours. Element 6—Protect Slopes Does not apply. No cut slope over 4 feet high will exceed 2 feet horizontal to 1 foot vertical, and no fill slopes over feet high will exceed 3 feet horizontal to 1 foot vertical. No engineered slope protection. Element 7—Protect permanent drain inlets There are no storm drain catch basin on site for which will install a temporary protection device, per storm drain inlet protection BMP C220 detail. Element 8—Stabilize channels and outlets Construction will occur during the dry weather. No storm drainage channels or ditches shall be constructed either temporary or permanent. Element 9—Control Pollutants Any and all pollutants, chemicals, liquid products and other materials that have the potential to pose a threat to human health or the environment will be covered, contained and protected from vandalism. All such products will be kept in a locked job site trailer. Element 10—Control De-watering No de-watering of the site is anticipated Element 11—Maintain best management practices Best management practices or BMPs will be inspected and maintained during construction and removed within 30 after the County Inspector or Engineer determines that the site is stabilized provided that they may be removed when they are no longer needed. Element 12-Manage the project This SWPPP will be implemented at all times. The erosion control BMPs will be implemented in the following sequences: 1. Mark clearing limits 2. Installed stabilized construction entrance is existing 3. Install protection for existing drainage systems and permanent drain inlets 4. Establish staging areas for storage and handling polluted materials and BMPs 5. Install sediment control BMPs as required 6. Grade and install stabilization measures for disturbed areas 7. Maintain BMPs until final site stabilization, at which time they may be removed Steve Triplett Permit Coordinator Town & Country Post Frame Buildings Name&j&-%L _ C Parcel# ZZ 510-79-Od 6Vo BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 1 of 2) Per Mason County Code,Title 14,Chapter 14.48 a Stormwater site plan is required whenever a building application is made for residential development,or redevelopment',with more than 2,000 square feet of impervious surface 2. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction,installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. 2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. To Calculate Impervious Surfaces Please Complete This Table Surface Type Length X Width = Area *All dimensions in feet Buildings X 2-1 X = Measurements for buildings are taken at the X _ perimeter of the farthest projections(example: eaves/gutters) X = Driveways X = X = Length of drive begins at the right of way X = Parking Areas X = X = Any paved, gravel or packed area per definition above table X = Patios/Walks X = X = Any paved, gravel or packed area per definition above table X = Others X = X = If the total impervious area of the proposed site X = development is greater than 2000 square feet a Small Parcel Stormwater Site Plan is Required Total Impervious Surface Area(sum of all areas) If the Total Impervious Surface Area is LESS THAN 2000 Square Feet,please read,acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described p rty for review and inspection as may be required. X Own Agent/ ontractor(circle one)Date: If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet,please read,acknowledge and sign the information provided on page 2 of 2. Page 1 of 2 Y Name !/ — Parcel# �Z.3 BLD# . ups-, rfF ,� 10 ]�-ab D Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity. Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website: http//www.co.mason.wa—us/code/commissioners/index.htm Please follow the links to"Title 14,Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan (Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan".This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details*are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system(see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with"Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A)_M_The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions,guidance and examples. (Section 14.48.130)contact Public works at: Phone: (360)-427-9670 EXT.450 Mail: P 0 Box 1850,Shelton WA 98584 Physical:415 N 6th St, Shelton WA 98584 If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason County Division of Environmental Health can be reached at: Phone: (360)-427-9670 EXT. 352 Mail: P 0 Box 1666, Shelton WA 98584 Physical:426 W Cedar St, Shelton WA 98584 A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described erty for�re�viand inspection as may be required. X Owner gent/C tractor(circle one)Date: �` 3 Page 2 of 2 I i -7 -7 coal MASON COUNTY PERMIT NO. -C C9�g DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING•FIRE MARSHAL _ WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg. III,426 West Cedar Street (360)275-4467 Belfair ext.352 yaw PO Box 279,Shelton,WA 98584 (360)482-5269 Elma ext.352 BUILDING PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: IFF'E 6 VE19,7LIR F NAME: 71C s� • 11- MAILING ADDRESS: I Z i4 I NE &A- -fit I MAILING AD R�, yl V&))�9q..$;k e' CITY: See-i -& STATE: u 1 A ZIP:C32�9 CITY: oa- STATE: ZIP:9?0-3 7 PHONE: %,n 377- 2ft CELL: PHONE:J2 CELL: EMAIL: EMAIL: 1 E- ,/Er. L&I REC3# - EXP. PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER) 7Z3J0 -7q-0U4yO FIRE DISTRICT LEGAL DESCRIPTION(ABBREVIATED):TP. (, o��Ldp.��Y I l�)7 SITE ADDRESS /,gSlr A4E,&4[k§1"6W De, �— CITY Se LQ4A DIRECTIONS TO SITE ADDRESS 15eP✓l1ar�P- 4� IS PROPERTY WITHIN 200 FT: SALTWATER❑ LAKE ❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES❑ NO Rr TYPE OF JOB: NEW g ADDITION ❑ ALTERATION❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(RESIDENCE,GARAGE ETC.) �ES/DFitt;.AL 6�7E, 944; ZIL-�AJ IS USE: PRIMARY❑ SEASONAL NUMBER OF BEDROOMS? NUMBER OF BATHROOMS DESCRIBE WORK)�2.�=n 24 VD"'-Ilec/=hQkai /sr6,d-'e-"Ez pifAi g;C"/'=O, SQUARE FOOTAGE: 1ST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq.ft. COVERED DECK sq.ft.STORAGE sq.ft. OTHER sq.ft. GARAGE L sq.ft. ATTACHED ❑ DETACHED'K CARPORT sq.ft. ATTACHED ❑ DETACHED [r MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECT! . INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. x -. � zh//i 3 Signature of A licant Date' x r ve7 ��P�'7" OWNER/ EPRESENTATIV�' ONTRACTOR Print NameRE MW 150M. BM IN BUILDING DEPARTMENT A. PLANNING DEPARTMENT FIRE MARSHAL �FEE'S TOTAL VALUATION: BUILDING PERMIT FEE - FIRE ACCESS AND GRADE PLAN REVIEW GEO-TECH REVIEW PLUMBING&BASE FEE STORMWATER REVIEW MECHANICAL&BASE FEE TOTAL FEES WOOD/GAS/PELLET STOVE VIOLATION INVESTIGATION FEE PLANNING REVIEW FEE VIOLATION FEE