Loading...
HomeMy WebLinkAboutGEO2020-00026 for BLD2020-00410 - GEO Geological Review - 5/27/2020 GEO?�ZU- ADD Mason County Review Checklist For a Geological Assessment Instructions: This checklist is intended to assist Staff in the review of a Geological Assessment.1-fie".Assessment is reviewed for completeness with respect to the Resource Ordinance. If an item is found to be not applicable,the report should explain the basis for the conclusion.The Assessment is also reviewed for clarity and consistency. If the drawings, discussion, or recommendations are not understandable,they should be clarified. If they do not appear internally consistent or consistent with the application or observations on site,this needs to be corrected or explained. If resolution is not achieved with the author, staff should refer the case to the Planning Manager or Director. Applicant's Name: I- e Y i' a V 114,q Permit#: 1771 l / !iy 2,0' Parcel Vs: i 30(0 Dod 1 Date(s)of the Document(s)reviewed: 2 -Z' 1. A discussion of geologic conditions in the general vicinity of the proposed development,with geologic unit designation based on referenced maps. OK? Comment: 2. (a) A discussion of the ground water conditions at the site, OK? ✓ Comment: (b) A discussion of the estimated depth to water, OK? �� Comment: (c) A discussion o the quantity of surface seepage, OK? Comment: (d) A discussion the upslope geomorphology, OK? Comment: (e) A discussion ocation of upland waterbodies and wetlands. OK? Comment: 3. The approximate depth to hard or dense competent soil, e.g. glacial till or outwash sand. OK? ✓ Comment: 4. A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks, terraced topography indicative of landslide block movement, bowed or arched trees indicating downslope movement, etc.). OK? ✓ Comment: 5. A discussion of the history of landslide activity in the vicinity,as available in the referenced maps and records. OK? /_Comment: 6. An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. OK? 1/Comment: 7. A recommendation by the preparer whether a Geotechnical-Report should be required to further evaluate site conditions and t "roposed development of the subject property. OK? Comment: 8. If the presence of a hazard is determined within 300 feet of the proposed development, then the following are delineated on a geologic map/site map: Pagel of 2 Form Effective June 2008 ( ,the area of the proposed development, O Comment: (b) the bo aries of the landslide hazard area(top, both sides, and toe), OK? Comment: (c) the associated bu (top, both sides, and toe) OK? Comme (d) building or other setbacks(tap, th sides, and toe). OK? Comment: 9. A site map drawn to scale showing the property boundaries, scale, north arrow, and the location and nature of existing and pr sed development on the site. OK? Comment: Are the Documents signed and stamped���`7- By h m? ` y I -�i La-el ,Z'�" License#: License type: FIRST REVIEW pproved ❑ Need more info. If not approved, what is the next action/recommendation for further action? Reviewed by , on 2 7 Time spent in review: ��7 �'il • ty. SECOND REVIEW/UPDATE ❑ Approved ❑ Need more info. If not approved, what is the next action/recommendation for further action? Reviewed by , on Time spent in second review: THIRD REVIEW/UPDATE El Approved ❑ Need more info. If not approved, what is the next action/recommendation for further action? Reviewed by , on . Time spent in third review: Disclaimer.Mason County does not certify the quality of the work done in this Geological Assessment Page 2 of 2 Form Effective June 2008 0 0 q c� C-teo 2o-w —oc�u �.t� RECEIVED MAY 112020 615 W.Ajder St Geological Assessment Hoch Single Family Residential Property 6151 NE Dewatto Holly Road, Tahuya Parcel No. 22306-43-00010 Mason County, Washington April 8, 2020 Project#2041 Prepared For: Mathew Hoch PO Box 366 Belfair, Washington 98528 Prepared By: Envirotech Engineering PO Box 984 Belfair, Washington 98528 Phone: 360-275-9374 PAL CLYOt Sr �ASy 9T 4 �FQSTf o45��p ss�nNALF 1G MASON COUNTY Submittal Checklist COMMUNITY SERVICES Geological Assessment Building,Planning,Environmental Health,Community Health Instructions: This checklist must be submitted with a Geological Assessment and completed,signed,and stamped by the licensed professional(s)who prepared the Geological Assessment for review by Mason County pursuant to the Mason County Resource Ordinance. If an item is found not applicable,the report should explain the basis for the conclusion. Note:Unless specifically documented, this report does not provide compliance to the International Residential Code Sections R403.1.7 for foundations on or adjacent to slopes,Section R403.1.8 for expansive soils or section 1808.7.1 of the Intemational Building Code Section for Foundations on or adjacent to slopes. Applicant/Owner Mathew Hoch Parcel# 22306-43-00010 Site Address 6151 NE Dewatto Holly Road (1) A discussion of the geologic conditions in the general vicinity of the proposed development,with geologic unit designation based on referenced maps. Located on page(s) 5 (2) (a) A discussion of