Loading...
HomeMy WebLinkAboutFinal Punchlist - COM Letters / Memos - 11/29/2006 COMMUNITY DEVELOPMENT DEPARTMENT MEMORANDUM DATE: November 29, 2006 TO: Lynda Ring Erickson, Commission Chair Jayni Kamin, Commissioner Tim Sheldon, Commissioner FROM: mmett Dobey, CD/Utilities Director Barbara Robinson, CD Deputy Director SUBJECT:° Lilliwaup Post Office — John Straatman This memo is a response to the October 30 letter from John Straatman to Gale Ashby of Ashby Homes, in which Mr. Straatman alleges several unresolved issues and concerns with the new post office constructed by Mr. Ashby in Lilliwaup. Emmett Dobey was provided a copy of this letter and asked to respond on behalf of Mason County with regard to compliance with the requirements of the permits issued for the construction of the post office. The following is a summary in response to the items listed in the letter. On the first page of the letter, Mr. Straatman lists 11 items that he states were not done per the plan. The majority of these items are cosmetic, or non-code issues that are not enforced by the County through the international codes. These range from cracked or damp sheetrock to installation of blinds in the service counter. Mr. Straatman states problems with the septic system, which was an existing system that he was allowed to continue using for the new post office. Since the receipt of the Straatman letter of October 30t", a permit has been issued for replacement of a septic tank on site. The problems identified were non-structural and issues not enforceable by the County or building codes. Mr. Straatman also makes allegations in his letter that the retaining wall was backfilled all at once and as a result, the retaining wall is "bent" two inches. A Washington licensed engineer designed the wall, which included the options for a 3', 6', 9' or 12' wall. There were two inspections done on the retaining (rockery) wall, which consisted of a progress and final inspection. The wall was built at the three foot high option, which, based on the engineer report met the slope for the three foot height based on the cut. The second page of Mr. Straatman's letter discussed issues related to erosion and stormwater. Mr. Straatman alleges that erosion control was not in place to prevent sediment and silt contamination in the bioswales in the front of the property. He further states that the infilitration trench was covered with dirt during construction. The building department does not inspect storm drainage plans or infiltration trenches as part of their inspection to verify the minimum requirements have been met for the project; however, our building inspectors did witness straw/hay bales in place for the erosion control. The stormwater and erosion and sediment control plan initially submitted for the project was reviewed and approved by the Mason County Public Works Department. During this construction project there was a higher than normal rainfall, which could account for some runoff of silt or dirt that was not absorbed by the erosion and sediment controls in place. Mr. Straatman also identified problems with on-site paving and the rockery (retaining wall). He states the driveway is not constructed to the plan, the south exit is too high and that there is only two inches of asphalt for the parking area instead of three inches. The parking lot is not an inspection requirement of the project. The driveway access is reviewed and approved by WSDOT. WSDOT is the regulatory agency that issues the access permit from Mr. Straatman's property to US Hwy. 101. The County does have requirements for compliance with fire apparatus roads and access. The project does meet the minimum requirements for fire access per the International Fire Code. The County is required to assure there is the number and size of parking stalls required for the proposed use. This verification was done in the plan review stages. The last portion of Mr. Straatman's letter references the Habitat Management Plan requirements, specifically