July 29, 1997
George A. Simms
12290 Bean's Rd SE
Tenino, WA 98589
RE: Simpson Timber Co Mason Lake Recreation Area.
Dear Mr. Simms:
This letter is a follow up to our July 24, 1997 meeting at Simpson Timber Co. Mason Lake
Recreation Area project site. The project is intended to place 300 lineal ft of riprap bank
protection/stabilization along both sides of Shumocher Creek; and to redirect the mouth of
Shumocher Creek at its confluence with Mason Lake by removing/dredging approximately
1200 cubic yards of gravel.
The segment of the bank along the Park Ranger's residence needs to be reinforced, as
proposed, to avoid potential damage to existing structure. According to the Mason County
Shoreline Master Program (MCSMP) guidelines, this type of project can receive an
Exemption status from securing a Shoreline Substantial Development Permit as provided
under Chapter 7.13, Section 7.13.010 (4). To obtain this exemption, this department needs to
receive a site plan with appropriate dimensions of the proposed riprap along the bank. There
is a $27.00 dollar fee for issuance of this document. Please make checks payable to Mason
County Treasurer.
The removal of gravel to redirect the Mouth of Shumocher Creek will require a Shoreline
Conditional Use. This project does not qualify as an emergency and therefore, a Shoreline
Exemption can not be issued for this project. The shoreline designation of the site is
Conservancy. This designation is given to those areas which are intended to maintain their
existing character.
Shumocher Creek's Delta (Mouth) is the result of geomorphic conditions and channel
characteristics in the watershed. These areas tend to move over time to find an equilibrium
between all the different factors affecting the geomorphology of the area as well as land uses
taking place upstream.
I have included a packet explaining the Shoreline Process. Please keep in mind that a
Shoreline Conditional Use Permit process will require two public hearings as well as review
by different federal, state, and local agencies and governments. A time frame of 3 to 4
months is usually required to complete the permitting process.
I hope the information included is helpful to you. If you have questions, you can contact me
at (360) 427-9670 ext. 295.
Sincerely,
Hugo R. Flores, Shoreline Planner
DEPARTMENT OF COMMUNITY DEVELOPMENT
CC: Gary Yando, DCD Director
MASON COUNTY
SHORELINE PRE-INSPECTION APPLICATION
PLEASE PRINT 544.00 Fee Required
1 . Owner: ,S1wSW Co. Applicant:
Site Address: W4,ToAl LAB ,tE2g:;aF4TioA/ A/46AApplicant Address:
Owner Address: &JAZ OPE2r4?t0AIS City: St Zip
City: S'-N,EL-rOAJ St_WA Zip 5 4 Phone: (
Phone: ( 060 426 - 132) 2. Parcel No. - -
Legal Description:
7o Ae 6F-
r'orZ Sc� i/isrT.
3. Purpose of Pre-Inspection: `?"o LE-TeRMln!e AA Q Fo/e 5' QED A417-.
4. Use of Building: I
5. Is there any type of water on or adjacent to property?: saltwater lake _
river pond wetland seasonal runoff other
stream _ seasonal creek
Directions to Site: -7b MAso v LAB 1106AD. Ge=T tJry A44_—zA/ LAB
LEE
If the information is incomplete, then Mason County must disclaim any errors resulting from
deficiencies in the original application. Pre inspection reports remain valid only until
development changes occur in the vicini h affect the lot evaluated in this inspection.
Applicant Signature: -- Date:
111d J
CA
41'r 4 r
Return application to: Department of Community Development,Planning Division
P.O. Box 578
Shelton, WA 98584
(360) 427-9670/1-800-562-5628
Please include a $44.00 check or money order payable to Mason County Treasurer
FOR OFFICE USE ONLY: Accepted by Date: ��I'
r -
Please illustrate below the proposed building site in relation to water & property lines:
Departmental Review
(For Office Use Only)
FPlanning Department Findings:
SHORELINE PRE-INSPECTION CHECKLIST
Permit Number Type of Use SPI # 7-00S6
Owner '60* TIMIXA JO. Parcel # 2a l0 7- 3C - 000/o
1. Saltwater/Lake 20z Acres fm4div Lo--6 SMP Designation
Name of Water body
2. Rivers, streams, or creeks 11�4 U 40W<rk G��< LT pC_ Z
Type of Water
❑ 3. Lakes or ponds less than 20 acres in size? (Check if yes.)
U 4. Wetlands: Areas that are inundated or saturated by surface water that under normal
circumstances support vegetation adapted for life in such conditions as the following:
Marshes, bogs, and swamps. (Check if yes.)
�a
❑ 5. Slopes greater than 15% or 8.50? If yes, degree of slope v °
Q 6. Floodplain? (Check if yes.)
❑ 7. Seismic Hazard Area? (Check if yes.)
es. U
Aquifer Recharge Area? Check if Y��
❑ 8. q 9 ( yes.)
❑ 9. Comprehensive Plan Designation
❑ 10. Other
Comments: Al
0-71Z14-"
Authorized Signature Date
DRAWINGS & ADDITIONAL FINDINGS