ground water conditions, Located on page(s) 6 (b) A discussion of the estimated depth to water, Located on page(s) 6 (c) A discussion of the quantity of surface seepage, Located on page(s) 6 (d) A discussion of the upslope geomorphology, Located on page(s) 3 (e) A discussion of location of upland waterbodies and wetlands. Located on page(s) 3 (3) The approximate depth to hard or dense,competent soil,e.g.glacial till or outwash sand. Located on page(s) 5 (4) A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks,terraced topography indicative of landslide block movement, bowed or arched trees indicating downslope movement,etc). Located on page(s) 4 (5) A discussion of the history of landslide activity in the vicinity,as available in the referenced maps and. records. Located on page(s) 7 (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. Located on page(s) 7 (7) A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property. Located on page(s) 10 (8) If the presence of a hazard is located within 300 feet of the proposed development,then the following are delineated on a geologic map/site map: (a) The area of proposed development, Located on map(s) n/a (b) The boundaries of the landslide hazard area(top, both sides, and toe), Located on map(s) n/a (c) The associated buffers(top,both sides, and toe), Located on map(s) n/a (d) Building or other setbacks(top, both sides, and toe), Located on map(s) n/a (9) A site map drawn to scale showing the property boundaries,scale, north arrow, and the location and nature of existing and proposed development on the site. Located on Map(s) Site Plan(Appendix A) I, Michael Staten, hereby certify under penalty of perjury that I am a civil engineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geological Assessment dated April 8,2020 , and entitled Hoch Single Family Residential Property , meets all the requirements of the Mason County Resource Ordinance, Geologically Hazardous Areas Section, is complete and true, that the assessment demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations,and that all hazards are mitigated in such a manner as to prevent harm to property and public health and safety. PTV CLYDE ST �`Lt��Yp4 W,1s/I RT�2 4 �;kl Ric srE5`�� �` Disclaimer: Mason County does not certify the quality of SS�oN L , 4/8/ the work done in this Geological Assessment. Page 2 of 2 TABLE OF CONTENTS 1.0 INTRODUCTION.................................................................................................................................1 1.1 PROJECT INFORMATION.................................................................................................................... 1 1.2 PURPOSE OF INVESTIGATION AND SCOPE OF WORK........................................................................ 1 2.0 SURFACE CONDITIONS...................................................................................................................3 2.1 GENERAL OBSERVATIONS.................................................................................................................. 3 2.2 TOPOGRAPHY..................................................................................................................................... 3 2.2.1 Upslope Geomorphology............................................................................................................3 2.3 SURFACE DRAINAGE.......................................................................................................................... 3 2.3.1 Upland Water Bodies.................................................................................................................3 2.4 SLOPE AND EROSION OBSERVATIONS...............................................................................................4 3.0 SUBSURFACE INVESTIGATION.....................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING...........................................................................5 3.2 GEOLOGIC CONDITIONS.................................................................................................................... 5 3.3 SPECIFIC SUBSURFACE CONDITIONS................................................................................................. 5 3.3.1 Groundwater...............................................................................................................................6 4.0 ENGINEERING CONCLUSIONS......................................................................................................7 4.1 LANDSLIDE HAZARDS.........................................................................................................................7 4.1.1 Landslides and Slope Stability Analysis.................................................................................... 