Loading...
HomeMy WebLinkAboutBLD2018-00777 SFR - BLD Application - 9/13/2018 E V1:.D JI IL 19 2018 rL12018 t,��r �, reet a ING Lio �. r - Ll i:J- Mason County WA GIS Page 1 of 1 Mason County WA GIS Mason County Homepage JUL 19 2018 + 223107700490 W. Alder Str47t Show search results for 22310... r` PLANNING107g51NE ANVIL LN 2231421;NE'ANVIL LN A • 420 NE 223090004000 -� _Aop2- rn"c► 300 NE 271 NE ANVIL Ll 2' t231ufit1U4y0 250 NE AN —221 NE ANVIL LN 22310 • 223107790481 - 200 NE ANVI 30 NE HORSESHOE DR • 22310779d�82 223097500180 �I 223097500260 22304f5ft roe or 22'. 300ft 122.932 47.507 Degrees https://gis.co.mason.wa.us/mason/?find=223107700490 7/25/2018 Rb V D r- JUL 19 2018 ! 8 0 m m -D r� 615 W. Alder Street o Z = ?� z Z 1� O m �' Z ITDz 'D m c � > � JC o � c $5 G o L15;Q DA z 3� aso t � a r C' �l S APPROVED D x MASON COUNTY DCD PLAitiiNING SITE PLAN REQUIRED T�F OfJ 51�= NG SUBJECTT(XAP�>; iq�; c / By Date fl_�// i W �� Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2015 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling loads. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section, some values will be calculated for you. If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at(360)956-2042 for assistance. Project Information Contact Information IRON KRAUS 1KRAUS 271 NE ANVIL LN,BELFAIR P 0 BOX 432 22310-77-00490 ISEABECK WA 98380 Heating System Type: O All other Systems O Heat Pump To see detailed instructions for each section,place your cursor on the word"Instructions". Design Temperature Instructions _ Design Temperature Difference(AT) 47 . Shelton AT=Indoor(70 degrees)-Outdoor Design Temp Area of Building Conditioned Floor Area Instructions Conditioned Floor Area(sq ft) 960 Average Ceiling Height Conditioned Volume . Instructions Average Ceiling Height(ft) 8.0 7,680 Glazing and Doors U-Factor X Area = UA Instructions U-0.30 . 0.300 162 48.60 Skylights U-Factor X Area = UA instructions 0.50 00 --- Insulation Attic _ U-Factor X Area = UA Instructions R-49 0.026 960 24.96 Single Rafter or Joist Vaulted U-Factor X Area UA Instructions No VaulOed CeilirW In this project V Above Grade Walls(see Figure t) U-Factor X Area UA Instructions R-21 Intermediate ���;� 0.056 926 51.86 _ Floors U-Factor X Area UA Instructions - No Floors above unconditioned spaces. L Below Grade Walls(s-Figure 1) U-Factor X Area UA Instructions 111 0.028 0� No Below Grade Walls in this project Slab Below Grade sa;Figure 1 F-Factor X Length UA Instructions 0.303 No slab Ilebw Grade In this project � Slab on Grade ts" R� F-Factor X Len th UA Instructions 0.540 960 518.40 R-10 Perimeter � ti111111 Location of Ducts Instructions Duct Leakage Coefficient UrtmrtdRioned space 1.10 Sum of UA 643.82 Envelope Heat Load 30,259 Btu/Hour Figure 1. SumofuAXAT Air Leakage Heat Load 3,898 Btu I Hour Volume X 0.6 X AT X.018 Above Grade Building Design Heat Load 34,158 Btu/Hour •"`�"'""�•-..,,,•4 Air Leakage-Envelope Heat Loss Building and Duct Heat Load 37,573 Btu/Hour Ducts in unconditioned space:Sum of Building Heat Loss X 1.10 Ducts in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 46,967 Btu/Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Building and Duct Heat Loss X 1.25 for Heat Pump (07101113) MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMEI§UILDING WSEC/Ventilation Code Compliance Application Submit with heating/cooling system size worksheet (see instructions #4) Owner: Parcel#: Type of project: M Total Sq. Ft. 1st Floor: 211 floor, s t nt: of heated area:: CIQU cl u0 JUL 19 2018 Heating System Type: O Electric wall heater O Electric Central Furnace O LArn� 5-uWAider Street O Heat Pump with electric furnace O Heat pump with gas furnace ® Ductless Heat O Boiler, specify fuel type: O Other. Specify: t X Prescriptive Option Table R402.1.1 (see table on previous page) Compliance Method ElComponent Performance, R402.1.3 — Calculation worksheets required Must Check one:: ❑ Other (Specify): Check one )1 Whole House Ventilation system ❑ Whole House Ventilation Ventilatio using exhaust fans &window or wall Integrated with a Forced Air ❑ Other,describe: fresh air vents (M1507.3.4). If using System (M1507.3.5) n System window vents be sure to order windows with vents. Referencing Table R406.2, "Additional Residential Energy Efficiency Requirements," all residential units must develop credits as specified in Table 406.2. Identify and describe which option(s)will be used to comply. If the table is not attached to this form you can access the table on our website at http://www.co.mason.wa.us/forms/Community DevAecc wsec.pdf Additional a) Description: Small dwelling units: less than 1,500 sq. feet of heated or cooled floor area and less than 300 sq. ft fenestration area (skylights, doors, windows, etc). Energy *Including additions to