Loading...
HomeMy WebLinkAboutHPA for MIS98-00634 Bulkhead - BLD Permit / Conditions - 11/13/1998 I1/16/98 10: 53 U206 752 4448 L. HARTMAN Z 001 SOUND BULKHEAD DB/A THE WILKESON QUARRY 29915 Quinnon Ext. Rd. PO Box 340 Wilkeson, WA 98396 (360) 829-0442 Telephone (360)829-5041 Fax FACSEMnE TRANSMITTAL SHEET DATE: 11/16/98 TO: Allan Borden, Mason County Planner RE: HPA-Jerry Dahl, NE 830 Dewatto Beach Dr., Tahuya, WA NUMBER OF PAGES(YNCLUDING THIS PAGE) 5 FAX NUMBER: (360)427-8425 COMMENTS: 11/16/98 10: 54 ^q 206 752 4448 L. HARTMAN U 002 NOV 14 199 11:43AM WDFW PORT ORCHARD P. 1 HYDR—,ULIC PROJECT APPROVAL state of w2shinaton W RCW 7510.160 Department of Fish sad Wikllfe W.W Reo"y office WULN 6W CapttM Way North,ME 3155 olympia,w9abinaton 98501-1091 PAIE OF EX '►F1 .: Npy mb.r JL 1498 LOG F.R Q0.- .Q O1 P.F_.RMTTTFE AUT190183ZEIIAGOMPE CON32ACT'� Jerry Dahl Sound Bulkhead RECEIVED 1809 Shorewood Drive P.O.Box 340 Bremerton, Washington 98312-2318 Wilkeson, Washington 98396 N 0 V 1 6 1998 360 507-4823 360 829-0442 MASON CO. PLANNINU PT. PROJECT DESCRIPTION. Replace Failed Timber Bulkhead with New Rock Bulkhead PROJECT LOCATION: 830 Dewatto Beach Road south of Dewatto Baby # WATER ROD Y 3 VAIECARY TO E, TO�+lYB� O 1NTV 1 15.MARI Hood Canal Admiralty Inlat 28 23 North 03 wcst Maxon NOTE; The existing timber bulkhead on this site failed in early November. The residence is approximately 15 feet from the former bulkhead face. High tides am eroding the fill at this time. This approval is an expedited HPA to replace the bulkhead in the location of the former bulkhead. A site review was done on November 11, 1998. Surfstnelt and sandlance have not bean documented in the area at this time. Beach substrate is primarily 2-3 inch gravel. PROVEXONS 1. Tr"TNC LIM TAT1ONS: The project may begin Immedfs►tety and%hall be completed by Marsh 14,1999. 2. Work shall be accomplished per plans submitted to the Washington DepartmeW of Fists and Wildlife, except as modified by this Hydraulic Project Approval. These plans reflect design criteria per Chapter 220-110 WAC. A copy of these plans shall be available on site during construction. 3. The existing timber/ecology block bulkhead shall be removed from the beach and deposited upland such that it does not enter waters of the state. 4. The waferward face of the rock bulk-head shall be located'no further wat=ward than the face of the timber/ecology block bulkhead which failed in October 1998. 5. Base rocks shall ba buried a minimum of 18 inches below the preprojeet natural beach grade. 6. Rock for the bulkhead shall be composed of clean,angular material of a sufficient durability and size to pmvent its being broken up or washed away by high water or wave action. 7. All upland drainage tightiines shall be incorporated into the bulkhead near beach grade to prevent erosion of the shoreline. 8, Project activities shall not occur when the project area, including the work corridor(excluding the area occupied by a grounded barge), is inundated by tidal waters. Page l of 4 11/16/98 10:55 C]^,206 752 4448 L. HARTMAN Zoo:i NOV 14 '98 11:44AM WDFW FORT ORCHARD P.Z E"I--_,,ULIC PROJECT APPROVAL.. state orw..t iaatun RCW 75.20.160 Deparanent or ClAh and W114M Resion 7 of.w Gcc 6M Capiml Way Noah,M9 3155 Olympia,Waehilastoa 99501-1091 DAT dE J9=t November 13. 1998 LOG NUMBER: 00-C9333-01 9. Equipment shall operate from the barge. Construction material shall be stockpiled on the barge or on the bank. 10. Bed material, other than material excavated for base rocks, shall not be utilized fnr pmjoct construction or fills, 11. Excavated materials shall not be stockpiled below the ordinary high water line. 12. Beach area depressions created during project activities shall be reshaped to preproject beach level upon project completion, 13, All trenches, depressions,or holes created in the beach area shall be backfilled prior to inundation by tidal waters. Trenches excavated far base rocks may remain open during construction. However, fish shall be prevented from antering such trenchea. 14. Eelgrass and kelp shall not be adversely impacted due to any project activities(e.g., barge shall not ground, equipment shall not operate, and other project activities shall not occur in eolgrass and kelp). 15. All natural habitat features on the beach larger than 12 inches in diameter,including trees, stumps, logs, and large rocks, shall be retained on the beach following construction. These habitat features may be moved during construction if necessary. 16, All debris or deleterious material resulting from construction shah be removed from the beach area and bed and prevented from entering waters of the state, All manmade debris on the beach shall be removed and disposad of upland such that it does not enter waters of the state. 