8 4.1.2 Surface and Subsurface Drainage............................................................................................8 4.2 EROSION HAZARDS............................................................................................................................8 4.3 SEIsrmc HAZARDS..............................................................................................................................9 4.4 OTHER CONSIDERATIONS..................................................................................................................9 5.0 CLOSURE.............................................................................................................................................10 Appendix A-Site Plan Appendix B -Soil Information 1.0 INTRODUCTION Envirotech Engineering, PLLC. (Envirotech) has completed this geological assessment for a residential property located at 6151 NE Dewatto Holly, identified as parcel number 22306-43- 00010 in Mason County, Washington. As presented herein, this assessment includes information pertaining to the Project in this Introduction Section; observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soils descriptions in the Subsurface Investigation Section; and, assessments for landslides, erosion, seismic hazards, and other considerations in the Conclusions Section. An initial geological/ geotechnical evaluation of the project was conducted by Envirotech on April 2, 2020. It was determined that natural slopes between 15% and 40% were present within 300 feet of the project. Due to these slope grades, a geological assessment is required pursuant to landslide hazard areas of the Mason County Resource Ordinance(MCRO). During the evaluation and site visit by Envirotech, surface and subsurface conditions were assessed in order to determine if further geotechnical studies are required. After completion of the field work and applicable Project research,Envirotech prepared this geological assessment. 1.1 Project Information Information pertaining to the project was provided by the proponent of the property, and observations from a field visit by Envirotech. The proposed development is expected to consist of a new single family residence, on-site septic system, and other ancillary features typical of this type of development. Approximate site development with relation to existing site features are illustrated in the Site Plan in Appendix A of this report. 1.2 Purpose of Investigation and Scope of Work The purpose of this geological assessment was to evaluate the project in order to confirm that the proposed development is outside of any landslide hazard area and its associated buffers and setbacks as determined in the MCRO. The investigation included characterizing the general project surface and subsurface conditions, and evaluating the suitability of the soils to support the planned site development. In order to fulfill the purpose of investigation, the geological/ geotechnical program completed for the proposed improvements of the Project include: • Review project information provided by the proponent of the project; • Conduct a site visit to document the site conditions that may influence the construction and performance of the proposed improvements; • Define general subsurface conditions of the site by observing soils within test pit excavations review well logs from existing wells near the Project and evaluate g g J geological and hazard maps depicting the site geology for the vicinity of the project; • Perform soils testing, such as visual classifications,to determine selected index properties of the soils; • Complete an engineering assessment supported by planned site alterations and the surface and subsurface conditions that were identified by the field investigation, soil testing, and applicable project research;and, • Establish engineering conclusions based on findings and anticipated development. Envirotech Engineering Geological Assessment PO Box 984 page 1 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 'LIt k I t � - r Canal { Project fiF w f s ;. / J t r v f 1 kmOak MI 1 MI p - Vicinity Map from WA DNR Website Envirotech Engineering Geological Assessment PO Box 984 page 2 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the project was gathered on April 2, 2020 by a representative with Envirotech. During the site visit, site features were documented that may influence construction or reveal potential geological hazards. This Surface Conditions Section provides information on general observations, vegetation, topography, drainage and slope/erosion conditions for the project and surrounding areas. 