HomeMy WebLinkAboutFPA2018-00011 Findings of Fact - FPA Permit / Conditions - 8/3/2018 A
FINDINGS OF FACT
FPA Case#2018-00011
APPLICANT: Cathie May
APPLICATION DATE: August 3, 2018
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees.
The proponent has filed a complete, signed application.
A map has been received that complies with the requirements of 11.05.120:
(I) Harvest boundaries and tree retention areas.
(II) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways,easements, skid
roads, haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves 2.5 acres on a single parcel.
That the notifications required by 11.05.060 have been made if applicable.
Note: Harvest unit is greater than 500 ft from a State Park.
Mason County Resource Ordinance
1
reviewed of DCD and he approved a submittal checklist on -
NOTE: Minimum Requirements 1-5 addressed b Dale Oien.
q y
Permission from Underlying Property Owners:
Yes—Cathie May signed the application.
CONCLUSION
In conclusion,this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I, being the Director of the Mason County Community Services, hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition to these facts
evidenced by the contents of the file for this Forest Practice Application.
Signed,
Da id Windom, Director Community Services Dept. Date
Michael MacSems, FPA Reviewer Date
3
RECEIVED
'`,CMASON COUNTY AUG 0 3 2018
COMMUNITY SERVICES 615 W. Alder Street
/ Building,Planning,Environmental Health,Community Healthy
615 W.Alder St.—Bldg.8,Shelton,Wa 98584 F P��s71�t(J Phone:(360)427-9670 ext.352 ♦Fax:(360)427-7798 i U
FOREST PRACTICES APPLICATION/NOTIFICATION
Type IV General
This application should be accompanied with an Environmental Checklist (SEPA) as well as an activity map/site plan which addresses
items listed below.
TYPE OR PRINT IN INK:
1. Landowner Timber Owner and O erator information.
Legal Name of LANDOWNER Lelzal Name of TIMBER OWNER Legal Name of OPERATOR
CaMtrin� e, „h� a �p
Mailing Address: M ilin Address: Mailing Address:
*/CIE 7 or�e> V Ii A K 01 RE Taonervi ll e PR, /q �k
City, State,Zip City, State,Zip City,State,Zip
Phone(3G)o -r 10— S q-r 0 Phone(3W -71 p_jq?g Phone(JFO
Email: I S/ / Email• 4h)L .s .S' i ' Email:
mai ,com Com
2. Contact person information.
Contact Person Phone( )
a5t-1,:�� 4 Email: Gd
3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: $O d O$3 6�i I
For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829.
4. Legal description where the forest practices will occur.
Parcel Number Sub Division '/,Y. Section Township Ran e E/W
.U"A-QnA9At61 3
5. Answer each question as it applies to your proposed forest practice.
a. Mlo. [] Yes. Is the activity within an urban growth area?
b. Wo. [] Yes. Is the activity within a public park?
C. LKNo. [] Yes. Is the activity within 500 feet of a public park? Park name:
d. bdNo. [] Yes. Is the activity located on lands platted after January 1, 1960?
e. o. [] Yes. Is the activity within 200 feet of saltwater lake river/creek/stream pond
wetland seasonal runoff slopes which exceed 15%?
f. What is the expected durati f FPA?
Proposed start date: Proposed end date: /p
6. Are you cutting or removing timber?
[]No. (VYes. Complete the table below and identify all timber harvest and salvage activity boundaries on the
activity map.
Rev.August 2017
Acres Volume to be Steepest Slope in
Unit# Harvest Tvve Yarding Method net Harvested mb Harvest Unit
7. Are you constructing or abandoning roads?
Yes. Complete the table below. Show locations and identify all road activities on the activity map.
Total Length Steepest Side Slope Abandonment Date
Type of Activity feet % Mo/Yr
Road Construction Does Not Apply
Temporary Road Construction
Road Abandonment
Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife
(WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm.
8. _Aq you installing or replacing water-crossings?
o. [] Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map.