17. Project activities shall be.conducted to minimize siltation of the beach arei and bed. Project activities shall not degrade water quality to the detriment of fish life. 5EPA: Exempt,Emergency AFPIACATION ACCEPTED: November 10, 1999 ENFORCEMENT OFFICER: Ohlde 029 [P2] Doris J. Smali (360) 895-4756 for Director Area Habitat Biologist WDFW cc: Allen Borden, Mason County Community Development (TIMRAi.PRQVigit�N9 This Hydraulic Project Approval(HPA)pertaiug only to the provisions of the Pisheries Code(RCW 75.20). Additional authorization from other public agencies may be necessary for this project. Page 2 of 4 11/16/98 10:56 ^V 206 752 4448 L. HARTMAN Z00 4 NOV 14 '98 11:44AM WDFW PORT ORCHARD P,:? HYDI`-ULIC PROJECT APPROVAL, State ofwashl'nWn d RCW 75.20.160 Department of Vish and W®dltte Region 7 office 1W 600 Capitol Wey North,M8 ILS6 t7tyiapis,Washington"601-1091 DATE.OF r Novmhar 13 LOG NII1.►TRF ., 00- .933 -01 This HPA shall be available on the job site at all timc9 and all its pzavieions followed by the perralUm and operstor(a)performing the work. This HPA does not authorize trespass. The persons)to whom this HPA fs issued may be held liable for any loss or damage to fish life or fish habitat which results from failure to comply with the provisions of this HPA. Failure to comply with the provisions of this Hydraulic Project Approval could result In a civil penalty of up to one hundred dollars per day or a gross misdemeanor charge,possibly punishable by file and/or imprisonment. All HPAs issued pursuant to RCW 75.20.100 or 75,20.160 are subject to additional reatrietions,conditions or revocation if the Department of Fish and Wildlife determines that new biological or physicallnformaticn Indicates the need for such action. The permittee has the right pursuant to Chapter 34,04 RCW to appeal such decisions. AR HPAx issued pursuant to RCW 75.20.103 may be modified by the Depsrtratnit of Fish and Wildlife due to changed conditk me at3eff consult on with the permitter: PROVIDED HOWP-VLR,that such modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 75.20.130. &P- ALB--GENERAL LWORMATION IF YOU WISH TO APPEAL A DENIAL OF OR CONDITIONS PROVIDED IN A HYDRAULIC PROJECT APPROVAL, THERE ARE INFORMAL.AND FORMAL APKAL PROCESSES AVAILABLE. A. INFORMAL APPEALS(WAC 220.110-340)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 75.20.100, 75.20.103,75.20.106,AND 75.20.160: A person who is aggrieved or adversely affected by the following Department actions may request an informal review of: (A) The denial or issuance of a EPA,or the conditions or provisions made part of a IWA;or (B) An order imposing civil penalties. It Is recommended that an aggrieved party contact the Area Habitat Biologist and di=w the concerns, Most problems are resolved at this level,but if not,you may elevate yaw concerns to his/her supervisor. A request for an INFORMAL REVIEW shall be in WRITING to tha Department of Fish anal Wildlife,600 Capitol Way North,Olympia,Washington 98501-1091 and shall be RECEIVED by the Department within 30-days of tht:denial or.issuance of a PPA or receipt of an order imposing civil penalties. The 30-day time requirement may be stayed by the Department if negotiations are occurring between the aggrieved party and the Area Habitat Biologist and/or his/her supervisor. The Habitat Protection Services Division Manager to his/her designee shall conduct a review and mcotnmend a decision to the Director or its designee, If you are not satisfied with the msult9 of this informal appeal,a formal appeal may be filed. R, FORMAL APPEALS(WAC 220-110-350)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO R.CW 75.20.100 OR 75.20.106: A person who is aggrieved or adversely affected by the fellvwing Department actions may request an formal review of: (A). The denial or issuance of a HPA,or the conditions or provisions made part of a HPA; (B) An order imposing civil penalties;or (C) Any other"agency action"for Whleh an adjudicative proceeding is required under the Administrative Prncedtre Act, Chapter 34.05 RCW. A request for a FORMAL APPEAL.shall be in WR=G to the Deparrmem of Figh and Wildlife,600 Capitol Way North, Olympia,Washington 98501-1091,sball be plainly labeled as"REQUEST 17OR FORMAL APPEAL"and shall be RECEIVED DURING OFFICE HOURS by the Depardn:nt within 30-days of the Department action that is being challenged. The time period fur requeiting a formal appeal is suspended during consicimtion of a timely informal appeal. If there has been an informal appeal,the deadline for requesting a formal appeal shall be within 30-days of the date of the Departments writtrm decision in response to the informal appeal C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 7520.103 or 75.20.160: Page 3 of 4 11/16/98 10:57 V206 752 4448 L. HARTMAN Z 005 NOV 14 '96 11:45AM WDFW PORT ORCHARD P.4 EI DI -XLIC PROJECT APPROVA saaorw..m.gton RCW 7510.160 Dep9rtment of Fteh and wiles Region 7 ot1",te "D Capitol Way North,M8 31M wum Olympia,Washington 98501.1091 DATE OF ISSEE: NoYemher 14; 1498 LOG NT1IVI R• 00-C9333-01 A person who is aggrieved or adversely affected by the denial or imaoce of a HWA,or dw Conditions or provisions lua&part of s HPA may request a formal appeal. The requw for FORMAL APPEAL shell be in WRMNG to the uydraulic Appeals Board per WAC 259-04 at Enyhvnmental Hearings Office,4224 Sixth Avenue SE,Building Two-Rowe Six,LaM,Washington 98504;-telephone 360/459-6327. D. FAILURE TO APPEAL WPI'HIN THE REQUIRED TIl1dg PERIODS RESULTS IN FORFEITURE OF ALL APPEAL RIGHTS. IF THERE IS NO TIMELY REQUEST FOR AN APPEAL,THE DEPARTMUNT ACTION SHALL BE FINAL AND UNAPPEALABLE. Page 4 of 4