2.1 General Observations The property is currently vacant land with few improvements such as an existing driveway, and surrounded by rural residential development. NE Dewatto Holly Road extends along the east side of the property. Vegetation on and near the property consists primarily of firs, maples, and other trees and shrubbery common to this area of the Pacific Northwest. An aerial photo of the Project and immediate vicinity is provided on the following page. 2.2 Topography The topographic information provided in this section was extrapolated from a public lidar source, and incorporated observations and field measurements. Where necessary, slope verification included measuring slope lengths and inclinations with a cloth tape and inclinometer. See the Site Plan in Appendix A for an illustration of the general slope indicators with respect to the planned development. Descending slopes exceeding 15% are located on and beyond the property. Average slope grades are approximately 8%with a vertical relief of approximately 60 feet. 2.2.1 Upslope Geomorphology Ascending grades are generally located to the west of the planned development. This slope is relatively minor within 300 feet of the Project, with no apparent slope grades of at least 15%. The upland area of the property is situated on a hillside and crest. Landforms are primarily of glacial origin with centuries of weathering overburden. Additional geomorphology that is pertinent to both upslope and downslope areas are provided in the Subsurface Investigation Section of this report. 2.3 Surface Drainage The majority of the stormwater runoff originating upslope from the anticipated development is expected to be minimal to moderate. Significant scour, erosion and sediment transport was not apparent near the project. 2.3.1 Upland Water Bodies There are no apparent water bodies or wetlands located upslope from the planned development that would significantly influence the Project. Envirotech Engineering Geological Assessment PO Box 984 page 3 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 2.4 Slope and Erosion Observations The existing moderate slopes near the Project signal a potential landslide or erosion hazard area. Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine, saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees,or, • Slope sloughing or calving. The above mentioned indicators, or other signs of significant mass wasting on the property or within the general vicinity of the Project were not observed or discovered during research. Indications of past landslides, current unstable slopes, deep-seated slope problems, or surficial slope failures were not observed during the site visit. N A i aoo Aerial Photo from Mason County Website Envirotech Engineering Geological Assessment PO Box 984 page 4 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the project was gathered during research and a site reconnaissance. The site visit was accomplished on April 2, 2020 by a representative with Envirotech. Specific information on field methods, sampling, field testing, subsurface conditions, and results from soil testing are presented in this section of the report. Appendix B has pertinent information on subsurface conditions for the Project,including test pit log(s)representative of the site soils,and water well report(s)originating from the subject property and/or nearby properties. 3.1 Field Methods,Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by probing anticipated foundation areas with hand tools, and observing soils within test pit excavations and/ or earth cuts. Information on subsurface conditions also included reviewing geological maps within the Project vicinity, and water well reports originating from nearby properties. No soil samples were collected for this Project. Envirotech measured the relative density of the in-situ soils by gauging the resistance of hand tools. 3.2 Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are generally unconsolidated deposits,and dominantly deposited from glacial drift,including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation."as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered by numerous ice sheets, with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. The "Geologic map of the Holly 7.5-minute quadrangle, Jefferson, Kitsap, and Mason Counties, Washington" by Contreras, Trevor A.; Weeks, Sarah A.; Stanton, Kelsay M. D.; Stanton, Benjamin W.; Perry, Benjamin B.; Walsh, Timothy J.; Carson, Robert J.; Clark, Kenneth P.; Mahan, Shannon A.,2012,provides the following caption(s)for the project area: Vashon ice-contact deposits—Diamicton,cobbly pebble gravel and melt-out till;yellow-tan to gray;clasts subangular to subrounded;loose to dense; variously sorted;massive to well-stratified;till is friable and permeable. 3.3 Spec Subsurface Conditions The following subsurface conditions are estimated descriptions of the project subgrade utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. Envirotech Engineering Geological Assessment PO Box 984 page 5 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 The project is primarily composed of undisturbed, native soils, without indications of substantial fill. Competent bearing soils were encountered at 12 inches below the existing native ground surface in locations where the ground was probed. For engineering purposes, these native soils consist of distinguishable layers,as presented below. Soils within the upper 3 feet of natural ground were observed to be primarily poorly graded sand with gravel (SP). Expanded and specific subsurface descriptions, other than what is provided in this section,are provided in the soil logs located in Appendix B of this report. According to the "Soil Survey of Mason County," by the United States Department of Agriculture, Soil