Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SEP2016-00103 Log 1.5 Acres of a 5 Acre Parcel - SEP Determinations - 11/9/2016
MASON COUNTY Department of Community Services Planning Division 615 W Alder St, Shelton, WA 98584 t (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2016-00103 Description of Proposal: This SEPA is associated with a Class IV General FPA to log 1.5 acres of a 5 acre parcel for the purposed of building a home. The site contains no critical areas. The FPA permit can not be issued until the applicant becomes the legal owner of the parcel (sale pending). Proponent: JOSHUA SCHOOLER Site Address (if Assigned): 281 NE BLACKSMITH DR BELFAIR Directions to Site: ST RT 3 TO BELFAIR, L ON ST RT 300, R ON SAND HILL RD, L ON BEARCREEK DEWATTO RD, L ON BLACKSMITH DR TO SITE Parcel Number: 223037500090 Legal Description: TR 9 OF SURVEY 6/151 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Michael MacSems at ext. ext 571 or mms@co.mason.wa.us with any questions. This DNS is issued under WAC 197-11-350. The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Community Services Department, 615 W Alder St, Shelton WA 98584 by 11/23/2016. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date SEP2016-00103 Page 1 of 2 MASON COUNTY Department of Community Services Planning Division 615 W Alder St, Shelton, WA 98584 (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2016-00103 CONDITIONS OF THIS DETERMINATION 1) ARCHAEOLOGICAL RESOURCES Archaeological or historical resources, such as ruins, sites, buildings, artifacts, fossils, or other objects of antiquity that may have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result in civil penalties. 2) STORM WATER & EROSION CONTROL Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations, and could subject the applicant(s) to civil fines or penalties. This project is represented as disturbing less than one-acre of ground and creating less than 5,000 sq ft of new impervious surfaces. The contractor shall comply with the 2005 WSDOE Stormwater Manual compliant 12-point best management practices narrative written by applicant Joshua SchoolerAen for this project. 3) SLASH ABATEMENT This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area, which is not owned by the owner of the fire hazard area. The land owner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural Resources (DNR). SEP2016-00103 Page 2 of 2 a 'mow i s E u „ y v e rs v } R i w a t • r .z e �a 4 e� #�X 5��..'�.,v. �' �, � �.: set 'fit # a' ' ♦ r ,¢� 9 � � v A a, F 1 _'!f'• „► s. ` fir°. . "` °s !"� Al r Sc hoc 1 OY 16- 1 y �5 1( - 10 3 Lk%A�l d n �+ t�l A {•�` t i r S• A ' ly +M4 9 'V ov t� Np 3� fNr p r as. Y 223037500040 N. AG 7 � t .r � �♦ s Ao. ''L. � a " t 1'. f U 223037500050 � � '`'� ., r �,�till •r,� '' '•, ,,,, ' , 223027600010 7 "' iSource E-sr'i. Dig�italGlobe, Leo ye, i-cubed, `�D , USGS, E� ,. 223037500060 Getp Ing Aer grid, IGN„ IG sdopo, and the GIS er Community 1 inch = 100.47 feet W E 1 inch = 0 miles S Department of Archaeology and Historic Preservation 223037500020 223037500110 223037500030 223037 500100 223021100000 223037 500040 Mason 223037500090 223037500050 223037500080 y 223027600010 223027600020 y s 223037500060 223037500070 October 28, 2016 1:3,009 Parcels o 0.025 0.05 0.1 mi 0 0.04 0.08 0.16 km county Sources: Esri, HERE, DeLortne, Intermap, ncrement P Corp., GEBCO, USGS,FAO,NPS,NRCAN,GeoBase,IGN,Kadaster NL,Ordnance Survey, SEPA Environmental Checklist ' Mason County Permit Center Use: SEP 2.0 i(a - QD t U ❑ Single Family DNS: $385 G Other DNS: 0 to 9.99 acres: $630 j Parcel#:o�a _�•75' CYX� ! 