HomeMy WebLinkAboutHPA-Replace Pilings - BLD Permit / Conditions - 4/9/2018 Washington Department of
Fish&Wildlife
Y
HYDRAULIC PROJECT APPROVAL PO Box 43234
Olympia,WA 98504-3234
FISH°,a 14TOLIFB
(360)902-2200
Issued Date: April 09, 2018 Permit Number: 2018-6-144+01
Project End Date: March 28, 2023 FPA/Public Notice Number: N/A
Application ID: 14271
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Green Diamond Resource Company
ATTENTION: Matt Nixon JAN 0 3 2020
215 N 3rd St 13UILDING 615 W. Alder Street
Shelton, WA 98584-3503
Project Name: Mason Lake Dock Repair
Project Description: Pilings on the boat launch dock have rotted and failed. Three additional pilings in the swim
area which hold the safety area cork line have rotted and failed. The project is limited to
replacing the pilings and pulling the rotted pilings from the water.
PROVISIONS
1. APPROVED PLANS: Work must be accomplished per plans and specifications submitted with the application and
approved by the Washington Department of Fish and Wildlife, entitled JARPA, dated March 28, 2018, except as
modified by this Hydraulic Project Approval. You must have a copy of these plans available on site during all phases of
the project proposal.
2. FISH KILL/WATER QUALITY PROBLEM NOTIFICATION: If a fish kill occurs or fish are observed in distress at the
job site, immediately stop all activities causing harm. Immediately notify the Washington Department of Fish and
Wildlife of the problem. If the likely cause of the fish kill or fish distress is related to water quality, also notify the
Washington Military Department Emergency Management Division at 1-800-258-5990.Activities related to the fish kill
or fish distress must not resume until the Washington Department of Fish and Wildlife gives approval. The Washington
Department of Fish and Wildlife may require additional measures to mitigate impacts.
3. Prevent contaminants from the project, such as petroleum products, hydraulic fluid, fresh concrete, sediments,
sediment-laden water, chemicals, or any other toxic or harmful materials,from entering or leaching into waters of the
state.
PILE REMOVAL, DRIVING
4. Piling removal:
a. Vibratory or water jet extraction is the preferred method of pile removal.
b. Place the piling on a construction barge or other dry storage site after the piling is removed. The piling must not be
shaken, hosed off, left hanging to dry or any other action intended to clean or remove adhering material from the piling
near waters of the state.
c. If a treated wood piling breaks during extraction, remove the stump from the water column by fully extracting. If the
stump cannot be fully extracted, remove the remainder of the stump with a clamshell bucket, chain, or similar means,
or cut it off three feet below the mudline. Cap all buried cut stumps and fill holes left by piling extraction with clean
sediment that matches the native material.
d. When removing creosote piling, containment booms and absorbent booms(or other oil absorbent fabric) must be
placed around the perimeter of the work area to capture wood debris, oil, and other materials released into marine
waters as a result of construction activities to remove creosote pilings.All debris on the bed and accumulated in
containments structures must be collected and disposed upland at an approved disposal site.
5. As specified in the approved plans, the 4 pilings must be untreated wood pilings.
Page 1 of 4
o , ,
Washington Department of
Fish&Wildlife
HYDRAULIC PROJECT APPROVAL PO Box43234
mr > Olympia,WA 98504-3234
FISH—i 117LDLIFE
(360)902-2200
Issued Date: April 09, 2018 Permit Number: 2018-6-144+01
Project End Date: March 28, 2023 FPA/Public Notice Number: N/A
Application ID: 14271
6. Fit all pilings with devices to prevent perching by fish-eating birds.
7. Remove all trash and unauthorized fill in the project area, including concrete blocks or pieces, bricks, asphalt, metal,
treated wood, glass, floating debris, and paper, that is waterward of the ordinary high water line and deposit upland.
LOCATION#1: Site Name: Mason Lake
. . WA
WORK START: April 9, 2018 WORK END: March 28,2023
WRIA Waterbody: Tributary to:
14- Kennedy-Goldsborough Mason Lake Sherwood Creek
1/4 SEC: Section: Township: Range: Latitude: Longitude: County:
07 21 N 02 W 47.320727 -122.986145 Mason
Location#1 Driving Directions
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
specifically Chapter 77.55 RCW. Additional authorization from other public agencies may be necessary for this project.
The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any
additional authorization from other public agencies(local, state and/or federal)that may be necessary for this project.
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person
(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work.
This Hydraulic Project Approval does not authorize trespass.
The person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held liable
for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic
Project Approval.
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one
hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment.
All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions, conditions, or
revocation if the Department of Fish and Wildlife determines that changed conditions require such action. The person(s)
to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals
are listed below.
