HomeMy WebLinkAboutGeoTech Assessment Review for BLD2005-01353 - BLD Engineering / Geo-tech Reports - 9/15/2005 .STAT
ON
F
y M MASON COUNTY
^
S u + DIRECTOR/COUNTY ROAD ENGINEER
N PUBLIC WORKS= shekon waahmgton vasaa
Z Ny y
1%4 DATE: September 15, 2005
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Chuck McCoy, DCD -Planner
FROM: Robert A. Thuring, PE, Engr and Constr. Mgr. BLD2005-01353/
SUBJ: Geo Tech Assessment Review NAME: James Huskey, Parcel 22304-76-90120
I have reviewed the Geo Tech Assessment and find it satisfactory. The evaluation raises no issues
or concerns, and appears acceptable for the level of reporting required.
Recommendations contained in the report should be incorporated into the site's development. The
applicant and his contractor to should be alerted to their responsibility to protect neighboring
properties during and after construction, from adverse stormwater runoff impacts.
Sincerely,
Robert A. Thuring, PE
Engineering and Construction Manager
06 Ser
ECEI 'VED
From: Jim Huskey SEP ,0 ] 2005
To: Charles Mead McCoy III (Land Use Planner) w
MCCD - PLANNING
Subj: GEOLOGICAL ASSESSMENT FOR CASE NO. BLD2005-013
NO. 223047690120/PROJECT DESC. 24X34 POLE BUILDING
1. The following geological assessment is provided to complete permit application
(case no. BLD2005-01353)for proposed construction of a 24X34 pole building on
parcel no. 223047690120. Please feel free to contact me at work(360)396-1894 from
08:00 AM to 4:00 PM or at home(360) 372-2608 for more information if required.
4e
incerely,
s .4Htiskke
RECEIVED
SEP yy 7 2005
MCCD - PLANNING
Geological Assessment
270 NE Lake Ridge Drive
Belfair, WA
Prepared for
James Huskey
Belfair, WA
by
Geotechnical Testing Laboratory
1
Olympia, Washington
September 2, 2005
rr
GEOTECHNICAL TESTING LABORATORY
.TAMES HUSKEY
270 NE LAKE RIDGE DRIVE
BELFAIR,WA 98528
RE: GEOLOGICAL ASSESSMENT
270 NE LAKE RIDGE DRIVE
BELFAIR,WA 98528
PARCEL 223047690120
N47030.688' W122056.692'
PURPOSE
The objective of the geological assessment is to assess the surface and subsurface conditions prevalent at the
subject site according to Mason County Ordinance 17.01.100.E4. The parcel is to be developed with a pole
building without a concrete floor. The existing structure and septic drainfield are not within the scope of this
report.
,T
SITE CONDITIONS
The subject site is approximately 1.69-acres
located 7 miles northwest of Belfair,
Washington. The site is accessed from Lake
Ridge Drive. The subject site is located in
an area of moderate residential development
�►:>.
• � , . and is surrounded by residentially developed
parcels. Currently the site has been prepared
for construction. The steepest portion of the
site has slopes approaching 38 percent along
the eastern property line. The slopes are
1, well vegetated with native plant species.
Rapid stream incision was not identified at
the site. Slope instability was not discerned
onsite or on adjoining parcels.
10011 Blomberg Street SW,Olympia,WA 98512 1
Phone#: (360) 754-4612 Fax#: (360)754-4848
GEOTECHNICAL TESTING LABORATORY
GEOLOGIC CONDITIONS
The Soil Survey of Mason County, USDA Soil Conservation Service (1960) has mapped the western site soils as
Alderwood gravelly sandy loam(Ab). The survey describes the site soil as follows:
The Alderwood soils typically formed from mixed gravelly glacial till dominated by acid igneous
rock. It occupies undulating to rolling moraines. In undisturbed areas a 1-to 2-inch mat of very
dark brown, acid organic matter is on the surface. This grades to a thin, dark grayish-brown,
highly organic mineral soil. The surface soil consists of a friable, brown, medium acid gravelly
sandy loam 8 to 13 inches deep. It has a weak granular structure and contains numerous
rounded shot. Below the surface soil, to depths ranging from 18 to 24 inches, is a pale-brown
gravelly sandy loam that is very friable, is single grained, and contains small to moderate
amounts of shot. Between this layer and the cemented till is a 3- to 10-inch layer of very pale
brown gravelly sandy loam. It contains no shot and is firmer but has the same texture as the
layer above. However, it is faintly to distinctly spotted and horizontally streaked with brown and
yellow. The cemented till consists of light-gray, gravelly sandy loam, and it normally occurs at
depths ranging from 24 to 32 inches. It is impermeable to roots and very slowly permeable to
water. The first few inches is usually laminated and streaked with reddish brown and yellow.
