Loading...
HomeMy WebLinkAboutReplace Bulkhead - BLD Engineering / Geo-tech Reports - 11/20/2020r CuVLD 'Mm NN I N"""I G • Austin Engineering 615 W. a'der street Civil Engineering Services 2182 NE Eton Lane, Bremerton, Washington 98311-9529 Voice: 360-698-1661 email: austinengr@gmail.com Date: 20 November 2020 Subject: Bulkhead replacement at 890 Dewatto Beach Rd., Tahuya, WA Mr. Frank Dahl 890 Dewatto Beach Rd. Tahuya, WA 98588 Dear Mr. Dahl: I have reviewed the attached sketches for the replacement of a portion of your Bulkhead Wall on the Hood Canal. I find the work proposed is adequate and safe. If there are any questions please contact the undersigned. Thank you for your business. �V NO1 E. Paul Austin PE&LS WA # 16968 Z cc: File: 18-07- Dahl Hood Canal NO ties n v -1 Sealevel Bulkhead Builders & P. O. Box 375 Kingston, WA 38346 r1*14lp,( 644 41- k---t 1,5- j 35" 'AU f t P1,17 o dwxElzs { r-ti a V � 2 �c a °' lid Qu►�kf}E�u / per. j cx° Lllhi.W _ T1E o Reek-- PATIO OWNERS WA s � 1 1 BurJNe'+fl4r ( ` i, HODS 37 u o 68 SSIONA`Cr1 i ( r UNIF t" , f..�. G'\ Lvy p-7r,- t DRAWING NUMBER SCALE: $ ll}' i evel DATE: �� REVISED DRAWN BY Ks 110 al- j wA 4 T-A ) W_ G N 7. I 6908 i C� �SS�n,V AL SCALE: 2 DRAWN BY ;.t r DRA WINO NUMBER r r DATE: (, k + %;, REVISED un ,nmu Ci FARP tmr.