Loading...
HomeMy WebLinkAboutMEP2012-00013 and MEP2012-00014 - MEP Application - 7/16/2012 sTATFo MASON COUNTY A o N DEPARTMENT OF COMMUNITY DEVELOPMENT o N Z Planning Division N i ti P O Box 279, Shelton, WA 98584 (360)427-9670 1864 MASON ENVIRONMENTAL PERMIT July 16, 2012 LILLIWAUP GENERATING COMPANY 1402 3RD AVE SUITE 1318 SEATTLE WA 98101 Parcel No.: 323192300000 Issued: 7/16/2012 Case No.: MEP2012-00013 Project Description: Repair storm damage to hydroelectric facility on Lilliwaup Creek and Winter Creek. The repairs consist of landslide and and intake area repairs. The dam is upstream of several fish impassable waterfalls. A Habitat Management Plan, Stormwater Plan, Geotechnical Report, SEPA checklist, Shoreline Exemption, and Grading Permit have been submitted for this proposal. The HMP requires dense planting of native trees and shrubs within the creeks' 150 foot buffers. Bonded fiber matrix is required on the steeper slopes. Mason Environmental Permit 7/16/2012 Case No.: MEP2012-00013 Conditions: 1.) HABITAT MAAf kG_EM€�T PLAN The a "al of this project to subject to the recommendations and specifications outlined in a Habitat Management Plan prepared by Kim Schaumburg (BioResources), dated A 12 C.,/ & 7 A, (0rJPry X O OIVAe✓'/J �-e/rr°rFl)LA Av� HABITAT MANAGEMENT PLAN INSPECTION / a3 Jv'/ 114- An inspection letter/report shall be submitted to verify compliance with the approved Habitat Management+ n. The report shall be signed and stamped by the author of the plan or-his or her deslg ee and submitted to the Mason County Department of Community De elopment .�final permit approval. Copies of the inspection report shall be made avai time of inspection. WATER QUALITY--------) Water is not to j)e degraded to the detriment of the aquatic environment as a result of t i project. D s or deleterious material resulting from construction shall be removed fro a -site- all not be allowed to enter waters of the State. X 7/16/2012 Page 3 of 3 MEP2012-00013 The following critical areas are present on this property: Long-Term Commercial Forest X FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands X Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date N-STgTF MASON COUNTY o CIO A o °N DEPARTMENT OF COMMUNITY DEVELOPMENT S N Planning Division N 1T, czi P O Box 279, Shelton, WA 98584 (360)427-9670 1864 MEP2012-00013 NOTICE OF MASON ENVIRONMENTAL PERMIT Notice is hereby given that LILLIWAUP GENERATING COMPANY, who is the owner of the described property, has filed an application on 04/20/2012 for a Mason Environmental Permit for the development of: Repair storm damage to hydroelectric facility on Lilliwaup Creek and Winter Creek. The repairs consist of landslide and and intake area repairs. The dam is upstream of several fish impassable waterfalls. A Habitat Management Plan, Stormwater Plan, Geotechnical Report, SEPA checklist, Shoreline Exemption, and Grading Permit have been submitted for this proposal. The HMP requires dense planting of native trees and shrubs within the creeks' 150 foot buffers. Bonded fiber matrix is required on the steeper slopes. A determination of completeness was made on: Site Address: 601 N LILLIWAUP ST LILLIWAUP Parcel Number: 323192300000 Location of Project: LOCATED OFF HWY 106 WEST OF LILLWAUP, AT THE END OF LILLIWAUP STREET Within: NW (quarter section) of Section: 19 Township: 23 N Range: 3 W, W.M. in, Mason County Washington. Said development is proposed at 501 Lilliwaup St.. Any person desiring to express their view or to be notified of the action taken on the application should notify: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT P O BOX 279 SHELTON, WA 98584 Written comments must be received by 6/25/2012. A decision on the application will be made within 120 days of the date of completeness MEP2012-00013 9/MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: YH ONDITIONAL USE($1520) MEP ZG1,9, -ABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd 2jb Zd i 2-- MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A, 39.34, 58.17,76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: 1` III 'LA-20 C-,'t-- 2 41 / del �UM rrr( Mailing Address: l o Z 3 A� o/ Work Phone: U 6 Z _ Sy 1/ Email Address: �� S g ,a*S' 0� Home/Cell Phone: v Fax#: "�► If an agent is acting for the property owner during the permit process, complete#2. 