Below this, to a depth of many feet, the till is uniformly cemented,fairly uniform light gray, and
medium to strongly acid. A thin mat of roots often lies over the till. The cemented substratum
tends to restrict the rapid downward movement of moisture.
C{41
The Soil Survey of Mason County, USDA Soil Conservation Service(1960)has mapped the eastern site soils as an
Alderwood gravelly sandy loam, 15 to 30 percent slopes(Ac). The Alderwood soil typically formed from glacial
advance outwash. The soil is described as having good natural drainage. Typically, there is no occurrence of a
high water table. Internal drainage is described as medium. An erosion hazard may exist if the vegetation is
removed; otherwise, the soil has a low erosion hazard in its present condition. Cementation is usually present.
10011 Blomberg Street SW,Olympia,WA 98512 2
Phone#: (360) 754-4612 Fax#: (360)754-4848
GEOTECHNICAL TESTING LABORATORY
The Geologic Map of Washington — Northwest Quadrant (2002) has mapped the site geology as glacial till
deposits(Qgt)of continental glacial origin. The report reads:
Till— Unsorted, unstratified, highly.compacted mixture of clay, silt, sand, gravel, and boulders
deposited by glacial ice; may contain interbedded stratified sand, silt, and gravel. Includes part
of the Vashon Drift undivided.
i;
lava
GROUNDWATER CONDITIONS
Groundwater seepage was not observed at or near the proposed building location. No wetland vegetation was
observed at or near the proposed building location. Minor wetland vegetation was observed along Erickson Lake.
Depth to static groundwater is presumed deep and approximately at the level of Erickson Lake.
may'
x
-
DEPTH TO COMPETENT SOIL
The proposed building location is underlain by glacially deposited gravelly sandy loam. Competent soil can be
expected approximately 2 to 8 inches below the existing ground surface.
10011 Blomberg Street SW,Olympia,WA 98512 3
Phone#: (360)754-4612 Fax#: (360)754-4848
GEOTECHNICAL TESTING LABORATORY
PAST SLOPE INSTABILITY
East of the proposed building location,trees were found straight and vertical. No indication of past instability was
discerned at the proposed building location or throughout the site. Adjoining parcels display similar signs of
stability as the subject site.
HISTORY OF LANDSLIDE ACTIVITY
No historical landsliding was observed during our site investigation onsite or near F
the subject parcel. At the proposed building location, the eastern slope is compact
and dense. Onsite trees are straight and vertical.
r
sr
POTENTIAL FOR LANDSLIDE ACTIVITY
This site has no indication or record of old or recent landslide activity. Even
though slopes approach 38 percent, the potential for landslide activity is not a
concern for the proposed deve
lopment.
i
The Liquefaction Susceptibility Map of Mason County, Washington by Palmer,
Magsino, Poelstra, Bilderback, Folger, and Niggemann(September 2004)maps the
site area as having a very low liquefaction potential.
The Site Class Map of Mason County, Washington by Palmer, Magsino, Bilderback, Poelstra, Folger, and
Niggemann(September 2004)maps the site area as site class C. Site class C is a very stiff soil.
RECOMMENDATIONS
There is no evidence of soil erosion or deposition onsite to suggest that the
site should be included in the Erosion Hazard Area designation. Site
conditions for the proposed development do not warrant a more
comprehensive Geotechnical Report. We recommend no further action is
needed unless areas of concern are unearthed during construction or damage
ensues from vegetation clearing. To minimize erosion and sedimentation, we
recommend that underbrush remain for areas outside the building location.
If there are any changes it the loads, grades, locations, configurations or types of facilities to be constructed, the
conclusions and recomm idations presented in this report may not be fully applicable. If such changes are made,
we should be given ' opportunity to review our recommendations and provide written modifications or
verifications,as appropi—ce.
Respectfully,
GEOTECHNICAL TESTING LABORATO
Wash;
Harold Parks, L.G., L.E.G.
Senior Engineering Geologist
10011 BlombergStreet SW,Olympia, WA 98512 �j �I►*`
YmP
827
Phone#: (360)754-4612 Fax#: (360)754-4848 c►e�sed Qeo�O
HAROLD PARKS
GEOTECHNICAL TESTING LABORATORY
VICINITY MAP
lip
7� U-)
A, ri
:7
4-11
if II !3*
t ,llXA"
aL
141
Ir
ff,
y ivs
\)qQ
it Im I Tj
I, / 44 ,V
'I .". , f"
te
.10 1
OM'
10 V:
6;47 —iolATI,
W
4�
41, rr
Al
+-V
We
4:
J7
t7
1 1,6
10011 Blomberg Street SW, Olympia, WA 98512 5
Phone#: (360)754-4612 Fax#: (360)754-4848