HomeMy WebLinkAboutPAR2015-00018 Shellfish Packaging Facility - PAR Letters / Memos - 5/13/2015 MASON COUNTY (360)427-9670 Shelton ext.352
0 �o
DEPARTMENT OF COMMUNITY DEVELOPMENT (360) 275-4467 Belfair ext. 352
BUILDING• PLANNING• FIRE MARSHAL (360)482-5269 Elma ext. 352
Mason County Bldg 8, 615 West Alder Street
Ihs-;
Shelton, WA 98584 www.co.mason.wa.us
RE: Pre-Submission Conference
PAR2015-00018
Parcel Number: 32331-23-90024
Dear Applicant,
Please find enclosed a computer-generated report summarizing the results of your pre-submission
conference on 5/13/2015 if you have questions regarding the summary report, please do not hesitate to
call the appropriate staff member.
The various staff members, the departments they represent and their telephone extensions are listed
below:
DEPARTMENT STAFF MEMBER EXTENTSION INITIALS
Fire Inspector/Comm. Dev. Jeromy Hicks 282 JNH
Building/Comm. Dev. Trish Woolett - TW
Environ. Health Spec./Public Health Cindy Waite 353 CEW
Eng. Tech/Public Works Fred Perryman 625 FJP
Planner/Comm. Dev. Grace Miller 360 GBM
Planner/Comm. Dev. Rebecca Hersha 287 RDH
Planner/Comm. Dev. Kell McAboy 365 KJM
Planner/Comm. Dev Michael MacSems 571 MMS
Stormwater Eng./Public Works Loretta Swanson 769 LGS
The comments are based on the project discussed during the pre-submission conference. Any changes or
alterations to the original proposal may significantly change the permit requirements. In this case a
second pre-submission conference will most likely be required to discuss the changes.
Information provided to the prospective applicant during the pre-submission conference is based on
Mason County regulations in effect at the time of the conference. Revised or new regulations could affect
a future development application. A pre-submission conference does not vest a future development
application.
If further assistance is needed please contact us at 360.427.9670 ext. 352 or www.co.mason.wa.us.
s,oU�� :- MASON COUNTY
a
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Bldg. III, 426 West Cedar Street
Shelton,WA 98584
www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Eima(360)482-5269
MASON COUNTY PRE-SUBMISSION CONFERENCE NOTES
• BUILDING DEPARTMENT REPRESENTATIVE: Rich Balderston (360)427-9670 x 285
E-Mail: rbalderston@co.mason.wa.us
• DATE: May 13, 2015
• PROJECT/PROJECT TRACKING NUMBER: PAR2015-00018
• PROJECT REPRESENTATIVE(S): Devin Harder
DESCRIPTION & SIZE OF PROJECT/OCCUPANCY CLASSIFICATION & USE: Proposed 3952 sq.ft.
structure for shellfish packaging. Only a site plan was provided, it shows a 4628 sq.ft. structure to
be remodeled.
Complete building permit applications will include the following information that is applicable to the project::
• SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale. Clearly identify all structures,
including fences, fuel tanks and other similar items, with setback dimensions on site the plan.
• DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where
required include fire-resistive details, including continuity, &tested assembly details.
• FIRE RESISTANCE FOR EXTERIOR WALLS: When applicable include fire-resistive details, including
continuity, &tested assembly details.
• IDENTIFY TYPE OF CONSTRUCTION& PROVIDE ALLOWABLE AREA CALCULATIONS WHERE
NEEDED. See Chapter 5, IBC. Type VB construction includes structures constructed with combustible
construction such as wood framed structures. Type II construction includes steel structures constructed
ENTIRELY by non-combustible construction. Existing building,type of construction unknown.
• FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION :
Where required demonstrate compliance. Identify the location of the assembly, compliance to
continuity requirements and construction details:
EXTERIOR WALL(IBC704), FIRE WALL(IBC705), FIRE BARRIER(IBC706), SHAFT
ENCLOSURES (IBC 707), FIRE PARTITIONS(IBC 708), SMOKE BARRIERS(IBC 709), SMOKE
PARTITIONS(IBC 710), HORIZONTAL ASSEMBLIES(IBC 711), PENETRATIONS(IBC 712), FIRE-
RESISTANT JOINT SYSTEMS(IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL
MEMBERS (IBC 714), OPENING PROTECTION(IBC 715), DUCT&AIR TRANSFER OPENINGS
(IBC 716), CONCEALED SPACES(IBC 717), ETC,
• NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Table 1004 is used to determine
occupant load used to evaluate the structure for exiting purposes, plumbing fixture requirements, and other
code related concerns. Include design calculations, demonstrating how occupant loads were calculated,
on building plans. No floor plan was provided. Applicant is proposing an occupancy classification
of S-2. Use of the building appears to meet the description of an F-1 as per IBC section 306.1,
packaging of food products. Final determination of occupancy classification and exit requirement
will be done during plan review.
• EXIT PLAN: Clearly identify the exit path and exit signage on construction plans.
• ENGINEERING REQUIRED: Structures that do not comply with prescriptive specifications of the 2012
International Code(IBC)shall be designed in accordance with Chapter 16 of the IBC. Engineering may
be required depending on scope of remodel.
Referencing Washington State RCW 18.08.410- Structures 4000 sq. ft or more shall have all plan
pages reviewed and stamped by a Washington State licensed design professional. The review shall
include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural
analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE
DESIGN PROFESSIONAL, including plumbing and mechanical pages.
• ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations
demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at
the time of submittal. Include information demonstrating compliance for restrooms, employee work areas,
parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that
building plans contain compliance information.
• PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Using IBC Chapter 10, determine
occupant load. The number of plumbing fixtures is determined based upon the occupant load. Plumbing
fixtures need not be provided for unoccupied buildings_ Permitted building shall comply. On plans, include
design calculations for the following: water closets(M/F), Lavatories, Drinking Fountains, etc.
• Referencing IBCIWAC 2902.2 separate plumbing fixtures shall be required for each sex, except when the
calculated occupancy load is 15 or less,then unisex fixtures shall be allowed. To calculate the number of
fixtures and referencing Table 2902.1 the following fixtures shall be required:
Offices: 1 water closet per 25 for the first 50 and 1 per 50 for the remainder exceeding 50. 1
lavatory per 40 for the first 80.
Storage(S1&S2): 1 water closet per 100 and 1 lavatory per 100.
Plumbing fixture count can be for the entire facility, including all structures)for compliance purposes.
Provide design calculations demonstrating how the fixture count was determined on construction plans.
• NON-RESIDENTIAL ENERGY CODE:ALL enclosed spaces require Non-Residential Energy
Conservation Code(IECC/WSEC). Provide completed compliance forms(envelope & mechanical).
Forms are available at: http://www.neec.net/resources/resources.html
• LIGHTING: All non-residential structures shall comply with IECC/WSEC lighting requirements. Complete
compliance forms and provide a lighting plan that includes switching locations.WSEC forms and
information can be accessed at: http://www.neec.net/resources/resources.htmi.
In addition your local utility may have an incentive program, designed to help you lower energy
consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by
calling (360)426-0777 or PUD1 at(360)877-5249.
• Ventilation and indoor Air Quality Code compliance: Provide calculations when required.
• COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a
kitchen is included in the project.
• GEOTECH REPORT REQUIRED? YES /NO (Refer to planning requirements)
• OIL SEPARATOR: REQUIRED when vehicle repair work is performed. identify location and provide
construction details.
• PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL&SOLID WASTE(WAC51-5M09):
Identify the location.
• SPECIAL INSPECTION: Referencing IBC Chapter 17, Section 1704.1.1. Statement of special inspections
prepared by registered design professional in responsible charge. Complete a Special Inspection
authorization form.
• INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC
Chapter 8.
• STORAGE SPACES: Identify material stored, anticipated quantities, height, and if hazardous, include
MSDS sheets for each product.
• STORAGE RACKS greater than 57 shall be permitted either with the proposed project or separate
building permit. Where required documents shall include design information demonstrating stability for
seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5),
storage racks, provide compliance information.
• MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and
outside the structure. Address foundation and support systems for equipment. Where new equipment will
be placed on site provide UL listing information and/or construction details stamped by a Washington State
licensed design professional. Where applicable include duct information and duct support compliance
information.
