HomeMy WebLinkAboutHPA-Bridge Abutment Armoring - BLD Permit / Conditions - 12/19/2007 r Washington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 Devonshire Road
FISH and RCW 77.55.021(8)-Appeal Pursuant to Chapter 34.05 Montesano,WA 98563
WILDLIFE RCW 77.55.181 -Appeal to Hydraulic Appeals Board (360)249-4628
Issue Date: December 19,2007 Control Number: 111591-1
Project Expiration Date: December 30,2007 FPA/Public Notice#: N/A
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Long Live the Kings
ATTENTION:Joy Lee Waltermire
Post Office Box 205
Lilliwaup,WA 98555
360-877-6960
Fax:360-877-9690
Project Name: Emergency- Bridge Abutment Armoring
Project Description: Replace riprap on upstream, left bank bridge abutment to fill scour hole.
Material is to be limited to the scour hole.
PROVISIONS
1. TIMING LIMITATIONS: The project may begin Immediately and shall be completed by
December 30, 2007.
2. This HPA is the written follow-up to the emergency verbal HPA issued by Gloria Rogers, to Joy
Lee Waltermire of Long Live the Kings Hatchery, on December 19, 2007. It is issued with the
understanding that the proposed work is necessary to address emergency conditions. The
permittee shall set up an on-site meeting with the Area Habitat Biologist listed below, as soon as
possible but not less than 60 days after work is completed, to determine if additional measures will
be necessary to restore fish habitat that may have been damaged as a result of this emergency
action.
CHANNEL PROVISIONS
3. Bank protection work shall be restricted to work necessary to protect the bridge abutment.
4. Placement of riprap waterward of the ordinary high water line shall be restricted to the minimum
amount necessary to protect the bridge abutment.
5. The toe shall be installed to protect the integrity of the riprap.
6. Riprap shall be placed from the bank. Dumping onto the scour hole shall be permitted only if the
toe is established and the material can be confined to the scour hole.
7. Armoring material shall be clean, angular rock, and shall be installed to withstand 100-year peak
flows. River gravels or other round cobbles shall not be used as exterior armor.
8. Riprap shall be placed in a manner to avoid damage to existing vegetation.
EQUIPMENT PROVISIONS
Page 1 of 4
- Washington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 Devonshire Road
FISH and RCW 77.55.021(8)-Appeal Pursuant to Chapter 34.05 Montesano,WA 98563
WILDLIFE RCW 77.55.181 -Appeal to Hydraulic Appeals Board (360)249-4628
Issue Date: December 19,2007 Control Number: 111591-1
Project Expiration Date: December 30,2007 FPA/Public Notice#: N/A
9. Equipment used for this project shall be free of external petroleum-based products while working
around the stream. Accumulation of soils or debris shall be removed from the drive mechanisms
(wheels, tires, tracks, etc.) and undercarriage of equipment prior to its working below the ordinary
high water line. Equipment shall be checked daily for leaks and any necessary repairs shall be
completed prior to commencing work activities along the stream.
WATER QUALITY & FISH PROTECTION PROVISIONS
10. Erosion control methods shall be used to prevent silt-laden water from entering the stream
during all phases of the project. These may include, but are not limited to, straw bales, filter fabric,
temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or
immediate mulching of exposed areas.
11. If high flow conditions that may cause siltation are encountered during this project, work shall
stop until the flow subsides.
12. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or
water quality problems develop (including equipment leaks or spills), immediate notification shall be
made to the Washington Department of Ecology at 1-800-258-5990, and to the Area Habitat
Biologist listed below.
PROJECT LOCATIONS
Location #1
WORK START: December 19, 2007 WORK END: December 30, 2007
WRIA: Waterbody: Tributary to:
16.0230 11-illiwaup Creek Hood Canal
1/4 SEC: Section: Township: Range: Latitude: Longitude: County:
NE 1/4 19 23 N 03 W N 47.47002 W 123.1251 Mason
Location#1 Driving Directions
Take Hwy 101 north towards Hoodsport and continue until Lilligaup,turn left on Lilliwaup Rd,go past the"end of
county road"sign,turn right and go through gate on tall wooden fence and across the bridge.
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be
necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying
for and obtaining any additional authorization from other public agencies (local,state and/or federal)that may be
necessary for this project.
Page 2 of 4
1 Washington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 Devonshire Road
FISH and RCW 77.55.021(8)-Appeal Pursuant to Chapter 34.05 Montesano,WA 98563
WILDLIFE RCW 77.55.181 -Appeal to Hydraulic Appeals Board (360)249-4628
Issue Date: December 19,2007 Control Number: 111591-1
Project Expiration Date: December 30,2007 FPA/Public Notice#: N/A
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the
person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work.