10 to 20 acres: $755 Date Revd: Over 20 acres: $945 j ❑ DS/EIS: $2,525 +70 Per hr RECEIVED OCT 0 6 20% i Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: hel This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. X BACKGROUNDh.".PiPl 1. Name of proposed project, if applicable: nci j 2. Name of applicant: itg1pi J ogiva. wd AnG et, SN ooIw 3. Address and phone number of applicant and contact person: It eip] ���Z 5 E KIYA Rd Npb) C 0 I -qmcl lyi 0Y ch G�Ycj W G'� 31u7 SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11 4. Date checklist prepared: L,.l ID -11 - Ulu 5. Agency requesting checklist: Lhelp� 6. Proposed timing or schedule (including phasing, if applicable): Lbeipl Di awed Iced Sftq- 1 Jiut-e i 0-m-2ui u to Novwber I I th Ovu ,cAmttd vvl I I -t-ake I -*) days 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. Lfic C 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. !hepi N 1A 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. Lr,Pip 10. List any government approvals or permits that will be needed for your proposal, if known. LheSU 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.)Lt2jPJ C►f u Y- cU+ I XNe- Of C�- �� r�c�re- )Uftl SOY QUO WY ylowlt— 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. tiejp Parcel#(s): �.QV-1 Address: eyWG1 Legal Description U_1 1�5 1 Twp/Range/Section and/or GPS location: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 2 of 11 B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site Ligipli (circle one): Fla rolling, hilly, steep slopes, mountainous, other: b. What is the steepest slope on the site (approximate percent slope)? (r c,,e2; c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. LL(P PI d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. LLeipj NU e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. ih 11 omr two fir( Vvwt <- 'e- f. Could erosion occur as a result of clearing construction, or. use? If so, generally describe. Lnelpl k yes, w"e fe. ow to cI Oc aw) kv S i t-e , (ki I expo�t1 d jrt \AAA Y)e [oVerej WJAV) StYaW. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)?Ltiuj AP\-)Ytx WM_+sty C4 ,U00 `�A AfZ4- C44- br In W Md 60-0,C)e bw 1+ h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:w jheripj t mAxvm Ve�,t+ ivv) '�4PY o- IIJ� uyl �ron� DF 1�re ty, 30-1�- 00 c)ldeS o-F PY_0Pe0 P1AL(e(nen-t o+ StraW cn eXP05e �i eartn clu0VIg 2. Air ( a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. i e1pl �fA b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. jhelp] NO c. Proposed measures to reduce or control emissions or other impacts to air, if any: ihtlp, N/A SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11 i 3. Water a. Surface Water: ink; 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. `h21PJ NU 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 1 NIA 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material impi N/A 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. (�;.gi L) 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. h( gm ND 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. ne-pJ N� b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. [Lei A \NW wM b �, imAa J -�bv huvS6) ld dnnV�N wmevr 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. Lbg1pj heOA r UUM SePb' C 1-0 c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. jheiU] tQ/A SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 11 2) Could waste materials enter ground or surface waters? If so, generally describe. h� No 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. N0 d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: NJA 4. Plants[t1 ] a. Check the types of vegetation found on the site: Iiif''I p.,I ✓ deciduous tree: alder, maple, aspen, other ✓ evergreen tree: fir, cedar, pine, other J shrubs grass pasture crop or grain orchards, vineyards or other permanent crops wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered?JheM I ALVP 04 V)Y-USh CLO(J —we-es c. List threatened and endangered species known to be on or near the site. [nE>ip] N/A d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: hei a�rn AY)9 Oct i uif���vM' _�`M b� t�4 . MAS's WO I doe I�I G��1t�d e. List all noxious weeds and invasive species known to be on or near the site. NON 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: [hpJ_p] birds: hawk, heron, eagle,Congb�irDls.,.other: mammals: deer, bear, elk, beaver, oer: fish: bass, salmon, trout, herring, shellfish, other: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11 b. List any threatened and endangered species known to be on or near the site. [help NONE c. Is the site part of a migration route? If so, explain. th.el'] N)0 d. Proposed measures to preserve or enhance wildlife, if any: InplPJ Iv 1A e. List any invasive animal species known to be on or near the site. 