Conservation Service (SCS), the site soils are described as Alderwood gravelly sandy loam, Ab and Ad, with 8% - 50% slopes, and Everett very gravelly sandy loam, Eg and Ek, with 0% -30% slopes. See the soil map below,and the applicable SCS soil profile(s)in Appendix B of this report. A Soil Survey From USDA Natural Resources Conservation Service 3.3.1 Groundwater From the water well report(s) and knowledge of the general area,permanent groundwater is at least 50 feet below the current ground surface at the building location. Surface seepage or perched groundwater at shallow depths was not observed on-site, nor indicated on the well reports. However, some seasonal groundwater is expected to flow directly above the hardpan on occasion. Envirotech Engineering Geological Assessment PO Box 984 page 6 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 4.0 ENGINEERING CONCLUSIONS The following sections present engineering assessments and conclusions concerning the project. These conclusions have been made available based on the planned construction activities as outlined in the Introduction Section of this report; general observations of drainage and topography as summarized in the Surface Conditions Section; and, soil conditions that were identified by the field investigation and soils testing as outlined in the Subsurface Investigation Section. Conclusions for the Project that is provided herein, includes pertinent information for landslide,erosion and seismic hazards. 4.1 Landslide Hazards For the planned development, as provided in the Introduction Section of this report, it is Envirotech's opinion that the proposed development is not subjected to or cause adverse impacts to a landslide hazard area or its associated buffer or setback. These conclusions are based on the contents provided in this report. Landslides are natural geologic processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. Geotechnical engineering cannot eliminate these risks for any site with sloping grades because gravity is constantly inducing strain on the sloping soil mass. Excessive wet weather and/ or earthquakes will exacerbate these strains. Geotechnical engineering considers excessive wet weather and `design' earthquakes in order to provide an acceptable factor of safety for developing on or near sloping terrain. These factors of safeties are based on engineering standards such as defining engineering properties of the soil,topography, water conditions, seismic acceleration and surcharges. Surface sloughing or other types of surficial slope movements usually do not affect the deep- seated structural capability of the slope. However, excessive and/or repeated surficial slope movements, if not repaired, may represent a threat to the structural integrity of the slope. Maintenance of the slope should be completed if the situation does arise in order to prevent the possibility of further surficial or deep seated slope movements that may be damaging to life or property. According to the Department of Natural Resources (DNR) "LHZ — Final A-1 Map — Landslide Inventory— Mason Watershed, by Sarikhan, et. al., May 2007,"previous landslide activity is not recorded near the project. Per the Resource Map from DNR, the Project is not within terrain labeled `highly unstable' or `highly erodible' relating to soils. DNR labeled portions of this project as medium to high slope instability with relation to slopes. This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without field observations or knowledge of the specific site geology or soils. A resource map from DNR is provided below: Envirotech Engineering Geological Assessment PO Box 984 page 7 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 t . 1 SoNs ` r Hydric Sails f - - Highly Unstable Highly Erodible { / No Data or Gravel Pits 1 ) w Slope stawnty-West Moderate Slope Instability On y* • ' ■ High Slope Instability Map from Washington State Department of Natural Resources Website 4.1.1 Landslides and Slope Stability Analysis Past landslide activity or high slope instability indicators near the proposed development was not revealed during the project research. In addition, detrimental landslide activity or potential high landslide indicators were not observed during the site visit as outlined in the Surface and Subsurface Conditions Sections of this report. Due to these factors, and existing/proposed conditions,a slope stability analysis was not deemed necessarX for this project. Considering the planned construction as summarized in a Introduction Section of this report; the aforementioned surface and subsurface conditions for the project; the slope stability assessment provided herein; and the Engineering Conclusions provided later in this report, it is our opinion that the project is not within a landslide hazard area, and that the proposed site alterations will not encourage a an s 4.1.2 Surface and Subsurface Drainage This project does not appear to experience significant subsurface drainage or surface runoff. It is our opinion that groundwater or surface drainage is not a limiting factor for this Project. 