• FIRE MARSHAL REQUIREMENTS: Carefully review Fire Marshal comments requirements including fire
protection requirements and identify compliance information on the proposed building plans. Show the
location of fire extinguishers and identify type. A monitored fire alarm system will most likely be
required.
• SPRINKLER SYSTEM: Verify that design calculations include additional load attributed to required fire
sprinkler system. It is likely that no sprinkler system will be required.
• SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings
where applicable. Details shall be designed and approved for seismic loading in accordance to IBC
Chapter 16. Where required designate special inspection plan.
• OTHER:
PERMITS REQUIRED FOR PROJECT
a BUILDING
o PLUMBING / MECHANICAL
n GRADING PERMIT(When greater than 200 cubic yards)
❑ CHANGE OF USE
n FIRE SUPPRESSION,where required. See Fire Marshal comments
n SIGN
n FENCE(Greater than 7'0°above grade)
❑
ADDITIONAL NOTES:
WHEN YOU ARE READY, SUBMIT FOUR(4 SiTE PLANS, DRAWN TO SCALE ALONG WiTH THREE (3)
COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE, ALL PLAN PAGES SHALL
BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE
EXCEEDS 4000 SO. FT.):
• CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section,
construction details, etc.
• MECHANICAL PLAN,
• PLUMBING PLAN AND
• NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION.
• DEFERRED SUBMITTAL WILL NOT BE ACCEPTED.
• A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED.
VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA
RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF
THE 1997 UBC.
DESIGN CRITERIA:
SEISMIC ZONE: D2
WIND SPEED: 85 MPH basic 110 ultimate, Exp B (Unless proven otherwise)
GROUND SNOW LOAD: 40 psf
REFERENCE CODE EDITIONS: Effective July 1, 2013
2012 INTERNATIONAL BUILDING CODE(IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING
H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND EXCLUDING
APPENDIX CHAPTERS A, B, D, F, G, 1, J AND K AND;ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-
50, AND THE 2012 INTERNATIONAL EXISTING BUILDING CODE.
2012 UNIFORM PLUMBING CODE(UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND
MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC
51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART 1.
2012 INTERNATIONAL MECHANICAL CODE(IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL,AND
THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC
51-52.
2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D,
AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-
54.
2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING
CODE WAC 51-11
To view the Mason County Building and Construction Code and adopted amendments go to the Mason
County website at www.co.mason,wa.us,
C� eat,..,
PRE-SUBMISSION MEETING
FOR WEDNESDAY MAY 13TH, 2015
PAR2015-00018 0
APPLICANT:Alpha Nature Resources
MEETING DATE AND TIME: May 13th, 20151:15/1:30-2:30pm
PARCEL NUMBER: 32331-23-90024
SITE ADDRESS: 27001 US Highway 101, Hoodsport
PROJECT DESCRIPTION: 3952 sq ft shellfish packaging facility
LOCATION: 426 W Cedar St, Bldg 3 Conference room
PLANNER: Grace Miller Ext 360 �, k Owq 5611,"' I-Le,
PUBLIC HEALTH STAFF: Cindy Waite Ext 353 9 v, 4
s,,,c� : '�•-�(��LuaQ � Cl� 5-e�,... 'yph w�CS,��,", 1,�,+.d c�.�eG� s�hx,
1 /�,
U U �
UP a—
)rMwr10,e,41b d
r-7 S p �OdMC(OY1wGy� 1G�L��7itOr'iOn. lVonlm7�Lrmir O�s� ,, �!/QS
� 6C
� w�li arm�,o f��'ot'.y".,°G..-��'.` r°l��� ���,-� wU�-�'•�o�c�u�
YB,,t�'avt,.,�d0 f Lam' �R 5N o].1.c2•wc ��4'I.IQ.N.G( . ��{,u r 0(.iG�`G✓a.�u' C:U�^^��
,�,- ,�'�f'/Gtc(�/ �a,.w-•u. �c �,.�„q,� , dlC
2 Gt�luu �-rea,� 1 air Goi' / Q U sw iGu u�a�d�.
,5 � ' ovu-�w� ? ,ire s-���� �-� �.. �d� ��» 6•� �l.