existing building that are greater than 500 sq. ft. of heated floor Efficiency Requirem but less than 1500 sq ft of floor area. Requires 1.5 credits ents b) Medium dwelling units that are not included in (a) above {small dwelling), OR (c) below Energy {large dwelling} Requires 3.5 credits credits EXCEPTION: Dwelling units serving R-2 occupancies shall require. Requires 2.5 requiirred. credits. See page two for description. c) Large dwelling unit is a dwelling unit that exceeds 5,000 sq. ft. of heated or cooled floor area. Requires 4.5 credits d) Additions less than 500 sq feet. Requires .5 credits (Fenestration is defined in the /ECC as skylights, roof windows, vertical windows, opaque doors, lazed-doors that include products with glass and non-glass glazing materials. Describe Energy CreditnOption(s): Using Option'� � r number(s): f� L.IGvL +.Ply. �LR� I I ►�� 3 FEN ESTRATION'SCHEDULE USE FOR ENERGY CREDIT. a) SMALL DWELLING OPTION & COMPONENT PERFORMANCE COMPLIANCE List all windows, doors, skylights. (If needed, attach an additional sheet) 'Fenestration is defined in IECC Chapter 2 as skylights, roof windows, vertical windows, opaque doors, glazed-doors that include products with lass and non- lassglazing materials, Manufacturer Location U-Factor Size Quantity Total rough opening) Square Feet Li i 0 l a4 30 5° v �o 30 (o i 10 Total Fenestration: windows, skylights and door area I(p Energy Credits 4 MASON COUNTY COMMUNITY SERVICES PERMIT ASSISTANCE CENTER: Permit No: E) -WrITI •BUILDING•PLANNING•PUBLIC HEALTH•FIRE MARSHAL 1 >'k 615 W.Alder Street,Shelton,WA 98584 Ir A"' w— ,Y Phone Shelton:(360)427-9670 ext.352•Fax:(360)427-7798 Phone _= R Belfalr(360)275-4467•Phone Elma:(360)482-5269 JUL 19 2018 185 . ,,;1.g UILD'INGBUILDING PERMIT APPLICATI0645 W. Alder street PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: 6 NAME: MAILING ADDRESS: 2 MAILING ADDRESS: CITY: j�, STATE: ZIP: CITY: STATE: ZIP: PHONE#l: PHONE: CELL: PHONE#2: EMAIL EMAIL: L&I REG# EXP. PRIMARY CO ACT: OWNER❑ CONTRACTOR❑ OTHER❑ NAME EMAIL MAILING ADDRESS Z CITY STATE ZIP PHONE CELL PARCEL INFORMATION: !y� PARCEL NUMBER(12 Digit Number) ZONING 1'1Y1'5 LEGAL DESCRIPTION(Abbreviat ) __ FIRE DISTRI SITE ADDRESS 2-r1 LIOE CITY DIRECTIONS TO SITE ADDRESS IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO ❑ IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply): ' SALTWATER❑ LAKE❑ RIVER/CREEK ❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM❑ TYPE OF WORK: NEW.❑ ADDITION❑ ALTERATION❑ REPAIR El OTHER ❑ USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc)y ��° Y iEc-i -tb 1P1-54ylci QA& IS USE: PRIMARY)� SEASONAL❑ NUMBER OF BEDROOMS I NUMBER OF BA OMS HEATED STRUCTURE? YES(Whole Bldg), YES(Part[s]of Bldg) ❑ NO ❑ DESCRIBE WORK r)Pj15 lam' �JL SOUARE FOOTAGE: (propose+existing) 1 ST FLOOR (Qy sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq. ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED N: *4 COPIES OF THE FLOOR PLAN REQUIRED* 71DT�H__ MODEL BEDROOMS BATHS SERIAL NUMBER ENVIRONMENTAL HEALTH: - SEWAGE/SEWER SOURCE: SEPTIC K SEWER❑ / NEW EXISTING ❑ PLUMBING IN STRUCTURE? YESM NO ❑ Ifyes, attach completed Water Adequacy Form PERIMETER/FOUNDATION DRAINS PROPOSED? YES�, NO❑ EXISTING SQ.FT. EXISTING BEDROOMS PROPOSED BEDROOMS TOTAL BEDROOMS OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permitlapplication becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT PLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED. (MASON COUNTY CODE 14.08.42) X Signature of OWNER(Must be signed by the OWNER) Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT CC- PLANNING DEPARTMENT FIRE MARSHAL PUBLIC HEALTH MASON COUNTY RECOW-D i COMMUNITY SERVI ' 4 / Building,Planning,Environmental Health,Community Health ' 1 ' G JUL 19 2018 Physical and Mailing Address: 615 W Alder St., Bldg 8, Shelton, WA 98584 615 W. Alder Street Shelton Phone: (360)427-9670 ext 352 e- Fax (360)427-7798 PLUMBING & MECHANICAL PERMIT APPLICATION Permit#:]JId 2616 - 06 71 OWNERAWORMAT ON: CONTRACTOR INFORMATION: NAME: &I1 naV� NAME: MAILING ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: CITY: STATE: ZIP: 15i PHONE: PHONE: CELL: w 2nd PHONE: EMAIL: ' EMAIL: L&I REG# EXP. PARCEL INFORMATION: PARCEL NUMBER (12 Digit Number): oA2-1 31D - q 1 " t-{ U Zoning: LEGAL DESCRIPTION (Abbreviated): SITE ADDRESS: I t C - fatA, CITY: DIRECTIONS TO SITE ADDRESS: TYPE OF JOB/WORK: NEW ADD ALT REPAIR OTHER USE OF BUILDING PLUMBING FIXTURES MECHANICAL UNITS Electric in-wall heaters(no fee) Type of Fixture No. of Fixtures Fuel Type Fees Type of Unit No. of Units Fuel Type Fees Toilet(s) — Fumace [E/G/LPG] Bathroom Sink(s) Heat Pump [ // /LPG] Bath Tub(s) ,� Ductless H.P. —1 E/Z/LPG] Shower(s) I Spot Vent Fan Water Heater(s) ( [E/ LPG Propane Tank _gal.] Clothes Washer(s) [E/G/LPG] Gas Outlet(s) ' L' 1_ Kitchen Sink(s) Heat Stove _ [EJ G/LPGW Dishwasher(s) ( Kitchen Exhaust Hood Hose bib(s) Dryer Vent Other Solar Panel Other Other Plumbing Subtotal Mechanical Subtotal Plumbing Base Fee Mechanical Base Fee Final Inspection Fee Final Inspection Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced withi 180 days or if construction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. CTIVI I OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X ?