2. AUTHORIZED AGENT Name: /2�i.G N� Sew e Cat G'j2G(1 12 Mailing Address: f J 9 e C o n Ave- S'�, �e -�-0 or fe4/e 9?l 6 Work Phone Z- r 94 r - 7 B Email Address: Home/Cell Phone(0-06)- 6'Zr, 7/SU Fax# CJ G SC f�e CR RGG� C l'� 3. PROJECT SITE Site Address: Parcel#: 3 2-3 1 GI 2 000 GQ Legal Description: Directions to Site: Af Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 EV"faandslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 ET Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify cqrrent use of the property with existing improvements: C'Le 4(" f;- C i' 6. Identify and describe the proposed project, including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): G� ////J ) I' G l S �� ,9' / F e r L�` G1-i � (.✓ Q yr rye f �o r�.-1 �:x r f/ � �e h-e ge co0 S- uCIe4 7. Describe why the action requiring this permit cannot be avoided. r ` A/2C LAin �e e hoQ WSAL C I, cTa if la t 7 d-J-c 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes [;fo 9. Identify any surface water on or adjacent to property (circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site, include records. Connected to Septic Connected to Community Septic ,/M 11. Identify existing water supply(circle one): Public Water Supply Well 11. Type of Job(circle one): N l/ ) ew Add Alteration epair Demoli o Other: rr ,� l A^ A 44-Zo -�Z Print Name fi nature Date 1Xommunity Development\PAC\MEP C Use Regulations —Lilliwaup Falls Power Project FWHCA (Fish and Wildlife Habitat Conservation Areas) 6CLX� Flume Replacement and Slope Stabilization and Restoration (response in}clew) i. Construction of utilities may be permitted in FWHCA's or their buffers, only when no practicable or reasonable alternative location is available and the utility corridor meets the requirements for installations, replacement of vegetation and maintenance outlined below. Utilities are encouraged to follow existing or permitted roads were possible. The location is only slightly altered from the existing location. Considering the nature of the project,the generation of hydroelectric power,the location is necessary to provide sufficient flow to operate the power plant. ii. Utility corridor construction and maintenance shall protect the environment of Fish and Wildlife Habitat Conservation Areas and their buffers. (1) New utility corridors shall be aligned when possible to avoid cutting trees greater than 12 inches in diameter at breast height. (2) New utility corridors shall be revegetated with appropriate native vegetation at not less than preconstruction vegetation densities or greater, immediately upon completion of construction or as soon thereafter as possible due to seasonal growing constraints. The utility shall ensure that such vegetation survives for a three-year period. The restoration of the landslide area will require that an acre of existing upland forest be cut to insure the stability and integrity of the re-sloped hillside. Afterwards, in the spring or fall,the area shall be replanted with native trees and shrubs at five feet on center, which is expected to result in preconstruction/pre-landslide vegetation densities. Stream Relocation i. The channel, bank and buffer areas shall be replanted with native vegetation that replicates a natural,undisturbed riparian condition; and, ii. For those shorelands and waters designated as Frequently Flooded Areas pursuant to Section 17.01.090, a professional engineer licensed in the State of Washington shall provide information demonstrating that the equivalent base flood storage volume and function will be maintained. iii. Relocated stream channels shall be designed to meet or exceed the functions and values of the stream to be relocated as determined by the monitoring in the Habitat Management Plan. The channel, bank, and areas of Winter Creeks buffer that do not currently support sufficient native vegetation and are not roadway or appurtenant to the intake area will be replanted with native trees and shrubs, as per the Habitat Management Plan (Lilliwaup Falls Power Project, 2012). Winter Creek is not a designated Frequently Flooded Area, as per the document, Flood Insurance Study for Mason County,revised December 8, 1998. Presently, the channel of Winter Creek(for approx. 80 to 100 feet upstream from the intake area and Lilliwaup Creek) is channelized and aggraded with coarse alluvial sediments. The stream lacks basic and complex habitat features, such as large woody debris, undercut banks, overhanging vegetation (and bank vegetation in general), large rock, and pools. Fish passage is severely compromised, as the stream has avulsed to flow directly at, then adjacent to the intake structure, before discharging into Lilliwaup Creek. The removal of approx. 