HomeMy WebLinkAboutSHX2005-00035 JARPA New Pilings - SHX Permit / Conditions - 2/28/2006 ON-STATE MASON COUNTY
�P5 C ° DEPARTMENT OF COMMUNITY DEVELOPMENT
o A o Planning Division
>- S N z P O Box 279, Shelton,WA 98584
7 N y ti (360)427-9670
OJ �O
1864
Exemption from Shoreline Management Act
Case No.: SHX2005-00035 Substantial Development Permit Requirement
The Proposal By: SIMPSON TIMBER CO
PO BOX 460
SHELTON,WA 98584 -P ; /I 21 Q"7 — S Q —()0�1 0
To undertake the following development: L
TO BE KEPT IN THE
NEW PILINGS - PARCEL
nn^EL FILE
Exec-ApA- ATvv. 5 E A -pr-r WAG
Within MASON LAKE and/or its associated wetlands is exempt from the requirement of substantial development because the
development is categorized under WAC 173-27-040(H)as being category
H-dock
Please contact Kell McAboy at ext 363 if you have any questions.
Issued: 2/28/2006
Expires: 2/28/2008 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
AGENCY USE ONLY
ti.
Agency Reference#: Date Received:
Circulated by: (local govt.or agency) R�nl
JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM F( �)
(for use in Washington State)
42
PLEASE TYPE OR PRINT IN BLACK INK 6.W,, CF
OA
❑ Application for a Fish Habitat Enhancement Project per requirements of RCW 77.55.290. You must submit a copy
of this completed JARPA application form and the (Fish Habitat Enhancement JARPA Addition)to your local
Government Planning Department and Washington Department of Fish &Wildlife Area Habitat Biologist on the same day.
NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working days.
Based on the instructions provided, I am sending copies of this application to the following: (check all that apply)
❑ Local Government for shoreline: ❑ Substantial Development ❑ Conditional Use ❑Variance ® Exemption ❑ Revision
❑ Floodplain Management ❑ Critical Areas Ordinance
® Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region)
❑ Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal Permit Unit)
❑ Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification
❑ Corps of Engineers for: ❑ Section 404 ❑ Section 10 permit
❑ Coast Guard for General Bridge Act Permit
❑ For Department of Transportation projects only: This project will be designed to meet conditions of the most current Ecology/Department of
Transportation Water Quality Implementing Agreement
SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications.
1.APPLICANT
Simpson Timber Company, Larry Gill
MAILING ADDRESS
PO Box 460, Shelton, WA 98584
WORK PHONE E-MAIL ADDRESS HOME PHONE FAX#
360 427-4883 I4ill(a)simpson.com 360 427-4931
If an agent is acting for the applicant during the permit process,complete#2. Be sure agent signs Section C(Signature Block)for all permit
applications
2.AUTHORIZED AGENT
MAILING ADDRESS
WORK PHONE E-MAIL ADDRESS HOME PHONE FAX#
3.RELATIONSHIP OF APPLICANT TO PROPERTY: ®OWNER ❑PURCHASER ❑LESSEE ❑OTHER:
4.NAME,ADDRESS,AND PHONE NUMBER OF PROPERTY OWNER(S),IF OTHER THAN APPLICANT:
5.LOCATION(STREET ADDRESS,INCLUDING CITY,COUNTY AND ZIP CODE,WHERE PROPOSED ACTIVITY EXISTS OR WILL OCCUR)
West end of Mason Lake, Mason County, 98584
LOCAL GOVERNMENT WITH JURISDICTION(CITY OR COUNTY)Mason County
WATERBODY YOU ARE WORKING IN TRIBUTARY OF WRIA#
Mason Lake Hood Canal 14
IS THIS WATERBODY ON THE 303(d)LIST?YES[I NO
IF YES,WHAT PARAMETER(S)?
