HomeMy WebLinkAboutFLOW & WASTE STRENGTH ANALYSIS - SWG Letters / Memos - 6/13/2014 NOODCANAL MemY, GAS, ANBNA gmi
FLOW& WASTESTRENTNAMYS/S
r
"; ..
BBTE.., 13 3UNE 2014
BTYNEB.. MIKEPURVIS
ABBBESS 791 W LOST LAKE RD.
MY,STAA4BA SHELTON,WA 98584
S/TEABBRESS 24151 N HWY 101
S/TEC/TY,STATE,ITP... HOODSPORT,WA
PARMNUMBER: 42212-51-07002
IMMBESCR/PT/BN MCREAVY'S ADD BLK:7 LOTS:2-3
B-LINE CONSTRUCTION
2971 E PHILLIPS LAKE LOOP RD.
SHELTON,WA 98584
&LIKE (360360)426-0221 (office)
(360)126-0509(fax)
b-linecanst@msn.com
Page 1 of 6
WASTE STRENGTH AND FLOW JUSTIFICATION:
Current Proposal:
This site currently consists of 3 parcels with the following developments:
42212-51-07001 Hood Canal Grocery Store w/sewage tanks&treatment(drainfield
off-site)
42212-51-07002 No building—tanks and drainfield for gas station
42212-51-07003 Gas station
The owner wishes to add an Ace Hardware store to the location.
The hardware store would go in the area between the grocery store and the gas station
(area of lot 07002). This would necessitate removal of the gas station's existing sewage
tanks and disposal system.
We are proposing that the wastewater from the new combined gas station and hardware
store be sent into the existing grocery store sewage treatment system. The following
analysis will show that there is adequate capacity in the grocery store system for this
small addition.
Page 2 of 6
Existing Grocery Store System:
The existing septic system was installed in 2007/8 for the new+/- 10,000sgft grocery
store which includes a deli,butcher shop, and bakery.
Size/Capacity
The existing system consists of a series of collection and settling tanks that time dose a
recirculating gravel filter where aerobic treatment occurs before effluent moves to the
fund pump tank where it is dosed into the drainfield for final treatment and disposal.
The system was designed to handle an influent BOD5 of roughly 800mg/L at a maximum
of 1,500 gallons per day.
Existing Flow and Waste-strength Analysis:
Flow—Water records show that the grocery store used 178,966 gallons of water last year.
This breaks down to roughly 488 gallons per day which is about 1/3 of designed capacity.
This means that there is additional capacity in the system.
Strength—The system continues to meet and/or exceed all operational expectations.
Current sampling results show that the waste strength is being reduced from a BOD of
500-800mg/L down to about 26mg/L. This shows the efficacy of the gravel filter in
reducing waste strength to well below residential strength before it is sent to the
drainfreld for final disposal.
Given this data,it is safe to say that current practices are maintaining waste strength
coming from the building well below initial projections. On top of that,the system is
performing a high-quality job on what is being produced. This is evidence that there is
additional capacity in the system for the addition of the gas station and proposed
hardware store.
Page 3 of 6
Proposed Gas Station and Hardware Store Addition- Flow and Waste-strength
Analysis:
Gas station water records show that the daily flow there is only about 80gpd. Projected
waste strength for gas station is a BOD of 300 or lower.
The hardware store is projected to be an addition to the gas station building(creating a
single,larger space). Dry goods stores such as this generate a minimal amount of
increased water use. The owner estimates that existing gas station employees will be
sufficient for hardware store, so no new employees will be added. The restrooms are
external porta-potty's at that location. Therefore,the only extra water from the hardware
store would come from cleaning and maintaining additional space. I project this to be no
more than 50gpd(overestimate)with a BOD of 300mg/L or less.
So,the gas station and hardware store combination will add roughly 130 gpd of BOD
300mg/L to the grocery store system if combined.
Combined Grocery,Gas and Hardware Breakdown:
Grocery Gas Station Hardware
Current/Estimated Flow 488gpd 80gpd 50gpd
Proiected Combined Flow 618sod - -
Current Capacity 1500gpd - -
It is our estimation that the system has ample capacity to meet the addition of this
proposed use while continuing to maintain a high level of treatment and disposal.
1
i
i
I
i
Page 4 of 6
OPERATION& MAINTENANCE:
Inspections
This system must be inspected annually at a minimum. Continued owner vigilance
coupled with ongoing professional inspections and maintenance will ensure proper
system performance and arrest any potential problems before they occur.
Waste Strength Sampling
We strongly advise waste strength sampling(Temp,pH, DO,BOD5,TSS,FOG)be
conducted annually. If parameters projected in this assessment are ever exceeded,
analysis should be conducted to determine cause so that any potential issues can be taken
care of before they become problems.
r•
J
O� .TAafMSYRnT
• LCENSED DESIGNILR
EXPIRES: W071
Toby Syrett
On-Site Licensed Wastewater Treatment System Designer# 5100299
Page 5 of 6
AQUATEST
INCORPORATED
DATE:SMSh4
CUSTOMER 6LAr Cmalnctbn
APn:Don W ooM roll
2921 East PMDpe I LooD Rd.
swtda.Waehrow gNsI
COilECi10N DATE: 0124114
RECEIVED TO LAD: 04/ 14
SAMPLE ID: Htodepotl Dnnary
P Tank
AW1LYso flE5Uli5
SOD,(mgL) 26 5
TSS(mg&) 14.0
06G(.DfL) 4.3
PH 6.59
Temp 11S
DO(mgQ 2.1
PREPARED WY. K / SAS /
01,
425AY1O9PY
495A11M514
5p0,72191%tA
P.O.8t 1116
BYri DYmttl.WA
MID
wYwlJpuaYtlY¢mn
Page 6 of 6
Rhonda Thompson
From: Taylor Toney <taylor@b-lineconstructionxom>
Sent: Monday, February 3, 2025 7:24 AM
To: Rhonda Thompson
Subject: Hoodcanal IGA/Gas Station
Attachments: HOOD CANAL GROCERY WASTE STRENGTH AND FLOW JUSTIFICATION -JUNE2014.pdf
Caution: External Email Warning!This email has originated from outside of the Mason County
Network. Do not click links or open attachments unless you recognize the sender, are expecting the
email, and know the content is safe. If a link sends you to a website where you are asked to validate
using your Account and Password, DO NOT DO SO! Instead, report the incident.
Good Morning Rhonda,
I have attached a file that Toby had written up a few years back that was submitted when the Ace
Hardware store was built in hoodsport. In the document you will see that he has gone into detail about
the flow and waste strengths of the Hoodsport IGA,Ace,and Gas Station and how the current system
installed is capable of handling all three of the buildings.
Let me know if this document will suffice or if you have any other questions.
Best,
Taylor Toney, Owner
B-Line Construction, Inc.
Office: (360)426-4221
Ceti: (360)489-9169
Please Note: The best time to reach me is between the hours of 6:30a to 8:OOa by calling the number
above.
1