ENVIRONMENTAL HEALTH REVIEW OF BUILDING PERMIT
HOOD CANAL MARINA 09/17/2019
PO BOX 609
UNION, WA 98592
Applicant: HOOD CANAL MARINA
Parcel Owner: HOOD CANAL MARINA
Site Address: 5101 ESTATE ROUTE 106
Primary Parcel Number: 322325001001
Permit Number: COM2019-00089
Add Water Heater, handwash sink, 3
Permit Description: compartment sink and grease inseplor to
area identified as staging area on Floor plan
Permit Submitted Date: 0 9/0 612 01 9
Permit Review Date: 09/17/2019
The above mentioned building permit has been reviewed by Environmental Health and found more information is
required.
Please contact a septic designer to evaluate commercial use of kitchen space and proposed plans for changes in flows
and waste strength. Please also contact the water system manager to complete a water adequacy for change in usage.
Submit water adequacy form and documentation from septic designer showing adequate septic fadiftles for proposed
changes.
If you have any questions or concerns let us know.
Sincerely,
[ ] Rhonda Elliott, EH Specialist
360-427-9670, Extension 581
relliott@co.mason.wa.us
[ ]Jeff Wilmoth, EH Specialist
360-427-9670, Extension 543
jwilmoth@co.mason.wa.us
[ ] Luke Cencula, EH Specialist
360-427-9670, Extension 594
Icencula@co.mason.wa.us
_P�umBin6
877-5608
/(Ooj4 A,NO `QAA4
vve
w
T
r4..Q
(1 111 612 0 0 6) Kell McAboy- RE: FW: Sewage Pump out and barge removal Page 1
From: "Vanzwalenburg, Kim"<kvan461@ECY.WA.GOV>
To: "Brian McGinnis"<bnan@pinnaclerealestate.us>,"Kell McAboy" <KellM@co....
Date: 11/15/2006 6:33 PM
Subject: RE: FW: Sewage Pump out and barge removal
Brian: I don't have answers to your specific questions regarding the
grant process and I will defer to Kell about setbacks for a septic
holding tank(while the master program may have a specific setback it
may be the County Health Dept.that has more to say about locating one
of these).
I also have no experience regarding pump out fees. I would suggest you
call marinas in the Puget Sound area to find out how they handle this
issue. The master program is silent about pump out fees but there may
be some requirement if paid for with grant funds.
Regarding the barge removal, I am unaware of any other permit that
Ecology would require.
Kim
Kim Van Zwalenburg
Shoreline Specialist
Department of Ecology-Southwest Regional Office
PO Box 47775
Olympia,WA. 98504-7775
(360)407-6520; FAX(360)407-6305
e-mail: kvan461@ecy.wa.gov
-----Original Message-----
From: Brian McGinnis[mailto:brian@pinnaclerealestate.us)
Sent:Wednesday, November 15, 2006 1:32 PM
To:'Kell McAboy
Cc:Vanzwalenburg, Kim
Subject: RE: FW: Sewage Pump out
Kell:
Thanks for your message.
1.The nautical distance is approximately 8,700 feet of 1.7 miles.
2.Al 10 miles per hour, the approximate boating drive time is 10
minutes.
3. Both facilities would be open to the public.
If we move forward with the shoreline variance process,we would need
approval from DOE-SW Regional Office(Pat Bailey)since they have
jurisdiction over our wastewater treatment plant.
I am very concerned about allowing the general public to use
Alderbrook's
pump out facility since it would impact Alderbrook's wastewater
treatment
plant. A dump of bad chemicals (bleach, diesel,etc.)and it could shut
down our treatment plant and the resort!
(1111612006) Kell McAboy- RE: FW: Sewage Pump out and bargeremovall Page 2
Due to the concern of harming Alderbrook's treatment plant,we are also
looking into installing a pump out and holding tank at the Hood Canal
Marina
and applying for a grant with Washington State Parks&Rec. -Boating
program. Do you have any experience with this? I understand that the
grant, if approved,could pay for a good portion of the cost.