4.2 Erosion Hazards Based on the USCS description of the Project soils, the surface soils are considered moderately erodible. According to the Resource Map from the Washington State DNR, as provided above, the Project is not within terrain labeled `highly erodible.' This Project is not within an erosion hazard area as defined by the MCRO. Erosion hazard areas are those with USDA SCS Envirotech Engineering Geological Assessment PO Box 984 page 8 Parcel 22306-43-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 designations of River Wash (Ra), Coastal Beaches (Cg), Alderwood Gravelly Sandy Loam on slopes 15% or greater (Ac and Ad), Cloquallum Silt Loam on slopes 15% or greater (Cd), Harstine Gravelly Sandy Loam on slopes 15% or greater (Hb), and Mtsap Silt Loam on slopes 15%or greater(Kc). Temporary and/ or permanent erosion control measures may be required for any site when land disturbance is involved. Erosion control will mostly depend on the timeliness of construction, moisture content of the soil,and amount of rainfall during construction. Soil erosion typical to the existing conditions and planned disturbance of this Project include wind-borne silts during dry weather, and sediment transport during prolonged wet weather. Sediment transport of disturbed soils could be from stormwater runoff or tracking off-site with construction equipment. Although an engineered erosion control plan is not warranted for this project, Best Management Practices (BMP's) should be employed during and after construction. Ordinary BMP's includes silt fencing,protection of drainage outlets and vegetating denuded areas. Erosion control information and specifications may be found in the applicable "Stormwater Management Manual for Western Washington,"prepared by the Washington State Department of Ecology Water Quality Program. 4.3 Seismic Hazards Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g. This estimation is based on the United States Geological Survey(USGS)National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the next 50 years. There are no known faults beneath this project. The nearest Class `A' or 'B' fault to this property is the Hood Canal Fault Zone. This fault is a Class `A', and is located approximately 2.5 miles to the northwest of the Project. This information is supported by the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be low for this project. This is based on subsurface conditions such as soil characteristics and the lack of a permanent and substantial shallow water table. Subgrade characteristics that particularly contribute to problems caused by seismic events include submerged and confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. 4.4 Other Considerations Conclusions in this report are based on the type and location of the anticipated development, and existing on-site and off-site conditions. Site development that significantly deviates from the anticipated improvements presented in this report, or nearby development that influences this Project may require geotechnical design recommendations. Envirotech Engineering Geological Assessment PO Box 984 page 9 Parcel 2230643-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 5.0 CLOSURE Based on the project information and site conditions as presented in this report,it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this project. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during construction are different than those described in this report. Therefore, it is recommended that Envirotech is promptly notified if project and subsurface conditions found on-site are not as presented in this report so that we can re-evaluate our recommendations. This report presents a geological/geotechnical assessment, and is intended only for the owner, or owners' representative. Furthermore, this report is only valid for the project information and location described herein. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards,and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirotech Engineering ►—� Jessica Smith, M.S. Michael Staten,P.E. Staff Geologist Geotechnical Engineer Envirotech Engineering Geological Assessment PO Box 984 page 10 Parcel 2230643-00010 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 April 8,2020 uvid ails v xiaNaddv SCALE; 1 INCH 2W PRLpERTY LI1E 50 100 200 IV E%ISTm DRIVEWAY 17. 6i+ PROPMED SO4GU FAH LY " RESIWCE J TPie 0 i TOP ff 40%.SLOPE TOE tf.a%.SLOPE v b�, Ft E%ISTMG CREU- .. PROJECT/ OWNER/ LOCATIIH SINGLE FAMILY PROPERTY GEOLOGICAL ASSESSMENT rani NCTm am W W-"TM M Lr M L LOPE HIOO:ATOM WERE FZ"REAMM T1 DWAUTECK ANV 03 TMLEL E870-40-OW OU AiPRATE!F101 A f71LS LIMO Tam WHM E.1 ON THIX UTE PLm WEK M3f PREP""Nr A L03az i..FCtF116II p„ m S}Ml T L.d*4 NC OF EITC WrX NEf T ice/l.