Page 2 of 4
Washington Department of
Fish&Wildlife
HYDRAULIC PROJECT APPROVAL PO Box 43234
Olympia,WA 98504-3234
FISHore 147LDWE
(360)902-2200
Issued Date: April 09, 2018 Permit Number: 2018-6-144+01
Project End Date: March 28, 2023 FPA/Public Notice Number: N/A
Application ID: 14271
MINOR MODIFICATIONS TO THIS HPA: You may request approval of minor modifications to the required work timing
or to the plans and specifications approved in this HPA unless this is a General HPA. If this is a General HPA you must
use the Major Modification process described below. Any approved minor modification will require issuance of a letter
documenting the approval.A minor modification to the required work timing means any change to the work start or end
dates of the current work season to enable project or work phase completion. Minor modifications will be approved only
if spawning or incubating fish are not present within the vicinity of the project. You may request subsequent minor
modifications to the required work timing.A minor modification of the plans and specifications means any changes in the
materials, characteristics or construction of your project that does not alter the project's impact to fish life or habitat and
does not require a change in the provisions of the HPA to mitigate the impacts of the modification. If you originally
applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a minor
modification through APPS.A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must
submit a written request that clearly indicates you are seeking a minor modification to an existing HPA. Written requests
must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID
number of the HPA,the date issued, the permitting biologist,the requested changes to the HPA, the reason for the
requested change,the date of the request, and the requestor's signature. Send by mail to: Washington Department of
Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234, or by email to HPAapplications@dfw.wa.gov. You
should allow up to 45 days for the department to process your request.
MAJOR MODIFICATIONS TO THIS HPA: You may request approval of major modifications to any aspect of your HPA.
Any approved change other than a minor modification to your HPA will require issuance of a new HPA. If you originally
applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a major
modification through APPS.A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must
submit a written request that clearly indicates you are requesting a major modification to an existing HPA. Written
requests must include the name of the applicant,the name of the authorized agent if one is acting for the applicant, the
APP ID number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA,the reason for
the requested change, the date of the request, and the requestor's signature. Send your written request by mail to:
Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234. You may email your
request for a major modification to HPAapplications@dfw.wa.gov. You should allow up to 45 days for the department to
process your request.
APPEALS INFORMATION
If you wish to appeal the issuance, denial, conditioning, or modification of a Hydraulic Project Approval(HPA),
Washington Department of Fish and Wildlife(WDFW) recommends that you first contact the department employee who
issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for
further appeal action. If you proceed with an appeal, you may request an informal or formal appeal. WDFW encourages
you to take advantage of the informal appeal process before initiating a formal appeal. The informal appeal process
includes a review by department management of the HPA or denial and often resolves issues faster and with less legal
complexity than the formal appeal process. If the informal appeal process does not resolve your concerns, you may
advance your appeal to the formal process. You may contact the HPA Appeals Coordinator at(360) 902-2534 for more
information.
A. INFORMAL APPEALS: WAC 220-660-460 is the rule describing how to request an informal appeal of WDFW actions
taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures. The following
information summarizes that rule.
Page 3 of 4
i
• ' w r r ,
Washington Department of
Fish&Wildlife
HYDRAULIC PROJECT APPROVAL PO Box 43234
noser�, n�mn,•,; Olympia,WA 98504-3234
FISH.�d MUIFE
(360)902-2200
Issued Date: April 09, 2018 Permit Number: 2018-6-144+01
Project End Date: March 28, 2023 FPA/Public Notice Number: N/A
Application ID: 14271
A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request an informal
appeal of that action. You must send your request to WDFW by mail to the HPA Appeals Coordinator, Department of
Fish and Wildlife, Habitat Program, PO Box 43234, Olympia, Washington 98504-3234; e-mail to
HPAapplications@dfw.wa.gov;fax to(360) 902-2946; or hand-delivery to the Natural Resources Building, 1111
Washington St SE, Habitat Program, Fifth floor. WDFW must receive your request within 30 days from the date you
receive notice of the decision. If you agree, and you applied for the HPA, resolution of the appeal may be facilitated
through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution
is not reached through the informal conference, or you are not the person who applied for the HPA,the HPA Appeals
Coordinator or designee may conduct an informal hearing or review and recommend a decision to the Director or
designee. If you are not satisfied with the results of the informal appeal, you may file a request for a formal appeal.
B. FORMAL APPEALS: WAC 220-660-470 is the rule describing how to request a formal appeal of WDFW actions
taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures. The following
information summarizes that rule.
A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request a formal appeal
of that action. You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and
serve a copy on WDFW within 30 days from the date you receive notice of the decision. You may serve WDFW by mail
to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia,
Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov; fax to(360) 902-2946; or hand-delivery to the Natural
Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. The time period for requesting a formal
appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, you may
request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in
response to the informal appeal.
C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal, the
WDFW action shall be final and unappealable.
Habitat Biologist Margaret.Bigelow@dfw.wa.gov �z ,; , �ru for Director
Margie Bigelow 360-427-2179 WDFW
I
Page 4 of 4