relating to plantings and vegetation areas required by the approved plan, stating the plantings were not done according to the approved plan. The owner and/or contractor are responsible to meet the requirements of the plan as developed by their consultant. The County can also require that the applicant/owner submit a monitoring plan of all plantings installed to ensure healthy growth over a three-year period. However, this was not required of Mr. Straatman, nor was the normal monetary bond for costs to ensure the plantings were installed per the approved plan. The County waived the requirement for a bond due to Mr. Straatman's strong persistence and the knowledge that the United States Postal Service would be responsible for the maintenance of the plantings. Without the bond, the County has no tool to ensure plantings are installed in compliance with the approved Habitat Management Plan. Overall the project was reviewed and approved as being in compliance with all applicable State and County codes. The development of the property required a geotechnical report for the soils, engineered erosion and sediment control plan and stormwater drainage plan and a habitat management plan. All these plans were reviewed and approved by the appropriate County staff, inspections performed in compliance with the International Building and Fire Codes. The building and rockery wall both meet the minimum requirements of the code as constructed. i John Straatman — Staff concerns The information provided in this memo relating to the construction of the post office facility in Lilliwaup exemplify the mannerisms of John Straatman, which we have seen and dealt with over the past several years. There have been many confrontations of County staff by Mr. Straatman over the years, dating back to early 2000 when one of our building inspectors was accosted in the field during an inspection. This incident was threatening to the inspector by not allowing him to leave the property, in addition to be verbally abused by Mr. Straatman. The unruly and borderline violent incidents with Mr. Straatman have continued over the years, to the point the Permit Assistance Center has installed 'panic" buttons that tie to a security company for response in emergency situations. Mr. Straatman attempted to enter the building prior to the opening of the center by beating on the doors and once in was belligerent to staff and acted in an unruly and irate manner. He was asked to leave, only after calls to the Shelton Police and Sheriffs Department for response. The most recent episode was related to the construction of the Lilliwaup Post Office. Mr. Straatman was in the office on several occasions, irate and unruly, intimidating office staff, planning department staff and field personnel. The culmination was he breaking the glass doors at the center, costing approximately $600.00 to replace. The actions by Mr. Straatman are a threat to County staff, and as a result we are scheduling safety training by an outside consultant to assist staff in dealing with such customers. Subsequently, Mr. Straatman has been charged with malicious mischief for the damage done to the permit center. Although this is compensation for the property damage done, it does not remove the potential for continued actions by Mr. Straatman in future visits he may make to County offices. Lilliwaup Post Office November 29,2006 2 i�} Al- r 7 _ 1 y 'Aw 1 11/16/06 ��L To: Straatman's Re: final punchlist �G C-C Items remaining to be completed. 