��ALE ll�ilTTDC N�MN FpE.VITN AELA790i T7 7NE 19Q'iA1Y LIIEi �EYiV� F]®IIIFJ:I�i NMI at HE34ffm 7r 7w UwwL TIE OMxJCIm An —s fL!!E D�d174t 1!5ITE P/N6viImaItplumaa IN 7FE�QIEG�/i./SCOLDMAL TAAS M=a sn M AID s 6F�ACE FrA M,S TWIT MY roNE RAW oF�F oF�Air uEs s°�rcn►'a:%MK r r n�sT rEr PLAN APPENDIX B SOIL INFORMATION TEST PIT LOG TEST PIT NUMBER TP-1 rROJECT: SFR Gedogitcal A.ssessraAnt DATE OF"-OG: 0411J2C120 PROJECT NO: 2041 LOGGED BY: JS CLIENT: Hoch EXCAVATOR: N/A LOCATION: Parcel 22306-43-00010 DRILL RIG: None Mason County,Washington ELEVATION: N/A INITIAL DEPTH OF WATER: NIA FR%AL DEPTH OF WATER: NIA IL STRATA, sTAN.ARC PEVSTIATION TC T SA DEPTH SAMPLERS USCS DESCRIPTION LL PI CJRVE AND TEST DATA DEPTH N 10 30 50 0 .......................................... SP Poorly graded SAND with GRAVEL. Gravel is fine and subrounded.Sand is primarily coarse. 1 2 3 Excavation terminated at approximately 3.0 feet 4 5 6 7 8 9 10 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnical Engineering interpreted as being indicitive of the entire site. Map Unit Description Alderwood gravelly sandy loam,30 to 50 percent slopes--Mason County,Washington Mason County, Washington Ad—Alderwood gravelly sandy loam, 30 to 50 percent slopes Map Unit Setting National map unit symbol: 2t628 Elevation: 50 to 800 feet Mean annual precipitation. 25 to 60 Inches Mean annual air temperature 46 to 52 degrees F Frost-free period 160 to 240 days Farmland classification, Not prime farmland Map Unit Composition Alderwood and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations,descriptions,and transects of the mapund. Description of Alderwood Setting Landform: Ridges,hills Landform position(two-dimensional). Backslope Landform position(three-dimensional): Side slope,nose slope,tali Down-slope shape: Linear,convex Across-slope shape: Convex Parent material Glacial drift and/or glacial outwash over dense glaciomanne deposits Typical profile A-0 to 7 inches: gravelly sandy loam Bwl-7 to 21 inches very gravelly sandy loam Bw2-21 to 30 inches: very gravelly sandy loam Bg-30 to 35 inches: very gravelly sandy loam 2Cdl-35 to 43 inches. very gravelly sandy loam 2Cd2-43 to 59 inches: very gravelly sandy loam Properties and qualities Slope 30 to 50 percent Depth to restrictive feature: 20 to 39 inches to densic material Natural drainage class: Moderately well drained Capacity of the most limiting layer to transmit water(Ksat). Very Itow to moderately low(0.00 to 0.06 inthr) Depth to water table: About 18 to 37 inches Frequency of flooding None Frequency of ponding: None Available water storage in profile. Very low(about 2.7 inches) Interpretive groups Land capability classification(irrigated): None specified Land capability classification(nonimgated): 7e Hydrologic Soil Group: B I Natural Resources Web Sal Survey V712020 NOW Conservation Service National Cooperative Soil Survey Page I of 2 Map Unit Description.Alderivood gravely sandy loam,30 to 50 percent slopes--Mason County,Washington Hydric sod rating No Minor Components Everett Percent of map unit 10 percent Landform Karnes,eskers,moraines Landform position(two-dimensional): Backslope Landform position(three-dimensional) Side slope Down-slope shape. Convex Across-slope shape Convex Hydric soil rating No Indianola Percent of map unit 5 percent Landform: Eskers,kames,terraces Landform position(three-dimensional) Tread Down-slope shape: Linear Across-slope shape Linear Hydnc sal rating No Shalcar Percent of map unit 3 percent Landform: Depressions Landform position(three-dimensional): Dip Down-slope shape: Concave Across-slope shape Concave Hydric soil rating Yes Norma Percent of map unit 2 percent Landform Depressions,drainageways Landform position(three-dimensional) Dip Down-slope shape. Concave,linear Across-slope shape Concave Hydric sod rating: Yes Data Source Information Soil Survey Area: Mason County,Washington Survey Area Data Version 15,Sep 16,2019 Natural Resources Web Sod Survey 4f7rAM Conservation Service National Cooperative Sal Survey Page 2 or 2 Map Unit Description-.Everett very gravelly sandy loam.15 to 30 percent slopes---Mason County.Washmoon Mason County, Washington Ek—Everett very gravelly sandy loam, 15 to 30 percent slopes Map Unit Setting National map unit symbol: 2t62c Elevation 30 to 900 feet Mean annual precipitation. 35 to 91 inches Mean annual air temperature. 48 to 52 degrees F Frost-free period. 180 to 240 days Farmland classification Farmland of statewide importance Map Unit Composition Everett and similar sods 80 percent Minor components: 20 percent Estimates are based on observations,descriptions,and transacts of the mapunit Description of Everett Setting Landform Karnes,eskers.moraines Landform positron(two-dimensional) Backslope Lartdform position(three-dimensional) Side slope Down-slope shape. Convex Across-slope shape Convex Parent material Sandy and gravelly glacial outwash Typical profile Ot-0 to 1 inches slightly decomposed plant material A- 1 to 3 inches very gravelly sandy loam Bw-3 to 24 inches very gravelly sandy loam C 1-24 to 35 inches very gravelly loamy sand C2-35 to 60 inches extremely cobbiy coarse sand Properties and qualities Slope 15 to 30 percent Depth to restrictive feature More than 80 inches Natural drainage class Somewhat excessively drained Capacity of the most limiting layer to transmit water(Ksat). High (1.98 