Loading...
HomeMy WebLinkAboutBLD2005-01277 Cancelled Replacement MFG Home - BLD Permit / Conditions - 10/14/2005 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2005-01277 OWNER: BETTY OLSEN RECEIVED: 7/28/2005 CONTRACTOR: LICENSE: EXP: ISSUED: 10/27/2005 SITE ADDRESS: 6580 NE BEAR CREEK-DEWATTO RD BELFAIR EXPIRES: 4/27/2006 PARCEL NUMBER: 223027590090 LEGAL DESCRIPTION: TR 9-A SURVEY 1/200 TR 1 SP# 1577 PROJECT DESCRIPTION: DIRECTIONS TO SITE: REPLACEMENT MANUFACTURED HOME 6.5 MILES UP BEAR CREEK DEWATTO ON THE RIGHT HAND SIDE OF THE ROAD. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 2 Type of Constr.: Type of Use: MH Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3 Lot Size: Deck: Type of Work: NEW Fire Dist.: 6 No. of Stories: 1 Occ. Load: Building: Valuation: Building Height: 14 Occ. Status: Unknown Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make:LIBERTY Length: 50 Ft. Front: S 102.0 Ft. Shoreline: Ft. Water Body: Rear: N 102.0 Ft. Slope: Ft. SEPA?: No Model:PERLES Width: 20 Ft. Side 1: W 40.0 Ft. Shoreline Desig.: Not Applicable Year:1981 Serial No.: Side 2: E 389.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures FEES Mechanical Fixtures Type Qty. Type ON Y. We By Date Amount Receipt Mobile Home Submittal Fee CMH 7/28/2005 $214.50 B12005 Planning Review Fee CMH 7/28/2005 $155.00 B12005 Building State Fee ARC 8/2/2005 $4.50 612005 Mobile Home Issuance Fee ARC 8/2/2005 $214.50 612005 EH Plan Review TW 8/3/2005 $75.00 B12005 Violation Fee TLG 8/11/2005 $419.50 612005 Violation Investigation Fee TLG 8/11/2005 $58.00 612005 Total $1,141.00 BLD2005-01277 Please refer to the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2005-01277 CONDITIONS FOR BLD2005-01277 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. x ? /.4�7 2) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. x 3) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X ,Z„j' ('/' 4) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or X removal ofapproved documents will result in failure of required building inspections. 5) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X : 'y 6) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved"site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. BLD2005-01277 Please referto the following pages for conditions of this permit. 2 of 5 7) Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each major part of the installation. RCW43-63B.090 An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily located in plain site within three of the home's front entry. There shall be one certification tag for each certified installer accounting for the work that each installer performed or installed. certification number and signature of the certified installer responsible for each major part of the installation. WAC365-210 X Z)_ 8) If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the instructions of the American National Standards Institute (ANSI). To order the ANSI instructions you may either get an order form from the Mason County Building Department or you can contact the Offfice of Manufacturing Housing (360) 725-2800. 9) The internatioanl code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 10) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X t—,V 11) REQUIRED INSPECTIONS (Footing Inspection-prior to pour, Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of any/all problems no occupancy(Final Inspection)will be granted for the residence. OWNER/CONTRACTOR(indicate which) Signature X 6-10 12) This permit is for the placement and installation of the manufactured home only and does not imply approval or review for any other items indidcated on the plot plan. X /%,% 6' 13) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 14) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. BLD2005-01277 Please refer to the following pages for conditions of this permit. 