HomeMy WebLinkAboutMIS98-00634 Cancelled Bulkhead - MIS Permit / Conditions - 10/3/2001 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
M I �(__ VE i__ t_ A N F C3 to_4z" P F R M I -T FOR INSPECTIONS CALL. 427--9670
MI S98-0634 PARCEL_ :323283100080 PLAT ., D I V : BLK . LOT -
JOR ADDRESS : 930 NE DFWA'TTO REACH DR TAI-10YA
APPI_ I CANT : JERRY DAHL PERMIT
OWNER : JI RPY DAHL_ MULL & IVOID BY EXPIRATION
LEGAL_ : T14 li 6F 64YT LOT 6 6 TAX 116-F & 1146-C �-
OATE --_--
PROJECT DESCRIPTION -
Emergency Bulkhead replacement of logs arid concrete with I aar fle rack and along the pr osent
alignment
PROJECT LOCATION :
Take nPwatto Holly Ltd to Dewa.tto Bay stay on Dewatto Bch Ur to the end of- the road .. Gate, duke
the dirt driveway to the left up the hill 250 ft stop at the blue propane tank . You are there .
Walk down t o the= house and beach
PROJECT NOTES :
This proposal Is ex+erapt due to emerge im-l;
......
TYPE A.It OUN't BY DATE RE-CE I PT
STFE $ 4 .50 TW 1 1 / 19/98 48899
PAMT $ 87 ,25 TW 1 1 / 19/98 48899 �
PLCK :6 56 . 71 TW1 1 / 19/88 488fTQ
SHA $ 44 . 00 IW 11 / '19/98 48899
I'C)TAL : 182 .4C '`OWNF:It C)I AGENT
NIS Full, rav; fAIVI9? i,()MPI IANGE 1*0 ATTACIIFD CONDITIONS IS
CONCRETE MECHANICAL MOBILE HOME
I Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
F date by
by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
Q W WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
II
I _
II
I
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
P F: VA M I T C; C:) N I I I 'r I C) N !-711
Case No . : MIS98 -0634
for - JERRY DAI-IL
Page ; I
1 ) Approved per, dimensions and setbacks (,.)n submitted
site-plan
X
2 ) The proposed proleot mutt be cotes istent. w# th all applk,.able polloies and other
provisions of tho Sh9rellne Management Act , its rules , and the Mason County Shoreline
Master Program .
X
3 ) Al I construct ion and demo it Ion debt, If-, must be removed .from the beach titter, protect
completion . Proper disposal of oon,3tructlon debris must be on land in such a manner
that debris cannot enter or oaur,,e water qua lltv degradation of State waters ,
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
4 ) App I i can't spat I sective a Hydrau I I c..r Pro lect Approva I from the Washington State
Department of F I sh A Wi I d I I f e must be granted prior to (,onstruction and follow the
psi ocif i0alt i c, a .d c o n d i t tons of t h&t permit
X
5 ) Temporary oros 1 on cont ro I inea s ure�S must tie Implemented to prevent water qual itV
degradation of adjacent waters or wetlands , and the drainage: pipes fro"i upland areas
sha I I be rou"'d to an oot I et that I s part of the bu I khead dec, Ign
X
6 ) ALL CONSTRUC,4 ION WIST MFET OR EXCIFUD ALL t OCAL COFS P AND 0C,13
REOUIREMENTS
X
7) Change,,; to approved bu I Idl nq plans 1.1tat effect comp I Jance to A tie the Un i f orai Btj I I d i ng
Code and/or Mason Couoty Regulations most be approved by Mason County prior to
con st r uct i onX-
A I I i n s p e v t ions t ts r this p r,oj e(,,,t to he performed it o d r,e p v,r t f,� subm I t t ed to t tie Mason
County Building Department by the engineer of record stab i Ishinq comp lance to the
des i gn spec. it i cat i on", .