N
Crossing Crossing Dimensions Crossing Crossing Dimensions
Identifier Type width x length) Identifier Type width x length)
9. Mark the following activities that will be done in or over typed water.
Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream
Removing culverts of bridges
Equipment crossing
Ground skidding
Suspending cables
Cable yarding
Falling and bucking
Other
10. Is any activity in a wetland or wetland buffer?
rNo.. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map.
Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area
Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres)
other
11. Describe how the following are identified on the odd. J
• Harvest boundaries/unit corners:
• Right-of-way limits and centerlines for road work,cu erts and bridges:
• Critical areas and critical area buffer boundaries:
Page 2 of 4
12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American
cultural resources? r-J YNo. [] Yes.
13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest
Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local
regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance
does not ensure compliance with the Endangered Species Act or other federal state or local laws.
Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR
(if different than landowner (If different�hat l-andowner)
Print name: C4+nie /4AI Print n e: �i Print name: ��4 A �i g,"
Date: 3,Jg IDate: ' 3• Date: !
I
Additional information: (Optional)
Per Mason County Ordinance 11.05,Section 11.05.120,a site map shall accompany this application which includes the
following information.
I Harvest boundaries and tree retention areas.
II The approximate location of any structures.
III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads, and landings
within the proposal.
IV The location of future land development including stormwater management facilities and vegetation to be retained
for site landscaping,open space,wildlife habitat,screening, and/or buffers.
V Site topography at contour intervals of 40 feet.
VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance.
VII Drainage ways and culverts.
VIII Site area targeted for further harvest including proposed timing.
IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet.
Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification.
Paee 3 of 4
a
NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion
control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered
stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE
Stormwater Manual.Applicants will be charged for Public Works staff time to review these plans and applications.
Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a
NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to
Mason County's threshold.WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is
not a perquisite for FPA approval.It is the responsibility of the applicant to obtain this permit when required.
FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730
10 to 20 Acres$880
Over 20 Acres$1,100
EIS(DS)$5,000+90/hr
Departmental Review
(For Office Use Only)
Site visit:
Date approved: Q 1
Mason County Community Services
Page 4 of 4
-IEa"May
401 N.E.Toonerville Drive
Date: 8/8/18
Project title: Kathy May Pasture (Narrative)
The site has an existing Home, Drain field and well house. The site has no evident critical slope
issues. The site slopes from North to south with a gentle slope across the property. We don't see any
distinct water channels or washout areas on the site. The perimeter buffers should contain any runoff
based on the site soils and the ability for site water to infiltrate into the existing soils.
The site has an existing access and will not require any more road building. Existing vegetation will be
pilled around the clearing edges to prevent run off and filter water from creating any wash.
The unchanged topo should allow the existing run off to discharge in the same manner of the past.
Once seeded the soils should contain any runoff buy way of natural infiltration.
The site access enters from a privately maintained road. (N.E.Toonerville Dr.)And will have no impact
on Mason county R/W
This project will clear—2 Acres other than existing home site and is meant to provide pasture for
horses for personal use.
Clearing limits will be marked by the use of orange ribbon around the clearing limits.
Logging/clearing will be done with shovel to lesson soil disturbance or channeling.
Weather shouldn't be a factor due to the soils and topo of the existing site.
Cleared area will be seeded by owner once cleared.
FPA Stormwater Minimum Requirements
Y
Guide to Preparing Required County Submittals (last update:09/2017)
i
FPA Construction SWPPP Elements -Template
Project description—Include the following information:
1. Project location and any associated permit numbers
2. Total site acreage and the acreage to be disturbed(logged)
3. Description of any new road construction(length,width, materials),or if existing roads are to be
used,note this
4. General description of soils,topography and drainage including where surface water enters and
leaves the property
5. Anticipated start and end date and any other project timing considerations
6. Description of logging method and expected use after logging
i
a
t
Element 1: Mark Clearing Limits ��
{
To protect adjacent properties and to reduce the area of soil exposed to construction,the limits of
construction will be clearly marked before land-disturbing activities begin. Trees that are to be
preserved,as well as all sensitive areas and their buffers,shall be clearly delineated, both in the field
and on the plans. In general,natural vegetation and native topsoil shall be retained in an undisturbed
state to the maximum extent possible. Applicant should describe how clearing limits will be marked
prior to logging and note on the site plan.
Element2: Establish Construction Access
Construction access shall be established and access points shall be stabilized to minimize the tracking of
sediment onto public roads. If sediment is tracked off site, public roads shall be cleaned by shoveling or
sweeping at the end of the day to prevent sediment from entering surface waters. Applicant should
describe where the construction access will be,obtain a Road Access Permit if it is a new location,and
construct access to minimize sediment tracking.
Element 3: Control Flow Rates
Downstream properties and waterways shall be protected from erosion due to increases in stormwater
runoff volume,velocity and peak flow rate. The applicant needs to clearly identify where runoff will
leave the site so potential downstream impacts can be evaluated. This element will be"not /
applicable"(N/A)for most FPA!;because the increase in runoff and/or erosion due to logging will be J/
negligible. If no BMPs are proposed,the applicant needs to describe rationale:e.g.,flat topography,
highly permeable soils,large vegetated buffers at site perimeter, logging method,or others.
Page 3 of 7
i
FPA Stormwater Minimum Requirements
Guide to Preparing Required County Submittals (last update:09/2017)
Element 4: Install Sediment Controls
Stormwater runoff from disturbed areas shall pass through a sediment removal Best Management
Practice(BMP)before leaving the site or prior to being discharged to an infiltration facility. In most
cases,an FPA will not require the construction of an infiltration facility. Whenever possible,sediment
laden water shall be discharged into onsite, relatively level,vegetated areas.
If no BMPs are proposed,the applicant needs to describe rationale.
More complex sediment control/treatment BMPs,such as infiltration facilities,should be used if
sediment controls are not(or not anticipated to be)adequate for the site-specific construction activities.
These BMPs are primarily used on:
■ Larger sites(i.e.greater than 5 acres),or,
■ Sites that have continual soil disturbance and are difficult to temporarily stabilize,or,
■ Sites at higher risk of erosion(i.e.slopes),or,
• Sites where the downstream environment is particularly sensitive and more stringent
discharge controls are required.
Element5: Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion
throughout the life of the project. In general,cut and fill slopes will be stabilized as soon as possible and
soil stockpiles will be temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized
from erosion, protected with sediment trapping measures,and where possible, be located away from
storm drain inlets,waterways,and drainage channels.
This element will be"not applicable"(N/A)for most FPAs unless there is new road construction that
includes cuts and fills. If no BMPs are proposed,the applicant needs to describe rationale.
Element 6: Protect Slopes
All cut and fill slopes will be designed,constructed,and protected in a manner that minimizes erosion.
This element will be"not applicable"(N/A)for most FPAs unless there is new road construction that
includes cuts and fills. If no BMPs are proposed,the applicant needs to describe rationale.
Element 7: Protect Drain Inlets
All storm drain inlets and culverts made operable during construction shall be protected to prevent
unfiltered or untreated water from entering the drainage conveyance system. However,the first
Page 4 of 7
r
FPA Stormwater Minimum Requirements
Guide to Preparing Required County Submittals (last update:09/2017)
priority is to keep all access roads clean of sediment and keep street wash water separate from entering
storm drains until treatment can be provided. Storm Drain Inlet Protection(BMP C220)will be
implemented for all drainage inlets and culverts that could potentially be impacted by sediment-laden
runoff on and near the project site.
This element will be"not applicable"(N/A)for most FPAs unless there is new road construction that
includes cuts and fills. If no BMPs are proposed,the applicant needs to describe rationale.