If we install a new pump out on the dock at the Hood Canal Marina and
bury a
holding tank,what would be the restrictionstsetbacks? Since we need to
be
open to the public,we will need to charge because of the cost to pump
out
the holding tank. Is the cost of using the pump out regulated? I know
that
the Pleasant Harbor Marina obtained a grant from Jefferson County and
they
charge$5.
Appreciate your assistance. This fuel permit is much more difficult
than I
expected!
Brian
Brian McGinnis
Pinnacle Real Estate LLC
22526 SE 64th Place, Suite 210
Issaquah,WA 98027
Tel: (425)369-9290
Fax:(425)369-9008
---Original Message---
From: Kell McAboy[mailto:KellM@co.mason.wa.us]
Sent:Wednesday,November 15,2006 10:41 AM
To:Brian McGinnis
Cc: kvan461 @ECY.WA.GOV
Subject: Re: FW: Sewage Pump out
Hi Brian,
I just spoke with her in the office about 20 minutes ago. Questions she
and
I have are:
1.What is the nautical distance to Alderbrook Inn from Union Marina?
2.What is the average time to travel by vessel between the marinas?
3.Will both facilities be open to the public?
Under Shoreline Master Program 17.50,060 Marinas 8. New marinas,or
expansion of existing saltwater marinas which provide moorage for more
than
ten boats, shall be required to be equipped with easily accessible
vessel
pump-out and shall provide on-shore sewage and waste disposal
facilities.
Each marina shall predominately display signs stating that sanitary
(11/16 2006)Kell McAboy- RE: FW: Sewage Pump out and barge removal Page 3
discharge of wastes is prohibited. Deviation from pump-out requirements
on
saltwater shall require a Variance.
Kim and I agree that the proposal to use Alderbrook pump-out facilities
can
be possible through the Shoreline Variance process, however, both
marinas
would need to be available to the public.
I apologize for the long delay in completing the meeting notes from your
pre-application,they will be sent to you as soon as possible.
I have the Shoreline Exemption application(SHX2006-00096)for the barge
removal on my desk and will process it in the order it was received. I
am
running about 20-25 days out.
Thanks for your patience, I realize you're eager to get the project
going.
Kell
Kell MCAboy, Land Use Planner
Mason County DCD
411 N. 5th/P.O. Box 279
Shelton,WA 98584
360.427.9670 ext.363
>>>"Brian McGinnis"<brian@pinnaclerealestate.us> 11/1 512006 1 0:15 AM
Kell:
Have you contacted Kim Van Zwalenberg concerning our sewage pumpout
request?
It has been 3 weeks since our preapplication meeting. I have spoken
with
Kim and she was expecting your call. (see my email message below) Can
you
please give me an update on these two issues?
Thanks,
Brian
-----Original Message-----
From: Brian McGinnis[mailto:brian@pinnaclerealestate.us]
Sent:Thursday, November 09, 2006 3:02 PM
To:'Kell McAboy
Subject: Sewage Pump out
Kell:
I spoke today with Kim Van Zwalenberg of DOE concerning the County's
request
for a sewer pump out at the Hood Canal Marina and the possibility of
using
(11/16/2006) Kell McAboy- RE FW: Sewage Pump out and barge removal Page 4
Alderbrock's nearby sewer pump out facility as a substitute,since both
docks are under the same ownership and in close proximity. I told her
that
you were going to contact her. With no sewer near the Hood Canal Marina
and
Alderbrook having a model wastewater treatment facility,we hope that
this
condition can be waived.
I also asked her if we would need DOE's approval for the removal of the
old
sunken barge next to the dock at the Hood Canal Marina. We send her
some
photos of that condition. We filed for a shoreline permit with Mason
County
on 10/25 for the removal of this hazard. She may ask you about that
condition as well.
Thanks,
Brian
Brian McGinnis
Pinnacle Real Estate LLC
22526 BE 64th Place, Suite 210
Issaquah,WA 98027
Tel: (425)369-9290
Fax: (425)369-9008
11 1 Ke cAbo -RE: :Sewage Pump out Pa e 1
From: "Brian McGinnis"<brian@pinnaclerealestate.us>
To: `Kell McAboy"<KeIIM@co.mason.wa.us>
Date: 11115/2006 1:38 PM
Subject: RE: FW: Sewage Pump out
CC: <kvan461@ECY.WA.GOV> ^
Kell: l„Y(\TIC
Thanks for your message.