135 cubic yards of alluvial sediments from Winter Creek (and the intake area)will alleviate flooding at the immediate site, as well as aggradation of coarse sediments downstream(in the anadromous reach of Lilliwaup Creek), which is detrimental to the spawning efforts of ESA listed salmonid species. The proposed stream relocation will add large woody debris (where there is none) and native vegetation in excess of the amount that is currently growing along the lower reach of Winter Creek. The slight relocation to the west will significantly improve fish passage by allowing for an unobstructed discharge into Lilliwaup Creek. SMP (SHORELINE MASTER PROGRAM) Flume Replacement and Slope Stabilization and Restoration Commercial Development Chapter 2. The proposed use is water-dependent. 6. The proposed development is located adjacent to the failed existing structure. 7. The proposed development shall not extend more than 35 feet in height above the AVERAGE GRADE. Dam Repair 2. The proposed use is water-dependent. There is no other practical location for the existing parking. 4. The use is water dependent and thus permitted over water. 6. The proposed development is a repair of an existing structure. 7. The proposed development shall not extend more than 35 feet in height above the average grade. t ` Landfill Chapter Flume Replacement and Slope Stabilization and Restoration 1.No landfilling shall occur waterward of the OHWM. 2 & 3. No landfilling will occur on estuaries,tidelands, marshes, ponds, swamps, or in a floodplain. 4. The proposed project includes the installation of stormwater drainage that will alleviate unnatural surface flows and potential downslope erosion until re-vegetation has time to become established. 5. The slope will be replanted with native trees and shrubs as per a planting plan in the HMP. 6. The requested information is included in the application. 7. All disturbed areas adjacent the re-sloping area will be replanted with native vegetation. 8. The fill material will be primarily alluvial and will not cause degradation of water quality. Utilities Chapter Dam Repair 2. Any excavation for a utility line will be restored to pre-project configuration, replanted with native species and provided maintenance care until the newly planted area is established. Dredging Chapter Dam Repair Dredging shall be permitted in an Urban Residential Environment: e. if it is necessary in creating solid foundations for placement of concrete, riprap, and other building materials. g. if it is necessary to facilitate channel clearance and improvement. A r MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP 7-b 1 .2— - OW+4 E HABITAT MANAGEMENT PLAN REVIEW($445) �}R Date Rcvd iG(�I '2o 1 Z MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RC W. PLEASE PRINT 1. PROPERTY OWNER Name: /L / Q Mailing Address: 4- �e- e— 41t Work Phone: C Z�V Z� �_ �� Email Address:LA,U s /t�6c-s,A., Soy... Home/Cell Phone: Fax#: If an agent is acting for the property owner during the permit process, complete#2. 2. AUTHORIZED AGENT Name: C f1� J�S'f!l °CA Mailing Address: / Z � Soo Work Phone: Z 16z I S 6 Email Address:C�i' `off Cad-► Home/Cell Phone: (-Z, Fax# 3. PROJECT SITE Site Address: LO ` n L 1 I h Aw L11110" Parcel#: 3 2 ? f ?—*? o 0 0 do I Legal Description: Directions to Site: Ai �- I �r', G-APj Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System, Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. 4. State which section requires permit: ❑ Long Tenn Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ®"Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 Ef Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property roper ••with existing improvements: �L /20 C_ /�e C C Pa C I" l 6. Identify and describe the proposed project, including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets, if needed): v► /� �9cr l bc lVec01 7. Describe why the action requiring this permit cannot be avoided. /�s aac n ede /`�A ke �kc 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes ( NJ 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake tream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site, include records. Connected to Septic Connected to Community Septic P ( ) 11. Identify existing water supply(circle one): Public Water Supply Well 11. Type of Job(circle one): A VA 6ew) Add Alteration Kepair Demol' 'on Other: SC�A Print Name Signatu a Date