Element 8: Stabilize Channels and Outlets
Where site runoff is to be conveyed in channels,or discharged to a stream or some other natural
drainage point,efforts will be taken to prevent downstream erosion. The general project description ,�// n
and site plan should identify where runoff will leave the site at natural drainage points. [" �` -
This element will be"not applicable"(N/A)for most FPAs unless there is new road construction,
existing roads with culverts and conveyances,resource protection areas,steep slopes,and/or highly
erosive soils. If no BMPs are proposed,the applicant needs to describe rationale.
Element9: Control Pollutants
All onsite pollutant sources shall be handled and disposed of in a manner that does not cause
contamination of Stormwater. Good housekeeping and preventative measures will be taken to ensure
that the site will be kept clean,well organized,and free of debris.
Applicant should describe all potential pollution sources and how they will be managed.
Element10: Control De-Watering
This element will be"not applicable"(N/A)for most FPAs.
Element11: Maintain BMPs
All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as
needed to assure continued performance of their intended function. Maintenance and repair shall be
conducted in accordance with each particular BMPs specifications. Visual monitoring of the BMPs will
be conducted at least once every calendar week and within 24 hours of any stormwater or non-
stormwater discharge from the site. If the site becomes inactive,and is temporarily stabilized,the
inspection frequency will be reduced to once every month.
All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site
stabilization is achieved or after the temporary BMPs are no longer needed.
This element will be"not applicable"(N/A)for most FPAs if Element 3's 3—8 are N/A or very minimal.
Page 5 of 7
FPA Stormwater Minimum Requirements
Guide to Preparing Required County Submittals(last update:09/2017) ,
Element 12: Manage the Protect
Erosion and sediment control BM Ps for this project have been designed based on the following
principles(not all will be applicable):
■ Design the project to fit the existing topography,soils,and drainage patterns.
■ Emphasize erosion control rather than sediment control.
■ Minimize the extent and duration of the area exposed.
■ Keep runoff velocities low.
■ Retain sediment on site.
■ Thoroughly monitor site and maintain all ESC measures.
• Schedule major earthwork during the dry season.
In addition, project management will incorporate the key components listed below(again,not all will be
applicable):
Seasonal Work Limitations
• From October 1 through April 30,clearing,grading,and other soil disturbing
activities shall only be permitted if shown to the satisfaction of the local
permitting authority that silt-laden runoff will be prevented from leaving the
site through a combination of the following:
❑ Site conditions including existing vegetative coverage,slope,soil type,
and proximity to receiving waters;and
❑ Limitations on activities and the extent of disturbed areas;and
❑ Proposed erosion and sediment control measures.
• Based on the information provided and/or loca►weather conditions,the local
permitting authority may expand or restrict the seasonal limitation on site
disturbance.
Page 6of7
FPA Stormwater Minimum Requirements
Guide to Preparing Required County Submittals (last update:09/2017)
• The following activities are exempt from the seasonal clearing and grading
limitations:
❑ Activities where there is 100 percent infiltration of surface water runoff
within the site in approved and installed erosion and sediment control
facilities.
Coordination with Utilities and Other Jurisdictions
' Care has been taken to coordinate with utilities,other construction projects,
and the local jurisdiction in preparing this SWPPP and scheduling the
construction work.
Inspection and Monitoring
' All BMPs shall be inspected, maintained,and repaired as needed to assure
continued performance of their intended function.
' Whenever inspection and/or monitoring reveals that the BMPs identified in this
SWPPP are inadequate,due to the actual discharge of or potential to discharge
a significant amount of any pollutant,appropriate BMPs or design changes shall
be implemented as soon as possible.
Page 7 of 7
Page 1 of 1
Michael MacSems - Re: Cathie May FPA Status
From: Cathie May<cathiemay515104@gmail.com>
To: Michael MacSems<mms@co.mason.wa.us>
Date: 9/2/2018 5:51 AM
Subject: Re: Cathie May FPA Status
Attachments: noname
There are no dogs on the property. Thank you for you for work.