1.The nautical distance is approximately 8,700 feet of 1.7 miles.
2.At 10 miles per hour,the approximate boating drive time is 10 minutes. _
3. Both facilities would be open to the public.
If we move forward with the shoreline variance process,we would need
approval from DOE-SW Regional Office(Pat Bailey)since they have
jurisdiction over our wastewater treatment plant.
I am very concerned about allowing the general public to use Alderbrook's `n� '�f'
pump out facility since it would impact Alderbrook's wastewater treatment V ZD�
plant. A dump of bad chemicals(bleach,diesel, etc.)and it could shut \
down our treatment plant and the resort!
Due to the concem of harming Alderbrook's treatment plant,we are also
looking into installing a pump out and holding tank at the Hood Canal Marina
and applying for a grant with Washington State Parks& Rec. -Boating
program. Do you have any experience with this? I understand that the O
grant, if approved,could pay for a good po ion o e cos .
If we install a new pump out on the dock at the Hood Canal Marina and bra�Vc���0..vl,✓a--
hol _ tank what would be the restricts t ack v Since we need to be
open to the public,we wil need to charge because of the cost to pump out
the holding tank. Is the cost of using the pump out reoulated2 I know that N o (-?
the Pleasant Harbor Marina obtained a grant from Jefferson County and they /
charge$5.
Appreciate your assistance. This fuel permit is much more difficult than I
expected!
Brian
Brian McGinnis
Pinnacle Real Estate LLC
22526 SE 64th Place,Suite 210
Issaquah,WA 98027
i Tel: (425)369-9290
Fax: (425)369-9008
—Original Message-----
From: Kell McAboy[mailto:KeIIM@co.mason.wa.us]
Sent:Wednesday, November 15,2006 10:41 AM
To: Brian McGinnis
Cc: kvan461 @ECY.WA.GOV
Subject: Re: FW:Sewage Pump out
Hi Brian,
7
(N/1__ 6 el cAboy-RE: FW: Sewage Pump out Page
I just spoke with her in the office about 20 minutes ago. Questions she and
I have are:
1.What is the nautical distance to Alderbrook Inn from Union Marina?
2.What is the average time to travel by vessel between the marinas?
3.Will both facilities be open to the public?
Under Shoreline Master Program 17.50.060 Marinas 8. New marinas,or
expansion of existing saltwater marinas which provide moorage for more than
ten boats,shall be required to be equipped with easily accessible vessel
pump-out and shall provide on-shore sewage and waste disposal facilities.
Each marina shall predominately display signs stating that sanitary
discharge of wastes is prohibited. Deviation from pump-out requirements on
saltwater shall require a Variance.
Kim and I agree that the proposal to use Alderbrook pump-out facilities can
be possible through the Shoreline Variance process,however, both marinas
would need to be available to the public.
I apologize for the long delay in completing the meeting notes from your
pre-application,they will be sent to you as soon as possible.
I have the Shoreline Exemption application (SHX2006-00096)for the barge
removal on my desk and will process it in the order it was received. I am
running about 20-25 days out.
Thanks for your patience, I realize you're eager to get the project going.
Kell
Kell McAboy, Land Use Planner
Mason County DCD
411 N. 5th/P.O. Box 279
Shelton,WA 98584
360.427.9670 ext.363
>>>"Brian McGinnis"<brian@pinnaclerealestate.us> 11 it 5/2006 10:15 AM
Kell:
Have you contacted Kim Van Zwalenberg concerning our sewage pumpout request?
It has been 3 weeks since our preapplication meeting. I have spoken with
Kim and she was expecting your call. (see my email message below) Can you
please give me an update on these two issues?