htt ;//)V�aw._ecy_wa..g(1ViprQ ms/wlJ(tirlksiimpaired_wtrs itml. WEBSITE FOR 303d
LIST
/.SECTION SECTION TOWNSHIP RANGE GOVERNMENT LOT SHORELINE DESIGNATION
7 21N 2W Urban
LATITUDE&LONGITUDE: r.18N 122.95W ZONING DESIGNATION
Rural Residential 5
TAX PARCEL NO: DNR STREAM TYPE,IF KNOWN
DARPA, Revised 7/02 Contact the State of Washington Office of Permit Assistance for latest version, 360/407-7037 or 800/917-0043 1
6.DESCRIBE THE CURRENT.USE OF THE PROPERTY,AND STRUCTURES EXISTING ON THE PROPERTY. HAVE YOU COMPLETED ANY PORTION OF THE PROPOSED ACTIVITY ON THIS
PROPERTY? ❑YES ®NO FOR ANY PORTION OF THE PROPOSED ACTIVITY ALREADY COMPLETED ON THIS PROPERTY,INDICATE MONTH AND YEAR OF COMPLETION.
The property is currently used as a private recreational camping site. There are currently six small recreational floats(5 ft X 40 ft)
connected to the shore to provide campers with a spot to dock their small boats during their stay at the campsite(see attached photos).
IS THE PROPERTY AGRICULTURAL LAND? ❑YES ®NO ARE YOU A USDA PROGRAM PARTICIPANT? ❑YES ®NO
7a. DESCRIBE THE PROPOSED WORK THAT NEEDS AQUATIC PERMITS: COMPLETE PLANS AND SPECIFICATIONS SHOULD BE PROVIDED FOR ALL WORK WATERWARD OF THE ORDINARY
HIGH WATER MARK OR LINE,INCLUDING TYPES OF EQUIPMENT TO BE USED. IF APPLYING FOR A SHORELINE PERMIT,DESCRIBE ALL WORK WITHIN AND BEYOND 200 FEET OF THE
ORDINARY HIGH WATER MARK. IF YOU HAVE PROVIDED ATTACHED MATERIALS TO DESCRIBE YOUR PROJECT,YOU STILL MUST SUMMARIZE THE PROPOSED WORK HERE. ATTACH
A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED.
The water level in Mason Lake has dropped since the beaver dam at the outlet was destroyed. This has left six recreational floats at the
camping site sitting on the lakebed instead of floating on the lake. The proposed work entails moving the six floats about 6 to 8 feet further
from shore to allow them to float with the new lake level. This work will involve cutting off the existing piling located at the end of each float
and installing new piling roughly 6 to 8 feet further into the lake. The new pilings would be made of untreated wood. The existing
prefabricated floats would be then moved out and attached to the new piling. The ramp connecting the floats to the shoreline would be
extended to accommodate the new location. Existing piling would be cut off at the mudline. There is a seventh piling(without an existing
float)at the west end of the six floats. This piling would be cut off at the mudline and not replaced. Given that the lake level has dropped
and a new Ordinary High Water mark is being established, we do not anticipate being much further offshore than what currently exists.
PREPARATION OF DRAWINGS: SEE SAMPLE DRAWINGS AND GUIDANCE FOR COMPLETING THE DRAWINGS. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE DRAWINGS
MUST BE ATTACHED. NOTE: APPLICANTS ARE ENCOURAGED TO SUBMIT PHOTOGRAPHS OF THE PROJECT SITE,BUT THESE DO NOT SUBSTITUTE FOR DRAWINGS. THE CORPS OF
ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON B-112 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES.
7b. DESCRIBE THE PURPOSE OF THE PROPOSED WORK AND WHY YOU WANT OR NEED TO PERFORM IT AT THE SITE. PLEASE EXPLAIN ANY SPECIFIC NEEDS THAT HAVE INFLUENCED
THE DESIGN.
The purpose of the project is to get the existing recreational floats off the lakebed because of a drop in lake level.
7c. DESCRIBE THE POTENTIAL IMPACTS TO CHARACTERISTIC USES OF THE WATER BODY. THESE USES MAY INCLUDE FISH AND AQUATIC LIFE,WATER QUALITY,WATER SUPPLY,
RECREATION,and AESTHETICS. IDENTIFY PROPOSED ACTIONS TO AVOID,MINIMIZE,AND MITIGATE DETRIMENTAL IMPACTS,AND PROVIDE PROPER PROTECTION OF FISH AND
AQUATIC LIFE. IDENTIFY WHICH GUIDANCE DOCUMENTS YOU HAVE USED. ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED.
Temporary localized increase in turbidity while cutting old piling and installing new piling.