On Fri, Aug 31, 2018, 10:37 AM Michael MacSems<mms(c�r�co.mason.wa.us>wrote:
Dale and Cathie,
Your FPA has finally reached the top of in-box. Here are my thoughts:
Regarding the stormwater review. We have to calculate in the area that was logged for the house last
years (because it wasn't permit exempt). By my calculations that puts the entire area of disturbed
ground at 2.47 acres,which it means that it still qualifies to only be reviewed for Minimum
Requirements 1-5. I have gone through the stormwater submittal and found a handful of items that I
need better answers to. These are:
1. How will you prevent tracking of sediment off the site and onto the road during the logging
operation? (Narrative Element 2)
2. Please address the question of on-site pollution controls(Narrative Element 9)
3. Who will be the project manager?(Narrative Element 12)
Also,there is no charge to review for stormwater when you qualify for Minimum Requirements 1-5.
You paid the$300 review fee for a fully engineered plan on submittal, and I believe that you qualify
for a 100%refund for that. I have attached a refund request form for you.
On the environmental habitat side, The County's GIS map(see below) is showing a Ns(seasonal
non-fish) stream on this property, but outside of the harvest area. Our GIS maps are notoriously
inaccurate for getting stream locations accurate and this instance seems to be no exception. (Can you
tell me if there is a culvert under Toonerville Rd anywhere near you place?)I need to come out to the
site and look for it in order to make sure the harvest unit maintains a 75' setback. I have scheduled
this visit for Wednesday Sept. 12th. Cathie,you don't need to be there for the inspection, but I would
appreciate it if you could secure any dogs that may be upset by my inspection.
One last question, do you plan to burn the stumps and debris, or are you planning to just pile all of it
along the edge of the unit?
Thank you and have a good weekend,
Michael MacSems
FPA Reviewer
file:///C:/Users/mms/AppData/Local/Temp/XPgrpwise/5 B 8B 7A4BMasonmai11001613462... 9/10/2018
i
I
Figure 1-2.4.1 Flow Chart for Determining Requirements for New
Development
Start Here
Does the site have 35% Yes See Redevelopment Minimum
or more of existing 10 Requirements and Flow Chart
impervious coverage? (Figure I-2.4.2).
No
Does the project convert Y4
acres or more of vegetation to
Does the project result in lawn or landscaped areas,or
5,000 square feet,or No convert 2.5 acres or more of
greater,of new plus native vegetation to pasture?
replaced hard surface
area?
No
Yes
IF
YeS Does the project result in 2,000
square feet,or greater,of new plus
All Minimum Requirements replaced hard surface area?
apply to the new and replaced
hard surfaces and converted Yes NO
vegetation areas,
7
IF
Does the project have land
Minimum Requirements#1 disturbing activities of 7,000
through#5 apply to the new Yes square feet or greater?
and replaced hard surfaces
and the land disturbed. No
IF
Minimum Requirement#2
applies.
Figure 1-2.4.1
Flow Chart for Determining Requirements for
New Development
DEPARTMENT OF Revised June2015
ECOLOGY please see http://vnyw.ecy.wa.gov/copydght.htmf for copyright notice including permissions,
Stale of Washinglon limitation of Ilablllly,and disclaimer.
2014 Stormwa ter Management Manual for Western Washington
Volume I- Chapter 2-Page 37
s
Figure 1-2.4.2 Flow Chart for Determining Requirements for
Redevelopment
Does the project result In 2,000 square feet,or more,of new plus replaced hard surface area?
OR
Does the land disturbing activity total 7,000 square feet or greater?
Yes No
Minlmum Requirements#1 through#5
apply to the new and replaced hard Minimum Requirement#2 applies.
surfaces and the land disturbed.
Next Question
Does the project add 5,000 square feet or more of new hard surfaces?
OR
Convert 3/a acres or more of vegetation to lawn or landscaped areas?
OR
Convert 2.5 acres or more of native vegetation to pasture?
Yes No
All Minimum Requirements apply Next Question
to the new hard surfaces and the Is this a road
related project? NO
converted vegetation areas.