3 of 5 15) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X A 16) The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. 17) All property lines shall be clearly identified at the time of foundation inspection. X 18) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X� ';z f_.i 19) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 20) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 4�1/(^' 21) Approve per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X , ' e 22) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X �l 23) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X �1 BLD2005-01277 Please referto the following pages for conditions of this permit. 4 of 5 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. i OWNER OR AGENT: DATE: BLD2005-01277 Please refer to the following pages for conditions of this permit. 5 of 5 z 3 r4,4 -, �v Q v Q ip fl COO 10 ( � l 0 3,vp�� y ! d Iv T 7 a o � ol_ alv0 - - 'IV.AONddd Ol 103fenS S3JN HO PLANNING : c l MIS NO 38 Ol 03dinb38 Ndld 31lS Q DNINNVId QOQ AlNnOO NOSVII ALL SETBACKS ARE MEASURED IA08 c!d H FROM THE FURTHEST d PROJECTION OF THE BUILDING 13ID2-ooS _ of2- -7 -? 2.2 30Z -75-- 90090 3E7-++y &�5c1,_f THESE PLAN;.; MUST BE ON THE JOB SITE FOR INSPECTION. ow Imo _ c�vbo�2� VIPD� P� MUST MEE 1 AFL CURRENT a AS WASHINGTON STATE CODES 0 �tbG� o��0 B� 0/NG / p,� p419B ECT to PAR eT0R ► '� G c„ opo� Gi CS _ N HANC- ' ♦ SUBMIT CHANGES rOR APPROVAL PRIOR TO PE.? 'G WORK vGa -ram —� Mason County Dept. of Community Development Mason County Bldg. III, 426 W. Cedar, P.O. Box 186, Shelton, WA 98584 Shelton: (360) 427-9670 Belfair: (360) 275-4467 Elma: (360) 482-5269 Web: http://www.co.mason.wa.us ENFORCEMENT ACTIONS PENDING May 28, 2008 BETTY OLSEN 6580 BEAR CREEK DEWATTO P.O. BOX 665 BELFAIR WA 98528 Case Number: BLD2005-01277 Parcel Number: 223027590090 The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code or the code your permit was issued. Your property is currently in violation status of occupancy and use and is pending enforcement actions. You have been made aware of these requirements and to date, have not made the necessary arrangements. Current violations consist of the followina: Building permit BLD2005-01277 for manufactured home never received any inspection or approval for occupancy and use. Enforcement actions are pending as occupancy has not been approved. To bring vour site into compliance, you must: Please reinstate permit BLD2005-01277 for half the permit cost of $214.50 and schedule the necessary. Failure to make the necessary arrangements will result in additional enforcement actions and fees. Please contact our office to make the necessary arrangements 10 days from the date of this letter. Failure to contact our office to make the necessary arrangements will result in enforcement actions. In the event that you feel you have received this notice in error or that the facts are inaccurate, I strongly encourage you to contact me immediately to discuss your concerns. If not, I will expect these issues to be resolved within 10 days from the date of this letter. If you should have any questions, I can be reached by phone at (360) 427-9670 ext. 356. BLD2005-01277 1 of 2 Sincerely, Mindi Brock Mason County Building Department BLD2005-01277 2 of 2 5/28/2008 Case Activity Listing 11:45:28AM IPIO Case#: BLD2005-01277 Assigned Done Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By BLDA201 STOP WORK ISSUED 7/14/2005 10/27/2005 Hold DONE JRN 10/27/2005 JRN Page 2 of 2 Caseactivity..cpt MASON COUNTY 427-9670 BUILDING DEPARTMENT -/9/7/ ALL PERSONS ARE HEREBY ORDERED TO AT ONCE 3G8 �- 3 c'-' On these Premises at This order is issued because A.M. Posted P.M. 19 By The failure to stop work, the resuming of work without permission from the WARNING Building Official, or the removal, mutilation,destruction or concealment of this Notice is unishable y fine an imprisonment. o,0 s 