X
9 ) Appears by engineered design -that exist Ing log/oonorete- wail it to be rpirloved If thli
i .,s Incorrect , the owner/applicant must resubmit plans which indloate if the existinq
wall will reftlain in Jo0atiran behind 'the roew propoc;al ,
X
Page No. 1 CONDITIONS/CORRECTIONS FOR CASE NO.: MIS98-0634
JERRY DAHL
NE830 DEWATTO BEACH DR TAHUYA
11/17/98
1) Site Plan -- Approved per dimensions and setbacks on submitted site-plan.
X
2) Shoreline Management Act -- The proposed project must be consistent with all applicable policies
and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline
Master Program.
X
3) Construction Debris Removal -- All construction and demolition debris must be removed from the
beach after project completion. Proper disposal of construction debris must be on land in such a
manner that debris cannot enter or cause water quality degradation of State waters.
X
4) Fisheries H.P.A. -- Applicant shall secure a Hydraulic Project Approval from the Washington State
Department of Fish & Wildlife must be granted prior to construction and follow the specifications
and conditions of that permit.
X
5) Temporary Erosion Control -- Temporary erosion control measures must be implemented to prevent
water quality degradation of adjacent waters or wetlands, and the drainage pipes from upland areas
shall be routed to an outlet that is part of the bulkhead design.
X
6) ALL CONSTRUCTION -- ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS
X
7) Changes to Approved Plans -- Changes to.approved building plans that effect compliance to the the
Uniform Building Code and/or Mason County Regulations must be approved by Mason County prior to
constructionX
8) ALL INSPECTIONS" --
All inspections for this project to be performed and reports submitted to the Mason County Building
Department by the engineer of record establishing compliance to the design specifications.
X
9) Removal -- Appears by engineered design that existing log/concrete wall is to be removed. If this
is incorrect, the owner/applicant must resubmit plans which indicate if the existing wall will
remain in location behind the new proposal.
X -
Dennis M. Bruce, P.P.
M.S.C.E., M.B.A. Geotechnical/Civil Engineer
September 23, 1998
Mr. and Mrs. Jerry Dahl
1809 Shorewood Drive
Bremerton, Washington 98312
Subject: Dahl Property
Replacement Rock Bulkhead
NE 830 Dewatto Beach Drive, Tahuya, Hood Canal,
Washington
This engineering report presents the results of a geotechnical evaluation of the
Dahl property at NE 830 Dewatto Beach Drive, Tahuya, Hood Canal, Washington.
This evaluation was required by owner concerns regarding failing existing timber/debris
bulkhead.
References:
• Location Map
• Dahl property map
• Site plan and replacement bulkhead designs by D. Bruce, P.E.
• Photographs
Assessment:
This engineer performed an on-site geotechnical assessment of the Dahl
property at NE 830 Dewatto Beach Drive, Tahuya, Hood Canal, Washington.
The Dahl property currently contains a failing bulkhead consisting of decaying
timber logs and concrete debris (see photographs). This existing residence is
approximately fourteen feet (14') set back from the existing bulkhead.
Tidal sea surge erosional forces, combined with the poor/mediocre original
bulkhead construction, have resulted in significant undermining and loss of property
immediately behind the failed bulkhead. The properties on either side of the Dahl
residence contain functional bulkheads.
Currently, the Dahl residence revealed no evidence of any geotechnical distress.
However, the rate of property loss due to the failing bulkhead will soon affect the Dahl
structure itself.
SOILS • FOUNDATIONS • SITE DEVELOPMENT • INSPECTION • DRAINAGE • DESIGN & PERMIT • LEGAL
P.O. Box 55502 • Shoreline, Washington 98155 • (206) 546-9217 • FAX 546-8442
r �
Dahl
Page two
Conclusions / Recommendations:
Based on the findings of this engineer's on-site geotechnical evaluation and
experience with similar waterfront properties, the following are recommended:
• The existing timber/debris bulkhead has failed. Property loss is on-going and
will continue.