Thanks,
Brian
-----Original Message-----
From: Brian McGinnis[mailto:brian@pinnaclerealestate.us]
Sent:Thursday, November 09,2006 3:02 PM
To: 'Kell McAboy'
Subject: Sewage Pump out
Kell:
I spoke today with Kim Van Zwalenberg of DOE concerning the County's request
11 15/2WS)Kell McAbo -RE: FW: Sewage Pump out
for a sewer pump out at the Hood Canal Marina and the possibility of using
Alderbrook's nearby sewer pump out facility as a substitute,since both
docks are under the same ownership and in close proximity. I told her that
you were going to contact her. With no sewer near the Hood Canal Marina and
Alderbrook having a model wastewater treatment facility,we hope that this
condition can be waived.
I also asked her if we would need DOE's approval for the removal of the old
sunken barge next to the dock at the Hood Canal Marina. We send her some
photos of that condition. We filed for a shoreline permit with Mason County
on 10/25 for the removal of this hazard. She may ask you about that
condition as well.
Thanks,
Brian
Brian McGinnis
Pinnacle Real Estate LLC
22526 SE 64th Place,Suite 210
Issaquah,WA 98027
Tel: (425)369-9290
Fax:(425)369-9008
007 Kell McAb0 - E: MARINA IN UNION Pa e 1
From: "Zabel, Kim (DOH)"<Kim.ZabeI@doh.wa.gov>
To: "Kell MCAboy'<KelIM@co.mason.wa.us>
Date: 1/29/2007 11:23 AM
Subject: RE: MARINA IN UNION
Hi Kell,
We rec'd the packet of info.you sent regarding the Union Marna, thank
you. We were happy to see that it did not include an expansion of the
Marina its self. Any expansion would have an impact on public health
and would change the size of the seasonal(May-end of Nov.)closure zone
around the Marina currently,and close a portion of approved commercial
shellfish growing area.
Our office is curious about the change in use as it relates to the
on-site septic system(OSS). Does Mason County Env. Health review this
proposal as well? Although their proposed use of the Nitrogen reducing
technology is admirable, the change in waste strength (residential to
high strength)due to the RV's,which use all kind of nasty chemicals
not suitable for on-site systems, could cause the system to fail. Many
new OSSs that have RV waste inputs have failed almost immediately due to
high strength waste. Was the previous OSS sized for the marina
wastewater and the mobile? 6-12 employees, two showers, two sinks,and
2 RV hook-ups is different than one mobile home.
Thanks for the help,
Kim
Kim Zabel
Division of Environmental Health
Washington State Department of Health
Shellfish &Water Protection
Town Center 2
111 Israel Road Southeast
PO Box 47824
Olympia,WA 98504-7824
Ph: 360.236.3310
Fax: 360.236.2257
Kim.Zabel@doh.wa.gov
Public Health-Always Working for a Safer and Healthier Washington
(11l20/2006) Kell MCAbcy RE FW: Sewage Pump out Page 1
From: "Brian McGinnis"<brian@pinnaclerealestate.us>
To: "'Kell MCAboy"<KellM@co.mason.wa.us>, "'Penny Orth'"<PennyO@co.mason....
Date: 11/20/2006 2:14 PM
Subject: RE: FW: Sewage Pump out O�
Attachments: Septic Tank test results for Restrooms at Marinak.pdf,, Septic Tank test res
ults for House Tank.pdf
Dear Kell and Penny: o
Last week,we had AAA Septic test the 1,200 gallon septic tank and drain VS/
field that are used for the existing mobile home. The 1,200 gallon tank and
drain field are in good working order I have attached the"Septic Tank
Pump&Service Reporr'from AAA Septic.
During the test,we found that the two restrooms in the Marina building were
not connected to the same septic tank. We found another separate 750 gallon
septic tank servicing the two restrooms. The 750 gallon tank and drain
field are in good working order as well. I have also attached is their
"Septic Tank Pump&Service Report".
We have retained Joyce Johnson to be our septic/drain field"designer".
Since we will be removing the existing mobile home and the existing septic
system is in perfectly good condition,we would like to propose the
following:
1. We locate the boundaries of the existing drain field and no longer
allow vehicles to drive over the drain field. We landscape the area above
the existing drain field to make certain it is kept in good condition.