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Ir_p O-AtLA1�I(_ , �Y >Alne, f�V1C1 VUC�i;CA `�`t bve- b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. �rE;�lca c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Lheipj N/ 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. jheip] NO 1) Describe any known or possible contamination at the site from present or past uses. t\J/A 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. N/A 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. N/A 4) Describe special emergency services that might be required. Nf A 5) Proposed measures to reduce or control environmental health hazards, if any: N/A SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11 b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)?thew NONE 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site, JbpM 1-3 .ays of IoggInq Y1DIS6. tXW\ t nv, 010-inSAWS, -ty u(_kS. :. .. t C 3) Proposed measures to reduce or control noise impacts, if any: h[ elpl Na+uvak veaM+tO ic)vi ��f-fe►� 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. LLLeM VCk-cavX-1 1&M Ck."d ftS Id"I u, I SI VI f TKM i l y b. Has the project site been used as working farmlands or working forest lands? If so, describe. Nv How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? N/A If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? h,elI?J NINE, 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: NU c. Describe any structures on the site. L'!pll d. Will any structures be demolished? If so, what?Ing!I N0 e. What is the current zoning classification of the site?IN";r,] ti S AtiKq f. What is the current comprehensive plan designation of the site?JtPjPJ N/A g. If applicable, what is the current shoreline master program designation of the site? h[ eM ►J/A h. Has any part of the site been classified as a critical area by the city or county? If so, specify. 19M (� 1, SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted). 2016 Page 7 of 11 i. Approximately how many people would reside or work in the completed project?L1,e� t4 ptr5on5 j. Approximately how many people would the completed project displace? hei NUNS k. Proposed measures to avoid or reduce displacement impacts, if any: LrIelpj N/A L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: LheiK?� m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: NA 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. (heipJ I UNIT b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. (.!rein; NONE c. Proposed measures to reduce or control housing impacts, if any: jh !p, N/A 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed?ljleipj apr�x►n te.�4 2��t ho'd i 'Ohm SI(A l m Db1 house. b. What views in the immediate vicinity would be altered or obstructed? r,[ efpl NQNE c. Proposed measures to reduce or control aesthetic impacts, if any: jhgM N/A 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? hei DVive%Aq IIIM_ Wil I be Ilk clvfmo Aft eV?'YllYA b. Could light or glare from the finished project be a safety hazard or interfere with views? Iheg7] Ili u c. What existing off-site sources of light or glare may affect your proposal? Lhepi NU N 1- d. Proposed measures to reduce or control light and glare impacts, if any: (help NONC SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? rMejpl N/A b. Would the proposed project displace any existing recreational uses? If so, describe. .Lt,.l a NL) c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Lt,,,pJ 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. 