HomeMy WebLinkAboutBLD2024-00898 Garage, Deck - BLD Inspections - 2/28/2025 t
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
���■' SHELTON:360-427-9670,EXT 352
I' k ■ �I COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352
Building,Planning,Environmentalli aith,Communityliealth ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bld-inspection.p
Permit Number BL02024-00898 Date Issued 08/22/2024 Issued By
Project 2 STORY GARAGE WITH 2ND STORY DECK
Site Address 691 E Eagle Point Dr
Applicant SINGH SOHAN
Contractor SOUTH SHORE CONSTRUCTION INC
Contractor Phone 360-801-4432
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type GARAGE/STORAGE Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
"THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.—
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks •1 ,Z q �>c Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches Jzo
J�ZPCe'(,cCd !>>cS Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing 7-11�,/z� f�
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing (J q 2a( ,,
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building ZIZS7, C'-_��S
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
-FP*, .'1 �F,;44 1;,I l 2 I zb(zs � 5�-�►�tt-
INSPECTION RESULTS Pagel
MASON COUNTY INSPECTION
of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Permit Ms,stante centea,Budding,Gtannmg (360) 427-9670 ext. 352
Application # BLD2024-00898 Application Type GARAGE/STORAGE Owner SINGH SOHAN
Parcel# 421227690061 Site Address 691 E Eagle Point Dr Shelton, WA 98584
Inspector Inspection Type Date Status Comments
9-24-24 D E C
Drew Carlson FOUNDATION WALL-PRE- 09/24/2024 FAIL PER PLAN DETAIL SHEARWALL B ON SD1 REQUIRES HDU2 AT EACH END OF
POUR INSPECTION SHEAR WALL. INSTALL 5/8" SSTB14 WHERE REQUIRED AND CALL FOR
REINSPECTION
I
INSPECTION RESULTS Pagel
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Permit Assistance Center,Budding,Ptannuig (360)427-9670 ext. 352
Application# BLD2024-00898 Application Type GARAGE/STORAGE Owner SINGH SOHAN
Parcel # 421227690061 Site Address 691 E Eagle Point Dr Shelton, WA 98584
Inspector Inspection Type Date Status Comments t',
2-26-25-JQ
deck ledger board lags are in line and spaced at 24" OC. please stager and add
Joshua more lags along ledger see IRC figure R507.9.1.3.1 (1)also see county hand out for
Quarders BLD-FINAL INSPECTION 02/26/2025 FAIL more information.
2. HDU's are loose please tighten
CALL FOR REINSPECTION WHEN CORRECTIONS HAVE BEEN MADE
fry , �;,,•� %alA Ica L�� (bcl�s cif' 3�" oc
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
BL 22024-00898 GARAGE/ STORAGE
PROJECT DESCRIPTION: 2 STORY GARAGE WITH 2ND STORY DECK ISSUED: 08/22/2024
SITE ADDRESS: 691 E EAGLE POINT DR SHELTON
EXPIRES: 02/18/2025
PARCEL: 421227690061
APPLICANT: SINGH SOHAN OWNER: SINGH SOHAN
691 E EAGLE POINT DR 691 E EAGLE POINT DR
SHELTON, WA 98584 SHELTON,WA 98584
1,818,606.3761
OWNER'S REP: SOUTH SHORE CONSTRUCTION INC
PO BOX 963
BELFAIR,WA 98528
360-801-4432
GENERAL CONTRACTOR'S LICENSE: SOUTH SHORE CONSTRUCTION INC License: SOUTHSCO16NL
PO BOX 963 Expires: 02/10/2026
BELFAIR,WA 98528
360-801-4432
VALUATIONS: FEES: Paid Due
Uncovered Deck 221.00 $3,315.00 State Fee-Residential $6.50 $0.00
U VB Utility, miscellaneous 1152.00 $76,584.96 Planning Residential Review $240.00 $0.00
Fee
Technology Surcharge $30.74 $0.00
Building Permit Fee $931.42 $0.00
Plan Check Fee $605.42 $0.00
Total: $79,899.96 Totals : $1,814.08 $0.00
REQUIRED INSPECTIONS
Setback Inspection Shearwall Inspection
Footing Inspection Framing Inspection
Foundation Wall-Pre-Pour Inspection BLD-Final Inspection
Printed by:Amber Selby on:08/22/2024 09:40 AM
Page 1 of 5
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2024-00898
CONDITIONS
* All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth, minimum 12 inches, shall be
observed below grade in undisturbed soils.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext.450 or 100 W Public Works Dr. Shelton.The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* Concrete used for basement walls,foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
Printed by:Amber Selby on:08/22/2024 09:40 AM
Page 2 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2024-00898
The use, handling and storage of hazardous materials or flammable and combustible liquids is not allowed without the
approval of the Mason County Fire Marshal.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
Printed by:Amber Selby on:08/22/2024 09:40 AM
Page 3 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2024-00898
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverti ng/d itch i ng system or road way.
* All property lines shall be clearly identified at the time of foundation inspection.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 mph with 110 mph gust factor.
* This structure is approved as unheated space.
To be considered unheated space the area may be provided with a heating system that does not exceed maxium output of 1
watt per square foot., or 3.4 Btu/h per square foot. A permit and approval is required prior to installation of any heating
system.
When a heating system exceeds 1 watt per sq.ft(or 3.4 btu/h per sq. ft)the heated space shall be insulated in accordance
with the energy code in effect at the time of permit application.
* This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other
use will be in violation of the international codes and Mason County Regulations unless a"Change of Use" permit is applied
for, reviewed and approved.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
Printed by:Amber Selby on:08/22/2024 09:40 AM Page 4 of 5
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2024-00898
* A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with
the 2018 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener
spacing is required to be 4 inches or less. The shear wall schedule shown on sheet designate wall(s)type and
with fastener spacing 4 inches or less.
The required inspection may be performed by the Mason County Building Department, a WABO certified inspector, certified
to inspect lateral connections,the Engineer of record (EOR), or an authorized representative of the (EOR). The special
inspectors duties and responsibilities shall be as specified in Chapter 17. When a third party inspector is used to perform the
inspection, special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton,
WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted
to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said
project.
* PLN SETBACKS
Front(S): 25'
Sides: 20'
Rear: 20'
.all setbacks measured from the farthest projection of the building
*subject to EH setbacks
*all changes are subject to review and approval
* Disclaimer
Mason County does not require surveys for building. As a result, site plans may not reflect accurate data. It is the applicant's
responsibility to comply with setback requirements.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein not. he granting of a p mit does not presume to give authority to violate or cancel
the provisions ny er state oc a ulating construction or the performance of construction.
Issued B .
Contractor or Authorized Agent: =- Date:
Printed by:Amber Selby on:08/22/2024 09:40 AM Page 5 of 5