2. We could put a grinder pump at the 750 gallon tank and pump the
contents from the two restrooms into the 1,200 tank and drain field. The
flow from the existing restrooms would be relatively minimal,which could
easily be handled by the existing septic system. Remember that the existing
system was designed for a 3-bedroom home.
We are also having the design done for a sewer pump-out on the dock. We are
looking at the sizing for a holding tank for the sewer pump out. In
speaking with Pleasant Harbor Marina,their sewer pump out is a drain field.
During a busy weekend,they pump no more than 3 boat or less than 100
gallons a day,since the volume per boat is 10 to 30 gallons each. With the
excess capacity of the 1,200 gallon tank,we would like you to consider
allowing us to use this existing septic tank and drain field to be used for
the two restrooms and for the sewer pump out on the dock.
I was going to schedule a meeting with Joyce, Penny and myself to review
this information. Given that you are planning a meeting tomorrow, I want to
get you thinking about our unique situation. I would be happy to meet with
you both tomorrow to discuss with Joyce.
Let me know.
Thanks,
Brian
-----Original Message----
(11/20/2006) Kell McAboy- RP. FW Sewage Pump out Page 2
From: Kell McAboy[mailto:KeIIM@co.mason.wa.us]
Sent: Friday, November 17,2006 3:40 PM
To: Brian McGinnis
Cc: Penny Orth
Subject: RE: FW: Sewage Pump out
Brian,
I am meeting with Penny Orth, EH on Tuesday morning regarding this project.
I will complete my notes at that time and e-mail/mail them to you then.
Have a good weekend.
Kell
>>>"Brian McGinnis"<brian@pinnaclerealestate.us> 11/15/2006 1:31 PM
Kell:
Thanks for your message.
1.The nautical distance is approximately 8,700 feet of 1.7 miles.
2.At 10 miles per hour,the approximate boating drive time is 10 minutes.
3. Both facilities would be open to the public.
If we move forward with the shoreline variance process,we would need
approval from DOE-SW Regional Office(Pat Bailey)since they have
jurisdiction over our wastewater treatment plant.
I am very concerned about allowing the general public to use Alderbrook's
pump out facility since it would impact Alderbrook's wastewater treatment
plant. A dump of bad chemicals(bleach,diesel, etc.)and it could shut
down our treatment plant and the resort!
Due to the concern of harming Alderbrook's treatment plant,we are also
looking into installing a pump out and holding tank at the Hood Canal Marina
and applying for a grant with Washington State Parks&Rec. -Boating
program. Do you have any experience with this? I understand that the
grant, if approved,could pay for a good portion of the cost.
If we install a new pump out on the dock at the Hood Canal Marina and bury a
holding tank,what would be the restrictionstsetbacks? Since we need to be
open to the public,we will need to charge because of the cost to pump out
the holding tank. Is the cost of using the pump out regulated? I know that
the Pleasant Harbor Marina obtained a grant from Jefferson County and they
charge$5.
Appreciate your assistance. This fuel permit is much more difficult than I
expected!
Brian
Brian McGinnis
Pinnacle Real Estate LLC
22526 SE 64th Place,Suite 210
Issaquah, WA 98027
Tel:(425)369-9290
Fax: (425)369-9008
11/20/2006 Kell McAbo -RE: FW: Sewa a Pum out
---Original Message-----
From: Kell McAboy[mailto:KeIIMQce.mason.wa.us]
Sent:Wednesday, November 15, 2006 10:41 AM
To: Brian McGinnis
Cc: kvan461QECY.WA.GOV
Subject: Re: FW:Sewage Pump out
Hi Brian,
I just spoke with her in the office about 20 minutes ago. Questions she and
I have are:
1.What is the nautical distance to Alderbrook Inn from Union Marina?
2.What is the average time to travel by vessel between the marinas?
3.Will both facilities be open to the public?
Under Shoreline Master Program 17.50.060 Marinas 8. New marinas,or
expansion of existing saltwater marinas which provide moorage for more than
ten boats, shall be required to be equipped with easily accessible vessel
pump-out and shall provide on-shore sewage and waste disposal facilities.
Each marina shall predominately display signs stating that sanitary
discharge of wastes is prohibited. Deviation from pump-out requirements on
saltwater shall require a Variance.