• Continued property loss will threaten the Dahl structure itself.
• A proper replacement bulkhead is required.
• This engineer recommends a rock bulkhead placed in the same alignment as the
existing failed bulkhead. This proper bulkhead will comply with the attached
engineered designs, and incorporate a standard drainage zone.
• This replacement bulkhead will be approximately fifty-five feet (55) long, and
have a total height of seven feet (7'), including eighteen inches (18") base rock
embedment.
• This engineer is to inspect and document the new wall installation, as well as the
drainage measures recommended herein.
.t
If there are any questions, do not hesitate to call.
C�Q)f A/o, ei
17405
41,� 1�� M
IV
S:sjnlVAI.ENG� Dennis M. Bruce, P.E.
Geotechnical / Civil Engineer
EXPIRES ]2/L3/Lq�q �
DMB:vIb
cc: Sound Bulkhead, Inc.
ZVV9-9VS XV:J - L26-94S (90Z) • SS196 uo36uiysW '0UII@J04S • 3099S Xo9 'O'd
7VO37 1IWd3d 9 NOIS30 30VNlV dO • NO1103dSNl • 1N3WdO73A30 3115 • SNOI1dONOOd • S710S
l »ds1Y / ?l� 3rr/ 51
zt . s3aidx� 7r1 � �/V/ LTIX�
9r'<r a nh 3 -LT V_q 1�
I � oN sobs� `✓Y ,�
p -� -1 ►n� -1 2 rv-9$11 5-9 V N-V S S-3 s-q o?J d
-7 rn fY0/SOa+� 7�P� r Na 1 7AI1- snl
N9i ?!vM l C4 w :
al-�L VIM � A � � �Q of 1 d
7ayrnQNv1 tin�Q
�o -�-� ) �d�3Nr�ng o ,z 8 '3N a� �
°�
ri ��
r �.sly - 3�I -� .�.r yA ly N 9) -)-V o � 5
-7nt 1.1.�9�do� d- 14 ,�
1N91n1g ?d3 '7-7 V17141 cod ^ ^c
,�7��'na► �1.���rvoJ � �N�V1S3� �
s'2/--78vy�L 9rv/AV2�9
9 !Y/.L5)SNoJ ?IIn$' y
-T H tf rlLl�vj
-5"Yq
i` pax: : '4'1tt1 NO
N ► L �► a -7
MUMU3 j!AIo/le3iuy3aj08!D
•3'd `a:)naE] .W siuuaa
Ed WdBV:20 866T 2T .^ON E"a 9PS 90Z ON 3NOHd aaau 16u8 •8•d aon Ag •Q W-IJA -
I
FF01 D.Bruce, P.E. Engineer PHONE NO. : 206 546 8442 Nov. 13 1998 03:49PM P3
e is M. Bruce P.E. 'la
M.S.C_E., M.B.A. Geotechnical/Civil Engineer
trY
� Ks� � CY
v 1-
REPLk011
XIS ?/!U6 Q` off" eoMMOV
� � Qo
\-kJ -
IEp
LO w C �l ,E �� �? MAS N BUILU,. 'TECTOR
ES SUBJEC;,
* -Ko c K 7 -ro-rR L,
Ir
•�ASt= eOc��SE S µA►J QOCY-
'
• VPPe(Z. Co�Rs�.i , lk b+tAN RocK �
,• 1SM. B
w�sfrA, �G
✓ hh
4��s,•17405
�
EXPIRES jW3/
SOILS FOUNDATIONS SITE DEVELOPMENT INSPECTION • DRAINAGE • DESIGN& PERMIT - LEGAL
P.O. Box 55502 • Shoreline, Washington 98155 • (206) 546-9217 • FAX 546-8442
FfUYM D.Bruce, P.E. Engineer PHONE NO. : 206 546 8442 Nov. 13 1998 03:48PM P1
(V p
Dennis M. Bruce, P.E.