1. Install parcel locker (Arriving today) r� 2. Install mini-blinds 3. Install door sweep n 4. Meet with Agua Tierra about plantings (scheduled for the 20th) Cam — QInstall Slat-wall (add-on to the contract-not here yet) 6. Build up road side of bioswail with topsoil 7. Talk to Betsy Dykes 8. Modify your driveway by removing first section of left curb and widening with asphalt 9. Add wooden slats to chain link front(this was an add on to the contract) We are waiting for the slat wall to arrive so we can do all of the installations at one time. If it doesn' come in the next few days we will be out anyway to install the other stuff. e� Gale Ashby October 30,200 T o: Gale Ashbuy Ashby Homes, Inc. , issues-- - e Ltiiu it simply ulli:Gl"LSi:i0iia,ole that tue UilCcsoLvtrcl i�Suc�siatcu�v cL-T�ar�-tLI 11 rciiLaiii a liciiuLLLg iiLattcr u1 concern. Once again we ask you to review and resolve these very real concerns by going by the plan as we all k-noku it. TT TrV TTII A nT AAT 11uLrvJ irvl 1lVLrL'.Aa7 rl:n I'LAir ll- ME IE SLAT`ri A11 iS DAL'viAGED AivTD NEEDS TO DE REPLACED. -,-2- LMST-Al.LL LANLiNATED WTINDOWSILL.S IN WORK- OG-M. O3- INSTALL J BOX AS SEPTIC HAS A HOLE IN IT,AND THE SEPTIC IS TO BE ABANDONED. T i C 1TA- oREssmrr1 13 Lev Ti IMS A L ED AS PE S A TE ELECTRICAL! t7ATT t`�3aT1E, a vv MUST USE CONNECTORS;THEREFORE,THE LIGHTS ARE A FIRE HAZARD AND ARE NOW USELESS ASS THEY HIA.VE A 3-INCH HOLE RJ T-W—M. THEY NEED TO BE ,( CHANGED OUT. O!' ` COIN TACT DEP L Or. TT'nANSPORTATIOiv Aiv'aD IIA`VT TITiEL'ri SiGN OFF TI1EIR PI RMIIT, 0 AFTER YOU FIX THE PARKING LOT. / 10 C'b- INTII -LAAR4 LODBY,THE SIIEETROCK ADOrE TIIE'VVuvDOvvS CRA �D AND NEEDS TO BE FIXED. r i- TIME RETAII'M-G WALL'WAS DACK�uLED ALL AT ONCE A 'D AS A RESULT, iilE RETAINING WALL IS BENT TWO INCHES. INS T ALL`r`v'OOD v SLATS,NTO PLASTIC 0`N`E S. J( INSTAL BLIND— IN SERVICE COUNTER. 00 WHEN THE POST OFFICE WAS FLOODED FOR 3 DAYS,THE SHEETROCK WAS SITTING IN WATER. THIS SHEETROCK WAS THEN USED. DUE TO TiiE vint n iLv Till BILMD.—NG,TII `BTuT1,DING WAS ivOT DR`MI)OUT PROPERLY AND THEN WAS SHEETROCKED WHEN STILL WET. NOW WOULD THERE BE A POSSIBILITY TIL T WE I•LAVE MO Tl GRQW—M.G LN THE WALLS????? LA.U13LUIwr n r.rn c3 mul%l Atr n mr)Tn L'1\VJLVLV ALVI.!171 VLtLY'1 YY III 11:1� t- [IT"A TJA T TA C, L tY1 J .AiVrALLS1TTLr U n INSTALLEDTw0111VRV LEANGTIlTlT t'/1 CST 1JL' WITH ENDS OF ADJACENT BALES TIGHTLY ABUTING ONE ANOTHER. THEY WERE NOT INSTALLED AS PER PLAN;TBEEREFORE,THE BIOSWALE I-GHT BE CONTAMINATED WITH SEDIMENT AND SILT AS THE BALES DID NOT KEEP OUT THE SEDIMENT. 2- THE INFILTRATION TRENCH WAS COVERED WITH ONE FOOT OF DIRT 1DVRIPG CO 41STLWL I'1VLTVT. lIIL PLAN CALLS roll m11TT1EI ilTiTTlTT/ T Tr1�LA1 LVt I1 l lJ OPEN. THEN AFTER PAVING,THE PLAN CALLS FOR SHAPING THE BIOSW Ate,AND THEN FILLING WITH ONE FOOT OF TOP SOIL.NOT ONE FOOT OF DIRT. AGAIN THE TRENCH WAS SUBJECT TO CONTAMINATION AND SILT. 3- NO SOIL PROTECTION WAS DONE UNTIL THE STATE OF WASHINGTON DEPT O LCOT vY 1740"RClED YOU TO INSTALL WHAT YOU SIIOULD HAVE DOI'M AS PER PLAN. 4- LtiL S L L DC L�OL IIAVE,A LETTLn PROM[TIM.DEFT O L�n..VLV�rJ 1,UL 1 J 1 DICKES,RESOLVING THE DISPUTE. S- TIIi WAY TIIL D10SWALE IS CORrruIRUCTLD,IT IATILL I'AIL DUE. TO TI1-1:USE OF DIRT INSTEAD OF USING TOP SOIL,AS THE WATER WILL NOT GO THROU GH THE DIRT;T B-IRR EFORLE,Tim TOP SOIL.W113.BE ON HIGHWAY 101. ST//'�TT �TttrAmnn Al.rrnTY rYnr�wr nnc�r rt•rri-n�r VI�LY1rYAllilt AlYI!1%1\VJiYJLY 1\1�JVLV L1VLT P�•.LY1V VL ALL IA. .D111T LIIt%T C(IlyA a TI■I: hN IL rATLVN 1R NCII, RESHAPE THE BIOSWALE AS PER PLAN THEN ADD THE TOP SOIL TO THE BIOSWALE. GET IN TOUCH WITH THE DEPT OF ECOLOGY AND RESOLVE THE DISPUTE. ASSUME RESPONSIBILITY FOR THE NEXT 30 YEARS IN WRITING,FOR THE CONTAMATION THAT HAS OCCURRED,BY NOT FOLLOWING THE PRINT. PAVING AND ROCKERY i- DRI vLVA Lr LvOT AS PER PLAN 2 -NORTH ROCK WALL NERDS TO BE BUILT NIGHER SO YOU CAN BLUR THE DRIVEWAY WHERE IT SHOULD BE AS PER PLAN. �. TIM TELvIPORAY DRIVEWAY SHOUT-D LvOT BE USED AS TIIE'ikTW Civ'E 4. THE POUR IN PLACE CURBING IS NOT TO GRADE. IT IS 01.1E FOOT TOO HIGH. S. SOUTH EXIT IS TOO HIGH AND 2 MOTERHOMES HAVE BEEN STUCK HALF ON HIGHWAY 101 AND THE OTHER HALF ON THE POST OFFICE PARKING LOT 6- T I IE BIOS`AFALE IS NOT TO GRADE AND NEEDS T C"B RE-DONE 7- THE PLANS CALL.FOR THREE INCHES OF ASPH,AT.T, NOT TWO INCHES. PAVIlvG RESOLUTION AL RCLv`iOVE ALL PA`v uvTG FRMT I THE SITE AID SET CURB T O GRADE ANTI)SET T ILI GRADE FOR THE PARKING LOT. REPAVE. THEN INSTALL NEW CURBS AND STRIPING. THEN REPLACE T1 E BIOSWALE. TO CTR ADE.,MOVE.DRIVEWAY ArTi_l R_ATSE. ROCK WALL. t � ITTT�,,TTT T��( T" T1LTAtT TT "AT ilLJFLA1 !v!l11llrL L:1vlj_,1141 i112111Y 1. 