Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MIS97-00006 Cancelled Propane - MIS Permit / Conditions - 1/25/2000
MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M 1 S C F L_ l._. A N kw ©tJ S 1-' F- Ut M 1 _L i ON I NSPECT I ON6 CALL 421 9670 MIS97--0006 PARCEL -P230977002t0 PLAT c DIV c BI..K c LOT . -JOB ADDRESS : NE 71 MAHOGANY CT BELFAIR APPLICANT : DOUGLAS 0 6-. 767 0934 OWNER c DOUGLAS T2 206— T67--0934 LEGAL c Tl 22 of SR1Y 131234 PEaM1? PeRp�14N PROJECT DESCRIPTION : PROPANE. TANK, WATER HEATER. HEAT PtIMP VVL` $t 01,0 " PROJECT LOCATION : BEAR CREEK DEWATTO RD . , 1..EFT ON TAHUYA BLACKSMITH RD . , STRAIGHT TO MUNSON BLVD, TAKE LEFT ,AT Y DOWN HILL FIRST RIGHT ON MAHOGANY CT t.OT 22 PROJECT NOTESe TYPE AMOUNT BY DATE RLGE I PT MCFE 19 .50 KS Olt03/97 43716 TOTAL . 19 .50 O NER OR AGENT DATE M! FRMT, rEti; l41/1!42 COMPLIANCE TO ATTACHED CONDITIONS I5 PEQUIRED tt CONCRETE MECHANICAL MOBILE HOME F6otings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING — OTHER Groundwork Attic date by date by I D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by II I 1 - I MASON COUNTY Mason County Bldg. 111 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 PE R 1\4 1 T C 0 N D- I -r 1 C3 N Ease Nu . t MIS97-0006 Fori DOUGLAS SCHWARTZ Page , I PURSUANT TO 1991 UNIFORM BOILDING CODE , SECTION 305(C) AND SECTION 513, ALL "' ITES MUST ISITION AS TO BE PLAINLY V I L HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A PC Is 6 F AND LEGIBLE FROM 'rHu STREET OR ROACH FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED ON RATES IN TABLE 3A Of THE 1994 UNIFORM BUILDING GODE WILL. BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REOUESTING INSPECTIONS , X The owner sha I I have avi I I ab I e on s I -t to for i napect I on by Mason County, a report indicating the naive and lioense number of the Installer , the amoiint of proussure at the time of testing and the length oaf test time . Trim r, report Thal I be s I pried bV the person conducting the test , MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O, Box 186 Shelton, Washington 98584 i . Tank is to be 10 feet_ i i om any bu i ti l i nq, put"I t %� wdy of property line . 2 . If the tank Is exposed to probable vehicular, damage, provide protective bollards . 3 . Al i weed-; , c1rass , brush , trash and other combustible material shall be kept a minimum of 10 reet away from LP containers . � 11 Installation of heatinq equipment in single faml1y residences shall meet the requirement of the 1991 WSEC . The furnace to br• Installed shy: i l not exoeed 150% of the, heating design load or proscriptive requirements of Chapter 9 . Fitrnac,e efficiency shall he .78 AFUE or, higher . Duot s sha l 1 be taped, :yea l ed and meohan i ca i i y fastened with a minimum fo�f 3 fasteners per joint . Ducts :shall be insulated to R-8 . T CONSTRUCTION PROCESS TO BE ri ELD CORRECTED AS REQUIRED REP, M SON C, IJNTY BUILDING DEPARTMENT AND UN I FORM BUS 1,1)l`NG CODE . x Permit No. `'l� - �✓ MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar/P.O. Box 186, Shelton, WA 98584 •427-9670 PLEASE PRINT #1 Owner 06Lwj Af - wck-r- Phone# ;2 0G 26-7-0 93-Y Site Address V " p- 7 °-t er- City St �ve-,, _ Zip Directions to Job Site Owner Mailing Address f`j oZ0 /C`6r-e` City .J cial-44 2 St lz e Zip 9'/6 Lien/Title Holder Address City St Zip #2 Contractor Name Contractor Reg. # Address Expiration date City St Zip Phone #3 Parcel No. �309 Legal Description Tf5 i 3%.g.3 c,� #4 Use of building Describe work i eK -- C' f ,2 y,2210 #5 Type of Job: New Add Alt Repair 40 -"Iz--O �j�;, C)`-:a-3, Plumbing Fixtures ($3.25 each Fee Mechanical Fixtures ($6.50 eachl No. Toilets CIRCLE FUEL TYPE: Gas, Electric, Bath Basins eatpump, her _Bath Tubs Units Fees _Showers F)04 -173' I _Hot Water Htr Heatpumps (r5� _Laundry Washer _ Vent Systems _Sinks _ Spot Vent Fans Floor Drains No. Boilers/Compressors _Laundry Basins _ HP Dishwasher No. Air Handling Units _Disposal _ cfm# _Urinals No. Other _Other eil Gas Outlets Co ,,ley X— Wood, Gas, Pellet Stove 32.00 Permit Basic Fee 16.25 h j 1�0 5-0 TOTAL PLUMBING $ _ Permit Basic Fee 9� 16.2 TOTAL MECHANICAL g_ No Basic Fee for Wood, Gas, Pellet Stov NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. Proof of continuation of work is by means of a progress inspection. NOTE: If this permit application includes the placement of a fuel tank, heat pump or other unit to be locatQd outside of the existing structures, a plot plan MUST be submitted as required below: Show following on the site plan below: Lot Dimensions, Existing Structures, Structure Setbacks, Water Lines, Septic Systems, Flood Zo es, Wells, Shorelines, Easements, Name of Flanking & Fronting Streets. Indicate directional by N, S, E, W, etc. k OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRAC- THE CONTRACTORS REGISTRATION LAW RCW 18.27,AND AM TOR IN THE STATE OF WASHINGTON AND I AM AWARE OF THE AWARE OFTHE MASON COUNTY ORDINANCE REQUIREMENTS ORDINANCE REQUIREMENTS REGULATING THE WORK FOR FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE SHALL BE MADEWITHOUT FIRSTOBTAINING APPROVAL FROM WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING THE BUILDINZL�t'j PARTMENT. DEPARTMENT. X OWNER -0-- L X BY DATE a f`�O/Q� DATE Return permit to: Department of General Services 426 W. Cedar/P.O. Box 186, Shelton, WA 98584 • 427-9670/1-800-562-5628 FOR OFFICIAL USE ONLY: Accepted by: Date: Receipt No. Referred To DEPARTMENTAL REVIEW Proposal Proposal FOR OFFICIAL USE ONLY Approved Denied Planning: Building: Fire Marshal: