FINDINGS OF FACT
Landslide Hazard Area Buffer Reduction
Applicant: Michael McGraw
Parcel No.: 32330-51-06007
Site Address: 183 N. Canal Hide-A-Way, Hoodsport
Date: August 28, 2009
Per the Mason County Resource Ordinance (MCRO) 17.01.100 (D)(6) an application has been
made to reduce the required 50-foot buffer to 49 feet and to allow for the reserve drainfield area
at the top of the slope. Notice of the application for the buffer reduction was made as provided in
Section 15.07.010 of the Mason County Development Code. Per MCRO(D)(6)(c) findings have
been made that there are no impacts to anadromous fish or their habitat or to fish and wildlife
habitat conservation areas. A Habitat Management Plan was submitted and adequately
addresses mitigation for impacts to the shoreline buffer. The project was reviewed and approved
by the Mason County Hearing Examiner. Findings have also been made that the approval is
conditioned as necessary to be consistent with the recommendations contained within the
Geotechnical Report and addenda that have been reviewed and approved by Vector
Engineering, Inc. (see conditions attached to VAR2008-00013).
This is a final administrative decision by the County. It is the appellant's responsibility to meet all legal requirements
of any appeal process.
If you have questions or require clarification on these issues please contact Tammi Wright, Land-Use Planner with
Mason County at 360-427-9670 x295.
Cc: Barbara Adkins, Planning Manager
Mr. Bill McTurnal
tZICEIVED
? r AUG 2 8 2Uuj
E N 6 1 N E E R I N 6\N
309 WASHINGTON STREET NE M C C D - PLAN N I N G
OLYMPIA WA 98501
TEL:360 352-2477• FAX: 360 352-0179
www.vectorengineeringinc.com
August 26,2009
Tammi Wright
Mason County
Department of Community Development
PO Box 279
Shelton,WA 98584
RE: McGraw Property Landslide Hazard Area Review
Dear Ms. Wright,
In our review letter dated July 29,2009 we requested that Mr. Cushman of Geotechnical Testing
Laboratory provide a slope stability model representative of the slope with the a reserve
drainfield constructed at the top. Mr. Cushman has provided a slope stability model and an
explanation letter dated August 10, 2009 which appears to satisfy our request. Based on the
above information provided to us by Mr. Cushman,we recommend that the 50-ft Landslide
Hazard Area buffer be reduced to allow for the reserve drainfield at the top of the slope.
Sincerely,
*ye, .
K\9000 Files\9027 MasonCo(McGraw)\Communication\Transmittal Letters\T1,02.doc
Page I of I
MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Shelton(360)427-9670
Mason County Bldg.I Belfair(360)275-4467
411 N 5th Street Elma(360)482-5269
PO Box 279
fxsa Shelton,WA 98584
HOME PAGE—www.co.mason.wa.us
August 17, 2009
Ms. Kathy Maxwell
Office Manager
Vector Engineering, Inc.
301 Washington Stree, NE
Olympia, WA 98501
Re: McGraw; VAR2008-00013 — Geotechnical Report Review
Dear Kathy,
I am enclosing the response from Curtis Cushman, Geotechnical Testing Laboratory, to a letter
from Ryan L. Moore, P.E. dated July 29, 2009. Mr. Moore recommended that a reserve
drainfield not be proposed within the 50-foot buffer at the tope of the Landslide Hazard area until
Mr. Cushman provides a slope stability model representative of the slope with a reserve
drainfield constructed at the top. I hope this meets your needs.
Thank you for your assistance in this matter. If you have any questions feel free to call me at
360.427.9670 ext. 295.
Sincerely, -
G!�ri.�n.0
Tammi Wright, Planner
Enclosure
cc: Barbara Adkins
Mike McGraw
Bill McTurnal
RECEIVED
TAMMI WIGHT AUG 17 ZOOS
PLANNER MASON COUNTY DCD
P.O.Box 279 M C C D -
PLANNING
SHELTON,WASHINGTON 98584
RE: ADDENDUM ON SLOPE MODELS
SITE INFORMATION: XXX NORTH CANAL HIDEAWAY
LILLIWAUP,WASHINGTON
GPS LOCATION: N47o 27' 19.11"W123o 06139.9311
PARCEL NUMBER: 323305106007
RESPONSE DATE: 08/10/2009
Dear Ms. Wright:
I am sending you this note to try to explain the following cross-sections. These were sent in before within the
note responding to Mr. David Strong, but there was considerable content in that letter and perhaps these points
were not adequately covered.
For these two cross-sections, we used the maximum slope angle that anyone considered valid, that is, 90%.
There are no superposed weights as there is no structure except for the distribution pipes and associated
plumbing.
The models assume homogeneity, which is reasonable, as the site is the lobe of a landslide and any variation in
lithology is likely to be chaotically incorporated in the general collapse.
The water is the crucial ingredient. The slopes are modeled as if the entire hill is saturated with water. This
adds considerable weight to the model. It is also unrealistic. To saturate the hill in such a manner would
require far more water than can be expected from the reserve drainfield. We also saw no evidence of water in
column along the hill slope, and none along the roads. The nearest wells indicate that static water levels are not
near-surface. Water would also drain.
In other words, these models are as about as worst-case as possible to the point of overstating any hazard.
These models also indicate, strongly,that no slope remediation is needed.
0 a{ Wash; Respectfully Submitted,
\�9f0�: GEOTECIiNICAL TESTING LABORATORY
En eering Geologist
2439
Sed Gao�o� Curtis D Cushman LG, LEG
�-- Senior Engineering Geologist
^JRTlS D ..,�I..
10011 Blomberg Street SW,Olympia,WA 98512 1
Phone#: (360)754-4612 Fax#: (360) 754-4848
G o cHNICAL TEsTi G UeoRAToRy
SHEAR RESULTS(SAMPLE LOCATION AS SHOWN ON THE ATTACHED SITE PLAN)
Peak Shear Stress vs. Normal Stress
--
2500
Shear=42*
2000
c
C.
tlM
H 1500
`w
m
t
41
Y
a
m
a 1000
�-1u ton
500
—�12 ton
Cohesion
=200 psf
0
0 500 1000 1500 2000 2500 3000
Normal Stress(psf)
10011 Blomberg Street SW, Olympia, WA 98512 2
Phone#: (360)754-4612 Fax#: (360) 754-4848
GEOTECRNICAL IUnNG ILAsoimToRy
10011 Blomberg Street SW,Olympia, WA 98512 3
Phone#: (360)754-4612 Fax#:(360)754-4848
GEoucKNI L Tmm no ToRy
SLOPE MODELS(AN INCREASED GRADE ON THE HILL SIDE
Static Mode!
McGraw Slope Model • ' •
Static Model • , • • ,
Fos 1.52 • • • • • • • • • • •
120 • ' • ' •
110
• , 1.52 P •
• , � •
100
90
Name:Gravel with Sand
Boo _ Unit Weight
-
= Phi:42
60 Phi-B:0
> 5o Piewmetric Line:I Proposed
W 40 Building
Location
30 Name:Sand ~�Uri We*123 ``— Bulk Head
20 Calxsbn:200 --'"
10 phu o
0 Pt Ix:1
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280
Distance (ft)
10011 Blomberg Street SW, Olympia, WA 98512 4
Phone#: (360) 754-4612 Fax#: (360) 754-4848
GEO T`ECHNI L USING ]LABORATORY
Dynamic Model
McGraw Slope Model • • •
Dynamic Model • • • • • •
Fos 1.20 • • • • • • • ' • •
tt • •
120 • • • • • • 1206
• •
100 •
90
80 Name:Gravel'Nith San
Vnit41'eight 133 -' --__
70 Cohesion:200
C Phr 42
.�
60 Phi-B:0 .f '
> so PiezonneUic Line:1 Proposed
w ao Building
4
Location
30 Name:Sad
Bulk Head
20 Uni Weigh 123
Cohesion:200
10
c,:34
...B:O
0 = -
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280
Distance (ft)
10011 Blomberg Street SW Olympia, WA 98512
5
Phone#: (360) 754-4612 Fax#: (360) 754-4848
1 e c t o r
f N G 1 N F F R I N G \N C
309 WASHINGTON STREET NE
OLYMPIA WA 98501
RECEIVEDTEL:360 352-2477• FAX: 360 352-0179
www.vectorengineeringinc.com 2009
AUG 0 3
July 29,2009 MCC D - PLANNING
Tammi Wright
Mason County
Department of Community Development
PO Box 279
Shelton,WA 98584
RE: McGraw Property Landslide Hazard Area Review
Dear Ms. Wright,
Vector Engineering, Inc. (VEI)has reviewed the documents pertinent to the Landslide Hazard
Area(LHA) located on the Michael McGraw property in Lilliwaup, Washington. The scope of
our work focuses on the LHA and the potential effects of construction within the 50' buffer
established by the Mason County Resource Ordinance (MCRO), Section 17.01.100.D.6.a. As
requested by Mason County,this letter represents our findings upon review of the following
documents:
Geotechnical Report. Geotechnical Testing Laboratory, 12 December 2007.
Michael McGraw Letter. Highland Excavation. 2 May 2009.
Review and geotechnical comments on the Geotechnical Report prepared for Mr. Michael
McGraw by Geotechnical Testing Laboratory under the seal of Curtis Dean Cushman and
dated December 12, 2007. Bradley-Noble Geotechnical Services, 29 May 2009.
Review Letter of David Strong. Geotechnical Testing Laboratory, 10 June 2009.
The December 12, 2007 Geotechnical Report prepared by Mr. Curtis Cushman, L.E.G. identifies
a LHA in the west portion of the site. The May 29, 2009 review of the Geotechnical Report
prepared by Mr. David Strong, L.E.G. verifies the LHA. Section 17.01.100.D.6.a of the MCRO
states that"a 50 foot buffer of undisturbed, natural vegetation is required around the Landslide
Hazard Area." It is our understanding that an application has been or will be made to reduce the
buffer as per section 15.07.010 of the Mason County Development Code.
Proposed construction within the 50-ft buffer at the toe of the slope includes a single family
residence and septic system with associated drainfield. There is an existing 20' right-of-way
near the toe of the slope providing access to the adjacent lots. MCRO, Section 17.01.100.D.6.c
states that"the Director shall approve such a reduction only on finding that the approval is
conditioned as necessary to be consistent with the recommendations contained with the
-1-
X:\9000 Files\9027 MasonCo(McGraw)\Communication\Transmittal Letters\TL01.doc
Geotechnical Report." Mr. Cushman makes the following conclusions on page 24 of the
Geotechnical Report:
We conclude the slope stability of the site will not be adversely impacted by the proposed
septic drainfield and the proposed septic drainfield will not be adversely impacted by the
landslide hazard area. We also conclude the proposed septic drainfield will not
adversely impact the proposed structure.
Based on our knowledge of the proposal,the recommendations made by Mr. Cushman and the
assumption that a buffer reduction request will be made,Vector Engineer, Inc. recommends that
the buffer reduction request be granted with the following provisions as shown on Figure 2, Site
Plan of the Geotechnical Report: the proposed septic system and drainfield shall be setback 34-ft
from the toe of the slope and the proposed building shall be setback 49-ft from the toe of the
slope.
The documents provided to us also indicate a proposed reserve drainfield at the top of the slope.
Much of the concern exhibited by the neighboring property owners, Mason County and Mr.
Strong centers on the reserve drainfield at the top of the slope. Mr. Strong has provided a
technical review of Mr. Cushman's Geotechnical Report in which he questions various aspects of
Mr. Cushman's slope stability analysis and makes the following recommendations on page 3 of
his Review and Geotechnical Comments:
To confirm the actual stability and slope profile, the following work needs to be
completed. One, the slope profile should be established by a site specific survey by a
licensed land surveyor. An additional boring at the top of slope must be performed to
verify the actual subsurface soil profile. Undisturbed soil samples should be obtained for
shear testing
According to Mr. Cushman, "The steepest slope measured onsite was approximately 70 percent,"
while Mr. Strong"measured the slope using a Leitz Pocket Transit and found the slope angle to
vary between 40 and 42 degrees(83 to 90%of slope)." In Mr. Cushman's June 10,2009 rebuttal
letter he provides a new slope stability model with an increased slope of approximately 90%and
"we STILL have acceptable Factors of Safety." In regards to Mr. Strong's recommendation for
"an additional boring at the top of slope,"Mr. Cushman replied with:
I admit to an important omission: I had sampled the hillside with a shovel near the north
property line for the late Hal Park's lab work before I was fully involved with the report
and before the drilling took place. This grab sample was subsequently tested for
gradation and shear (sample 41674, 1110112007). This is the shear in the report. Its
provenance was inadvertently not cited but is in our records. Mr. Strong need not be
concerned.
Regarding the reserve drainfield, William L. Russell, a licensed onsite wastewater treatment
system designer for Highland Excavation, adds"From this designers viewpoint the only reason
for a reserve drainfield in this case is that the State guide lines require a reserve area...I also
predict that this reserve will never be constructed, because it would be far cheaper to rebuild the
primary part." While there is no guarantee that the reserve area will never be utilized, Mr.
Russell suggests that it would be more feasible to replace the primary drainfield rather than
construct a drainfield in the reserve area.
-2-
XA9000 Files\9027 MasonCo(McGraw)\Communication\Transmittal Letters\TLOl.doc
Furthermore, Mr. Strong's observations of the slope and the surrounding areas strongly suggest
active surface erosion on the slope. In the Geotechnical Report,Mr. Cushman states that"no
evidence of active surface erosion was seen." In his rebuttal letter to Mr. Strong, Mr. Cushman
continues to say that"we stand by our observation that there is no evidence for deep-seated
failure and the observation that no erosion was detected on Mr. McGraw's parcel." However,
Mr. Strong provides examples such as: "a wood retaining wall constructed at the top of the slope
that is failing due to soil movement,"or"trees growing on the slope that have bowed
trunks...colluvium retained on the upslope side of the trees which suggest active downslope soil
movement"among other observations.
The physical evidence of surface erosion presented by Mr. Strong is too significant for Vector
Engineering,Inc to overlook. Although Mr. Cushman has provided a revised slope stability
analysis, it is unclear whether or not the model accounts for construction of the reserve drainfield
at the top of the slope. Vector Engineering, Inc requests that Mr. Cushman provide further
clarification of the most recent slope stability model and how construction of the reserve
drainfield will affect the slope.
Conclusions & Recommendations
Mr. Curtis Cushman, L.E.G., of Geotechnical Testing Laboratory has satisfactorily met the
recommendations made by Mr. David Strong, L.E.G. of Bradley-Noble Geotechnical Services.
Vector Engineering, Inc. recommends that the 50-ft LHA buffer be reduced at the toe of the
slope as shown on Figure 2, Site Plan included in the Geotechnical Report. This includes a 34-ft
setback for the proposed septic system and drainfield and a 49-ft setback for the proposed
building. Vector Engineering, Inc also recommends that the primary reserve drainfield not be
proposed within the 50-ft buffer at the top of the LHA until Mr. Cushman provides a slope
stability model representative of the slope with the a reserve drainfield constructed at the top.
The findings of this letter are based on Vector Engineering, Inc's understanding of the project
requirements and on documents prepared by Geotechnical Testing Laboratory, Bradley-Noble
Geotechnical Services and Highland Excavation. Vector Engineering, Inc. staff did not conduct
any field reconnaissance,but based all findings on the documents provided to us by Mason
County. Vector Engineering, Inc. warrants that its services were performed with the level of care
and skill ordinarily exercised by members of the same profession currently practicing in the same
locality under similar conditions. No other warranty or representation, expressed or implied,is
included or intended hereunder.
Sincerely, l`t L Mop
4qP� was '',
.0
4Pro"
4�Eineer
re, P.E. 80
GIs �ti
.r1
oNAL�
ptPtAE3 OS/30'67
-3-
X:\9000 Files\9027 MasonCo(McGraw)\Communication\Transmittal Letters\TLOl.doc
. t o r Invoice
f N 6 1 N E E A 1 N 6 \N C
309 WASHINGTON STREET NE
OLYMPIA WA 98501
Bill To:
Number: 9027-01
Mason County
Dept of Community Development Date: 7/30/2009
PO Box 279
Shelton WA 98584
PO# VAR2008-00013
Project: 9027 MasonCo(McGraw) Terms: Due 20 days from date of
invoice
[Project Manager: Erick Mahugh Due Date: 8/20/2009
Serviced Description Quantity Rate Amount
7/30/2009 Project Administrator 1 60.00 60.00
7/9/2009 Supervising Engineer 1.5 140.00 210.00
7/28/2009 Project Engineer 3 115.00 345.00
7/29/2009 Engineer III 27 95.00 2,565.00
This billing is for work performed necessary to
produce report dated July 29, 2009. Extensive
issues or questions arising from the requested
information may necessitate additional billing.
Invoice Total: $3,180.00
[Billing Period: July 2009
We gladly accept Visa and MasterCard.
Please call our office to make phone payments with your card. Thank You.
TEL:360 352-2477 FAX: 360 352-0179
www.vectorengineeringine.com
0N Coop MASON COUNTY
� aA Shelton (360) 427-9670
DEPARTMENT OF COMMUNITY DEVELOPMENT
Belfair (360) 275-4467
Planning 482-5269
Mason County Bldg.1411 N.5th Elma (360)
P.O.Box 279 Shelton,WA 98584
Sf
June 30, 2009
Ms. Kathy Maxwell
Office Manager
Vector Engineering, Inc.
301 Washington Street, NE
Olympia, Washington 98501
Re: McGraw; VAR2008-00013
Geotechnical Report Review
Dear Kathy:
I am enclosing a Geotechnical Report prepared by Geotechnical Testing Laboratory for
Mike McGrow, applicant. Mr. Bill McTurnal has requested a third party review and we
are providing you with a letter from him accepting responsibility for payment of your
fees.
Thank you so much for your assistance in this matter. If you have any questions, please
feel free to call Tammi Wright at 360/427-9670 ext. 295., or me at ext. 286.
Sincerely,
Barbara A. Adkins, AICP
Department Manager
Enclosures
c: Tammi Wright
RKOWD
June 28, 2009
JUN 2 9 2009
MASON CO. PLANNING DER
Tammi Wright
Mason County DCD
PO Box 279
Shelton, WA 98584
Dear Ms. Wright:
In response to your letter dated June 16, 2009,please consider this my formal request for
a third party review in the case of Michael McGraw. Also please be advised that I will be
responsible for the cost of the third party review.
SincLumal
l
) Yl
PO Box 12048
Olympia, WA 98508-2048
G Eort Nic iL "T` "SING LABORATORY
RECAZN2D
TAMMI WIGHT Juh .F 5 `9
PLANNER MASON COUNTY DCD
P.O.Box 279 MASON COUNTY
SHELTON,WASHINGTON 98584
RE: REVIEW LETTER OF DAVID STRONG
SITE INFORMATION: XXX NORTH CANAL HIDEAWAY
LILLIWAUP,WASHINGTON
GPS LOCATION: N47°27' 19.11"W123°06' 39.93"
PARCEL NUMBER: 323305106007
RESPONSE DATE: 06/10/2009
Dear Ms. Wright:
Thank you for the opportunity to respond to you concerning the letter sent to Mr. Bill McTurnal on May 29,
2009 by David Strong LEG, in reference to the above property owned by GTL's client, Mr. Mike McGraw. Mr.
McGraw has requested that I contact you to insure as quick a resolution to this as possible.
Mr. Strong brings up several points, some of which will require technical rebuttal. I do not wish to get esoteric,
so if on review, a point has been "fogged over," I apologize for that and will clarify upon your request. To
simplify matters, I will take his points in order followed by my response per point.
In the description of the site (alongside which Mr. McGraw has written "Not Correct"), Mr. Strong has stated
that the slope is between 83% and 90% instead of 70%. Locally, Mr. Strong may be correct, although when I
review our pictures and sketches, I am not sure of these places. The 70%was derived by tape,traverse, Brunton,
and use of the site map, which were modeled with the total difference in elevation to derive a reasonable overall
slope. Please see below.
In the following paragraph Mr. Strong takes issue with the statement"no evidence of active surface erosion was
seen," citing several examples of nearby surface creep. Creep is indeed an erosional process and should have
been mentioned. That said, "surface erosion" was meant as downcutting and visible erosion of materials. The
thrust of the issue is the deep-seated failure. Creep is endemic for sloped surfaces in Western Washington. It is
a fact of life every residence built on or near a slope must reckon with. We stand by our observation that there
is no evidence for deep-seated failure and the observation that no erosion was detected on Mr. McGraw's
parcel. If the presence of creep is a matter of concern,this concern should be toward the existing homes as well
as this parcel. If creep can be remediated, as was done with these homes, it can also be done on the McGraw
property.
Mr. McGraw indicated the land swap has been"done and approved."
In the following paragraph, despite the jejune editorial concerning professional standards, Mr. Strong brings up
an interesting point concerning the location of the drill hole. Not having an unlimited budget, we felt that the
primary object of the drilling was to verify the buildability of the site; hence the hole was located near the
proposed residence,primarily to test likely fill and water table depth as well as soils. (Also: see below).
10011 Blomberg Street SW,Olympia, WA 98512 1
Phone#: (360) 754-4612 Fax#: (360)754-4848
GtOrEcaNicAL TESTING LABORATORY
Now, for the next paragraph. I admit to an important omission: I had sampled the hillside with a shovel near
the north property line for the late Hal Park's lab work before I was fully involved with the report and before
the drilling took place. This grab sample was subsequently tested for gradation and shear (sample #1674,
11/01/2007). This is the shear in the report. Its provenance was inadvertently not cited but is in our records.
Mr. Strong need not be concerned. (There is another reason: see below.)
Additionally, in this paragraph, Mr. Strong makes an error. Apparently, he is unaware that the Direct Shear
method of ASTM D 3080-04 specifically allows compacted specimens (Section 7.5.2 ff). This is the technique
here employed. Disturbed samples are permitted. Mr. Strong's statement on wet/dry conditions is not only
confusing; it does not appear to be relevant.
Next paragraph: please see our models. We prefer the empirical to the anecdotal. As any slope not at its
internal angle of friction is subject to instability; there would be few places on the coastland or in upland Mason
County that would be buildable. Even soils reposing at their internal angle of friction are susceptible to erosion.
And no one is using apparent cohesion.
I thank Mr. Strong for his recommendations, but as most or all are not needed, they are not pertinent to this
geotechnical discussion.
Concerning retaining walls. Nowhere do we discuss "Construction of a standard cantilever retaining wall" as
Mr. Strong accuses. We only provide geotechnical data, as we do in all reports, if such construction is
envisioned. The construction details for short walls are... Mason County's. In addition, please note that on
page 21, we state "Walls greater than 4 feet in height must be designed by a Professional Engineer."
(Emphasis added.) This is our stated policy and apparently was overlooked by Mr. Strong... Finally, Mr.
Strong is absolutely mistaken when he says we recommended an active soil pressure of 25 pcf. What was given
was the active pressure coefficient (Ka) which not only doesn't have units of pcf; it is unitless and is used by
engineers to calculate total active pressures. (As Pa=0.5Kayh2). This basic error is why we use engineers to
design retaining walls, and not engineering geologists.
The paragraph beginning "In summary"relates to points already answered above.
The final paragraph introduces new points even though there was a "summary" paragraph above it. This
involves the existing concrete bulkhead. Mr. Strong implies we should have evaluated the wall. That is not the
purview of an engineering geologist, although the bulkhead looked pretty solid to me.
I believe the nuts and bolts of installing the pump-up system is best left to the engineer of record and the
contractor. We have evidence of the slope being disturbed by human activity with little consequence (beyond
the obvious residences): e.g. the unsupported cut to the immediate south of Mr. McGraw's property. This cut,
according to Mr. McGraw, reaches a height of 8 feet on the Herrmann property located behind the garage sitting
across the right-of-way.
These final paragraphs are those referenced by the notes ("See below") in various places in the text above.
Please bear in mind, the opposition to Mr. McGraw appears to depend on a narrow sliver of upland that may be
built with a secondary drainage field for the residence proposed for lower on the site. There are no structural
elements of consequence, and the material is well drained. It is difficult to imagine a circumstance in which the
amount of water injected into the system will damage the hillslope, especially when compared with torrential or
1001 1 Blomberg Street SW,Olympia, WA 98512 2
Phone#: (360) 754-4612 Fax#: (360)754-4848
Gr" ®mcnNi L TEsTING LABORATORY
even normal rains. In any event, surficial drainage can be planned for, and, if needed, 2" pin-piles could be
employed to secure the hillside.
In fact, please find attached two new slope stability models. For these models, we used an increased slope of
approximately 90%, we reduced the cohesion to 200 psf, consequently increasing the shear to 42 degrees (a
better fit for the three test points on peak shear stress vs. normal stress curve), we put the water table near
surface (adding weight and ignoring the fact that the water will readily drain), and we STILL have acceptable
Factors of Safety.
It is odd that this lot should cause such a problem for Mr. McGraw alone. The entire development, waterside as
well as the view sites, is located on the "hummocky terrain" of an old and large landslide. The drillhole we
advanced, the sample taken for shear, and observation of nearby outcrops show that any "layer-cake" model is
not possible unless it is on a fairly small scale. We have therefore modeled it as homogeneous.
If the load proposed by this drainfield design is not tolerable, then many of the houses, especially those built
before the latest geotechnical rules were drawn up,may not be safely located, and I have not seen any claim that
they are unsafe, despite the abovementioned creep.
Respectfully Submitted,
GEOTECHNICAL TESTING LABORATORY
Wash; �o
6►.iy n du Curtis D Cushman LG, LEG
ineering Geologist ,� Senior Engineering Geologist
2439
o�sed G eo�o
^JDTIS AN CUSHMAN
10011 Blomberg Street SW,Olympia, WA 98512 3
Phone#: (360)754-4612 Fax#: (360)754-4848
Bradley-Noble Geotechnical Services
A Division of The Bradley Group, Inc.
PO Box 12267, Olympia WA 98508-22.67
Phone 360-357-7883 • FAX 360-867-
MAY 2 9 ZUUJ
29 May 2009 M CC D - PLANNING
Mr. Bill McTurnal
P.O. Box 12048
Olympia, Washington 98509-2048
Subject: Review and geotechnical comments on the Geotechnical Report
prepared for Mr. Michael McGraw by Geotechnical Testing Laboratory
under the seal of Curtis Dean Cushman and dated December 12, 2007.
Dear Mr. McTurnal:
As requested, we have reviewed the above report prepared as part of the permit
process for a new residence proposed by Mr. McGraw to the immediate south of your
Mason County Tax Parcel 323305106004 on North Canal Hideaway, Lilliwaup area of
Mason County. This letter will present our review comments on this report.
We are familiar with this area. We have prepared a report for a proposed project at
your beach cabin, our report date 27 July 2007 and for another residence to the south
on Beach Drive. We met with you and other neighbors on 21 May 2009 to discuss the
proposed construction and to allow for us to again observe site conditions on the
McGraw and adjacent properties. Our work then has consisted of this site visit, a
review of the report prepared under the seal of Mr. Cushman of Geotechnical Testing
Laboratory, and preparation of this review and comment letter.
The McGraw property is a "pie" shaped piece that has a frontage of about 68 feet at the
bulkhead adjacent to Hood Canal. The apex of the property is in the upland area, in a
area now used for driveway of the upslope property at 120 North Canal View. From
the information provided for Figure 2, Site Plan of the report, we find one boring
indicated. This boring was conducted at the northeast corner of the proposed
residence footprint. No other subsurface exploration is indicated.
Figure four of this report, titled cross section, shows the area of proposed construction
to be of low relief. We are in agreement with this portion of the cross section. In the
cross section, between 100 feet to 150 we find a steep slope indicated. From 150 to
09050701
Page I of 4
09050701
Page 2 of 4
200, we find represented again an area of low relief. This is consistent with our
observations. In the cross section, the slope is indicated as being 70%. We disagree
that this is the actual slope as it exists at this site. We measured the slope using a Leitz
Pocket Transit and found the slope angle to vary between 40 and 42 degrees (83 to 90%
of slope).
On page 7 of the Geotechnical Testing Laboratory report, it is stated that no evidence
of active surface erosion was observed. This is not a supportable statement based on
physical evidence obvious to visual field observation. On this slope above the project
area, we can observe a wood retaining wall constructed at the top of slope that is failing
due to soil movement. On the slope of this property, the low-growing vegetation
indicates that soil creep is active. To the north as you drive into the property along
North Canal Hideaway you can observe that most of the trees growing on the slope
have bowed trunks. Many of these trees have colluvium retained on the upslope side of
the tree which suggest active downslope soil movement. At the top of the slope, which
is easily accessed by Canal View Road we can observe a failing retaining wall system on
the west side of the residence at 120 N. Canal View Road. At this site, the asphalt
pavement for the driveway also shows distress due to lateral movement creating tension
cracks in the pavement. This movement is to the east towards the top of slope. At the
top of slope, there is a small segmented block planter. The eastern four blocks, those
adjacent to the top of slope, show downslope deflection due to loss of soil support
caused by movement of the soils forming the slope.
From our field discussion, we understand that the property owner of 120 N. Canal View
Road has agreed to a land swap where the apex of the McGraw property will be
exchanged for a section of property adjacent to the slope. The actual location of this
property must be located by survey as we understand that this will be proposed for the
reserve drain field. With the obvious instability of the slope as indicated by the
deflection of the planting bed segmented blocks and vegetation on the slope, we have
concerns about placement of a drain field near or at the top of slope. With the
steepness of the slope, we expect that the soil profile will be a thin layer of weathered
soils over dense soils. The thickness of the weathered soils will determine if on site
infiltration is possible. Also, the added water load to the weathered soils of the upland
and the colluvium of the slope will be a destabilizing influence. The proposed drain field
area must be evaluated by a competent design professional.
We have reviewed the slope stability analysis prepared in this report. One boring away
from the slope does not meet standards of the industry. Extrapolating data from a
boring not conducted specifically to evaluate the soils forming the slope is not the
standard of practice of our profession. The top of slope is easily accessed by standard
truck mounted soil exploration equipment.
09050701
Page 3 of 4
Mr. Cushman has indicated a Peak Shear Stress vs. Normal Stress on page 31. The
depth of this soil sample is not indicated. Our review of the soils in the boring log on
page 30 and the gradation analysis of select soils indicates that the soils are cohesionless.
In the laboratory test, a cohesion of 250 p.s.f. This is a false cohesion created by
negative pore pressure (i.e. the soils are dry) . When the soil is saturated, no cohesion
is present. We are also curious how a soil sample was obtained for laboratory testing.
The boring log indicates that only the 2-inch outside diameter split-spoon sampler was
used to developN-values. B definition, the 2-inch diameters lit spoon samples are
Y P P P
considered to be disturbed samples. To obtain a soil sample for shear testing a ring-
lined sampler (Dames & Moore Sampler) or other larger diameter samplers would be
required to obtained undisturbed soil samples for shear testing. The question then is
how this shear test was actually performed and is the data valid.
If we use the indicated shear angle of 38 degrees, this is the angle of internal friction of
the soils. This angle was obtained from soils not cropping out or forming the slope, but
are extrapolated from the one boring conducted away from the slope. With our
measurement of the slope being in excess of 38 degrees, the slope then is obviously
unstable. Stable slopes have slope angles less than the angle of internal friction of the
soils forming the slope. Use of apparent cohesion for increased safety factor in
cohesionless soils is not acceptable.
To confirm the actual stability and slope profile, the following work needs to be
completed. One, the slope profile should be established by a site specific survey by a
licensed land surveyor. An additional boring at the top of slope must be performed to
verify the actual subsurface soil profile. Undisturbed soil samples should be obtained for
shear testing. This boring should extend to a depth of at least ten feet below the toe
elevation or to bedrock, whichever occurs first. This work will also verify the actual
depth to the near surface water table. The cross section presented showing the
piezometric surface is an estimate and is not supported by exploration data.
In the report on page 21, a discussion is presented on the use of a retaining wall to
increase the available land area. On page 22 of this report, a prescriptive design
prepared by Mason County Department of Community Development is presented. The
prescriptive design would be appropriate where level backfill would be equal to the
height of the wall. Also, this prescriptive design is limited to a maximum wall height of
eight feet. An active soil pressure of 25 p.c.f. is recommended for design plus surcharge.
The 2006 International Building Code (IBC) mandates that retaining walls be designed to
a minimum active soil pressure of 30 p.c.f.
Construction of a standard cantilever retaining wall as discussed in this report has the
risk of inducing a mass wasting event by removal of toe support of the soils forming the
slope. Also, we do not expect that this type of wall can be constructed even if the toe
09050701
Page 4 of 4
of slope was cut. Once forms or walls exceed four feet in height, the void between the
wall and forms is considered to be a trench under the Department of Labor and
Industries Standards. We do not consider that sloping of the cut to meet the
requirements of Chapter 296-155 WAC, Construction Work, Part N, Excavation,
Trenching and Shoring is possible. Use of shoring to provide stabilization of the slope
during construction will require additional geotechnical evaluation and engineering
design. If a new retaining wall were to be constructed, use of a soldier pile wall with
either wood or concrete panel lagging would be appropriate. Again, this would require
geotechnical and structural engineering services.
In summary, the geotechnical report prepared for this proposed residential
development by Geotechnical Testing Laboratory under the seal of Mr. Cushman, L.E.G.
for the McGraw residence has addressed foundation design, but has not addressed slope
stability to the accepted standards of practice of our industry. At a minimum, additional
soil exploration and obtaining of undisturbed samples for laboratory testing is required
to adequately address slope stability. Once the actual location of the reserve drain field
is established by survey, this location must be evaluated by a competent professional to
ensure that the reserve area will not create a hazard to the slope and downslope
structures by either movement and failure of the drain field or by the introduction of
additional water load on the slope.
We have geotechnical concerns about this proposed development due to the very
limited area available for the residence and primary drain field. The lack of evaluation of
the present slope stability and the ignoring of the obvious active downslope movement
of soils must be addressed. Also, the stability of the building site is controlled by the
continuing functioning of the concrete bulkhead which also restrains soils that form the
available building area. No evaluation of the condition of this wall or if it is structurally
adequate to ensure long-term performance has been presented. No recommendations
have been presented as to how effluent would be transported to the reserve field
without disturbing the existing slope.
Cordially,
BRADLEY-NOBLE GEOTECHNCIAL SERVICES
O Wash/'
David C. Strong, L.E.G. cj
1129
�Sed Geo
..�.
MICHAEL MCGRAw
P.O.Box 429
ONALASKA,WASHINGTON 98570
RE: GEOTECHNICAL REPORT
SITE INFORMATION: XXX NORTH CANAL HIDEAWAY
LILLIWAUP,WASHINGTON
GPS LOCATION: N470 27.3283 W123°06.6643
DATE: 10/13/2008
Mr. McGraw:
This letter serves as a response to the letter dated October 09, 2008 by Tammi Wright of Mason County
Department of Community Development. The missing items in the original geotechnical report will be
addressed as follows.
1. A line representing 50 foot vegetation buffer has been added in the site plan. It is to be noted that the
right of the way for the adjoining parcel and the proposed septic system will be included in this "buffer
zone", if enforced. I would like to emphasize the fact that the area does not contain any vegetation. We
request you to apply for a buffer reduction request to the county as per section 15.07.010 from Mason
County Resource Ordinance.