-)S/� 'Sig re of Appfi ant Date X o� /?/ccc� Owner/Owners Representative/Contractor Print Name (Circle one) DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTESICONDITIONS O Building O Fire Marshal J O Permit Tech (OTC penult only) 1:ISi. tt5^:e.'Irw: h;ti::J/Iwvv'w.co.IT.-aSOi?.wa.Ust,co ,-,munity deN/ Rev:3/08;20ii CONSTRUCTION NOTES 1, ALL DRAWINGS SHALL BE REVIEWED AND APPROVED BY OWNER AND/OR CONTRACTOR PRIOR TO BEGINNING OF SITE WORK POLE BUILDING PLANS OR BUILDING CONSTRUCTION. ALL DIMENSIONS AND SPECIFICATIONS SHALL BE VERIFIED AND ANY DISCREPANCIES, ERRORS AND/OR OMISSIONS SHALL BE REPORTED TO SOUTH VALLEY ENGINEERING PRIOR TO MATERIAL PURCHASE AND BUILDING OWNER: RON KRAUS BEGINNING OF CONSTRUCTION. SOUTH VALLEY ENGINEERING SHALL NOT BE HELD LIABLE FOR ANY COSTS OR DAMAGES INCURRED DUE TO DISCREPANCIES,ERRORS AND/OR OMISSIONS DISCOVERED AFTER CONSTRUCTION HAS BEGUN. BUILDING LOCATION: 271 NE ANVIL LANE 2. THE BUILDING OWNER AND OR CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR ANY WORK DONE THAT IS NOT SHOWN BELFAIR,WA.98528 ON OR DOES NOT COMPLY WITH THESE PLANS. REQUESTS FOR ANY CHANGES SHALL BE MADE TO THE ENGINEER IN COUNTY: MASON WRITING,AND SHALL BE RECEIVED FROM THE ENGINEER IN WRITING PRIOR TO IMPLEMENTATION. BUILDING DIMENSIONS: 20'X 48'X 9'ADDITION 3. STRUCTURAL CONCRETE FOR SLABS AND FOUNDATIONS SHALL BE A MINIMUM OF 2,500 PSI COMPRESSIVE STRENGTH AT 28 BUILDING AREA: 960 SF(ADDITION ONLY) DAYS WITH NO SPECIAL INSPECTION REQUIRED. FOOTINGS AND FOUNDATIONS SHALL BE CAST AGAINST UNDISTURBED NATIVE SOIL UNLESS OTHERWISE NOTED ON THE PLANS. ROOF PITCH: 3 IN 12 CONSTRUCTION TYPE: V-B 4. ALL DIMENSIONAL LUMBER SHALL BE#2 DF OR BETTER UNLESS OTHERWISE NOTED ON THE PLANS, HIGHER GRADE ROOF FRAMING SYSTEM: PRE-ENGINEERED TRUSSES BY OTHERS LUMBER OF SAME SPECIES MAY BE SUBSTITUTED FOR SPECIFIED GRADE. ROOF ASSEMBLY: METAL OVER WOOD SHEATHING 5. ALL WOOD IN CONTACT WITH CONCRETE ABOVE GROUND SHALL BE PRESSURE TREATED FOR ABOVE GROUND CONTACT. WALL ASSEMBLY: EXTERIOR WOOD WALL SHEATHING ALL WOOD EMBEDDED IN GROUND SHALL BE PRESSURE TREATED FOR BURIAL. BUILDING USE: RESIDENCE 6. ROOF&WALL WOOD SHEATHING(IF USED)-UNLESS OTHERWISE NOTED ON THE PLANS: ALL ROOF AND WALL WOOD SHEATHING SHALL BE AN APPROVED APA RATED SHEATHING,EXPOSURE I,GRADE C-D, CONTRACTOR/BUILDER: NA EXTERIOR GLUE,7116"THICK(MINIMUM). EXTERIOR GRADE SHEATHING SHALL BE RATED FOR EXTERIOR USE. WOOD ROOF SHEATHING SHALL BE NAILED WITH 8d NAILS AT 6"O.C.EDGES AND 12"O.C.FIELD. 2X BLOCKING IS NOT REQUIRED FOR ADDRESS: ROOF SHEATHING. WALL SHEATHING SHALL BE NAILED WITH 8d NAILS AT 6"O.C.EDGES AND 12"O.C.FIELD OR AS SPECIFIED ON THE PLANS. 2X BLOCKING SHALL BE INSTALLED AT ALL PANEL EDGES ON ALL WALLS. 7. ALL FASTENERS EXPOSED TO THE ELEMENTS SHALL BE GALVANIZED OR CORROSION RESISTANT. ALL FASTENERS IN BUILDING DESIGN CRITERIA SHT DRAWING LIST PRESSURE TREATED WOOD SHALL BE HOT-DIPPED GALVANIZED OR STAINLESS STEEL. GROUND SNOW LOAD,P 25 PSF 1 C1.0 COVER SHEET 8. IF PLANS SPECIFY GRAVEL BACKFILL IN POSTHOLE,BACKFILL WITH%"MINUS CLEAN CRUSHED GRAVEL TO SPECIFIED 9-— EMBEDMENT DEPTH. BACKFILL IN 6"LIFTS AND SATURATE AND COMPACT EACH LIFT. ROOF DEAD LOAD=3 PSF 2 P1.0 PLAN VIEW 9. INSTALL ALL TRUSS BRACING PER TRUSS ENGINEERING. INSTALL TEMPORARY TRUSS BRACING DURING CONSTRUCTION WIND SPEED=115 MPH(3 SEC.GUST) 3 E1.0 ELEVATION VIEWS PER BCSI-1310 GUIDELINES FOR POST FRAME TRUSS INSTALLATION,RESTRAINT&BRACING DURING CONSTRUCTION. WIND EXPOSURE=B 4 S1.0 SECTION A 10. IF SOLID ROCK IS ENCOUNTERED AND THE POSTHOLE DEPTH CANNOT BE DRILLED TO THE DEPTH AS SPECIFIED,THE SEISMIC DESIGN PARAMETERS: 5 S2.0 SECTION B FOLLOWING CRITERIA MAY BE USED: SS=1.44; S1 =0.58 6 D1.0 DETAILS A. ALL POSTHOLES MUST BE A MINIMUM OF 18"0 X 30"DEEP AND B. THE SOLID ROCK PORTION OF THE POSTHOLE DEPTH MUST BE A MINIMUM OF 18"DEEP AND SEISMIC DESIGN CATEGORY=D-2 C. ALL POSTHOLES MUST BE BACKFILLED WITH CONCRETE BACKFILL FULL DEPTH RISK CATEGORY=II D. THE 6"CONCRETE FOOTING AT THE BOTTOM OF THE HOLE MAY BE OMITTED FOR POSTS BEARING ON SOLID ROCK SOIL BEARING CAPACITY=1,500 PSF COVER SHEET BUILDING CODES&REFERENCES I DRAWING NO.: C1.0 o-NER: RON KRAUS -2015 IBC q,4 REV.: 0 SHEET: 1 LocnnoN:271 NE ANVIL LANE -ASCE 7-10 �' PROJECT NO.: 18-110 BELFAIR,WA.98528 -NDS 2012 x DATE: 12 APR 2018 SCALE: NIA DRAWN BY: SA