HomeMy WebLinkAboutReplace Bulkhead - BLD Engineering / Geo-tech Reports - 11/20/2020r
CuVLD
'Mm NN I N"""I G
• Austin Engineering 615 W. a'der street
Civil Engineering Services
2182 NE Eton Lane, Bremerton, Washington 98311-9529
Voice: 360-698-1661 email: austinengr@gmail.com
Date: 20 November 2020
Subject: Bulkhead replacement at 890 Dewatto Beach Rd., Tahuya, WA
Mr. Frank Dahl
890 Dewatto Beach Rd.
Tahuya, WA 98588
Dear Mr. Dahl:
I have reviewed the attached sketches for the replacement of a portion of your
Bulkhead Wall on the Hood Canal. I find the work proposed is adequate and safe.
If there are any questions please contact the undersigned. Thank you for your
business.
�V NO1
E. Paul Austin PE&LS WA
# 16968 Z
cc: File: 18-07- Dahl Hood Canal NO
ties n v -1
Sealevel Bulkhead Builders &
P. O. Box 375
Kingston, WA 38346
r1*14lp,( 644 41-
k---t 1,5-
j 35"
'AU f t
P1,17 o
dwxElzs
{
r-ti
a
V
� 2
�c
a °'
lid
Qu►�kf}E�u / per. j
cx° Lllhi.W _ T1E o Reek-- PATIO OWNERS WA s � 1 1
BurJNe'+fl4r ( ` i,
HODS
37 u o
68
SSIONA`Cr1
i ( r
UNIF
t" , f..�.
G'\ Lvy
p-7r,- t
DRAWING NUMBER
SCALE: $ ll}'
i
evel
DATE: �� REVISED DRAWN BY
Ks
110
al-
j
wA 4 T-A )
W_ G
N 7.
I 6908
i
C�
�SS�n,V AL
SCALE: 2 DRAWN BY ;.t r DRA WINO NUMBER
r r DATE: (, k + %;, REVISED
un ,nmu Ci FARP tmr.