7d. FOR IN WATER CONSTRUCTION WORK,WILL YOUR PROJECT BE IN COMPLIANCE WITH THE STATE OF WASHINGTON WATER QUALITY STANDARDS FOR TURBIDITY
WAC 173.201A-110? ® YES ❑NO (SEE USEFUL DEFINITIONS AND INSTRUCTIONS)
6.WILL THE PROJECT BE CONSTRUCTED IN STAGES? ❑YES ®NO
PROPOSED STARTING DATE: As soon as possible.
ESTIMATED DURATION OF ACTIVITY: One t0 three days.
9.CHECK IF ANY TEMPORARY OR PERMANENT STRUCTURES WILL BE PLACED:
®WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH OR TIDAL WATERS;AND/OR
❑WATERWARD OF MEAN HIGHER HIGH WATER LINE IN TIDAL WATERS
10.WILL FILL MATERIAL(ROCK,FILL,BULKHEAD,OR OTHER MATERIAL)BE PLACED:
❑WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH WATERS? IF YES,VOLUME(CUBIC YARDS)/AREA(ACRES)
❑WATERWARD OF THE MEAN HIGHER HIGH WATER FOR TIDAL WATERS? IF YES,VOLUME(CUBIC YARDS) AREA (ACRES)
JARPA, Revised 7/02 Contact the State of Washington Office of Permit Assistance for latest version, 360/407-7037 or 800/917-0043 2
11.WILL MATERIAL BE PLACED IN WETLANDS? ❑YES ®NO
IF YES:
A. IMPACTED AREA IN ACRES: 1
B. HAS A DELINEATION BEEN COMPLETED? IF YES,PLEASE SUBMIT WITH APPLICATION. ❑YES ❑NO
C. HAS A WETLAND REPORT BEEN PREPARED? IF YES,PLEASE SUBMIT WITH APPLICATION. ❑YES ❑NO
D. TYPE AND COMPOSITION OF FILL MATERIAL(E.G.,SAND,ETC.):
E. MATERIAL SOURCE:
F. LIST ALL SOIL SERIES(TYPE OF SOIL)LOCATED AT THE PROJECT SITE,&INDICATE IF THEY ARE ON THE COUNTY'S LIST OF HYDRIC SOILS.SOILS INFORMATION CAN BE OBTAINED
FROM THE NATURAL RESOURCES CONSERVATION SERVICE(NRCS):
G. WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑YES ❑NO
IF YES,IMPACTED AREA IS_ACRES OFDRAINED WETLANDS.
NOTE: If your project will impact greater than%of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form
NOTE.,a 401 water quality certification will be required from Ecology in addition to an approved mitigation plan if your project impacts wetlands that are: a)greater than% acre in size,or
b)tidal wetlands or wetlands adjacent to tidal water. Please submit the JARPA form and mitigation plan to Ecology for an individual 401 certification N a)or b)applies.
12. STORMWATER COMPLIANCE FOR NATIONWIDE PERMITS ONLY:
THIS PROJECT IS(OR WILL BE)DESIGNED TO MEET ECOLOGY'S MOST CURRENT STORMWATER MANUAL,OR AN ECOLOGYAPPROVED LOCAL STORMWATER MANUAL ❑YES ❑NO
IF YES-WHICH MANUAL WILL YOUR PROJECT BE DESIGNED TO MEET
If NO-FOR CLEAN WATER ACT SECTION 401 AND 404 PERMITS ONLY-PLEASE SUBMITTO ECOLOGY FOR APPROVAL, ALONG WITH THIS JARPA APPLICATION,DOCUMENTATION THAT
DEMONSTRATES THE STORMWA TER RUNOFF FROM YOUR PROJECT OR ACTIVITY WILL COMPLY WITH THE WATER QUALITY STANDARDS,WAC 173.201(A)
13.WILL EXCAVATION OR DREDGING BE REQUIRED IN WATER OR WETLANDS? ❑YES ®NO
IF YES:
A. VOLUME: (CUBIC YARDS)/AREA (ACRES)
B. COMPOSITION OF MATERIAL TO BE REMOVED:
C. DISPOSAL SITE FOR EXCAVATED MATERIAL:
D. METHOD OF DREDGING:
14,HAS THE STATE ENVIRONMENTAL POLICY ACT(SEPA)BEEN COMPLETED? ❑YES ®NO
SEPA LEAD AGENCY:Mason County SEPA DECISION: DNS,MDNS,EIS,ADOPTION, DECISION DATE(END OF COMMENT PERIOD):
SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION
15.LIST OTHER APPLICATIONS,APPROVALS,OR CERTIFICATIONS FROM OTHER FEDERAL,STATE OR LOCAL AGENCIES FOR ANY STRUCTURES,CONSTRUCTION,DISCHARGES,OR
OTHER ACTIVITIES DESCRIBED IN THE APPLICATION(I.E.,PRELIMINARY PLAT APPROVAL,HEALTH DISTRICT APPROVAL,BUILDING PERMIT,SEPA REVIEW,FEDERAL ENERGY
REGULATORY COMMISSION LICENSE(FERC),FOREST PRACTICES APPLICATION,ETC.) ALSO INDICATE WHETHER WORK HAS BEEN COMPLETED AND INDICATE ALL EXISTING WORK ON
DRAWINGS.