33 1-rAT..DO GL ASF1R 2. 32 1-GAL BIG LEAF MAPLE 3. 87 1-GAL VINE MAPLE 4. 86 1-GAL EVERGREEN HUCKLEBERRY 5. 87 1-GAL OCEANSPRAY ITT 6. 150 i-GAL O REGOI.T CRAP IE 7. 210 1 -GAL SALAL 8. 150 1 -CT.T..LADY FERN 9. 209 1 -GAL SWORD FERN F.EVEGETATiOI tl BcHuvTu f%LUS-Y Lr'isL1S(`v'r'IDTri iviAY VA:Y AS REQUIRED TO REVEGETATE EXCAVATED AREAS) PROVIDE WESTERN RED CEDAR,CASCARA,STEP MOSS PLAN- TWGS(1_rAL.SIZE)AS RMQ?ER.ED TO R ET ALN SLOPE AND BLEND AESTHETICALLY WITH UNDISTURBED FORESTED AREAS. HABITAT Pv "^"'`T",T PLAi�"iuOLuTTICN Inj�nvl jvu;jv 1 1�J.ilY1C Y L.L.' ALL 1'LAlvT T J 1YOT CALLED 1 Cl�ilY ! Jr PLAT\ INSTALL ALL THE PLANTS CALLED OUT IN THE PLAN (SEE ABOVE LISTED PLANTS) REMOVE. ALL.BARE ROOT PLANTS,AS THE PLAN CALLS FOR 1-CTAT_T.ON SIZE. REMOVE ALL DEAD SHRUBS IN FRONT OF POST OFFICE jolt(!&SGrI111,i111G au ad fra l CC: Hugh ROu-11G Cornerstone Architects Len Wilbanls Marly L Young WESTERN FACILITIES SERVICE OFFICE UNITEDSTZTES I�OSfX SERVKE May 31, 2006 MEMORANDUM: Hunter Roop - Contracting Officer SUBJECT: Lilliwaup, WA - MAIN Post Office Final Inspection Punch List The following shows the items remaining from the pre-final punch list that still need to be corrected: ,1-., USPS Signage at road not installed (2) Redwood slats not installed in chain link fence around trash enclosure and HVAC Unit. Electrical panel directory not typed 4. Access cover in janitor closet not labeled. w 5. O&M Manuals not provided. 6. Slat wall not installed 7. Automatic door bottom not installed. 8. . Concrete curb at planter near loading not installed. 9. Window sill missing in workroom. 10. Blinds missing at all type "B"windows. 11. Accessible parking signs must be raised. 12. Emergency exit sign (raised characters and Braille) missing. H. C. Roche Contracting Officer's Representive rL May 30, 2006 To: Gale Ashby Ashby Homes, Inc Below are a list of unsettled concerns that I and my wife have regarding this project. Please review these concerns and go according to plan. l. The bioswale is not finished according to the plans. (The bioswale is not 10 feet; nor is the top soil 1 foot deep) .'2' `' The blinds for the workroom windows are not there,as the plans show. 3. The window sills are not in the workroom as the plans show. 4. The blinds for the counter area are not there as the plans show. 5. There is no curbing in the Loading Area, as the plans show. 6. Our driveway is not satisfactory,and this is obvious when looking at the plans. 7. After speaking with Tami Clark of the Department of Planning recently,I was informed that the Wildlife Habitat Management Plan must be carried out as the plans state and that this will be inspected by Agua Tierra of the Land and Water Services. 8. Regarding the front door mat: Is this mat durable enough for long term public use? 9. I spoke to Betsy Dickes on Friday, 2r of May. As far as she is concerned, the erosion and sediment practices,as reflected in the report,remain an open issue and that in her opinion, she has never met anyone who has been so uncooperative as yourself. We are concerned about the long term effects this matter will have upon us, if this is not satisfactorily resolved. 10. There were no straw bales around bioswale throughout the period of construction as stated in the plans. 11. We do not understand why we are being charged $875.00 for shaping the hillside, ' when a decision was made earlier between Kamin,yourself and I to remove the dirt from the job site onto our property rather that hauling it away(which is a procedure outlined in the plans). 12. The entrance culture stone cap is too wide and not according to plan. (It was mentioned that a person could hurt themselves if they bumped into it) n13. The exit approach holds water badly and must be fixed. Sincerely John&Bernadine Straatman cc: Hugh Roche Cornerstone Architects