THE PLANS FOR THIS BUILDING ARE THE PROPERTY OF SOUTH VALLEY ENGINEERING,LLC AND SHALL BE SURRENDERED UPON REOUEST.THIS BUILDINGHAS BEEN 39198 South Valley Engineering ENGINEERED TO CONFORM TO THE DIMENSIONS AND BUILDING DESIGN CRITERIA SPECIFIED,AND SHALL BE BUILT ONLY AT THE LOCATION DESIGNATED ON THESE 4742 Liberty Rd.S#151• Salem,OR.97302 PLANS.ANY CHANGES OR MODIFICATIONS TO THESE PLANS,INCLUDING BUT NOT LIMITED To BUILDING DNENSIONS,DESIGN CRITERIA,OR BUILDING LOCATION ph 503 302-7020• Fax 888 535-6341 WITHOUT EXPRESS WRITTEN PERMISSION OR DOCUMENTATION BY THE ENGINEER WHOSE SEAL IS AFFIXED TO THESE PLANS SHALL RENDER THESE PLANS NULL .1 AND VOID,AND THE ENGINEER WHOSE SEAL IS AFFIXED TO THESE PLANS SHALL NOT BE HELD LIABLE FOR THE STRUCTURAL INTEGRITY OR CODE COMPLIANCE OF www.southvalleyengineering.com ANY BUILDING CONSTRUCTED REFERENCING THESE PLANS UNDER THESE CONDITIONS. (2)1.75X11-718"VERSALAM TYPE Fb2800 LEDGERS INSTALL PER DWG S2.0 0 o e \ TYP(4)PLCS ON THIS EAVE WALL J E p C r? w L L EXISTING BUILDING !� T L ,� e 1 12'0" rX11D I MASTER 6'-W T-0" MUD ROOM t 8'-0" BATH A.I.C. I I REF L ' I I RE-ENGINEEREpMONOTRUSSES 12"X12"THICKENED SLAB EDGE @ 24"0. I20'0" INSTALL PER DWG S1,0 x C.TYPTYP ENTIRE PERIMETER EMASTER OF NEW ADDITION SLAB ONGRADE I I I I I I I I KITCHEN I BEDROOM I I B X I J I S2.0 TYP 49 X39 W 30 X6e WD 4Q X3Q W 54 X30 W 59 X39 W STUD WALL WI 2X6#2 OF Q STUDS @ 16"O.C. INSTALL PER DWG S1.0 26'0" 22'0" TYP WHERE SHOWN 48'-0" TABLE 1 HOLE DIMENSIONS POST SIZE IDIAMETERLDEPTH I BACKFILL NOTES QA 4X6 1 18"p 1 2'-6" 1 GRANULAR INSTALL PER CONSTRUCTION NOTES PLAN VIEW GENERAL NOTES 1. ALL POSTS TO BE#2 HF PRESSURE TREATED FOR BURIAL AND ORIENTED AS SHOWN DRAWING NO.: P1.0 OWNER: RON KRAUS UNLESS OTHERWISE NOTED REV.: 0 SHEET: 2 LocanoN:271 NE ANVIL LANE 2.UNLESS OTHERWISE DIMENSIONED,ALL WINDOWS AND WALK DOORS MAY BE LOCATED PROJECT NO.: 18-110 BELFAIR,WA.98528 BY THE OWNERICONTRACTOR IN THE WALLS SHOWN DATE: 12 APR 2018 SCALE: 118" —1'-0" DRAWN BY: SA 3. EMBED POSTS AND BACKFILL PER DWG D2.0. CONCRETE BACKFILL MAY BE SUBSTITUTED FOR GRANULAR BACKFILL 39188 South Valley Engineering 4. ALL INTERIOR ROOM DIMENSIONS ARE FOR REFERENCE ONLY AND SHALL BE FIELD ' 4742 Liberty Rd.S#151• Salem,OR.97302 VERIFIED BY OWNER OR CONTRACTOR Ph.(503)302-7020• Fax(888)535-6341 5. ALL HEADERS OVER WINDOWS AND WALK DOORS SHALL BE 3-PLY 2X8 OR 4X8(MIN)#2 DF HEADERS wwwsouthvalleyengineering.com METAL ROOFING OVER WOOD SHEATHING PER DWG 01.0 EXISTING BUILDIf!�_ EXISTING BUILDING _.__ _ _ _ - J�1__. VC►1 EXTERIOR WOOD 12"OVERHANGS WALL SHEATHING TYP EA END OF SHED PER DWG D1.0 16'-0" j I> 14'-0" EXTERIOR WOOD WALL SHEATHING 9 0" PER DWG D1.0 40 X38 W 30 X68 WD 40 X30 W 50 X30 W 58 X30 W I 60 X30 W 48'-0" 20'-0" FRONT EAVE RIGHT GABLE EXISTING BUILDING 18"OVERHANG TYP THIS EAVE ONLY EXTERIOR WOOD q�{ G 1 WALL SHEATHING 1 PER DWG D1.0 l 14'-0" i 68 X48 W 60 X68 WD 40 X49 W 20'-0" LEFT GABLE ELEVATION VIEWS DRAWING NO.: E1.0 OWNER: RON KRAUS REV.: 0 SHEET: 3 LOCAnON'271 NE ANVIL LANE PROJECT NO.: 18-110 BELFAIR,WA.98528 x DATE: 12 APR 2018 SCALE: 3132" =V-0" I DRAWN BY: SA 391USouth Valley Engineering 4742 Liberty Rd.S#151• Salem,OR.97302 Ph.(503)302-7020• Fax(888)535-6341 www.southvalleyengineering.com *ROOF PITCH PER ~f ELEVATIONS 2X6 BLOCKING ` INSTALL TIGHT BETWEEN _ TOP OF TRUSS HEELS _ v MONO TRUSS c, EXISTING BUILDING ROOF SHEATHING PER ELEVATIONS PER CONTRACTOR ! LEDGERS PER PLAN VIEW INSTALL PER DWG D1.0 ATTACH EA END TO EA POST WI (6)5"LONG LEDGERLOK SCREWS 12 ATTACH EA TRUSS TO LOWER LEDGER WI SIMPSON LU210 HANGER CEILING PER CONTRACTOR 2 X 6 DOUBLE TOP PLATE NAIL-LAMINATE WI 16d NAILS @ 16"O,C. STAGGER JOINTS INSTALL 2X6 FULL LENGTH T i'; STUDS PER PLAN VIEW BEARING BLOCK TIGHT ;(, I 6" P.T.SILL PLATE �—ATTACH TO TOP&BOTTOM UNDER LEDGERS ! .I i #4 L-BARS @ 24"O.C. MIN TATTACH TO T.O.STEM WALL WI HEIGHT PER A PLATES WI(2)16d NAILS ATTACH TO POST W116d '7 TYP IN STEM WALL 112"AB @ 64'(MAX)O.C. NAILS @ 3"O.C.STAGGERED ; AND WITHIN 12"BUT NO LESS ELEVATIONS THAN 4"OF EA PLATE END 6"MINTL CONCRETE SLAB EXTERIOR WALL SHEATHING i ,ti PER PLAN PER DWG D1.0 GRADE 2X6 P.T.SILL PLATE CONCRETE SLAB INSTALL PER DETAIL 1.1 PER PLAN 1'0'MIN INSTALL(2)#4 HORIZONTAL BAR IN GRADE THICKENED EDGE AS SHOWN MIN TYP ENTIRE THICKENED PERIMETER MONOLITHIC FOOTING 8 STEM WALL DETAIL 1.1 AT SLAB EDGE INSTALL PER DETAIL 1.1 SCALE:112"=1"-0" TYP THICKENED CONCRETE EDGE SECTION A SECTION A S SEC sis° A ,� DRAWING NO.: S1.0 OWNER. RON KRAUS SCALREV,: 0 SHEET: 4 LOCA-M 271 NE ANVIL LANE PROJECT NO.: 18-110 BELFAIR,WA.98528 DATE: 12 APR 2018 SCALE: 318" =1'-0" 1 DRAWN BY: SA South Valley Engineering 4742 Libeity Rd.S#151• Salem,OR.97302 Ph. (503)302-7020• Fax(888)535-6341 www.southvalleyengineering.com a 0 2X4 OUTRIGGERS FLAT @ 24"O.C. ATTACH END TO FIRST TRUSS BACK WI(2)16d NAILS ROOF CONSTRUCTION PER DWG D1.0 NOTCH END TRUSS AS REQ'D TYP o 2X FASCIA /—PRE-ENGINEERED _ 0 � N q —� TRUSSES PER PLAN u 0 v � � o v Q DOUBLE TOP PLATE o o INSTALL PER DWG S1.0 ATTACH TRUSS DOUBLE TOP 1 •51 PLATE WI(3)16d NAILS AND(1) T SIMPSON H1 HURRICANE TIE O o �9)° -� WALL SHEATHING INSTALL PER MANUFACTURER'S v 13 6 a PER ELEVATION VIEWS�1 SPECIFICATIONS a � a p a .