2. Figure 4, cross section has been updated and attached along with this letter.
3. Please refer the following line as a correction to the original report on page 10.
"This site does not meet the technical criteria of an erosion hazard area." We apologize for the
typographical error on the original report.
If you have any questions concerning the above items, the procedures used, or if we can be of any further
assistance please call us at the phone number listed below.
e of Was h Respectfully Submitted,
CO,��� fo j GEOTECHNICAL TESTING LABORATORY
3-4
<< 2439
c+a�8ed Geo�o
rU1TIS DEAN CUSHMAN Curtis D Cushman L.E.G.
Senior Engineering Geologist
10011 Blomberg Street SW,Olympia,WA 98512 1
Phone#: (360)754-4612 Fax#:(360)754-4848
CROSS - SECTION A
( EAST-WEST)
70 ............................................. ........................................................................................................................r........................................................................................................................ 70
60 . . . . . . . . . . . ALTERNATE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
n
50 SLOPE
u"i . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VIEGETAMD" . . . . . . ale. . . . . . . 50
WITH
40 _j . . . NATIVE
. . . . . . . . . . . . . . . . . . . . . . .
40
S�_ipu QIs
M Qls
30 . . . . . . . . . . . . . .
z 30
0
cn
PROPOSED
QIS
20 10 PROPOSED 20
5� BUILDING SEPTIC DRAIN Q13 QIS
LLJ TIO 16%SLOPE
OCATION FIELD
10 . , - I . . I . . I . . . . I :
. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 10
GRAVEL W/
0 SAND
I
0
0 i50 1100 1150 1200 250
Geotechnical Testing Laboratory
Geotechnical Services I0011 Blomberg St.SW FIGURE 4
Olympia,WA 98512 SCALE
QAIQC Services Phone:(360)754-4612 =30' CROSS-SECTIONS
Testing Services Fax:(360)754-4848
DATUM FOR THE SITE PLAN INCORPORATED VARIOUS TECHNIQUES AND SOURCES FILTER FABRIC MATERIAL W WIDE ROLLS
USE STAPLESWIRE RING TO ATTACH Geotechnical
INCLUDING THE FOLLOWING: USE
FABRIC TO N WRE RE
TAPING AND PACING,SLOPE MEASUREMENTS WI AN INCLINOMETER ANGLES AND zx2 xl a GAUGE WARE
BEARINGS USING A BRUNTONO GEO TRANSIT,SITE LOCATIONS USING A GARMINO HAND FABRIC OR EQUIVALENT
HELD GPS UNIT,TOPOGRAPHIC MAPS FROM DELORME®,MASON COUNTY G.I.S.WEBSITE, Testing
AND SURVEYS RECORDED AT THE MASON COUNTY ASSESSOR. GEOLOGIC SITE 2
RECONNAISSANCE OCCURRED ON MARCH 20,"7 AND JUNE 27,2007 By LEVINE.
Sd .Q�
THE PRESENT RECORDED SURVEY WAS CONDUCTED BY FOREST LAND SURVEYS:THE DEVELOPED Laboratory
SURFACE
SURVEY IS DATED NOVEMBER OF 1993. THE SURVEY IS BASED UP THE PREVIOUS SHORT PLATS#1981 AND#1962.
AREA `wx
2'XP WOOD POSTS,STANDARD OR BURY BOTTOM OF FILTER
BETTER OR EQUAL ALTERNATE'. MATERIAL IN M12'TRENCH
STEEL FENCE POSTS
\ \ FILTER FABRIC S'
\ FABRIC OR
GAUGE WIRELIE
�Q FABRIC OR EOUNALEM
7d
\ \ GROUND SURFACE 5'd
O PROVIDE ACC 1?WASHED
GRAVEL BOTH SIDES
L IN TRENCH 17
AND ON BOTH SIDES OF FILTER
\ O FENCE FABRIC ON THE SURfACE S
2'XP WOOD POSTS
ZA11� '., to O 8L-1 ALT:STEEL FENCE POSTS Geotechnical Services
. PGK ''� v•� FILTER FANUC FENCE NOTES:
/^, QA/QC Services
\ , 1.FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLLOUT TO
Ate^ � ` THE LENGTH THE BARRIER TO AVOID USE JOINTS.WHEN JOINTS
A
ARE NECESSARY.FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT Testing Services
\ QI$ A QI$ A SUPPORT POST WITH A MINIMUM INCH OVERLAP AND SECURELY
� � FASTENED AT BOTH ENDS TO THE
� ,
' 2.ROB TS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN
� SECURELY INTO THE GROUND(MINIMUM OF 301NCHES).
O/r^'�' O �y 7 3.A TRENCH SHALL BE EXCAVATED APPROXIMATELY 81NCHES WADE AND 12 10011 Blomberg St.SW
O. Y \• ((� INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. Olympia,WA 98512
lTs Y� is CIS //J (O� \ ESH
\ `0 + SSUPPORT EVINCE SHALL BE FASTENED N STANDARD STRENGTH FILTER SECCUREBRIC IS LY TO THE UPSED,A WIRE LOPE SIDE Phone:(360)754-4612
\ \Lf R,/,, / (/ V' OF THE POSTS USINGNEAVY-0UfYNARESTAPLESATLEASTIINCM Fax:(360)754-4848
1`1I• LONG,TIE WIRES OR HOG RINGS.THE WARE SHALL EXTEND INTO THE
S �S�GK C`, O Q TRENCH A ABOVE
THE OF A INCHES AND SHALL NOT EXTEND MORE THAN 35 _
4 T� INCHES ABOVE THE ORIGINAL GROUND AND HALLSURFACE.
s p9 sE P 2 SIL EN 5 THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED Date: 12/27/07
TO THE FENCE AND 20114CHES OF FABRIC SHALL BE EXTENDED
VEGE D REA,I INTO THE TRENCH.THE FABRIC SWILL NOT EXTENO MORE THAN 36 Designed by:PL
INCHES ABOVE THE ORIGINAL GROUND SURFACE.FILTER FABRIC SHALL Drawn by: PL
NOT BE STAPLED TO THE EXISTING TREES.
16%$LOPE S.WHENEXTRASTRENGTH FILTER FABRIC ANDCLOSER POSTSPACING IS Checked by: CDC
Z0 USED,THE WIRE MESH SUPPORT FENCE MAP BE EUMINATED,IN SUC
QIS _ H M1 /�
A CASE,THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE Dwg#: 12-26-07-104
POSTS WATH ALL OTHER PROVISIONS OR ABOVE NOTES APPLYING.
00, I 7 FILTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE
AREA HAS BEEN PERMANENTLY STABILIZED.
GE ATE PROPOSED S PTIC DRAIN SYSTEM S FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL,ANY
REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
50'VEGETATION BUFFER? GENERAL FROSIOH COITRQ NOTES:
Qi8 \�� ((REQUEST WAIVER) 1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE
BEGINNING OF CONSTRUCTION.THE PROJECT ENGINEER AND THE COUNTY
SHALL INSPECT AND APPROVE THE INSTALLATION OF
EROSION CONTROL MEASURES PRIOR TO BEGINNING CONSTRUCTION,
DEVELOPED AREA
2.EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS
ON THIS PLAN THE CONTRACTOR IS RESPONSIBLE FOR THE
ALTERNATE INSTALLATION AND MAINTAINANCE OF ALL EROSION CONTROL MEASURES
NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES
LIMIT OF LANDSLIDE HAZARD AREA NORTH SHALL BE ALLOWED.CARE SHALL BE TAKEN TO PREVENT MIGRATION PROJECT NAME:
SCALE 1"=30' OF SILTS TO OFF SITE PROPERTIES
3.THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL EROSION McG RAW SITE
C.I.=S Ft. TO THE EROSION CONTROL
AND KE ANY ASURES NECESSARY REPAIRSOR SHADDIT PROVIDE X)()(NORTH CANAL HIDE A WA'
TO THE EROSION CONTROL MEASURES.THE CONTRACTOR SHALLLSSARY
BY THE COUNTY
EROSION CONTROL MEASURER AS DETERMINED NECESSARY
BY THECOUNTYINBL LOCAL AND OR THE PROTON CONTROL
.FAILURE LILLIWAUP,WASHINGTON
TO COMPLY WITH ALL LOCAL AND STATE EROSION CONTROL
AGAINSTREQUIRE ENTSTHE
MAY CONTRACTOR
IN CAVIL PENALTIES BEING LEVIED PARCEL 323305106007
AGAINST THE CONTRACTOR AND/OR PROJECT OWNER.
1.DURING THE WET SEASON.OVEMBER TO MARCH)ALL DISTURBED SOILS
0 10 20 30 SHALL BE STABILIZED WITHIN N HOURS AFTER STOP OF WORK EROSION ���
CONTROL MEASURES SHALL INCLUDE,BUT NOT BE LIMITED TO.
COVERING THE EFFECTED AREA INCLUDING SPOIL PILES YATM
PLASTIC SHEETING,STRAW MATTING,JUTE MATTING,STRAW MULCH,
OR V,OOD CHIPS.SEEDING OF THE DISTURBED AREAS SHALL TAKE
PLACE AS WEATHER PEWTS.
5.ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY
TO MAKE SURE VEGETATIVE COVERAGE IS COMLETE.AREAS SHALL BE
REPAIRED.RESEEDED,AND FERTILIZED AS REQUIRED.
S TRACKING OF SOL OFFSITE HALL NOT BE ALLOWED IF ANY SOIL IS
TRACKED ONTO A COUNTY STREET.IT SHALL BE REMOVED BY THE END
OF T/AT WORWNG DAY,ANY FURTHER TRACKING OF MUD WILL THEN
BE PREVENTED BY SWEEPING OR WASHING OF THE VEHICLES TIRES
BEFORE DRIVING ON A COUNTY STREET.
7.NO MORE THAN 5D0 LF OF TRENCH ON A DOWNSLOPE OF MORE THAN 5
PERCENT SHALL BE OPENED AT ONE TIME.
S.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
0.TRENCH DEWRTEMNG DEVICES SHALL BE DISCHARGED IN A MANNER THAT WALL
NOT ADVERSELY AFFECT FLOWING STREAMS.DRAINAGE SYSTEMS OR
OFFSITE PROPERTIES.
10.ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE PROJECT DURING SCALE:1 inch=30 feet
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDWENTIADEN WATER
WALL BE FILTERED BEFORE ENTERINGTHE CONVEYANCE SYSTEM.
11.ALL OFFSITE CATCH BASINS IMMEDIATELY ADJACENT TO THE SITE
SHALL BE DISTURBED
FROM SILTATION. FIGURE 2
12 ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED UPON COMPLETION
OF WORK.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT
COMPLETE COVERAGE OF THE DISTURBED AREAS IS PROVIDED S THAT
GROWTH OF THE VEGETATION IS ESTABLISHED.
13.CATCH BASINS SHALL TRAP SEGMENT FLIER FABRIC MUST BE SITE P LA.P
PLACED UNDER GRATE UNTIL VEGETATION IS ESTABLISHED.
Serving Clients inAGUA
TIERRA
NorthwestPacific
• Provinces since 1993WATER SERVICES,
March 11, 2008
Dear Mike,
I have enclosed the Geotechnical Report and the other original documents you provided
Agua Tierra for the completion of your HMP report.
Additionally, I noticed during file archival that several attachments had been left out of
the original reports you were provided. I have enclosed two updated `Attachments' cover
sheets, and the additional attachments. Please replace/add in the sheets that are enclosed.
I apologize for the inconvenience.
Once again,thank you for selecting Agua Tierra to work with you on your project needs.
We are ready to serve any future needs you may have.
Sincerely,
Jennifer Overton
Restoration Specialist
506 Edison St SE, Suite 100
Olympia, WA 98501
P. 360.754.3755
F. 360.754.3434
jennifer@aguatierra.net
AGUA TIERRA LAND&WATER SERVICES,INC.
506 Edison Street SE,Suite 100 • Olympia,WA 98501 • T(360)754-3755 • F:(360)754-3431 www.aguatierra.net
Rivers,Wetlands,Lakes,Marine Shorelines,Surface Mines
DATUM FOR THE SITE PLAN INCORPORATED VARIOUS TECHNIQUES AND SOURCES FILTER FABRIC MATERIAL 80'WIDE ROLLS
USBRICTOSTAPLES OR WIRE RING TO ATTACH Geotechnlcal
INCLUDING THE FOLLOWING: FABRIC ORE
TAPING AND PACING,SLOPE MEASUREMENTS WITH AN INCLINOMETER,ANGLES AND 2'XTXI4GAUGEWARE
BEARINGS USING A BRUNTON®GEO TRANSIT,SITE LOCATIONS USING A GARMIN®HAND
FABRIC OR EOUNALENT
HELD GPS UNIT,TOPOGRAPHIC MAPS FROM DELORME®,MASON COUNTY G.I.S.WEBSITE, Testing
AND SURVEYS RECORDED AT THE MASON COUNTY ASSESSOR. GEOLOGIC SITE T
RECONNAISSANCE OCCURRED ON MARCH 20,2007 AND JUNE 27,2007 BY LEVINE.
5-V AF �' Laboratory
THE PRESENT RECORDED SURVEY WAS CONDUCTED BY FOREST LAND SURVEYS;THE DEVELOPED
SURVEY IS DATED NOVEMBER OF 1993. THE SURVEY IS BASED UP THE PREVIOUS SHORT Tor
PLATS#1981 AND#1962.
AREA
27Ir WOOD POSTS,STANDARD OR BURY BOTTOM OF FILTER
BETTER OR EQUAL ALTERNATE: MATERIAL IN MIT TRENCH
eTEEL FENCE POSTS
�s o•
FILTER FABRICZXM1 S
\ FABRIC R EQUIVALENT
WIRE
IO FABRIC OR UGE W EHT
T
GROUND SURFACE SR
PROVIDE 34'-1 1/T WASHED
O GRAVEL BACITILL IN TRENCH IT
AND ON BOTH SIDES OF FILTER
OFENCE FABRIC ON THE SURFACE 8'MI
O 27Lr ROOD POSTS
ALT:STEEL FENCE POSTS
.rod AAA• z�1� � Geotechnic-�a�l Services
�l��jt*10A ��SePGY. `SL-1 V'�J FLTER FABRIC FENCE NOTES: QA/QC Services
CUT TO
ool ��(SAS` 6FS I/ OI 1 THE LENGTH OF THE BARRIER TO AVOID USE OFJOINTS•WHENJOINTS Testing Services
a G) A ARE NECESSARY,POST
FILTER CLOTH TH A MINIMUM
6-INCHALL BE SPLICED TOGAND SECURELY
UELY AT
\ GT" QIS 7- A FASTENED
AT B T H ENDS TO THE POST.
OVERLAP AND 9ECURELV
QIS FASTENED AT BOTH ENDS TO THE POST.
,\ 2.POSTS SHALL BE SPACED A MAXIMUM OF 8 FEET APART AND DRIVEN
�Q V' a 0 , 0 G � ` SECURELY INTO THE GROUND(MINIMUM OF 30 INCHES),
F� ^ �y 3.A TRENCH SHALL BE EXCAVATED APPROXIMATELY BIRCHES WIDE AND I2 10011 Blomberg St.SW
INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. Olympia,WA 98512
Y \"
10 7 4.WHEN STANDARD STRENGTH FILTER FABRIC IS USED,A WIRE MESH Phone:(360)754-4612
\„ Q OOFFTHHE OSTSS USING HEAVY43UTY WIRE STAPLES AFENCE SHALL BE FASTENED SECURELY OT LEAST IINNCM THE UPSLOPE SI� Fax:(360)754-4848
LONG,TIE WARES OR HOG RINGS.THE WARE SHALL EXTEND INTO THE
R W TRENCH A MINIMUM OF 41NCHES AND SHALL NOT EXTEND MORE THAN 38
VICE INCHES ABOVE THE ORIGINAL GROUNDSURFACE.
6 \ 3A gECBP Z SIFT FE 5 THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED Date: 12/27/07
QI \ �9 INTO THE TRENCTO THE FENCE H TH 20 INCHES
FABRIC SHALL NOT EXTEND THAN 35 Designed b PL
FABRIC SHALL BE EXTENDED
VEGE `D REA1 g y:
\ INOTBESCHES TA EDTOTHEEXISTINGTVE E ORIGINAL REEyRFACE.FILTER FABRIC SHALL Drawn by: PL
\ 1\ 16%SLOPE 6.WHENEXTRASTRENGTH FILTER FABRICANDCLOSERPOSTSPACINGIS Checked by: CDC
USED.THE WIRE MESH SUPPORT FENCE MAP BE ELIMINATED,IN SUCH
QIS A CASE,THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE Dwg#: 12-26-07-104
POSTS NTH ALL OTHER PROVISIONS OR ABOVE NOTES APPLYING.
�O \ 7.FILTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE
\ AREA HAS BEEN PERMANENTLY STABILIZED.
\ \ V GE ATE S.FILTER FABRIC FENCES SMALL BE INSPECTED IMMEDIATELY AFTER EACH
PROPOSED S PTIC DRAIN SYSTEM RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL.ANY
REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
\ 50'VEGETATION BUFF R?
iI GENERAL EROSION CONTROL NOTES:QIS
(REQUEST WAIVER) 1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE
BEGINM NO OF CONSTRUCTION.THE PROJECT ENGINEER AND THE COUNTY
SHALL INSPECT AND APPROVE THE INSTALLATION OF
I DEVELOPED AREA EROSION CONTROL MEASURES PRIOR TO BEGINNING CONSTRUCTION.
2,EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS
ON THIS PLAN.THE CONTRACTOR IS RESPONSIBLE FOR THE
ALTERNATE INSTALLATION AND MAINTAINANCE OF ALL EROSION CONTROL MEASURES.
NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES
LIMIT OF LANDSLIDE HAZARD AREA NORTH SHALL BE ALLOWED.CARE SHALL BE TAKEN TO PREVENT MIGRATION PROJECT NAME:
SCALE 1"=30' OF SILTS TO OFF SITE PROPERTIES.
3.THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL EROSION M cG RA W SITE
C.I.=5Ft. CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS XXX NORTH CANAL HIDE A WA
TO THE EROSION CONTROL MEASURES.THE CONTRACTOR SHALL PROVIDE
ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY
By
THE COUNTY INSPECTOR AND/OR THE PROJECT ENGINEER.FAILURE L I L L I WA LI P, WA S H I N G TO N
TO COMPLY WITH ALL LOCAL AND STATE EROSION CONTROL
REQUIREMENTS MAY RESULT IN CIVIL PENALTIES BEING LEVIED PARCEL 323305106007
AGAINST THE CONTRACTOR AND/OR PROJECT OWNER.
4.DURING THE WET SEASON(NOVEMBER TO MARCH)ALL DISTURBED SOILS
0 10 20 30 SHALL BE STABILDE0 WITHIN 48 HOURS AFTER STOP OF WORK EROSION
CONTROL MEASURES SHALL INCLUDE.BUT NOT BE LIMITED TO, 6,:rN 17N AI(I
COVERING THE EFFECTED AREA INCLUDING SPOIL PILES NTH
PLASTIC SHEETING,STRAW MATTING,JUTE MATTING,STRAW MULCH,
OR WOOD CHIPS.SEEDING OF THE DISTURBED AREAS SHALL TAKE
PLACE AS WEATHER PERMITS.
5.ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY
TO MAKE SURE VEGETATIVE COVERAGE 18 COMLETE.AREAS SHALL BE
REPAIRED,RESEEDED,AND FERTILIZED AS REQUIRED.
S TRACK'
NO OF SOIL OFFSITE WILL NOT BE ALLOWED.IF ANY SOIL IS
TRACKED ONTO A COUNTY STREET,IT SHALL BE REMOVED BY THE END
OF THAT WORKING DAY.ANY FURTHER TRACKING OF MUD WILL TIER
BE PREVENTED BY SWEEPING OR WASHING OF THE VEHICLES TIRES
BEFORE DRIVING ON A COUNTY STREET.
7,NO MORE THAN 500 LF OF TRENCH ON A DONNLOPE OF MORE THAN 5
PERCENT SHALL BE OPENED AT ONE TIME.
8,EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
9.TRENCH DEWATERING DEVICES SHALL BE DISCHARGED IN MANNER THAT WILL
NOT ADVERSELY AFFECT FLOWING STREAMS.DRAINAGE SYSTEMS OR
OFFSITE PROPERTIES.
10.ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE PROJECT DURING SCALE:1 inch=30 feet
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT4ADEN WATER
WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM.
11.ALL OFFSITE CATCH BASINS IMMEDIATELY ADJACENT TO THE SITE
PROTE
FROM
SHALL
DISTURBED
EA SHALL ESEED, FIGURE A
12.ALL DISTURBED AREAS STALL H SEEDED OR SODDED UPON COMPLETION L)OF WORK THE COVERAGE
F THE
STALL BE RESPONSIBLE TO ENSURE THAT
COMPLETE COVE RAGE A THEDISTURBED AREAS I6 PROVIDED.THAT
GROWTH OF THE VEGETATION IS ESTABLISHED.
13.CATCH BASINSSHALL TRAP SEDIMENT FILTER FABRIC MUST BE SITE PLAN
PLACED UNDER GRATE UNTIL VEGETATION
IS N IS ESTABLISHED.