NOTE:FOR USE WITH CORPS NATIONWIDE PERMITS,IDENTIFY WHETHER YOUR PROJECT HAS OR WILL NEED AN NPDES PERMIT FOR DISCHARGING WASTEWATER AND/OR
STORMWATER,
TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION NO. DATE OF APPLICATION DATE APPROVED COMPLETED?
SEPA Mason County February 2, 2005 No
Shoreline Permit Mason County February 2, 2005 No
Corps Permit rmy Corps of Engineers February 2, 2005 No
HPA WA Dept. of Fish& Wildlife February 2, 2005 No
16.HAS ANY AGENCY DENIED APPROVAL FOR THE ACTIVITY YOU'RE APPLYING FOR OR FOR ANY ACTIVITY DIRECTLY RELATED TO THE ACTIVITY DESCRIBED
HEREIN?❑YES ®NO IF YES,EXPLAIN:
JARPA, Revised 7/02 Contact the State of Washington Office of Permit Assistance for latest version, 360/407-7037 or 800/917-0043 3
SECTION B-Use for Shoreline and Corps of Engineers permits only:
17a. TOTAL COST OF PROJECT. THIS k1EANS THE FAIR MARKET VALUE OF THE PROJECT,INCLUDING MATERIALS,LABOR,MACHINE RENTALS,ETC.
17b. IF A PROJECTOR ANY PORTION OF A PROJECT RECEIVES FUNDING FROM A FEDERAL AGENCY,THAT AGENCY IS RESPONSIBLE FOR ESA CONSULTATION. PLEASE INDICATE IF YOU
WILL RECEIVE FEDERAL FUNDS AND WHAT FEDERAL AGENCY IS PROVIDING THOSE FUNDS. SEE INSTRUCTIONS FOR INFORMATION ON ESA"
FEDERAL FUNDING ❑YES ONO IF YES,PLEASE LIST THE FEDERAL AGENCY
18.LOCAL GOVERNMENT WITH JURISDICTION:
19.FOR CORPS,COAST GUARD,AND DNR PERMITS,PROVIDE NAMES,ADDRESSES,AND TELEPHONE NUMBERS OF ADJOINING PROPERTY OWNERS,LESSEES,ETC...
PLEASE NOTE: SHORELINE MANAGEMENT COMPLIANCE MAY REQUIRE ADDITIONAL NOTICE—CONSULT YOUR LOCAL GOVERNMENT.
NAME ADDRESS PHONE NUMBER
SECTION C- This section MUST be completed for any permit covered by this application
20.APPLICATION IS HEREBY MADE FOR A PERMIT OR PERMITS TO AUTHORIZE THE ACTIVITIES DESCRIBED HEREIN. I CERTIFY THAT 1 AM FAMILIAR WITH THE
INFORMATION CONTAINED IN THIS APPLICATION,AND THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF,SUCH INFORMATION IS TRUE,COMPLETE,AND
CCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH
HIS APPLICATION IS MADE,THE RIGHT TO ENT OVE-DE SCRIBED LOCATION TO INSPECT THE PROPOSED,IN-PROGRESS OR COMPLETED WORK. I
AGREE TO START WORK ONLY AFTER CESSA TS HAVE BEEN RECEIVED.