44,
/.i„��� 5 6-(/��
yo C/,Vl -ym" A
ky o9-in.?uaN(gJ> I d ollYv
/ U
o o, n�� lea ,rWA QS
RECEIVED
APR 2 4 2015
PAR o15 -Omg
426 W. CEDAR ST, DATE
PRE-APPLICATION CONFERENCE REQUEST FOR
The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as
possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building
Department, Environmental Health, Planning, and Public Works Departments may attend the meeting to discuss rules
and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive
plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction,
fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative
when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site
plan.Applications will be accepted when all information is received and deemed complete.
Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting
complete the applications and return with 6 copies of the detailed site plan, by 3:00 PM on the Wednesday two weeks
prior to the proposed meeting.
1. Pre-Application./Dept. of Community Dev. 2. Environmental Health
426 W Cedar Street 415 N 5`h /PO Box 1666
Shelton,WA 98584 Shelton,WA 98584
360.427.9670 ext.352 360.427.9670 ext.400
Check amount: $255.00 Check amount: f
BOTH CHECKS MADE PAYABLE: MASON COUNTY TREASURER
Applicant: e Site Plan
Name: �c sC7 vc P` Submit 6 copies
Mailing Address: v o 1� (� { /0 `��'1 Include the following information
Daytime Telephone:_:AD.3 Z S 3 L Fax: ❑ Indicate Scale and North Arrow
Email address: 7' ' , �'t' . /�'� ❑ Property line dimensions,easements,
and right-of-ways.
Representative:,
Name: I ❑ The location of all existing and
proposed structures.Include square
Mailing Address: ET-� footage of existing and proposed
Daytime Telephone: %6—Z"—6099C Fax: structures.
❑ Setback distance,in feet from all
Email address:IA�,n w c-t t,. coyo property lines and structures.
Parcel Number: (I2 digits) 3 3 3 1 2-3 -1 0 0 2- ❑ Existing and proposed road access to
and from the site.
Description of Project:
Include: 1) Square footage of structure,2)Use of building and rooms(i.e., ❑ Parking sites
office,warehouse,restaurant,storage,etc),3)Occupancy classification per ❑ Location of on-site sewage tanks and
drainfields.
IBC, Section 302.1,and construction type.4)Provide two sets of plans,if
n ❑ Location of drinking water supply.
available.Use separate sheet if necessary 2 •'1' Include location on the proposed site
/ and surrounding parcels.
A au4
❑ Steep bluffs,wetlands,streams,and
bodies of water
L�
❑ Location of fire hydrants and
emergency vehicle access roads,
including grade.
❑ Surface and storm water run-off routes.
r
Has the pz
been discussed during a previous Pre-Application Conference: If yes,please indicate datee
Will the building have employees? If yes, how many?
What is the water availability of the proposed project? If there is an existing well, what is the name of the
system?
What is planned for the on-site sewage p g system? If you are proposing a new on-site system provide detail on the
required site plan.
ADDITIONAL INFORMATION.•
q.0S l
a vI
APPLICABLE BUILDING CODES
2012 International Building Code/2009 International Residential Code
2012 International Fire Code-ANSI Al 17
2012 International Mechanical Code—WAC 51-42
2012 Uniform Plumbing Code—WAC 51-56/51-47
2012 International Energy Cons. Code/Washington State Energy Code—WAC 51-11C&51-11R
Mason County Ordinance Title 14
Code changes are on a 3 year cycle; effective in July of that particular year.
Date of Conference: m(� T' of Conference:
Location of Conference: 426 West Cedar Street,Shelton Planner: �U, ext. ��
TO BE KEPT IN THE
PARCEL
FILE
MASON COUNTY
PRE-SUBMISSION CONFERENCE APPLICATION 7
Mason County uses the pre-submission conference to assist applicants in preparing 4
proposals which are consistent with all Mason County, City of Shelton (when \
applicable) and PUD concerns and regulations. At the pre-submission conference,
representatives of all relevant departments will be in attendance and will be able to
inform you of the regulations.and standards with which your proposal must comply.