� d INSTALL STUDS PER DWG S1.0 a '0 ONON .7 p :�ij 'U (.I.� bA a a t N O �y N `" U O O w �� N q w A'v �N � W � Ca7 E� o ' '� v tr � Q H SECrIONSB DRAWING NO.: S2.0 OWNER: RON KRAUS 0 o REV.: 0 SHEET: 5 °�^n°"°271 NE ANVIL LANE F ,� BELFAIR WA.98528 a. PROJECT NO.: 18-110 x DATE: 12 APR 2018 SCALE: 318" = 1'-0" DRAWN BY: SA 391U South Valley Engineering 4742 Liberty Rd.S#151• Salem,OR.97302 AL Ph.(503)302-7020• Fax(888)535-6341 www.southvalleyengineering.com STUDS PER PLAN VIEW INSTALL 7116"OSB OR 112"CDX PLYWOOD INSTALL HEADER OVER TRUSS PER PLAN SHEATHING OVER TRUSSES OPENING PER PLAN VIEW ATTACH Wl 8d NAILS @ 6"O.C.EDGES&12"O.C.FIELD UNLESS OTHERWISE NOTED �J , <' NO INTERMEDIATE BLOCKING REQUIRED INSTALL(1)KING AND(1)2-PLY I TYP ENTIRE ROOF (MIN)TRIMMER STUD ON EA SIDE OF OVERHEAD DOOR j PAINTED OR GALVANIZED 29 GA(MIN) P.T.SILL PLATE j RIBBED METAL WALL SHEATHING PER DWG S1.0 I.i S INSTALL#14 X 1"SCREWS WI NEOPRENE WASHERS @ 9"O.C. CONCRETE SLAB PER FLOOR PLAN / I PLACE SCREWS NEXT TO EA LARGE RIB AS SHOWN DETAIL 1.1 SCALE:NTS DETAIL 1.2 STUD FRAMING AT DOORS&WINDOWS(SIMILAR) ROOF SHEATHING STUDS PER DWG S1.0 P.T.POST .I PER PLAN INSTALL 7116"(MIN)EXTERIOR 1 I i GRADE WOOD SHEATHING CONCRETE SLAB I I OVER STUDS ,.. PER PLAN I.I I I ATTACH WI 8d NAILS @ 6"O.C. } EDGES&17 O.C.FIELD OR AS I CONCRETE BACKFILL PER PLAN I I I ( INDICATED IN TABLE 2 ON THE HOLE INSTALL PER CONSTRUCTION NOTES ELEVATION VIEWS DEPTH PER 1 �1 INSTALL 2X BLOCKING AT ALL PLAN VIEW - ` ii--' INTERMEDIATE EDGES TYP ALL WALLS DIAMETER —PER-- DETAIL 1.3 PLAN VIEW DETAIL 1.4 WALL SHEATHING POST EMBEDMENT DETAILS DETAILS R DRAWING NO.: D1.0 OWNER: RON KRAUS �44�04 REV.: 0 SHEET: 6 LOCATION:271 NE ANVIL LANE PROJECT NO.: 18-110 BELFAIR,WA.98528 x DATE: 12 APR 2018 SCALE: NTS DRAWN BY: SA South Valley Engineering 4742 Liberty Rd.S#151• Salem,OR.97302 Ph.(503)302-7020• Fax(888)535-6341 www.southvalleyengineering.com Job: 31078 RON KRAUS/20'MONOS Fill in later/20'SCISS MONO THIS DWG.PREPARED FROM COMPUTER INPUT LOADS&DIMENSIONS)SUBMITTED BY TRUSS MFR. Top chord 2x4 DF-L#1&Bet. 110 mph wind,15.00 ft mean hgt,ASCE 7-10,CLOSED bldg,Located anywhere in roof,RISK CAT It,EXP C,wind TIC Bot chord 2x4 DF-L#1&Bel DL=4.2 psf,wind BC DL=6.0 psf. Webs 2x4 DF-L#2 Wind loads and reactions based on both MWFRS and C&C. (a)Continuous lateral restraint equally spaced on member. Right end vertical not exposed to wind pressure. Bottom chord checked for 10.00 psf non-concurrent bottom chord live bad applied per IRC-15 section 301.5. Deflection meets U240 live and U180 total load.Creep Increase factor for dead load Is 2.00. Truss designed for balanced snow bad based on Pg=25.00 psf,Ct=1.10,Ce=1.00,CAT II(Is=1.00)&Pf=19.25 psf. 20' _I 1112 4 T 12 4 p o 3X (a) 00 3X Cl) 3X _+12'4"3 D -5X5 ti -6X8 °D El) CV M (M 3X8(A1 1112X4 its �9'1"2 a 2 12 20' _I �1'6r' 20' R=1081# U=243# RL=274/-45# W=5"8 R=938# U=262# (Rigid Surface) LEFT RAKE=17" LEFT JIG=2174 RIGHT JIG=15'6"2 DESC.= 20'SCISS MONO SEQ= 451053 PLT.TYP.-WAVE DESIGN CRIT-IRCZO151TM2014FT/RT=tO%(O%y5(0) QTY=23 TOTAL=23 REV. 17.02.02B.0123.11 SCALE=0.2500 "WARNING!"READ AND FOLLOW ALL NOTED ON THIS DRAWINGI TIC LL 30.0 Sf REF "IMPORTANT"FURNISH THIS DRAWING TO ALL CONTRACTOR@ INCLUDING THE INSTALLERS, P Tn the re st e,deems eero a,Id"kd.0n mw4 S e dy hft Ml ,b artl brec W Refer ro eM ,da..m mi.teaxla,wecsle.f--.I tel•�serey.n.rm.mrr,brTyb—I T BCSIelelr TIC DL 7.Opsf DATE 02-13-2018 premcee mror ro p.far"Aq emm+vw hm W11IY snow p sh-1Leel sh r hIl we o.ecsl. wden„doe dr.wl.b e>p a rW.d Iwo prweM elmd,.e elmen.d snedneq sd edlem d,ord - ehewnew,a aweer elmd,ea npe re,w.g.ieedla»en"wn,"verm.�er.I.mrr r0M.I'web. BC D L 10.0 psf DRW G sl,e•ne a brecYg r,elewed p.BCSI eed,oee ea,I7 a 570,es lees--e.Apply lee. beach kce d e„"erd pe+l.e"r shwm sew.ane e.nb.bed Detrdle,odes'nded ollr.tie Rea.ro BC LL O.Opsf KELLY I1W Idk.rp Comporronb Gro1N Ins.she.ml be reeporubb for erN eee..h".mb Wbtt, erry felure to bold Oro Uuee In cadamence vM ANSYIR t,n la haNlrp,ehppMq,Mrleletbn A n,.drN or tree'''. TOT.LD. 47.Opsf O/A LEN. 20 Asadan Ihb A.*Va—p.wk*VIrrdrwlnp,nmcelw.m.-1 fp.(—" �aw.