3�a� " a w 'o�z� ss � Page 1 of 1 Tami Griffey-Bear Creek Dewatto Road From: "Karen Burns" <karenb(a-,)masonpud3.org> To: "Tami Griffey" <Tlg@co.mason.wa.us> Date: 2/23/2006 3:56:12 PM Subject: Bear Creek Dewatto Road Hi Tami, I can't get through to you on the phone. It just rings and rings, but the house fire on 2/22/06 was at 6580 NE Bear Creek Dewatto Road—Frank Olsen. Karen l� r lor� on file://C:\Documents%20and%20Settings\tlg\Local%20Settings\Temp\GW}OOOOI.HTM 2/23/2006 BLD2005-01277 REINSTATE PERMIT Krista, granddaughter intends to reinstate permit at the Belfair Annex. Site Address: 6580 Bear Creek DeWatto, Belfair Parcel: 22302-75-90090 ATF permit for manufactured home due to be cancelled, owner is required to reinstate permit at half the cost. Explained to get all inspections after reinstated. FEES D $214.50 ee's already added under BLD2005-01277) pzm-A r� ( 124 0g OWNER IS RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS. Contact me if you have any questions. Mindi x 356 1 ZZ3�Z��S '160 �O i,� o ( Z-7 -7 ],IVj n� �❑agent . A Signature � ❑Addressee and;' Also X C.pate oj�Delive ■ Complete items 1,2 is desired• d Name) /u, item 4 if Restricted Delivery on the reverse eived by .,_i/ ■ print your name and address 6�^ J SG� ,� Yes of the rnailpiece, different from iYem 0 No so that this can return e backthe rd to You D is delivery address ace permits. enter delivery address below Attach this card It YES,or on the front if space t Article Addressed to: A51C* 1,A5— BETTY OLSEN ATTO e ,�/„•A s R CREEK DEW 650 B E A 5 I Service TYPO 13 Express Mail ,W-j�'ertrfied Mail Retum Receipt for Merchandise SELF AIR W p 995219 0 Registered C.O.D. ❑insured Mail Yes 4. Restricted Delivery?(Extra Fee) 7 268p 0�p1 7962 0166 ,02595-02-M.1e40 2• Article Numberice label) a pransfer from Domestic Return Receipt PS Form 3811,February 2004 MASON COUNTY PERMITNO. dUUS`U� BUILDING PERMIT APPLICATION 426 W. Cedar • P.O. Box 186, Shelton, WA 98584 zC Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us A P P LI Cf NFORM TION CONTRACTOR INFORMATION OwnerU. Company Name Mail AAress Mailing Address City State Zip Code City State Zip Code Phone 'a Other Ph. Phone Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well L Water System Name of Water System PARCEL INFORMATION - 12 Di ft Parcel No. c2a Fire District Legal Description 1 I r I -1 Site Address (Please include street name, stre t nurpber and cjty) 80 ✓ J D,i ecti ns to e ` r _ C' ✓l P . Will timber be cut and sold in parcel preparation?Yes/No Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑ Use of Building Describe Work No.of Bedrooms No. of Bathrooms i>2 Square Footage- 1 st Floor 2nd Floor. 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached Detached Carport Attached Detached MANU URED E INFORMATION - Make I`..+ R Modeler r 1; Year Length WidthSerial No. No.of Bedrooms No.of Bathrooms Type of Heat`* r` tr I Purchase Price $ Llr5M_ Replacement Unit? Yes No Installer Name Certification I OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the qQntractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I ham h permis- sion from all the necessary parties.If permission is required from any easement holder or any other party in interest P2g=too�a ica- tion or the work proposed in the application, I have obtained permission from kemto apply for this permit and conduct the work pr sed. X Date R 2 8 109S Owner/ wne /Contractor (indicate which one) ,BE FOR OFFICIAL USE BEYOND THIS POINT (_,L: Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department / Planning Department ct Environmental Health Department Public Works Department Fire Marshal FEES (� Building Permit Fee / • S O, Site Inspection Plan Review Fee EH Review Fee Plumbing & Base Fee Planning Review Fee Mechanical & Base fee Other Wood/Gas/Pellet Stove Fe State Fee Violation Fee ��MY r Pre-Paid at Submittal ) Valuation $ TOTAL FEES