Kim and I agree that the proposal to use Alderbrook pump-out facilities can
be possible through the Shoreline Variance process, however, both marinas
would need to be available to the public.
I apologize for the long delay in completing the meeting notes from your
pre-application,they will be sent to you as soon as possible.
I have the Shoreline Exemption application(SHX2006-00096)for the barge
removal on my desk and will process it in the order it was received. I am
running about 20-25 days out.
Thanks for your patience, I realize you're eager to get the project going.
Kell
Kell MCAboy, Land Use Planner
Mason County DCD
411 N. Sth/P.O. Box 279
Shelton,WA 98584
360.427.9670 ext.363
>>>"Brian McGinnis"<brian@pinnaclerealestate.us> 11/15/2006 10:15 AM
Kell:
Have you contacted Kim Van Zwalenberg concerning our sewage pumpout request?
It has been 3 weeks since our preapplication meeting. I have spoken with
Kim and she was expecting your call. (see my email message below) Can you
please give me an update on these two issues?
Thanks,
Brian
—Original Message-----
(11/20/2006)Kell McAboy RE: FW: Sewage Pump out
From: Brian McGinnis[mailto:brian@pinnaclerealestate.us]
Sent:Thursday, November 09,2006 3:02 PM
To: 'Kell McAboy
Subject:Sewage Pump out
Kell:
I spoke today with Kim Van Zwalenberg of DOE concerning the County's request
for a sewer pump out at the Hood Canal Marina and the possibility of using
Alderbrook's nearby sewer pump out facility as a substitute, since both
docks are under the same ownership and in close proximity. I told her that
you were going to contact her. With no sewer near the Hood Canal Marina and
Alderbrook having a model wastewater treatment facility,we hope that this
condition can be waived.
I also asked her if we would need DOE's approval for the removal of the old
sunken barge next to the dock at the Hood Canal Marina. We send her some
photos of that condition. We fled for a shoreline permit with Mason County
on 10125 for the removal of this hazard. She may ask you about that
condition as well.
Thanks,
Brian
Brian McGinnis
Pinnacle Real Estate LLC
22526 BE 64th Place,Suite 210
Issaquah,WA 98027
Tel: (425)369-9290
Fax:(425)369-9008
Septic Tank Pump & Service Report
❑Prsioenuel ❑Motel ❑ Food Service Restaurantt���
O RV Pane ❑YouU,Camp Est OMer,Please oescnee� ryJ'f"Q.CL�J t'I$ �T
❑Campground ❑Mobile Hone Pane Space s_ M14%2-1 t4 4^r
Property Owner phone rt 8rY$ u�-
Buslnessname(ifapp'nxzbl9) FboDU4Fkai. YLWWt�r1.Afef(fng address t.B o t E. AW y iOto pry t�t•4 t0M• sh"ov--.ap g8'9ptZ
Site address, S"C
Tarparcel5 _ — _�' - - - - - - - - -
SEPTIC TANK
rank Size 750 Gallons tot Compartments I rank Construction: b(Manufactured ❑Home Mada
Tank Matelot ❑Metal O WOOd 'K Concrete ❑Fiberglass ❑Other
Effluent Leinet. ❑High WNonnal ❑Low Tank Condfdorx10fSatistactory ❑Needs Repair
Tank Pumped: J19 Yes ❑No Were repairs made to the tank? ❑Yes No
If yes,Please explain
BAFFLES �yYRx+G-tS p'T
Inlet Baffle Condition. )(Satisfactory ❑ Needs Repair
Outlet Battle Condiborr. )(Satistactory ❑Needs Repair Mwn.64NA
Center Battle Condition 0Satisfactory ❑Needs Repair 'V(Nol Applicable
Effluent Filler Cleaned? []Yes ❑No `JO�Nrot Applicable
WPM MpAIM nLide f0 lire haf/lea? ❑Yes K1*1
If yes,please explain: "Cf)
7 PUMP OR SURGE TANK ❑Yes YNo If yes,lank alze -_ . Gallons
Were repairs made to the pump orsurge tank? ❑ YOS ❑NO
It yes,please explain
SEPTAGE It
Depth of Floating Mat ist Compartmertt: 2nd corrilmrlment �� ur_Pump Tank 14 14
Depth of Sludge: ist Compartmant nd compartment—='c/ Purtp Tank it
Total Gallons Pumped Z.'5Q Dmpoiral Facf/fly.�fBiorecycle O Other:
General Comments t'"m,`C QM
Iactz-e0 Fva au wtgTF,2.