1r,gip No b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. Lne! N� c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and rrhistoric preservation, archaeological surveys, historic maps, GIS data, etc. [t)eop� N/A d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. NNF 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. irIejp� 'Dr R i v ate -d b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop?!nealp] c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? !; q SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 11 d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). LG! .I NO e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. [npjpj ND f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to Make these estimates?Lt,91p] g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. NL h. Proposed measures to reduce or control transportation impacts, if any: n( gjpj N/A 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. Jtjql> N�l b. Proposed measures to reduce or control direct impacts on public services, if any. 1h.jpi fvf I` 16. Utilities a. Circle utilities currently available at the site: ihe.l i electricity natural gas, water, refuse service, telephone, sanitary sewer, septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might 9 Y be needed. giglpJ w eA I , -00weer.and Sdt c, SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11 f C. SIGNATURE The above answers are an j'complete to the best of my knowledge. I understand that the lead agency is relying on th m to ke its decision. Signature: 11L Date Signed: l o"'q "ZD 10 Print Name of Signee: 'z�)L LoL Schooner If applicable, Position and Agency/Organization: Date Submitted: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11 MASON COUNTY DCD SEPA Contact List r PA to (check all that apply) onkomish Tribal Nation, Nat. Res.Dept. ; Department of Ecology ATTN: Randy Lumper Environmental Review Section N 541 Tribal Center Rd., Skokomish Nation, 98584 PO BOX 47703, Olympia, 98504-7703 lmper@skokomish.org separegister@ecy.wa.gov Skokomish Tribal Historic Preservation Officer WA Department of Commerce ATTN: Kris Miller reviewteam@commerce.wa.gov 80 N Tribal Center Rd, Skokomish Nation, 98584 shlanay1@skokomish.org U.S.Army Corps of Engineers SEPA Reviewer-Jason Sweeney Quinault Indian Nation PO Box C-3755, Seattle, 98124 ATTN: Mark Mobbs Jason.t.sweeney@usace.army.miI PO Box 189, Tahola, 98587 mmobbs@quinault.org WA Dept.of Fish and Wildlife SEPAdesk@dfw.wa.gov Squaxin Tribal Nation, Natural Res. Dept. 2952 SE Old Olympic HWY, Shelton 98584 WA Dept.of Fish and Wildlife jdickison@squaxin.us ATTN: Joshua Benton (360)602-0364 emarbet@squaxin.us (Habitat Biologist-Hood Canal Watershed) szaniewski@squaxin.us 450 Port Orchard Blvd, Suite 290 sneil@squaxin.us Port Orchard,WA 98366 Joshua.Benton@dfw.wa.gov The Confederated Tribe of the Chehalis ATTN: SEPA Reviewer-Glen Connelly 420 Howanut Rd., Oakville, 98568 r7 WA Dept.of Fish and Wildlife gconnelly@chehalistribe.org ATTN: Margie Bigelow (Habitat Biologist-S Puget Sound Watershed) WA DNR,South Puget Sound Region 2391 W Deegan Rd., Shelton, 98574 950 Farman Avenue N, Enumclaw, 98022-9282 margaret.bigelow@dfw.wa.gov southpuget.region@dnr.wa.gov ID WA Dept.of Transportation WA DNR,Aquatic Resources ATTN: Dale Severson PO BOX 47027, Olympia, 98504-7027 P.O. Box 47440, Olympia 98504-7440 rd@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov WA DNR,SEPA Center City of Shelton ATTN: External Coordinator ATTN: Jason Dose PO BOX 47015, Olympia, 98504-7015 525 West Cota St., Shelton 98584 sepacenter@dnr.wa.gov jasond@ci.shelton.wa.us Olympic Region Clean Air Agency 71 Port of Shelton ATTN:Aaron Manley ATTN: Brandon Palmer 2940-B Limited Ln. NW, Olympia. 98502 21 West Sanderson Way, Shelton 98584 aron.manley@orcaa.org randonP@portofshelton.com Mason County Transit Office of Archaeology&Historic Preservation ATTN: Mike Oliver ATTN: Lance Wollwage PO Box 1880, Shelton, 98584 P.O. Box 48343, Olympia, 98504-8343 moliver@masontransit.org Lance.Wollwage@dahp.wa.gov Mason County PUD#1 71 Tacoma Public Utilities-Real Property Services ATTN: Jocelyn Gray ATTN: Dave Letterman N 21971 Hwy 101, Shelton, 98584 3628 S 35th St,Tacoma, 98409-3192 251"'Mcelyneg@mason-pud1.org dletterm@cityoftacoma.org oason Cty P.W.ATTN: 0 Mason Cty E.H. ATTN: Other: chool District: Mason Cty Bldg ATTN: Agent: MC DCD last updated on 8/24/2016 Applicant: Tarp 4 - s ji Z Ili N9 _ STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 -Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service -Persons with a speech disability can call 877-833-6341 November 23,2016 Mr.Michael MacSems Mason County Department of Community Development Planning Division PO Box 279 Shelton, WA 98584 Dear Mr.MacSems: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Schooler-Clearing Project(SEP2016-00103) located at 281 Northeast Blacksmith Drive in Belfair as proposed by Joshua Schooler. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Chris Montague-Breakwell (360)407-6364 Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. The following construction activities require coverage under the Construction Stormwater General Permit: 1. Clearing, grading and/or excavation that results in the disturbance of one or more acres and discharges stormwater to surface waters of the State; and 2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more and discharge stormwater to surface waters of the State. a) This includes forest practices(including,but not limited to, class W conversions) that are part of a construction activity that will result in the disturbance of one or more acres, and discharge to surface waters of the State; and 3. Any size construction activity discharging stormwater to waters of the State that Ecology: a) Determines to be a significant contributor of pollutants to waters of the State of Washington. b) Reasonably expects to cause a violation of any water quality standard. Mr. Michael MacSems November 23, 2016 Page 2 If there are known soil/ground water contaminants present on-site, additional information (including,but not limited to:temporary erosion and sediment control plans; stormwater pollution prevention plan; list of known contaminants with concentrations and depths found; a site map depicting the sample location(s);and additional studies/reports regarding contaminant(s))will be required to be submitted. You may apply online or obtain an application from Ecology's website at: http://www.ecy.wa.goy/programs/wq/stormwater/construction/-Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater from construction activities and must submit it on or before the date of the first public notice. WATER RESOURCES: Vicki Cline(360)407-0278 Any ground water withdrawals in excess of 5,000 gallons per day or for the irrigation of more than one-half acre of lawn or noncommercial garden, requires a water right permit from Ecology. All water wells shall be constructed in accordance with the provisions of Chapter 173-160 WAC by a driller licensed in the State of Washington. Well reports must be submitted to Ecology within 30 days after completion of a well. All water wells that may be drilled must be a minimum of 100 feet from any known, suspected,or potential source of contamination. Wells shall not be located within 1,000 feet of a solid waste landfill. WAC 173-160-171(1)The proposed water well shall be located where it is not subject to ponding and is not in the floodway, except as provided in Chapter 86.16 RCW. (2)It shall be protected from a one hundred year flood and from any surface or subsurface drainage capable of impairing the quality of the ground water supply. The Growth Management Act(RCW 19.27.097)requires an applicant to submit evidence of an adequate water supply before a building permit can be issued for any building requiring potable water. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:16-6063) cc: Vicki Cline, WR Chris Montague-Breakwell, WQ Joshua Schooler(Proponent) Authentisign ID:7793C9FO-9133-4552-BAo5-FASE5BB1BSE7 Form 34 ©Copyright 2010 Addendum/Amendment to P&S Northwest Multiple Listing Service Rev.7/10 ALL RIGHTS RESERVED Page 1 of 1 ADDENDUM!AMENDMENT TO PURCHASE AND SALE AGREEMENT The following is part of the Purchase and Sale Agreement dated August 22,2016 1 between Joshua Schooler Angel Schooler ("Buyer")Bu er")2 Buyer Buyer and Melovidoff ("Seller")3 Seller Seller concerning 0 xxx Blacksmith Drive Belfair \ OVA 98528 (the"Property").4 Address city state, Zip IT IS AGREED BETWEEN THE SELLER AND BUYER AS FOLLOWS: 5 Seller provides permission for the county to continue the Forest Practice Application in the name of 6 the buyer. Permit will not be issued until the title has transferred. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ALL OTHER TERMS AND CONDITIONS of said Agreement remain unchanged. 31 lyls 11/07/2016 [aS] 11/07/2016 Buyer's Initials Date Buyer's Initials Date Seller's?nitials Date Seller's Initials Date I