to 5.95 iNhr) Depth to water table More than 80 inches Frequency of flooding None Frequency of ponding None Available water storage in profile. Low(about 3.2 inches) Interpretive groups Land capability classification(irrigated) None specified Land capability class cation(nonlmgated) 4e Hydrologic Sod Group. A i uza Natural Resources Web Soil Survey 4ru2020 AM Conservation Service National Cooperative Sad Survey Page 1 of 2 Map Unit Description Everett very gravelly sandy loam,15 to 30 percent slopes—Mason County.Washington Forage suitability group: Droughty Soils(G002XN402WA), Droughty Soils(G002XS401 WA) Hydric soil rating. No Minor Components Alderwood Percent of map unit. 10 percent Landform: Ridges,hills Landform positron(two-dimensional) Backslope Landform position(three-dimensional) Side slope,nose slope,talf Down-slope shape Linear,convex Across-slope shape Convex Hydnc soil rating. No Indianola Percent of map unit 10 percent Landform: Eskers,kames,terraces Landform positron(two-dimensional): Backslope Landform position(three-dimensional) Side slope Down-slope shape Linear Across-slope shape: Linear Hydnc soil rating No Data Source Information Soil Survey Area Mason County,Washington Survey Area Data. Version 15,Sep 16,2019 A)A Natural Resources Web Sod Survey 4/7/2020 ri Conservation Service National Cooperative Sal Survey Page 2 of 2 i� F. WATII Yell IEP01T Start Card its 'Y101It1 ar Up Oaigae Yell I.I Al lv 6-lb STATE OF I1S111CT011 Water ltlit Permit No t� I;*0i +.+.{..la,[=i..a[l,fi,il:t.:f.it,,,[iti}ltitt.tS Stifit■■t,t::Si LLt SLLL:Sfit ti lttaitflLtS:::t,t..l tll[f fttf{l ttii i[:tt i..f i! 3 (l) OYNEI Mamr[[ltOfll, 10.... d.... 5 Address fill U O . U . ..0• atei+•.,itt.,.f[Lt.,l{li.+ii+t.,ttiii.tli,f t..........................................-i.i L![l ta.......... N fII LOCATION OF WILL- Coon NASO4 .SN 1/4 SSI 111 Ste i T 23 It , I IV Y4 ta) SW AIDiESS__ _OP WILL{o aterest address) Hill 111 HIM 1OLLT U. SM (l)tP1DP ,"',*N9...b11)?STIC t:,.•...... ,sirs:ae[,ti.itams::tiff,—III1LaIaas'a C fit..........x...S'. ..... ......tisi,t..t„[,:......itf[....... - ----.- O (1) TTPI OP WX Owner's Nipber of veil i Poraatla Describe 6y eolpr claracttr, size of material e ttI f more tin one I aid strecture, mad slow tb�c�aess of ainfers aid tMt kind O 18Y WELL 411bod• All War and wire of tle material In tick strata �pttaetraled vltl ::,......,a...t.........+::::,,,a......ili:a:::aaa::fi..=:: it lean one entry for tack ckn a to rormalioa. all (S) DINEN5tOr5 llnel of well 6 lodes t -----•------`------------------------------- Sri -E fle ie.t tt k1t6 of comp eked cell if.t rt I NATUTAL i FION TO ` .........:tit,f,[[„:tt.t:.............Tt,...i. PIPE ICi- P 0 t O (il coNST1OCT10N MAUS. t � AID YU!JLAT t 11. ii 156 GsloB_installed 6 9Ei from 1 ft to ft. to 51,1 fl i IM+T15YHL �,AT VIT LDMSBS OF CUT 159 tit ............................. -......._._.; TEI t SAD I Perforations 110 a. Tridppee or ptrrerater used O Slii of perroratloas Is if it t I I +p Perforattns from It to ft t I t G perforation from 1t to (l I I t R perforations frog ft to ft l t 1 ...........-•--------------•-............................t I t krCiiacctarer's Name M I t I O Tit AINt3S9 Nodel No.. f RECEIVED: CE V l I B n Blot !Ile li from SI ft t�` « ! Gravel tck�td >i0 S le of ravel c Gravel placed era it to tI AUG 0 8 ZOO1 Soffit pp1!# TIS To vlat te tb? 11 ft. + ll',i.hin ioii Si.nf � .�. Nterial istd to seal 1)L1T01f1� ft P ?� Tydt o�rilir+roataia ionsik a kill of strata rl i p'nnrcrtt of Ecology 1 t Ne�bod of seallel strata off t:r,:,uu:::aazsaiu enu:::=u u,z.:::::uaaasrnesiz:ra a,' i I ;1) P1.'MP Nanafactnrer't Mace I t I Z Type l P y •-ttif........Skit..:::LStLtL,f if litf!=:fi.tt......... :P........ i ( I y 11) WATER LIYELS Liad-sartate elevation O +bore Eta sea level ft. I t I �p Static level t,s ft below lop of well Date/5113/01 Artesia Pressure lbs per snare nob lute Artesian water coatrolled by I i .... i .......................................Wort started . : C.Z......ompleted.:__..1 .. __ zl:aft,.lst:Luz::: :::5:[f.ses=:z:t:ata[a=zi::xa:zs.ei+imam::: IS)WELL TESTS- 8raadfil is mail water level is lowered blow WELL COAST10CT01 CSITIFICATION static level I [ contracted sadlar accept respoutblIItF tar cat- W Was pimp test made,S� If yes 1FF what I strectioa of Ibis veil, aid Its Xpliaire with all Tier; lal./na w III tt draidon alter lrs. Wa bintttoi well construction stuaAeaards Naterials istd sae k€ isforation reported above are trae to ey best C lecpvery data I taovtedge and belief Time Water Level Time Water level Time Water Level i NAME SICIOLSON HILLI4G INC i IPersoa. fire, or corponhoa) (Type or prial) ADaIE;s ro A1t3 Date of test // t� qs Baiter test 10 ``al/ali tl ft drndowa afty 1 brs ISiGNIDI �� Lictisc No fill O Air teal 1a1(ata, v1 sten set it ft far his.l -- d Artesian flta 1 p I. hie I Coatr ,tor's Z Temperature of water Was a tittle+? analysis made'10 ;lelistratios No VICO113IGN Note 48/16/11 ..t:.........ilk:t,z i:::Lis::t::i...........tlas:Leas[:[tsizi:..ae,zasz:ls,aa.at.....a.S.a.t...z:................„..........+::LL