�►�^w�.Iona.d*fwftdwIp.ha Th w6ftily I—pfft h.11 DUR.FAC. 1.155 JOB#:31078 hr ra.trudlr.1.IRA r.a" NKyd Ir9uftVn.lft—wANWM 1 Mot Fa mere tilam.I.,n.ee mle pb.wrbrd r,dea peoe.ro,ne,"w"b.roe.: SPACING 24.0" TYPE SLIM ITW BCG:www.weAcy.com;T%:www.IpeW.arp:WTGA:wwe.ebcMeuelry.can;ICC:www.lcdde.orp Job: 31078 RON KRAUS/20'MONOS Fill in later/20'SCISS MONO THIS DWG.PREPARED FROM COMPUTER INPUT(LOADS&DIMENSIONS)SUBMITTED BY TRUSS MFR. Top chord 2x4 DF-L#1&Bet. All plates are 2X4 except as noted. Bot chord 2x4 OF-L#1&BEL Webs 2x4 DF-L#2 (")1 plate(s)require special positioning.Refer to scaled plate plot details for special positioning requirements. 110 mph wind,15.00 it mean hgt,ASCE 7-10,CLOSED bldg,Located anywhere in roof,RISK CAT 11,EXP C,wind TIC DL=4.2 psf,wind BC DL=6.0 psf, Wind bads and reactions based on both MWFRS and C&C. Truss designed to support 1-0-0 top chord outlookers and cladding bad not to exceed 3.00 PSF one face and 24.0"span Right end vertical not exposed to wind pressure. opposite face.Top chord must not be cut or notched,unless specified otherwise. See DWGS A71515ENC101014,GBLLET1N1014,&GABRST101014 for gable wind bracing and ocher requirements. Bottom chord checked for 10.00 psf non-concurrent bottom chord live bad applied per IRC-15 section 301.5. Deflection meets U240 live and U180 total load.Creep Increase factor for dead load is 2.00. Truss designed for balanced snow load based on Pg=25.00 psf,Ct=1.10,Ce=1.00,CAT II(Is=1.00)&Pf=19.25 psf. Shim all supports to solid bearing. 20' _I 12 4 ;3X 53X4('" m LO _12'4"3 3X III 3X8 =3X �t111'3"14 8 M CV M CM =2X4(A1 l 1 its 1 19'1"2 2 0 12 13'4"6 w j m 5'10"10 F 1'6" 20 R=345# U=117# RL=306/-49# W=5"8 R=72plf U=100plf W=5'10"10 (Rigid Surface) (Rigid Surface) R=96pif U=100plf W=13'4"6R=88# U=66# W=3" (Rigid Surface) (Fcperp 565psi) LEFT RAKE=17" LEFT JIG=2174 RIGHT JIG= 15'6"2 DESC.= 20'SCISS MONO GAB SEQ= 451055 PLT.TYP:WAVE DESIGN CRIT=IRC2015yTM2014FT/RT-20%(0%Y5(0) QTY=2 TOTAL=2 REV. 17.02.02B.0123.11 SCALE=0.2500 "WARNIN01 READ AND FOLLOW ALL NOTE{ON THIS DRAW N01 300 Sf REF "IMPORTANT"'PURNISH THIS DRAWINO TO ALL CONTRACTORS INOLUDINO THE INSTALLERS TC LL . , p Tvsses"ke eabems are M Indtllm fsbdaminq.h hg,shtpphq. q m,d aacmq.Rdw 10 mM fdl,.I"meW wllt1 d SCSI(Bwdw,a c0 a+w0e01 B.ey b o 0rw,by rnI-d wTCA)I—Mely TC DL 7.Op sf DATE 02-13-2018 P,.dlces P,W 1"pedumhq saes Maaua.Matesera alas prwae haauary breesp per SCSI. Udass rated dh &,,"lord.has hale Prppery Mlached xtch"shewfty end balls"thud ,hell I—a prapady mmdmd rpa ceov.Incalla,a.hoar fa pm—t mwd nsb-"d webs BC DL 10.Opsf DRWG alas here braeg aatased pm SCSI sedi—83,B7 a 810,a ep0imt a Apply plain t0 each fete of Wes end p"aPoan es s1aaT 0—and Pn the Joss Delay.unle.e nsNd atlweMe. R.fmWdme WIWA-ze„emndmdpisi, naa. BCLL 0.OpS KELLY If W B'AAV Comps or'* 1 eM M bs eeeparrebb/a/N deAadm ban Ise draai9. m�a bold®boas n�°°""sae"*'""Bv'°l''a'a'anea°'°"pp°'"'.r'"°" TOT.LD. 47.Opsf O/A LEN. 20 A.W Pn 1M.dpaahp a aoAf p.p Ylbq dIM dreablp,Moelw ar:aodo d pIPMnMnsl «al+e,ba, o«IhRIed ra u.dw%p*1aea,.n»awexo.na».arrr*.A w DUR.FAC. 1.15 JOB#:31078 fa.ny.badu.M f—p—N1y ar dr§uWq D..4,.r p.fANWM 1 tan: Fa^ass'an^.a^•e.d*wa'ad.°'^am°Pea°"""aa°we°'"ea' SPACING 24.0" TYPE GABL RW BCD:www.swbaq.mm:TRI:www.lpbal.aq:W TCA:—GbcbduelD'.aartc ICC:www.sasd—q South Valley Engineering 4742 Liberty Rd. S #151 • Salem, OR. 97302 Ph. (503) 302-7020 • Fax (888) 535-6341 www.southvalleyengineering.com Project No. 18-110 Calculations for Ron Kraus 271 NE Anvil Lane Belfair, WA. 98528 Date 7/6/2018 Engineer HE � �w 0 � z Imo` .d 39188 FGISTF"w TONALyG STUD FRAME BUILDING SUMMARY SHEET Owner: Ron Kraus Date: 7/6/2018 Building location: 271 NE Anvil Lane Belfair,WA.98528 Project No.: 18-110 Building Description: Private shop Building dimensions: Environmental information: Width: 20 ft. Wind speed: 110 MPH Length: 48 ft. Wind exposure: B Low Eave Height: 9 ft. Seismic design category: D High Eave Height: 14 ft. Ss: 1.44 Overhang: 1 ft. SI: 0.58 Roof pitch: 3 /12 Ground snow load: 25 psf. Concrete Slab: Yes Design roof snow load: 25 psf. Roof dead load: 10 psf. Soil bearing capacity: 1,500 psf. Risk Category: II Per Table 1.5-1 ASCE 7-10 Studs:2x6#2 DF @ 16"o.c. Roof&Wall sheathina Roof sheathing:FMetal-roofing over 7/16"OSB All walls sheathed with: 7/16" min Exterior wood sheathing' Continuous footinq Stemwall width: 6 in(0 if monolithic) Stemwall height from t.o.footing:1in(0 if monolithic) Continuous footing thickness: 12 in Continuous footing width: 12 in Page 1 1 i Snow Load Calculations Snow load calculations per ASCE 7-10 Chapter 7 pg: 25 psf-Ground Snow Load C8: 1.0 Exposure Factor from ASCE Table 7-2 Ct: 1.2 Thermal Factor from ASCE Table 7-3 Is: 1.0 Importance Factor from ASCE Table 1.5-2 Flat Roof Snow Load,pt=paxCBxCtxls pt: 21 psf-Flat Roof Snow Load Cs: 0.95 Figure 7-2 based on Ct,roof slope and surface ps: 25.0 psf-Sloped roof snow load pdesig,,: 25 psf-Design snow load Page 2 Wind Pressure Calculations Wind calculations per ASCE 7-10 Chapter 28 Part 1:Enclosed and Partially Enclosed Low Rise