Yes
Does the project add 5,000 square feet or more of new hard surfaces?
Yes No
Is the total of new plus replaced hard surfaces
Do the new hard 5,000 square feet or more,
surfaces add 50%or Np No additional NO AND
more to the existing does the value of the proposed improvements
hard surfaces within requirements. -including interior improvements-exceed
the project limits? 50%of the assessed value(or replacement j
value)of the existing site Improvements?
Yes All Minimum Requirements apply to the new and replaced
hard surfaces and converted vegetation areas. Yes
Figure 1-2.4.2
Flow Chart for Determining Requirements for
Redevelopment
DEPARTMENT OF Revised June2015
ECOLOGY Ploase soe http.'IAvww.ecy.wa.gou/copyright.htmJ for copyright notice Including permissions,
Slate of Washington limitation of liability,and disclaimer.
2014 Stormwater Management Manual for Western Washington
Volume I-Chapter 2-Page 38
FPA Stormwater Minimum Requirements
Guide to Preparing Required County Submittals (last update: 09/2017)
Figure 2.2 of the 2005 Stormwater Management Manual for Western Washington identifies thresholds
that determine which Minimum Requirements will apply to various projects. Most Forest Practice
Applications will have"land-disturbing"activities of 7,000 square feet or more, meaning that Minimum
Requirements#1 through#5 of the Manual will generally apply. These minimum requirements are
briefly described in pages 1-2. Typically, a professional engineer is not required in these cases.
Some FPAs may trigger the need to comply with all Minimum Requirements(#1-#10). These typically
are projects where new road construction is necessary for harvest,particularly if there is also the need
for a MEP and/or geotechnical report or study. A professional engineer is needed in these cases.
PLEASE NOTE.In addition to County Code,applicants may need to obtain a Construction Stormwater
General Permit(CSWGP)issued through the Department of Ecology.
Minimum Requirement#1: Prepare a stormwater site plan
This minimum requirement will always apply,although in a much-abbreviated form of the full
requirements for an engineered stormwater site plan. The site plan used for the SEPA and/or FPA
application can be used as the stormwater site plan,if it includes the following information:
1. Note the construction access location and type of stabilization to be used to prevent tracking
sediment off-site.
2. Identify the clearing limits,sensitive areas and their buffers,and any trees required for
preservation.
3. Note the location of any proposed sediment controls to be used to contain sediments on-site. /u cw
4. Note the location of any soil and/or slope stabilization that will occur. _ VIC t,-`-
5. Note the location of all natural and constructed drainage features on site and in the near -*Ncw L
vicinity. Natural features may be wetlands,streams,draws, ravines,springs,etc. and
constructed features could include culverts,ditches,catch basins,ponds,dikes, berms,or
others.
The site plan should also provide a brief narrative of the project including:
1. Project location and any associated permit numbers
2. Total site acreage and the acreage to be disturbed(logged) l ;
3. Description of any new road construction(length,width, materials),or if existing roads are to be
used,note this
4. General description of soils,topography and drainage including where surface water enters and pe'
leaves the property
5. Anticipated start and end date
6. Description of logging method and expected use after logging Shc..c 1 s-ytwe..
This narrative can be the same as that included in the beginning of the SWPPP template found on pages
3 through 7. Applicants may use information also included in SEPA,MEP,and/or FPA applications.
Page 1 of 7
FPA Stormwater Minimum Requirements
Guide to Preparing Required County Submittals(last update:09/2017)
Minimum Requirement#2: Prepare a Construction Stormwater Pollution Prevention Plan(SWPPP)
This minimum requirement will also always apply and includes 12 elements. Depending on the project
size, location,timing,and other considerations,some projects will need to address all 12 elements
while others may only address a few. If an applicant feels that an element is not applicable,the
rationale should be clearly described. See pages 3 through 7 for a FPA Construction SWPPP template
applicants may choose to use.