Date Pumped i I f 6<.. ,Becom ntied Next Pumping Date 1-2 V O-S
Certified Pumper Signature }� Company Name 000,V* 5C.VrrL
Findings and deremrirrafkna OfOW Nupeotion reaecf mMitiwrs as ereyexdtedon are daytfa$spb'C fans seaiourVed.No gaen Is made
by Miff cwWny,eftherexpreseedor urpffed,cortcemog suaxss or leilure of rho soptk system.
Mason County Department of Health Services•426 W Cedar•Mason County Building III
PO Box 1666•Shelton,WA 98584•(360)427-9670 ext.352
While copy-Haath Department Yellow copy..Pumper Pink copy-Owner
2mbd ` 2T gooe-LT-11
Septic Tank Pump & Service Report
> g-dermal ❑Motel ❑f000 Service Restaurant
❑ nv Pad, O Youth Comp ❑Olhar,Pkaaa Deacrba:
❑Cernpgrourrd 0 Wbdo Hone Park Space M
Property Owner ? Pitons x 896 2-Z-52
Business name(viaptail:& ie) _ 14=DQk 041Wy KtAIL111410t.
Rfailmiladdress 5101 E OWN IOtra City t1�1O_t-I al��p Q$9ejL
Site address -�-
Tax parcel x —
SEPTIC TANK
Tank Size: i It=_Gallons /otComparOmeretc Z Tank ConstruCSOM WManulacturad ❑Home Made
Tank Materfal, O Metal O Wood j0 Concrete ❑Fiberglass ❑Other—_ _
Efftuent Levet O High 'd Normal ❑Low Tank Condition: �Satiefactory ❑Needs Repair
Tank-Pumped: �l Yes ❑_Nolte. Were repairs made to the tank? ❑Yes W No
If yes,please explain..—T/:
BAFFLES Rouse, Ti41-FK KyP
InletaaRle Condition: Satisfactory O Needs Repair
Outlet Bathe Condition Satisfactory ❑ Needs Repair �lth�t
Center Battle Condition: '%Satisfactory O Needs Repair ❑Not Applicable
Effluent Fliter Clean yoed? ❑ Yes ❑ No Not Applicable
Were repairs made to the baffles? ❑ Yes VNo
If yes,please explait.
PUMP OR SURGE TANK ❑ Yes No g yes, tank size: Gallons
Were repaint made to tie pump of surge 00*7 ❑Yes LINO
If yes,Please explain
SEPTAGE
Depth of Flosting Mat 1 st Companmem: 12 rirn 2nd compw men t�Pump Tank
Depth of Sludge, tatcompanment - I"0 2ndcompartment 5 Pump Tank 'Q!;-
Toml Gallons Pumped 1740 Disposal Facifity)(aiorecycie O Other.
General comments -JIDT'E1n rr`i'Fitt FCTL OVpJL y0 Mt►1
WCLePrEb wu— witre2 _T No R_wuac Ftn�✓
Dare Pumped 1 i t7+O!� Recarrinnended Next Pumping Date 2'
Certified Pumper6*Ud&uey N!t_` +aft Company Name W'bp i5vitQTff.
Fnfings and deta rptions of this msp,wwnrarecrc«tdieons as they aostoom me day the septic rankwaspunrped No eosin lsmade
by this corrrpam% o%thar expressed ar viplied, conremlrnJ sueeese a osi o aft septic system.
Mason County Department of Health Services r 426 W Cedar•Mason County Building III
PO Box 1866•Shelton,WA 98584•(360)427-9670 ext. 352
White copy-Health Department Yellow copy--Pumper Pinkcapy-Owner
1319 td 92:2T 9aB2-LT-TT