M,S.C.E., M.B.A. Geotechnical/Civil Engineer
Sow
— N M ALL-ft �
� aM�n1
f�- eft 3 6 a tea'-?
11131.
VA
To `�
pp
5 �� � � ' R.UL ke- A
Ms . ( � hC 40LT
V `�'HIS6 PLANS MUST BE
ON THE JOB SITE
TION.
NEE Ap. e r2 ��V1sF1� �UL_k� I� e7SlGk1,
Ta w kT 4 ts Pv� L Hof- evey M UkGUNG7
er
APic4 L� uLiz lkIFAt 1k� s �` P Lot tlEt �I LA--CE Mt Jr
P-FQb� S000 -
• T�{z�s - i -�-9 Amtc -ANY Twts E&Ge! s
p-�ePop�-
Cv�'J' i-- , ( Q () FS-T,/(0 d S
SOILS - FOUNDATIONS - SITE DEVELOPMENT INSPECTION - DRAINAGE - DESIGN & PERMIT - LEGAL
P.O_ Box 55502 - Shoreline, Washington 98155 • (206) 546-9217 • FAX 546-8442
MASON COUNTY
MISCELLANEOUS PERMIT APPLICATION
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 • 427-9670
PLEASE PRINT
#1 Owner 'Icrry - Phone#`1 6 .6 / T8a Fire District#
Site Address city7A N Tq
Mail Address
City St ulA Zip 2. - CIS
Applicant Phone o
Applicant Address T,:�) 3dk ?Lq)
city L,o I k xc-5 o St —Zip 1�G,
Directions to Site: f
go iLcl( 7 .4T� �.s/ — ILLt.t
29 ..-
G
#2 Parcel No., a5, 9 3/ (XM� f- 30(:2s 31z6/v)
Legal Description
#3 Indicate by circling the applicable source if an water is on or adjacent to the property site:
saltwat rere ' lake river creek streall�' �pbT1Q�Ltlar/� Peasonal runoff marsh other
N O V 1 3 1998
#4 Project Start Date 0 SW Project Completion Date U.)C1K) RM
MASON CO. PLANNINU DEFL
#5 Use of Buildiing Describe proposed construction
'Depending upon the type of permit,a floor plan and plot plan may be required.
'This permit is valid for 180 days from the date of issuance.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED CON-
MENTS OF THE CONTRACTORS REGISTRATION LAW TRACTOR IN THE STATE OF WASHINGTON AND I AM
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AWARE OF THE ORDINANCE REQUIREMENTS REGULAT-
ORDINANCE REQUIREMENTS FOR WHICH THIS PERMIT ING THE WORK FOR WHICH THE PERMIT IS ISSUED AND
IS ISSUED AND THAT ALL WORK DONE WILL BE IN CON- ALL WORK DONE WILL BE IN CONFORMANCE THERE-
FORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITH. NO CHANGES SHALL BE MADE WITHOUT FIRST
WITHOUT FIRST OBTAINING APP OVALFROM THE BUILD- OBTAINING APPROVAL FROM THE BUILDING DEPART-
ING DEPARTME T. MENT.
X OWNER - X BY
DATE �' DATE
Show following on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Wells
Water Lines Shorelines
Drainage Plan Easements directional by
Indicate dir
Septic Systems Name of Fronting Street I N, S, it W etc
Proposed Improvements Name of Flanking Street
PLOT PLAN AREA
FOR OFFICIALIUSE ONLY:Accepted by: Date
DEPARTMENTAL REVIEW
FOR OFFICIAL USE ONLY
Planning tw� iY ,G�(� ( �? APP ON APP HOLD
Building
Fire Marshal
Other
Special Conditions Fees Z
Permit Fee $
Plan Check
r Other
OthePaynt4dAg UTA t,1�ir
State Building Fee
TOTAL DUE $