This Hydraulic Project Approval does not authorize trespass.
The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held
liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this
Hydraulic Project Approval.
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one
hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment.
All Hydraulic Project Approvals issued pursuant to RCW 77.55.021 (EXCEPT agricultural irrigation,stock watering or
bank stabilization projects)or 77.55.141 are subject to additional restrictions,conditions or revocation if the Department
of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The
person(s)to whom this Hydraulic Project Approval is issued has the right pursuant to Chapter 34.04 RCW to appeal
such decisions. All agricultural irrigation,stock watering or bank stabilization Hydraulic Project Approvals issued
pursuant to RCW 77.55.021 may be modified by the Department of Fish and Wildlife due to changed conditions after
consultation with the person(s)to whom this Hydraulic Project Approval is issued: PROVIDED HOWEVER,that such
modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.301.
APPEALS INFORMATION
If you wish to appeal the issuance or denial of,or conditions provided in a Hydraulic Project Approval,there are
informal and formal appeal processes available.
A. INFORMAL APPEALS(WAC 220-110-340)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021,
77.55.141,77.55.181, and 77.55.291: A person who is aggrieved or adversely affected by the following Department
actions may request an informal review of:
(A)The denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic
Project Approval; or
(B)An order imposing civil penalties. A request for an INFORMAL REVIEW shall be in WRITING to the Department
of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North,Olympia,Washington 98501-1091 and shall be
RECEIVED by the Department within 30 days of the denial or issuance of a Hydraulic Project Approval or receipt of an
order imposing civil penalties. If agreed to by the aggrieved party, and the aggrieved party is the Hydraulic Project
Approval applicant, resolution of the concerns will be facilitated through discussions with the Area Habitat Biologist and
his/her supervisor. If resolution is not reached,or the aggrieved party is not the Hydraulic Project Approval applicant,
the Habitat Technical Services Division Manager or his/her designee shall conduct a review and recommend a decision
to the Director or his/her designee. If you are not satisfied with the results of this informal appeal,a formal appeal may
be filed.
B. FORMAL APPEALS(WAC 220-110-350)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021
(EXCEPT agricultural irrigation,stock watering or bank stabilization projects)or 77.55.291:
A person who is aggrieved or adversely affected by the following Department actions may request a formal review of:
(A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic
Project Approval;
(B)An order imposing civil penalties;or
(C)Any other'agency action'for which an adjudicative proceeding is required under the Administrative Procedure
Act, Chapter 34.05 RCW.
A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife HPA Appeals
Coordinator,shall be plainly labeled as'REQUEST FOR FORMAL APPEAL'and shall be RECEIVED DURING
OFFICE HOURS by the Department at 600 Capitol Way North, Olympia,Washington 98501-1091,within 30-days of
the Department action that is being challenged. The time period for requesting a formal appeal is suspended during
Page 3 of 4
Washington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 Devonshire Road
FISH and RCW 77.55.021(8)-Appeal Pursuant to Chapter 34.05 Montesano,WA 98563
WILDLIFE RCW 77.55.181 -Appeal to Hydraulic Appeals Board (360)249-4628
Issue Date: December 19,2007 Control Number: 111591-1
Project Expiration Date: December 30,2007 FPA/Public Notice#: N/A
consideration of a timely informal appeal. If there has been an informal appeal,the deadline for requesting a formal
appeal shall be within 30-days of the date of the Department's written decision in response to the informal appeal.
C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (agricultural irrigation,
stock watering or bank stabilization only),77.55.141,77.55.181,or 77.55.241: A person who is aggrieved or adversely
affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a
Hydraulic Project Approval may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to
the Hydraulic Appeals Board per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE, Building Two-
Rowe Six, Lacey,Washington 98504;telephone 360/459-6327.
D. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO CHAPTER 43.21 L RCW: A person
who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval,or the conditions or
provisions made part of a Hydraulic Project Approval may request a formal appeal. The FORMAL APPEAL shall be in
accordance with the provisions of Chapter 43.21 L RCW and Chapter 199-08 WAC. The request for FORMAL APPEAL
shall be in WRITING to the Environmental and Land Use Hearings Board at Environmental Hearings Office,
Environmental and Land Use Hearings Board,4224 Sixth Avenue SE, Building Two-Rowe Six, P.O. Box 40903,
Lacey,Washington 98504;telephone 360/459-6327.
E. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS results in forfeiture of all appeal rights. If there is
no timely request for an appeal,the department action shall be final and unappealable.
ENFORCEMENT: Sergeant Makoviney (31) P2
Habitat Biologist 61 0�� WD Fwctor
Gloria Rogers 360-249-4628
CC:
Page 4 of 4
1 