Minimum Requirement#3: Pollution Source Control
This minimum requirement will likely be N/A(not applicable) because most of the BMPs will already be
addressed in Minimum Requirement#2,the construction SWPPP. The applicant may want to call out G ,
those elements of the SWPPP that provide pollution source control;for example:"See Element 9 of the
SWPPP.,'
Minimum Requirement#4: Preserve Natural Drainage Systems and Outfalls
The applicant should have provided a brief narrative of the natural drainage patterns and constructed
drainage features on the property(Minimum Requirement#1). These locations should also be clearly
identified on the site plan(also Minimum Requirement#1)with the note that they are to be protected
to the maximum extent feasible.
The applicant can repeat and/or reference the applicable sections from Minimum Requirement#1. If
drainage systems or features need to be altered,the applicant should note the possible downstream
impacts and how they will be mitigated.
Minimum Requirement#5: Manage Stormwater On-Site
To the maximum extent feasible, projects shall infiltrate,disperse,and retain Stormwater runoff onsite
to prevent flooding and erosion impacts. Most FPAs will manage stormwater onsite through dispersion
and infiltration,and can simply note that under this minimum requirement. Sites that include steep
topography,and/or erosive soils, low permeability,sensitive downstream areas may require additional
onsite management features and the applicant should describe how this will be accomplished. Sites
that require a geotechnical report or study,or MEP are potential candidates for additional on-site
stormwater management beyond dispersion and infiltration.
Page 2 of 7
ewe �- , TT �'.,• ,� _ - 4 .,;;,� 'r"
�► 223024100200
� .�``. f 1g "ems y��• fir"
223024200180
223024200170 223024100190
223024200160 223024100030�s` � ,� a4k,�r '
!
E TOONERVfL
223024200150
, r
or
• u
iF.
2230240000;
223024290142
223024100040
223024100020 223024100010
223024290141
223024200130 223024100050
T ¢` •F, ,AMR` *' . . _ OIL
k�'�� y* � �,.. ,.. '
� .
t
F
.. '• 223024000040 :�;y .� ,,K �
223024300050
a,
223024300060 � �.F ��• x f .` ,F4` '�� � * '�
a !
v
223024300070 o r : E- ri, �igitalGl• • • - -, i-- b DA, lF,-tmappiny, ero rid, I �I?�f
wi 4 po, and he I- er Co t i2_r i01;7700040 "223027700050j
le
Allied II--aigA Inca STYE PLAN Scale= 1"= 59' Address: 401 ill:Toonerville Dr, 9elfair Name: 4ay T,,# 22302-41-9904U �—
This is not a survey;all property lines/houndaries have l?een demonstrated by the owner(s)and/or heir A.gen E(s).
1
✓ — -2'
SL#1
+6' 600't --
--- 0-24"Loamy Medium Sand
24-48" Medium Sand&
Gravel 15%
R' S L#2
0-24" Loamy Medium Sand
Cl)
0 24-46" Medium Sand&
Gravelly%
SL#3
0-24" Loamy Medium Sand
roP p4
y .uried P
\
ar N°Mc- � � � � 24-36" Medium Sand&
m Drivew Y _ ° Gravel15%
,r
a _ 1 ..� % 3
W co PPP
Z N
SiJ-"" + �" { 0-24" Loamy Medium Sand
24-32" Medium Sand&
Gravel 15%
�
51 C0333
+4' 600't ucr>:�o ,GH�R'
FV
�. Yt t »s,3 s ���' 't`' = R'4 � `;S '� x � �•ttzla-
g)yy r t qy[5 r t.
All
t Fes_'
;w
1
t
" w i
' t
1 :R
{
s
,....�/�pr• 'yt��,c}. ! 7'}k ,. y iµ fit, p •` �� f f b it+¢,.( ! �� ��i
ot7j�.,.. •� tit - �'
F o ♦�`�� t T' i 14! + AK
• '+'"�,�! � �' •-:, t�* ''4 a J � �' ate~ .�� !� '�"� a• .
�Pi� � g - � �