Buildings Roof Pitch: /12 Basic Wind Speed,V: 110 MPH Risk Category: Eave Height:1 9 Ift. Wind Exposure:1 B Velocity Pressure,qz&qh per equation 28.3-1 =0.00256 x KZ x Kzt x Kd x V2 at mean roof height z qh=0.00256 x Kh x K:t x Kd x V2 at mean roof height z Angle: 14.04° Kz: 0.62 Velocity pressure coefficient at eave ht.z from Table 27.3-1 Kh: 0.70 Velocity pressure coefficient at roof ht.h from Table 27.3-1 Kn: 1.0 Topographic effrect-assume no ridges or escarpments Kd: 0.85 Wind Directionality Factor,Table 26.6-1 G: 0.85 Gust Effect Factor per Section 26.9 Velocity Pressure,q== 16.32 psf qh= 18.43 Determine Velocity Pressure Coefficients&Wind Pressures per ASCE 7-10 Figure 28.4-1 for M WFRS MWFRS 1. Windward Eave Wall Pressure 2. Leeward Eave Wall: Cpfw : 0.80 Cpfwr: -0.50 qww: 11.10 psf qtw: -7.83 psf 3. Windward Eave Roof Pressure 4. Leeward Eave Roof: Cptw,: -0.18 Cpty: -0.52 qwr: -2.82 psf qtr: -8.11 psf 5. Windward Gable Wall: 6. Leeward Gable Wall: CpfM: 0.80 C'ptwg: -0.28 qtw: 11.10 psf qtw: -4.39 psf Components&Claddina GCp;: 0.18 Internal pressure per Figure 26.11-1 7. Roof elements GCp,: -0.82 qer: 18.47 psf Roof elements per Figure 30.4-213 8. Wall elements: GCpw: -0.96 qer: 20.95 psf lWall elements per Figure 30.4-1 Page 3 Seismic Design Parameters Calculate seismic building loads from ASCE 7-10 Section 12.14.8 Seismic Parameters Ss= 1.44 S,= 0.58 Fa= 1.00 Fv= 1.50 per Tables 11.4-1 &11.4-2 SMs= 1.44 SM,= 0.87 Calculated per Section 11.4.3 Sps= 0.96 So,= 0.58 Calculated per Section 11.4.4 Seismic Design Category= D From Section 11.6 Response Modification Coefficient,R= 2.5 From Table 12.14-1,Section B-24 F= 1.0 For 1 story building Calculate building weights,W,for seismic forces Areas Building width= 20 Building length= 48 Building eave height= 9 Roof area= 1,100 sf Wall areas for seismic: Gable walls= 115 Low eave wall= 216 High eave wall= 336 Roof DL= 10 psf Wall DL= 7 psf Snow LL(if appliable)= 0 psf Roof W= 11,000 lbs Gable wall W= 805 lbs Low eave wall W= 1,512 High eave wall W= 2352 Calculate Seismic Base Shear,V V=[(FxSps)/R]xW V9able walls= 2,421 lbs.Seismic base shear for gable walls Vbw eave wad= 2,693 lbs.Seismic base shear for low eave wall Vhgn_aava_wae= 3,015 lbs.Seismic base shear for high eave wall Page 4 Roof and Gable Wall Shear Loads and Diaphraom Desion Roof Roof width= 20 ft. Hroaf= 5.00 ft. Total roof wind pressure,Pr= 3.18 lost(0.6'Pr) Total roof wind pressure to use= 3.18 psf-use 0 if Pr<0 Total wall wind pressure= 11.36 psf(0.6 x(q.-qir)) Total wall wind pressure to use-- 11.36 psf-use 0.6 x 16=9.6 psf minimum Diaphragm seismic load= 1,695 Ibs(0.7 x(V/2)] Diaphragm wind load= 1 813 Ibs Diaphragm load to use= 1,813 Ibs-Wind load controls Roof shear= 91 pit Sheathing= Metal over OSS wood sheathing Allowable shear= 200 pit>Roof shear-OK Sheathing fastening= 8d nails 6 in.o.c.edges 12 in.o.c.field Gable walls Gable wall shear load: 1,813 Ibs(from roof shear load above) Left Gable Wall Left Gable wall: 227 pit-based on 12'overhead door in main building for this end of shear support Allowable shear= 335 pit>Wall shear-OK Sheathing fastening= 8d nails @ 6 in.o.c.edges Block all panel edges 12 in.o.c.field Right Gable Wall Right Gable wall: 129 plf-based on 6'double walk door in main building for this end of shear support Allowable shear= 335 pit>Wall shear-OK Sheathing fastening= 8d nails @ 6 in.o.c.edges Block all panel edges 12 in.o.c.field Page 5 Eave Waif Shear loads and Diaphragm Design Eave walls Building Length= 48 ft. Gable wall wind pressure= 15.49 psf-use 0.6 x 16=9.6 psf minimum Seismic load-low eave= 1,885 Ibs[0.7 x(V/2)] Wind load-low eave= 309 Ibs Diaphragm load to use= 1,885 Ibs-Seismic load controls Seismic load-high eaves 2111 Diaphragm wind load-high eaves 483 Diaphragm load to use= 483 Ibs-Seismic load controls Low Eave Wall Low eave wall: 70 pif Allowable shear= 335 pit>Wall shear-OK Sheathing fastening= 8d nails @ 6 in.o.c.edges Block all panel edges 12 in.ox,field High Eave Wall Rear eave wall: 28 pit-includes additional 772 Ibs shear from ebsdng building Allowable shear= 335 plf>Wall shear-OK Sheathing fastening= ed nails @ 6 in.o.c.edges Block all panel edges 12 in.o.c.field Page 6 Wail-headers Building dimensions Building Width= 20 ft. Overhang= 12 ft.eave side Building Length= 48 ft. Overhang= 12 ft.gable end Eave height= 9 ft. Roof snow load= 25 psf Roof dead load= 10 psf Eave wall header loads wsnow= 550 pff wdead= 230 plf-assume headers half-way down wall Gable wall header loads Truss spacing= 2 ft.o.c. ws.w= 325 pif wdaad= 130 plf-assume headers half-way down wall WaR Headers Max.Length ft Header` Eave Wall Gable Wall 4x6 4'0" 5101, 4x8 5101, T 0" 4x10 6'0" 9'0" 4x12 8'0" 10'0" 'Use#2 DF solid sawn or 3-ply headers. Support all headers with 2-ply trimmers+(1)king stud Page Stud wall calculations Wall studs=2x6#2 DF studs at 16"o.c. Stud length= 93 in. Weak axis braced by wall sheathing Determine allowable stresses for studs Co S.W= 1.15 Load duration factor for vertical loading(Fc) Co fatera= 1.6 Load duration factor for bending(Fb) CF= 1.3 Size factor(Fb,Fc) C,= 1.15 Repetitive member(Fb) Fb= 900 psi-nominal allowable bending stress for#2 DF Fc= 1350 psi-nominal allowable compression stress(II grain)for#2 DF Fb,n°w= 2,153 psi-final allowable bending stress F°•= 2,018 psi-allowable bending stress to be multiplied by C.below Ervin= 580,000 psi (K x le)/d= 16.91 K= 1.00 FcE= 1,667 le= 93 in C= 0.8 d= 5.5 in Cp= 0.62 >>Fc Wj.