This is a general informational meeting for the applicant and does not constitute
approval of the proposal. Pre-submission conferences are only held on Wednesdays
and are approximately 60 minutes in length. SEVEN COPIES OF A DETAILED SITE
PLAN SHALL BE SUBMITTED ONE WEEK PRIOR TO THE CONFERENCE. The site
plan must contain all setbacks between proposed and existing structures and the
property lines. If applicable, please show all critical areas (shorelines, wetlands,
landslide hazard areas.) All existing and proposed structures must be shown and
labeled with their use and the type of construction materials to be used (i.e. stick built,
modular, etc.) PLEASE PRINT when completing this application.
APPLICANT: (.��d L✓t o� Qr aret�l/�r?15S1 E ADDRESS:
CONTRACTOR: 5� /U 2-7ool l4ry lot /`AedEs4"'f— /
��rsf-a-(J�/�.1� i2Jl�ut1��
CONTACT: &6� S l,t"J TAX PARCEL NUMBER:
PHONE#: '06 1 7---(iq7 7 Z�`3 1 2,5 ej Qa Z �
Tr of sP ,0�2-q6S,
Describe Project, indicating square footage of building and describe the use of the building in as much
07-K1 ) ,(
« bu c
detail as possible. Kew , Cxisfkw /Ulob:� �� r — i vis��i 11 - Non f do Kit'
OAK P;�•ti �aL ,�5 - xo 01(Awbina Poll',
,r i�-
e X l5`I�vl rj(itL w L C�/ �P S Ia G i l J �5
Type of instruction (Please circle) Wood Concrete Masonry Metal Other:
Water Source: /JC' Septic System:
>! I=YY ;kkkk = For Office Use Below This Line , < : k : < = = = = : :�: : :
Meeting Date: �I S Meeting Time: G " C) U
Meeting Location: sup's ' Am '<E9 7
Ll�c�rl'�
nationwide cabin referral service
is provided to campgrounds with
Conestoga cabins. It helps campers
find you.
assistance with selection,
placement and marketing.
1 year cabin return policy!
CYNTHIA SUND
t REST-A-WHILE
For more information call or write today 27001 N US HIGHWAY 101
Conestoga Log Cabins HOODSPORT WA 98548-9748
987 Valley View Rd., New Holland, PA 17557
1-800-914-4606
Also Dealer
Inquiries
Welcome
1 11 . 11 . 1
Highly profitable Log Cabin Rentals
< ta��Jass��ayfo
\ anti 6�
CX�v G i
$3,995 and up
I
{ ; 5X1Stl N& MON LE:
x
5i�co"w 527.42� --
15
FAP
f f�
PAP
FIE a;
M•n!r
1
Gr-AVEL MlYt�-
v --- --
�XIS�'I NG i O
(TI Da LAN CAS)
1 0
- ola
AV
1
-- -- -- 1 -- •
-'o plop, �N 1 N -
L� 2
SITE PL�I � I = 30' ° 17 YAgcH le98 WHLE- oops wY lol
4
oo-t�VaL C&Azfy�- aQ Ou
Ito" swdo- -dVO42 U�Wjz
4��Lk4-v,
C►� �. ��'` y� - ►� ,�. �- mac -+� �
�s f-v,, +�aA b CIO cqr-,�
. -i
V_m qv
VR
ern
cvvv
IM
1
eueucw l�.e¢� , V'O ►.-per
3 - �1� Yam,.
� 1 l
�-
'PIBC-- qf-c�w a -�v
5
GARY YANDO,DIRECTOR
�oN.srArFo
o A DEPARTMENT OF COMMUNITY DEVELOPMENT
u
o T z PLANNING - SOLID WASTE - UTILITIES
z� N Y y BLDG. I e 411 N. 5TH ST. • P.O. BOX 578
0`� rasa SHELTON, WA 98584 • (360) 427-9670
April 15 , 1999
Cindy Sund
27001 N US Hwy 101
Hoodsport, WA 98548
Dear Ms Sund,
This letter is a follow up to this department ' s April 5th
response to your Initial Review Questionnaire. It has come to my
attention that your request to relocate your seafood sales
location may be subject to provisions of the Mason County
Shorelines Master Program. Please contact Pam Bennett-Cumming at
your earliest convenience. ( k 2r+4 )
Sin erely,
Gary Y Director
Dept . o C mmunity Development
Qorriptl .