SIGNATURE OF AP ICANT
� DATE
ZZ06—
SI&Af—URE OF A ORIZED AGENT DATEf
DATE
I HEREBY DESIGNATE
TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PERMIT(S). I UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED,
I MUST SIGN THE PERMIT.
SIGNATURE OF APPLICANT DATE
SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS,E.G.DNR)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED.
18 U.S.0§1001 provides that: Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a
material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
COMPLETED BY LOCAL OFFICIAL
A. Nature of the existing shoreline. (Describe type of shoreline, such as marine, stream, lake, lagoon, marsh, bog, swamp, flood
plain, floodway, delta; type of beach, such as accretion, erosion, high bank, low bank, or dike; material such as sand, gravel, mud, clay,
rock, riprap; and extent and type of bulkheading, if any)
B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade
level, indicate the approximate location of and number of residential units, existing and potential, that will have an obstructed view:
C. If the application involves a conditional use or variance, set forth in full that portion of the master program which provides that
the proposed use may be a conditional use, or, in the case of a variance, from which the variance is being sought:
These Agencies are Equal Opportunity and Affirmative Action employers.
For special accommodation needs,please contact the appropriate agency in the instructions.
DARPA, Revised 7/02 Contact the State of Washington Office of Permit Assistance for latest version, 360/407-7037 or 800/917-0043 4
� a
tr
,u
i
Figure 1. Looking west at four floats.
AdELI
I Lft"
171
�k
r..�
Figure 2. Looking east at the other two floats.
Both pictures were taken on May 20, 2004.
JARPA, Revised 7/02 Contact the State of Washington Office of Permit Assistance for latest version, 360/407-7037 or 800/917-0043 1
SIMPSON TIMBER
2X10 FASCIA MAKE 3
4X8 WALERS
2X8 STRINGERS
2X8 BLOCKING
32'
O
13 ROWS SINGLES WHITE RUB STRIP BOTH SIDES
14) X—LARGE SINGLES ON RAMP END AND OUTBOARD END
WHITE VINYL CORNERS
ON OUTBOARD END
RAMP HINGE CLEATS EVERY 10'
3'
2X8
Marine Floats
INS FattD St•TL -WA 98441-2M-8832740
scus 1/4-l'-O 1— WB
wa 3/5/03 mrs®
RAMP AND FLOAT FRAMING
SIMPSON TIMBER
MASON LAKE 03-926
I
Simpson" RECEIVED
FEB 0 4 2005
February 2, 2005 MCCD - PLANNING
Mason County
Planning Department
P.O. Box 279
Shelton, WA 98584
Dear Sir or Madam:
I am writing to request an exemption from SEPA for a minor alteration of some
recreational floats on Mason Lake. Simpson has a private recreational camping site at the
west end of Mason Lake with six floats for employees to temporarily tie up their small
boats while using the camping site(see attached photos). The lake level at Mason Lake
has dropped recently due to the destruction of a beaver dam near the outlet and our floats
are now sitting on the lakebed. We are proposing to move the floats roughly 6 to 8 feet
further offshore to enable them to float again.
Each of the six floats includes a 5 ft by 40 ft float, a timber piling at the end of the float to
keep the float from drifting, and a short ramp connecting the float to the shore. We would
like to cut off the existing piling at each float and install new,non-treated piling 6 to 8
feet further out. The new piling would then be attached to the existing float and a new
ramp would be attached to connect the float to the shore. There is an existing seventh
piling without a float that would be cut off, but not replaced.
The only issue we foresee would be a temporary increase in turbidity when cutting the
existing piling and installing the new piling.
Please contact me if you have any questions.
Sincerely,
Larry Gill
Simpson Timber Company
Simpson Timber Company Northwest Lumber Division P.O. BOX 460 SHELTON,WASHINGTON 98584
N
I
J J /
p
t�
.vo aJo Q
c
Ouch E/er. of
Brads of Br.%j• O
s�o z/a t
N
P L A N
^ a a
S$� G•L paef P+�.e/s
I
h
i
78-,lo-'a 27' 6/r• li. Aw,. r
BR/D G E CROSS SECT/ON
SOUnD
. DESICM
i
1
A R C H I T E C T U R E
uA- E N G I N E E R I N G
P L A N N I N G
I �
j ELF VA T I N 2417 PACIFIC AVE
j OLYMPIA WA 9F
�206 ) 943