=Fe,*x Cp Fc aeow= 15255 psi Determine lateral loads&stresses for studs p,,,,a=max.value of gh(GCP GCp;) p WI= 9.60 psf wind load on walls w,,ii= 1.07 pli-wind load on ea stud Mstud= 1,153 in-Ibs S.-Mud= 7.56 in 3 fb_awd= 153 <allowable bending stress,OK Usage= 79/6 Determine vertical loads&stresses for studs PS ow= 3 Ibs/stud Pdead= 433 Ibs/Stud Ptotal= 436 Ibs/stud <allowalbe compression stress OK Usage= 1�_�Wd=F-53 4% 2x6#2 DF studs at 16"ox. are adequate Page 8 Strip footing/stem wall calculations Soil capacities gson= 1,500 psf vertical soil capacity gktarw= 100 psf lateral soil capacity Wall plate height= 6 in.assume wall is 6"above grade NOTE:Unless otherwise noted on the plans, wsta,,,,,,an= 6 in-width of stemwall(0 if monolithic) install(1)#4 bar within 12"of the top of dstemwaa= 12 in-height of stemwall to t.o.footing the stemwall and(1)#4 bar 3"up from (0 if monolithic) the bottom of the footing. Bottom of wfooting= 12 in-width of strip footing the footing shall be located below frost dfoodng= 12 in-thickness of strip footing depth per local codes. wftg_afbw= 1,500 plf-Total allowable load on strip footing Max.footing loads wtiotal= 225 plf-Total weight of stemwafi and strip footing wsnow= 550 plf wdead= 230 plf wftg_load=F 1,005 <Total allowable load-OK Usage= 679/ it Page 9 South Valley Engineering Project Title: Ron Kraus addition 4742 Liberty Rd.S#151 Engineer: S. Heryford Salem,Or.97302 Project ID: 18-110 Ph.(503)302-7020 Project Descr: Fax(888)535-6341 www.southvalleyengineednq.com Wood Beam File=Z:\SZBYAK-OIIYLHIK-U\140DLH-2\13UD7M-9.EC6 ■ 0.00: 00 Licensee:South Valley Engineering Description: LVL ledger CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10 Load Combination Set:ASCE 7-10 Material Properties Analysis Method: Allowable Stress Design Fb+ 2,800.0 psi E:Modulus of Elasticity Load Combination ASCE 7-10 Fb- 2,800.0 psi Ebend-xx 2,000.Oksl Fc-Prll 3,000.0 psi Eminbend-xx 1,036.83ksi Wood Species : Boise Cascade Fc-Perp 750.0 psi Wood Grade :Versa Lam 2.0 2800 West Fv 285.0 psi Ft 1,950.0psi Density 41.750pcf Beam Bracing Beam is Fully Braced against lateral-torsional buckling D(0.1)S(0.25) 1.75x11.875 Span= 12.0 ft Applied Loads Service loads entered.Load Factors will be applied for calculations. Uniform Load: D=0.10, S=0.250, Tributary Width=1.0 ft DESIGN SUMMARY ' • Maximum Bending Stress Ratio = 0.57Q 1 Maximum Shear Stress Ratio = 0.388 : 1 Section used for this span 1.75x11.875 Section used for this span 1.75x11.875 f o:Actual = 1,836.55 psi fv:Actual = 127.18 psi FB:Allowable 3,220.00psi Fv:Allowable = 327.75 psi Load Combination +D+S+H Load Combination +D+S+H Location of maximum on span = 6.000ft Location of maximum on span = 0.000 ft Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1 Maximum Deflection Max Downward Transient Deflection 0.240 in Ratio= 600>=280 Max Upward Transient Deflection 0.000 in Ratio= 0<280 Max Downward Total Deflection 0.336 in Ratio= 428>=180 Max Upward Total Deflection 0.000 In Ratio= 0<180 Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Moment Values Shear Values Segment Length Span# M V C d C FN C I Cr C m C t C L M fb Fb V fv F v +D+H 0.00 Ho 0.00 0.00 Length=12.0 It 1 0.208 0.142 0.90 1.000 1.00 1.00 1.00 1.00 1.00 1.80 524.73 2520.00 0.50 36.34 256.50 +D+S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length=12.0 ft 1 0.570 0.388 1.15 1.000 1.00 1.00 1.00 1.00 1.00 6.30 1,836.55 3220.00 1.76 127.18 327.75 Overall Maximum Deflections Load Combination Span Max."•"Defl Location in Span Load Combination Max."+"Deft Location in Span +D+S+H 1 0.3359 6.044 0.0000 0.000 + South Malley Engineering Project Title: Ron Kraus addition 4742 Liberty Rd.S#151 Engineer: S. Heryford Salem,Or.97302 Project ID: 18-110 Ph.(503)302-7020 Project Descr: Fax(888)535-6341 www.southvalleyengineedng.com Wood Beam File=Z:1SZBYAK-011YLHIK-U114QDLH-2113UD7M-9.EC6 Description: LVL ledger Vertical Reactions Support notation:Far left is#1 Values in KIPS Load Combination Support 1 Support 2 Overall MAXimum 2.100 2.100 Overall MINimum 1.500 1.500 +D+H 0.600 0.600 +D+S+H 2.100 2.100 D Only 0.600 0.600 S Only 1.500 1.500